Prefabricated wall stabilizing structure of fabricated building

By integrating filling, flipping and adjusting components on the prefabricated wall panels, the problem of temporary support adjustment is solved, stable connection and precise adjustment of the prefabricated wall panels are achieved, and the construction efficiency and quality of prefabricated buildings are improved.

CN118855261AInactive Publication Date: 2024-10-29ANHUI TONGJI CONSTR GRP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411132331.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The temporary supports of prefabricated walls in existing prefabricated buildings are difficult to adjust, causing the prefabricated walls to tilt during the pouring process, affecting the progress of the project, and the fixing bolts will damage the surface of the prefabricated walls, increasing maintenance difficulty and quality problems.

Method used

A prefabricated wall structure is designed that includes a filling component, a flipping component and an adjusting component. The filling component fixes the prefabricated wall panels through sticky cement, the flipping component seals the installation slot to prevent foreign matter from entering, and the adjusting component realizes the prefabricated wall through screws and detection components. Precise adjustment and fixation of boards.

Benefits of technology

It improves the installation stability and pouring effect of precast wall panels, reduces manual operation steps and maintenance requirements, avoids surface damage and later repairs of precast wall panels, and improves project progress and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118855261A_ABST
    Figure CN118855261A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of prefabricated walls, and particularly discloses a prefabricated wall stabilizing structure of a prefabricated building, which comprises a prefabricated wall panel, the prefabricated wall panel is pre-cast by using concrete, two mounting grooves are symmetrically formed in the middle of the prefabricated wall panel, and a first sliding groove is formed in the bottom end of the prefabricated wall panel below the two mounting grooves; a filling and blocking assembly is arranged in the first sliding groove, a special-shaped cavity is formed in the top end of the first sliding groove, a communicating groove is formed between the special-shaped cavity and the mounting groove, a connecting rod is slidably connected into the communicating groove, an overturning assembly is arranged in the mounting groove, a second sliding groove is formed in the top of the positioning seat, and an adjusting assembly is arranged in the second sliding groove. And compared with a traditional mode, operation is more convenient, the efficiency of installation and later maintenance of the prefabricated wall panel can be effectively improved, and the installation stability is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of prefabricated walls, and in particular to a prefabricated wall stabilizing structure of an assembled building. Background Art

[0002] Prefabricated buildings mainly produce precast concrete components on factory production lines, which are transported to the site in a reliable manner. On site, the precast concrete components are initially connected by hoisting and temporary support, and then an integral structure is formed by pouring concrete and cement slurry.

[0003] In order to ensure the stability of prefabricated walls and the reliability of assembly standards, temporary supports are often used on site by bolting the two ends of the temporary support rods to the prefabricated wall and the floor respectively. This method has fewer operating steps, but in actual use, there is often a problem that the position of the temporary support cannot be adjusted after it is fixed. If the prefabricated wall is found to be tilted during later pouring and the angle needs to be adjusted, the temporary support needs to be dismantled, which greatly affects the progress of the project and increases the difficulty of operation. At the same time, the fixing bolts used to connect the temporary support also damage the surface structure of the prefabricated wall to a certain extent, which needs to be repaired later and is prone to quality problems. Summary of the invention

[0004] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a prefabricated wall stabilizing structure for an assembled building.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A prefabricated wall stabilizing structure of an assembled building, comprising a prefabricated wall panel, the prefabricated wall panel is precast with concrete, two installation grooves are symmetrically arranged in the middle of the prefabricated wall panel, a first slide groove is arranged at the bottom end of the prefabricated wall panel below the two installation grooves, a pouring and plugging assembly is arranged in the first slide groove, a special-shaped cavity is arranged at the top end of the first slide groove, a connecting groove is arranged between the special-shaped cavity and the installation groove, a connecting rod is slidably connected in the connecting groove, and a flip assembly is arranged in the installation groove;

[0007] The plugging assembly includes a lifting rod and a spring. The lifting rod is slidably connected in the first slide groove. The bottom end of the lifting rod is flush with the bottom end of the first slide groove. The lifting rod is sleeved with a spring fixedly connected to the bottom of the lifting rod.

[0008] The flip assembly includes a U-shaped baffle and a slider, wherein a horizontal U-shaped baffle is rotatably connected to the inner wall of the mounting groove, a slider is slidably connected to the inner wall of the mounting groove on one side of the U-shaped baffle, and a wedge-shaped top block is fixedly connected to the side wall of the slider away from the U-shaped baffle;

[0009] It also includes a positioning seat, a second slide groove is provided on the top of the positioning seat, and an adjustment component is provided in the second slide groove;

[0010] The adjustment component includes a sliding seat, a sliding seat is slidably connected in the second sliding groove, a support rod is rotatably connected to the top of the sliding seat, a detection component is arranged on the top of the support rod, a screw is threadedly connected to the middle of the sliding seat, and both ends of the screw are rotatably connected to the two ends of the positioning seat respectively.

[0011] Preferably, a plurality of steel bars are fixedly connected to both sides of the prefabricated wall panel, and two thread grooves are symmetrically provided on the top of the prefabricated wall panel, hooks are threadedly connected in the thread grooves, and the thread grooves can also be used for threaded connection of connection columns.

[0012] Preferably, a silo is provided in the special-shaped cavity, the top end of the spring is fixedly connected to the bottom end of the special-shaped cavity, and the silo contains viscous glue.

[0013] Preferably, the bottom end of the connecting rod abuts against the silo, and the top end of the connecting rod is fixedly connected with a wedge block, and the side wall of the wedge block abuts against the side wall of the wedge top block.

[0014] Preferably, two steel ropes are fixedly connected to the top side wall of the connecting rod, and the ends of the two steel ropes are respectively fixedly connected to the two sides of the bottom of the U-shaped baffle.

[0015] Preferably, a side wall of the sliding block away from the connecting rod is bolted to a fixing seat, and a width of the fixing seat is smaller than a width of the U-shaped baffle.

[0016] Preferably, a plurality of bolt holes are evenly opened on both sides of the positioning seat, and six reinforcing ribs are symmetrically arranged on both sides of the positioning seat.

[0017] Preferably, one end of the screw rod is fixedly connected to a hexagonal fixing block, and a handle is movably connected to the hexagonal fixing block.

[0018] Preferably, the detection assembly includes a rotating rod and a gas spring, a storage groove is opened on the top side wall of the support rod, the bottom of the storage groove is rotatably connected to the rotating rod, a level is installed in the middle of the rotating rod, a matching groove is opened on the top of the rotating rod, and a gas spring is rotatably connected between the inner wall of the storage groove and the inner wall of the matching groove.

[0019] Compared with the prior art, the present invention has the following beneficial effects:

[0020] The present invention provides a grouting assembly. During the period before the prefabricated wall panels are installed after leaving the factory, the spring in the grouting assembly pushes the bottom end of the lifting rod to seal the bottom end of the first slide groove, which can effectively prevent foreign matter from entering the first slide groove and affecting the normal connection of the subsequent connecting columns during transportation and stacking. When installing the prefabricated wall panels, the top end of the lifting rod penetrates the material bin, and the viscous glue in the material bin flows down along the first slide groove and eventually fills the gap between the first slide groove and the connecting column. The viscous glue gradually solidifies and becomes fixed as the temporary support time goes by, which is convenient for fixing the two prefabricated wall panels and improving the stability of the subsequent casting connection. It can prevent the prefabricated wall panels from being unevenly stressed during the casting process and thus deviating, which affects the casting and molding effect. The automatic operation of the grouting assembly can also reduce the steps of manual operation without the need for additional sealing.

[0021] The present invention provides a flip assembly, which blocks the open end of the installation groove through the side wall of the U-shaped baffle before the prefabricated wall panel is installed. Like the lifting rod, it can effectively block the installation groove to prevent external foreign matter from entering the installation groove and causing blockage. When installing, the slider can be pushed out of the installation groove by pushing the wedge-shaped top block, and the U-shaped baffle can be pulled to the bottom of the installation groove. At this time, the fixing seat on the slider can be used to connect with the support rod. The flip assembly is used in conjunction with the plugging assembly and the lower prefabricated wall panel or the bottom plate to achieve the fixation of two prefabricated wall panels or the floor. At the same time as the fixed connection, the slider and the fixing seat can be pushed out of the installation groove, which is convenient for the connection of the support rod without drilling holes and bolting in the side wall of the prefabricated wall panel, which can reduce the damage to the prefabricated wall panel and reduce subsequent maintenance. After the slider is pushed out of the installation groove, the side wall of the slider is flush with the open end of the side wall of the installation groove, and the installation groove can be closed synchronously without additional blocking. After the later pouring is completed, the fixing seat can be directly removed without disassembly on the side wall of the prefabricated wall panel. Compared with the traditional method, it can effectively improve the efficiency of the installation and subsequent maintenance of the prefabricated wall panel.

[0022] The present invention provides a positioning seat and a detection component. When the prefabricated wall panel is hoisted, the positioning seat is fixed on the floor, and the top of the support rod is connected to the fixing seat by bolts. At this time, the initial fixation of the positioning seat and the prefabricated wall panel is completed. The adjusting component can drive the support rod and the prefabricated wall panel to perform fine position adjustment by rotating the screw rod, and then cooperate with the horizontality detection of the detection component to realize the adjustment of the prefabricated wall panel. The prefabricated wall panel can be fine-tuned to a state perpendicular to the bottom plate, so that the installation accuracy and stability of the prefabricated wall panel are improved, which is convenient for improving the later casting effect and reducing the problem of construction delay caused by disassembling the support rod for adjusting the position of the prefabricated wall panel. The adjusting component is easy to operate. Due to the existence of the adjusting component, the installation position of the positioning seat only needs to be simply measured, and there is no need to disassemble it in the later stage to adjust the verticality of the prefabricated wall panel. It only needs to be dismantled once after the casting of the prefabricated wall panel is completed. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is a schematic diagram of the overall structure of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention;

[0024] Figure 2 A schematic diagram of a hook and a connecting column structure of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention;

[0025] Figure 3 A schematic diagram of a prefabricated wall panel structure of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention;

[0026] Figure 4 A schematic diagram of a cross-sectional structure of a prefabricated wall panel of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention;

[0027] Figure 5 A schematic diagram of the connection state of a plugging component and a flipping component of a prefabricated wall stabilization structure of an assembled building proposed by the present invention;

[0028] Figure 6 A schematic diagram of a jacking rod structure of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention;

[0029] Figure 7 A side view of a flip assembly of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention;

[0030] Figure 8 A schematic diagram of a flip assembly structure of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention;

[0031] Fig. 9 A schematic diagram of a slider structure of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention;

[0032] Fig.10 A schematic diagram of the structure of a flip assembly of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention in a flip state;

[0033] Fig.11 A schematic diagram of a support rod structure of a prefabricated wall stabilization structure of an assembled building proposed by the present invention;

[0034] Fig.12 The present invention provides a prefabricated wall stabilizing structure for an assembled building. Fig.11 A magnified view of the structure of the area in the middle;

[0035] Fig.13 A schematic diagram of a positioning seat structure of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention;

[0036] Fig.14A schematic diagram of the structure of an adjustment component of a prefabricated wall stabilizing structure of an assembled building proposed by the present invention.

[0037] In the figure: 1. prefabricated wall panel; 2. steel bar frame; 3. threaded groove; 31. hook; 32. connecting column; 4. installation groove; 41. first slide groove; 42. special-shaped cavity; 5. plugging assembly; 51. silo; 52. lifting rod; 53. spring; 6. connecting rod; 7. wedge block; 8. flip assembly; 81. U-shaped baffle; 82. wire rope; 83. slider; 9. fixing seat; 10. positioning seat; 11. bolt hole; 12. second slide groove; 13. adjustment assembly; 14. screw; 15. sliding seat; 16. hexagonal fixing block; 17. handle; 18. support rod; 19. storage groove; 20. detection assembly; 21. rotating rod; 22. level; 23. gas spring. DETAILED DESCRIPTION

[0038] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0039] Reference Figure 1-14 A prefabricated wall stabilizing structure of an assembled building comprises a prefabricated wall panel 1, the prefabricated wall panel 1 is precast with concrete, two mounting grooves 4 are symmetrically provided in the middle of the prefabricated wall panel 1, a first slide groove 41 is provided at the bottom of the prefabricated wall panel 1 below the two mounting grooves 4, a plugging component 5 is provided in the first slide groove 41, a special-shaped cavity 42 is provided at the top of the first slide groove 41, a connecting groove is provided between the special-shaped cavity 42 and the mounting groove 4, a connecting rod 6 is slidably connected in the connecting groove, and a flip component 8 is provided in the mounting groove 4;

[0040] The plugging assembly 5 includes a lifting rod 52 and a spring 53. The lifting rod 52 is slidably connected in the first slide groove 41. The bottom end of the lifting rod 52 is flush with the bottom end of the first slide groove 41. The lifting rod 52 is sleeved with a spring 53 fixedly connected to the bottom of the lifting rod 52.

[0041] The flip assembly 8 includes a U-shaped baffle 81 and a slider 83. A horizontal U-shaped baffle 81 is rotatably connected to the inner wall of the mounting groove 4. The inner wall of the mounting groove 4 on one side of the U-shaped baffle 81 is slidably connected to the slider 83. The side wall of the slider 83 away from the U-shaped baffle 81 is fixedly connected to a wedge-shaped top block.

[0042] The invention also includes a positioning seat 10, a second slide groove 12 is formed on the top of the positioning seat 10, and an adjustment component 13 is arranged in the second slide groove 12;

[0043] The adjustment assembly 13 includes a sliding seat 15, the sliding seat 15 is slidably connected in the second slide groove 12, the top of the sliding seat 15 is rotatably connected to the support rod 18, the top of the support rod 18 is provided with a detection assembly 20, the middle of the sliding seat 15 is threadedly connected to the screw rod 14, and the two ends of the screw rod 14 are rotatably connected to the two ends of the positioning seat 10. When installing the prefabricated wall panel 1 of the assembled building, the prefabricated wall panel 1 to be installed is hoisted to the installation position by external lifting equipment, and the position of the prefabricated wall panel 1 is fine-tuned by manual operation so that the first slide groove 41 is connected to the connecting column 32 for fixing the position. During the period before the prefabricated wall panel 1 is installed after leaving the factory, the spring 53 in the plugging assembly 5 pushes the bottom end of the lifting rod 52 to block the bottom end of the first slide groove 41, which can effectively prevent foreign matter from entering the first slide groove 41 during transportation and stacking and affecting the normal connection of the subsequent connecting column 32. When installing the prefabricated wall panel 1, when the lower connecting column 32 is connected to the first slide groove 41, it will push the lifting rod 52 along the first slide groove 41. The spring 53 is compressed, and finally the connecting column 32 is completely connected to the first slide groove 41, and the two prefabricated wall panels 1 are connected. At this time, the top of the lifting rod 52 breaks through the silo 51, and the viscous glue in the silo 51 flows down along the first slide groove 41 and finally fills the gap between the first slide groove 41 and the connecting column 32. The viscous glue gradually solidifies and becomes fixed as the temporary support time goes by, which is convenient for fixing the two prefabricated wall panels 1 and improving the stability of the subsequent pouring connection. It prevents the prefabricated wall panels 1 from being offset due to uneven force during the pouring process, which affects the pouring and molding effect. It can also reduce the steps of manual operation through the automatic operation of the pouring and plugging component 5, and no additional Before the prefabricated wall panel 1 is installed, the flip assembly 8 blocks the open end of the installation groove 4 through the side wall of the U-shaped baffle 81. Like the jacking rod 52, it can effectively block the installation groove 4 to prevent external foreign matter from entering the installation groove 4 and causing blockage. When installing, the connecting column 32 pushes the jacking rod 52 to break through the silo 51 and then continues to rise and abuts against the bottom end of the connecting rod 6 and pushes the connecting rod 6 and the wedge block 7 to rise. The slider 83 can be pushed out of the installation groove 4 by pushing the wedge-shaped top block, and the U-shaped baffle 81 is pulled to the bottom of the installation groove 4. At this time, the fixing seat 9 on the slider 83 can be used to connect with the support rod 18, and the flip assembly 8 and the plugging assembly 5 and the lower prefabricated wall panel 1 or The slider 83 and the fixing seat 9 can be used together with the bottom plate, and the slider 83 and the fixing seat 9 can be pushed out of the installation groove 4 while realizing the fixed connection between the two prefabricated wall panels 1 or the floor, so as to facilitate the connection of the support rod 18, without drilling holes and bolting in the side walls of the prefabricated wall panels 1, which can reduce the damage to the prefabricated wall panels 1 and reduce the subsequent maintenance. After the slider 83 is pushed out of the installation groove 4, the side wall of the slider 83 is flush with the open end of the side wall of the installation groove 4, and the installation groove 4 can be closed synchronously without additional blocking. When the prefabricated wall panel 1 is hoisted, the support rod 18 needs to be used for temporary support and fixation. At this time, the positioning seat 10 is fixed to the floor, and the top of the support rod 18 is connected to the fixing seat 9 by bolts.At this point, the initial fixation of the positioning seat 10 and the prefabricated wall panel 1 is completed. At this time, the verticality of the prefabricated wall panel 1 has not been adjusted. It may be tilted and offset due to the deadweight of the prefabricated wall panel 1 and improper operation during the hoisting process. The adjustment component 13 can move the sliding seat 15 along the second slide groove 12 by rotating the screw 14. Since the position of the positioning seat 10 is fixed, when the sliding seat 15 is moved, it can drive the support rod 18 and the prefabricated wall panel 1 to perform fine position adjustment, and then cooperate with the horizontal detection of the detection component 20 to achieve the adjustment of the prefabricated wall panel 1. The prefabricated wall panel 1 can be fine-tuned to a state perpendicular to the bottom plate, so that the installation accuracy of the prefabricated wall panel 1 is improved, which is convenient for improving the later pouring effect and reducing the delay in the construction period caused by disassembling the support rod 18 to adjust the position of the prefabricated wall panel 1. The adjustment component 13 is easy to operate and does not require additional disassembly and assembly.

[0044] As a technical optimization solution of the present invention, a plurality of steel bars 2 are fixedly connected to both sides of the prefabricated wall panel 1, and two thread grooves 3 are symmetrically provided at the top of the prefabricated wall panel 1. A hook 31 is threadedly connected in the thread groove 3, and the thread groove 3 can also be used for threaded connection of a connecting column 32. When the prefabricated wall panel 1 is hoisted, the hooks 31 are threadedly connected in the two thread grooves 3, which is convenient for hoisting by external hoisting equipment, and the first chute 41 at the bottom of the current prefabricated wall panel 1 is connected to the top of the installed lower prefabricated wall panel 1 or the connecting column 32 preinstalled on the ground, and the hook 31 at the top of the installed prefabricated wall panel 1 is replaced with the connecting column 32.

[0045] As a technical optimization solution of the present invention, a silo 51 is provided in the special-shaped cavity 42, and the top end of the spring 53 is fixedly connected to the bottom end of the special-shaped cavity 42, and viscous cement is contained in the silo 51. After being penetrated by the jacking rod 52, the viscous cement in the silo 51 will flow into the first chute 41, and at this time, the spring 53 is compressed by force and filled with the viscous cement and finally solidified into a whole, forming a preliminary fixation of the two prefabricated wall panels 1.

[0046] As a technical optimization solution of the present invention, the bottom end of the connecting rod 6 abuts against the silo 51, and the top of the connecting rod 6 is fixedly connected with a wedge block 7, and the side wall of the wedge block 7 abuts against the side wall of the wedge top block. The connecting rod 6 and the connecting groove are tightly matched. Before and after the installation of the prefabricated wall panel 1, the position of the connecting rod 6 slides from bottom to top, and the bottom of the connecting groove can be filled with the top of the lifting rod 52, and the connecting groove will not be hollow. Similarly, after the connecting rod 6 and the wedge block 7 rise to the top of the installation groove 4, the top of the wedge block 7 fills the top of the installation groove 4, which can reduce the hollow part of the installation groove 4.

[0047] As a technical optimization solution of the present invention, two steel wires 82 are fixedly connected to the top side wall of the connecting rod 6, and the ends of the two steel wires 82 are respectively fixedly connected to the two sides of the bottom of the U-shaped baffle 81. When the connecting rod 6 is not pushed by the jacking rod 52, the steel wires 82 are not subjected to force, and at this time, the U-shaped baffle 81 is not subjected to force and the side wall blocks the open end of the installation groove 4. When the prefabricated wall panel 1 is installed, the connection rod 6 rises and synchronously drives the two steel wires 82 to rise and pull the U-shaped baffle 81 to rotate around the rotating shaft and finally rotate to the bottom of the installation groove 4, so that the open end of the installation groove 4 is completely unobstructed, which can facilitate the wedge block 7 to synchronously push the slider 83 and the fixing seat 9 to slide out of the installation groove 4.

[0048] As a technical optimization solution of the present invention, the side wall of the slider 83 away from the connecting rod 6 is bolted with a fixing seat 9, and the width of the fixing seat 9 is smaller than the width of the U-shaped baffle 81. The fixing seat 9 is used to connect with the top of the support rod 18, and the fixing seat 9 is bolted to the side wall of the slider 83, which is equivalent to installing the fixing seat 9 in advance. After the positioning seat 10 is installed, the support rod 18 can be directly connected to the fixing seat 9, which improves the prefabrication effect of the prefabricated wall panel 1, reduces the on-site operation steps, and after the later pouring is completed, the fixing seat 9 can be directly removed without disassembling the side wall of the prefabricated wall panel 1. Compared with the traditional method, it can effectively improve the efficiency of the installation and later maintenance of the prefabricated wall panel 1.

[0049] As a technical optimization solution of the present invention, a plurality of bolt holes 11 are evenly opened on both sides of the positioning seat 10, and six reinforcing ribs are symmetrically arranged on both sides of the positioning seat 10. The positioning seat 10 is fixed with the bottom plate bolts through the bolt holes 11, and due to the existence of the adjustment assembly 13, the installation position of the positioning seat 10 only needs to be simply measured, and there is no need to disassemble it later to adjust the verticality of the prefabricated wall panel 1. It only needs to be dismantled once after the prefabricated wall panel 1 is cast.

[0050] As a technical optimization solution of the present invention, one end of the screw rod 14 is fixedly connected to a hexagonal fixing block 16, and a handle 17 is movably connected to the hexagonal fixing block 16. When the detection component 20 detects that the prefabricated wall panel 1 is not perpendicular to the floor, the screw rod 14 can be driven to rotate by manually rotating the handle 17 to move the sliding seat 15 to adjust the angle of the support rod 18 and the prefabricated wall panel 1. Compared with the traditional method of disassembling the support rod 18, the operation is safe and simple, and does not require the cooperation of multiple people, thereby improving the operation efficiency.

[0051] As a technical optimization solution of the present invention, the detection component 20 includes a rotating rod 21 and a gas spring 23. A storage groove 19 is opened on the top side wall of the support rod 18. The bottom of the storage groove 19 is rotatably connected to the rotating rod 21. A level 22 is installed in the middle of the rotating rod 21. A matching groove is opened on the top of the rotating rod 21. A gas spring 23 is rotatably connected between the inner wall of the storage groove 19 and the inner wall of the matching groove. Before the support rod 18 is installed, the rotating rod 21 is stored in the storage groove 19, the gas spring 23 is compressed by force and limited by the buckle. When the support rod 18 is installed, the buckle is opened, and the gas spring 23 loses force and extends to push the rotating rod 21 to rotate out of the storage groove 19. Finally, the end of the rotating rod 21 should be on the same vertical plane as the top end of the support rod 18. At this time, it can be judged that the prefabricated wall panel 1 is in a vertical state, and the liquid level of the spirit level 22 is in the center position. When the prefabricated wall panel 1 is installed and tilted, it can be judged by observing the liquid level position of the spirit level 22, and adjusted by adjusting the adjustment component 13 to finally make the spirit level 22 display a horizontal state. Through the setting of the detection component 20, the verticality of the prefabricated wall panel 1 can be effectively observed and adjusted in time with the adjustment component 13, so that the verticality of the prefabricated wall panel 1 can be adjusted before the viscous mud solidifies, so as to prevent the tilt from being found during the later pouring and affecting the progress of the on-site construction.

[0052] When the present invention is in use, during the period before the prefabricated wall panel 1 is installed after leaving the factory, in order to prevent external debris from entering the interior of the prefabricated wall panel 1, the spring 53 in the plugging assembly 5 pushes the bottom end of the lifting rod 52 to block the bottom end opening of the first slide groove 41, and at the same time, the side wall of the U-shaped baffle 81 blocks the open end of the installation groove 4. When installing the prefabricated wall panel 1, the external lifting equipment lifts the prefabricated wall panel 1 to be installed to the installation position through the hook 31, and the position of the prefabricated wall panel 1 is fine-tuned by manual operation so that the first slide groove 41 is connected to the connecting column 32 for fixing the position. When the lower connecting column 32 is connected to the first slide groove 41, it will push the lifting rod 52 to rise along the first slide groove 41. At this time, the spring 53 is compressed, and the top end of the lifting rod 52 penetrates the silo 5. 1, the viscous glue in the silo 51 will flow down along the first slide groove 41 and eventually fill the gap between the first slide groove 41 and the connecting column 32, and the connecting column 32 pushes the lifting rod 52 to break through the silo 51 and then continues to rise and abuts against the bottom end of the connecting rod 6 and pushes the connecting rod 6 and the wedge block 7 to rise, and finally the connecting column 32 is completely connected to the first slide groove 41, and the two prefabricated wall panels 1 are connected. The rising of the connecting rod 6 synchronously drives the two steel wires 82 to rise and pulls the U-shaped baffle 81 to rotate around the rotating shaft and finally rotates to the bottom of the installation groove 4. After the connecting rod 6 and the wedge block 7 rise to the top of the installation groove 4, the top of the wedge block 7 fills the top of the installation groove 4 and pushes the slider 83 and the fixing seat 9 to slide out of the installation groove 4, and the preliminary installation of the prefabricated wall panel 1 is completed.

[0053] At this time, temporary support is required. The positioning seat 10 is fixed to the floor, and the top of the support rod 18 is connected to the fixing seat 9 by bolts. At this time, the preliminary fixation of the positioning seat 10 and the prefabricated wall panel 1 is completed. When the support rod 18 is installed, the buckle is opened, and the gas spring 23 loses its force and extends to push the rotating rod 21 to rotate out of the storage groove 19. Finally, the end of the rotating rod 21 should be on the same vertical plane as the top end of the support rod 18, and the liquid level of the level 22 is in the center position. At this time, it can be judged that the prefabricated wall panel 1 is in a vertical state. When the prefabricated wall panel 1 When the installation is tilted and offset, the end of the rotating rod 21 does not abut the prefabricated wall panel 1 or the gas spring 23 cannot be fully extended, and the liquid level of the spirit level 22 deviates from the center. The handle 17 can be manually turned to drive the screw rod 14 to rotate and the sliding seat 15 to move along the second slide groove 12. When the sliding seat 15 is moved, the support rod 18 and the prefabricated wall panel 1 can be driven to fine-tune the position until the spirit level 22 displays a horizontal state. After the pouring is completed and the shaping is finalized, the fixing seat 9 and the positioning seat 10 can be removed, and the two hooks 31 can be replaced with connecting columns 32.

[0054] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

[0055] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A prefabricated wall stabilizing structure for an assembled building, comprising a prefabricated wall panel (1), characterized in that: The prefabricated wall panel (1) is precast with concrete, and two installation grooves (4) are symmetrically provided in the middle of the prefabricated wall panel (1). A first slide groove (41) is provided at the bottom of the prefabricated wall panel (1) below the two installation grooves (4), and a plugging component (5) is provided in the first slide groove (41). A special-shaped cavity (42) is provided at the top of the first slide groove (41), and a connecting groove is provided between the special-shaped cavity (42) and the installation groove (4), and a connecting rod (6) is slidably connected in the connecting groove, and a flip component (8) is provided in the installation groove (4); The plugging assembly (5) comprises a lifting rod (52) and a spring (53); the lifting rod (52) is slidably connected in the first slide groove (41); the bottom end of the lifting rod (52) is flush with the bottom end of the first slide groove (41); and the lifting rod (52) is sleeved with a spring (53) fixedly connected to the bottom of the lifting rod (52); The flip assembly (8) comprises a U-shaped baffle (81) and a slider (83); the inner wall of the mounting groove (4) is rotatably connected to a horizontal U-shaped baffle (81); the inner wall of the mounting groove (4) on one side of the U-shaped baffle (81) is slidably connected to the slider (83); and the side wall of the slider (83) away from the U-shaped baffle (81) is fixedly connected to a wedge-shaped top block; It also includes a positioning seat (10), wherein a second slide groove (12) is provided on the top of the positioning seat (10), and an adjustment component (13) is provided in the second slide groove (12); The adjusting assembly (13) comprises a sliding seat (15), the sliding seat (15) is slidably connected in the second sliding groove (12), the top of the sliding seat (15) is rotatably connected to a support rod (18), the top of the support rod (18) is provided with a detection assembly (20), the middle of the sliding seat (15) is threadedly connected to a screw rod (14), and the two ends of the screw rod (14) are respectively rotatably connected to the two ends of the positioning seat (10).

2. The prefabricated wall stabilizing structure of an assembled building according to claim 1, characterized in that: A plurality of steel bars (2) are fixedly connected to both sides of the prefabricated wall panel (1). Two thread grooves (3) are symmetrically provided at the top of the prefabricated wall panel (1). A hook (31) is connected to the inner thread of the thread groove (3). The thread groove (3) can also be used for threaded connection of a connecting column (32).

3. The prefabricated wall stabilizing structure of an assembled building according to claim 1, characterized in that: A material bin (51) is arranged in the special-shaped cavity (42), the top end of the spring (53) is fixedly connected to the bottom end of the special-shaped cavity (42), and the material bin (51) contains viscous cement.

4. The prefabricated wall stabilizing structure of an assembled building according to claim 3, characterized in that: The bottom end of the connecting rod (6) abuts against the material bin (51), and the top end of the connecting rod (6) is fixedly connected with a wedge block (7), and the side wall of the wedge block (7) abuts against the side wall of the wedge top block.

5. The prefabricated wall stabilizing structure of an assembled building according to claim 1, characterized in that: Two steel wires (82) are fixedly connected to the top side wall of the connecting rod (6), and the ends of the two steel wires (82) are respectively fixedly connected to the two sides of the bottom of the U-shaped baffle (81).

6. The prefabricated wall stabilizing structure of an assembled building according to claim 1, characterized in that: A side wall of the sliding block (83) away from the connecting rod (6) is bolted to a fixing seat (9), and the width of the fixing seat (9) is smaller than the width of the U-shaped baffle (81).

7. The prefabricated wall stabilizing structure of an assembled building according to claim 1, characterized in that: A plurality of bolt holes (11) are evenly arranged on both sides of the positioning seat (10), and six reinforcing ribs are symmetrically arranged on both sides of the positioning seat (10).

8. The prefabricated wall stabilizing structure of an assembled building according to claim 1, characterized in that: One end of the screw rod (14) is fixedly connected to a hexagonal fixing block (16), and a handle (17) is movably connected to the hexagonal fixing block (16).

9. The prefabricated wall stabilizing structure of an assembled building according to claim 1, characterized in that: The detection assembly (20) comprises a rotating rod (21) and a gas spring (23); a storage groove (19) is provided on the top side wall of the support rod (18); the bottom of the storage groove (19) is rotatably connected to the rotating rod (21); a level (22) is installed in the middle of the rotating rod (21); a matching groove is provided on the top of the rotating rod (21); a gas spring (23) is rotatably connected between the inner wall of the storage groove (19) and the inner wall of the matching groove.

Citation Information

Cited By

  • Prefabricated PC prefabricated part for building

    CN120347870A