Sectional multi-stage fracturing method with controllable temporary plugging time efficiency
By using long-lasting temporary plugging agents prepared from oil-soluble resins and surfactants in horizontal wells with small boreholes, combined with the application of aqueous solutions and degradation fluids, the problem of staged fracturing control in small wellbore and the short-lasting temporary plugging agents are solved, achieving It provides more efficient and safer fracturing construction and is suitable for high-temperature reservoirs.
Patent Information
- Application Number
- CN202411029710.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-29
AI Technical Summary
Existing technology is difficult to achieve fine control and efficient reformation in staged fracturing of small borehole horizontal wells. Moreover, the well pressure duration in long horizontal sections is long, and the effective time of temporary plugging agent plugging is short, which cannot meet the needs of on-site construction.
A long-acting temporary plugging agent is used to block the advantageous channels. It is prepared by mixing oil-soluble resin and surfactant to form a stable long-acting temporary plugging agent, which maintains stable physical and chemical properties in the aqueous solution. It is combined with coiled tubing to pump the degradation solution to achieve temporary Accurate control of plugging time.
It achieves fine control of layered fracturing of small wellbore, extends the plugging time of temporary plugging agent, and ensures the safety and efficiency of fracturing construction. It is suitable for reservoir temperatures of 80 to 180°C, and the maximum applicable temperature is not limited to 180°C. ℃.
Smart Images

Figure CN118855439A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oilfield fracturing, and in particular to a staged multi-stage fracturing method with controllable temporary plugging time. Background Art
[0002] The use of long horizontal wells with multi-stage fracturing is a conventional process for the production and development of tight low-permeability oil and gas reservoirs. With the continuous development of such oil and gas reservoirs, the depth of oil and gas wells is also increasing, and the number of small-bore horizontal wells (mainly 3.5-inch horizontal wells) is also increasing.
[0003] At present, the multi-stage fracturing transformation process of horizontal wells mainly includes mechanical segmentation or temporary plugging agent plugging blasthole segmentation or a combination of the two processes. On the one hand, for small-borehole cementing and completion horizontal wells, due to the small size of the wellbore, fracturing requires more precise control and higher technical requirements. Therefore, the mechanical segmentation process used in fracturing is expensive, or the performance indicators of the mechanical segmentation tool do not meet the standards, or the implementation process is cumbersome and the fracturing efficiency is low. As a result, the current staged transformation of small-bore horizontal wells usually adopts single-layer fracturing or multi-layer combined fracturing, which cannot achieve effective staged fracturing; on the other hand, during the fracturing transformation of long horizontal wells, due to many factors that affect the implementation progress, the pressure time of the long horizontal well is long, and the effective time limit of conventional temporary plugging agents to plug the perforated holes is short (generally within 10 days), and the temporary plugging time cannot be accurately controlled, resulting in the existing staged fracturing transformation cannot meet the on-site construction needs. Summary of the invention
[0004] The purpose of the present invention is to provide a staged multi-stage fracturing method with controllable temporary plugging time in view of the shortcomings of the prior art. On the one hand, for small wellbores, a long-term temporary plugging agent is pumped to plug the dominant channel to achieve the purpose of stratified fracturing; on the other hand, the long-term temporary plugging agent of the present invention is utilized to achieve long-term temporary plugging due to its stable physical and chemical properties in aqueous solution, and then a degradation liquid is pumped into the continuous oil pipe to degrade the long-term temporary plugging agent, thereby achieving accurate control of the temporary plugging time.
[0005] The technical solution adopted by the present invention to solve the technical problem is: a staged multi-stage fracturing method with controllable temporary plugging time, comprising the following steps:
[0006] 1) Analyze the reservoir geological data, determine the specific perforation location and layer section, and complete the perforation operation of the whole well;
[0007] 2) According to the ground stress data of different perforated layers, the difficulty of fracture and cracking of the formation is judged, and the perforated layers are ranked from easy to difficult, that is, the layer that is easiest to be fractured is recorded as the first level, and so on until the layer that is most difficult to fracture and cracking is the last level;
[0008] 3) Start the first-stage perforation layer fracturing construction according to the construction design; the fracturing construction is to use a large-scale fracturing transformation to form the first-stage cracks. The sand volume of the large-scale fracturing transformation is 50-70 cubic meters, and the displacement is 6.0-8.0m 3 / min, the fracturing fluid is slick water, the liquid volume is 1000-1200 cubic meters, and the scale of other fracturing levels is the same;
[0009] 4) After the first-stage perforation layer section fracturing construction is completed, according to the specifications and number of the perforation holes of the first-stage perforation layer section, add a long-term temporary plugging agent into the wellbore and reduce the pumping displacement so that the construction displacement of the pumped long-term temporary plugging agent is less than the displacement of the fracturing of the holes of this stage. When the pumping liquid volume is close to the first-stage fracturing position and rises significantly and then falls back quickly, it means that the long-term temporary plugging agent has blocked the perforation holes of this stage and the next-stage perforation layer section will be fractured;
[0010] 5) Complete the fracturing construction of the next level of formation according to the fracturing construction design. The fracturing construction of the next level of formation is the same as the fracturing construction of the previous level of formation;
[0011] 6) Repeat the above steps 4) and 5) until the fracturing construction of all perforations is completed;
[0012] 7) Run the coiled tubing to the toe of the horizontal section of the construction well, and inject organic solvent as degradation liquid into the horizontal section through the coiled tubing, so that the degradation liquid fills the entire horizontal section. After the long-term temporary plugging agent plugging the perforated holes is degraded, carry out subsequent operations such as spraying, production and other subsequent operations.
[0013] Furthermore, the preparation of the long-acting temporary plugging agent includes heating the oil-soluble resin into a viscous liquid, adding a surfactant under stirring conditions and mixing evenly, cooling and extruding by a screw, cutting or crushing by a pulverizer.
[0014] Furthermore, the oil-soluble resin is one or more of C5 petroleum resin, C9 petroleum resin, terpene resin, rosin resin, phenolic resin, and coumarone resin.
[0015] Furthermore, the surfactant is one or more of Span 20, Span 60, Span 80, oleic acid, alkylbenzene sulfonate, and alkyl sulfonate.
[0016] Furthermore, the mass percentages of the oil-soluble resin and the surfactant are as follows: oil-soluble resin: 75%-90%, surfactant: 10-25%.
[0017] Furthermore, the degradation liquid is diesel or white oil.
[0018] The beneficial effects of the present invention are: 1. The present invention has a construction displacement of pumping long-term temporary plugging agent to plug the perforation, which is smaller than the displacement during fracturing of the perforation of the same level, so as to reserve space for the pressure rise after the perforation is successfully plugged, and prevent overpressure during fracturing. While keeping the pumping displacement unchanged, the temporary plugging agent is judged to be successful in plugging the perforation according to the change in pressure combined with the amount of pumped liquid. When the amount of pumped liquid is close to the position of the previous level of fracturing and there is an obvious pressure rise and rapid drop, it means that the long-term temporary plugging agent has plugged the perforation of the same level, and the next level of perforation has also been fractured. The next level of perforation is fractured while the previous level of perforation is plugged. 2. The degradation of existing temporary plugging materials is affected by many factors, the temporary plugging time cannot be accurately controlled, and the effective time of temporary plugging is short, especially in high-temperature deep wells. As the ambient temperature increases, the temporary plugging material degrades faster, usually within 10 days. With the continuous degradation of the temporary plugging material, its plugging ability shows a downward trend, that is, the pressure bearing capacity gradually decreases, and it cannot achieve effective plugging of the perforation blasthole, and cannot meet the construction requirements. It is not suitable for long-term (temporary plugging for more than 20 days) temporary plugging staged fracturing process. The long-term temporary plugging agent of the present invention is made by mixing an oil-soluble resin with a surfactant. The long-term temporary plugging agent has stable physical and chemical properties in water or fracturing fluid, and will not degrade naturally. It can remain unstratified for more than 20 days in water or fracturing fluid, and will not degrade for more than one year. The plugging pressure is higher than 36Mpa, which is conducive to improving the plugging time of the long-term temporary plugging agent; at the same time, the long-term temporary plugging agent of the present invention can be quickly degraded in diesel or white oil, which is conducive to accurate control of the temporary plugging time. 3. The present invention adds a surfactant to the oil-soluble resin to make the long-acting temporary plugging agent hydrophilic, so that the long-acting temporary plugging agent can be dispersed in the water-based fracturing fluid to achieve the plugging of the perforation hole; and the preparation method of the long-acting temporary plugging agent of the present invention is simple. According to the different softening points of the oil-soluble resin, long-acting temporary plugging agents with different softening points can be obtained, so that they can be used for long-term plugging at different reservoir temperatures, preferably suitable for reservoir temperatures of 80 to 180°C, and the maximum applicable temperature is not limited to 180°C. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the perforating operation of the present invention.
[0020] Figure 2 It is a schematic diagram of completing the first stage fracturing construction of the present invention.
[0021] Figure 3 It is a schematic diagram of pumping in a long-acting temporary plugging agent according to the present invention.
[0022] Figure 4 It is a schematic diagram of the long-term temporary plugging agent plugging the first-stage perforating blasthole.
[0023] Figure 5 This is a schematic diagram of completing the second-level fracturing construction.
[0024] Figure 6 It is a schematic diagram of completing the fracturing construction of the entire well section in sequence.
[0025] Figure 7 Schematic diagram of the normal displacement of degradation fluid to the horizontal section through the coiled tubing.
[0026] Figure 8 It is a schematic diagram of removing the coiled tubing and shutting in the well to wait for the long-acting temporary plugging agent to degrade.
[0027] Fig. 9 It is a dispersion diagram of the long-acting temporary plugging agent of the present invention in the water-based fracturing fluid.
[0028] Fig.10 It is the dissolution diagram of the long-acting temporary plugging agent of the present invention in water-based fracturing fluid and diesel at different temperatures. DETAILED DESCRIPTION
[0029] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments, but the implementation scope of the present invention is not limited thereto.
[0030] It should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0031] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] like Figure 1 As shown, a staged fracturing method with controllable temporary plugging time in this embodiment includes the following steps:
[0033] 1) Analyze the reservoir geological data, determine the specific perforation location and layer section of the horizontal well, and complete the perforation operation of the whole well;
[0034] 2) According to the geostress data of different perforated layers, the difficulty of formation fracture is judged, and the fracturing layers are graded and ranked from easy to difficult, that is, the order of fracturing layers. The layer segment that is easiest to fracture is the first level, and so on until the layer segment that is most difficult to fracture is the last level.
[0035] 3) Start the first stage of fracturing construction according to the construction design, and carry out the first stage of fracturing construction transformation on the formation that is most prone to cracking.
[0036] 4) After the first stage of fracturing is completed, according to the specifications and number of the first stage perforation holes, add a long-term temporary plugging agent with matching particle size specifications and quantity into the wellbore, and appropriately reduce the construction displacement of the pumped long-term temporary plugging agent to reserve space for the pressure rise after the first stage perforation holes are successfully plugged to prevent overpressure during fracturing construction. While keeping the pumping displacement unchanged, judge whether the temporary plugging agent has successfully plugged the holes based on the change in pressure and the amount of pumped liquid; when the amount of pumped liquid is close to the first stage fracturing position and there is an obvious pressure rise and rapid drop, it means that the long-term temporary plugging agent has blocked the first stage perforation holes and the second stage formation has been broken.
[0037] 5) Complete the fracturing construction of the second-level formation according to the fracturing construction design.
[0038] 6) Repeat the above steps 4) and 5) to complete all the fracturing operations.
[0039] 7) Run the coiled tubing to the toe of the horizontal section of the construction well and replace with an appropriate amount of plugging remover. Shut down the well for 12 hours and wait for the long-acting temporary plugging agent to fully degrade before carrying out subsequent operations such as gushing and production.
[0040] The preparation method of the long-term temporary plugging agent comprises the following steps: heating and melting an oil-soluble resin, wherein the heating temperature is 10-30° C. higher than the softening point of the oil-soluble resin to make it a viscous liquid; adding a surfactant under stirring conditions to mix the mixture evenly; and then cooling and extruding the mixture through a screw, cutting the mixture or crushing the mixture with a pulverizer to obtain a long-term temporary plugging agent of a desired particle size.
[0041] The oil-soluble resin is a mixture of one or more of C5 petroleum resin, C9 petroleum resin, terpene resin, rosin resin, phenolic resin and coumarone resin.
[0042] The surfactant is Span 20, Span 60, Span 80, oleic acid, alkylbenzene sulfonate, or a mixture of one or more of alkyl sulfonates.
[0043] The mass percentage of the oil-soluble resin is 75% to 90%, and the mass percentage of the surfactant is 10% to 25%.
[0044] The degradation liquid is diesel or white oil.
[0045] Example 1
[0046] like Figure 1 As shown, in step 1, the horizontal section of the well is cemented and completed using 3.5-inch casing (inner diameter 76 mm); the multi-stage perforation is performed using tubing transmission, and according to the logging data, the spacing between the perforation sections is preferably ≤40m, the number of perforation sections is 5, and the perforation thickness of each section is 6m, wherein the perforating gun phase is 60°, and the perforation density is 16 holes / meter.
[0047] like Figure 2-6 As shown, in step 2, according to the analysis of the geostress data of the perforation sections, the fracture pressure of perforation section No. 2 is the smallest and is firstly fractured, which is the first-level fracturing layer. Perforation section No. 4 is the second-level fracturing layer. Perforation sections No. 1, 3, and 5 are the third-level, fourth-level, and fifth-level fracturing layers, respectively.
[0048] like Figure 2 As shown, in step 3, a large-scale fracturing modification is used to form the first-level cracks. The amount of sand in the large-scale fracturing modification is 50 to 70 cubic meters, the displacement is 6.0 to 8.0 m3 / min, the fracturing fluid is slick water, and the liquid volume is 1000 to 1200 cubic meters. The scale of other fracturing levels is the same.
[0049] like Figure 3-6 As shown, in step 4, after completing the first-stage fracturing construction, 100 kg of a long-term temporary plugging agent with a particle size of 3-5 mm is added to the wellbore, and the long-term temporary plugging agent is pumped to the temporary plugging perforation holes by a small displacement of 1-2 m3 / min. Since the first-stage perforation formation has been pressurized and becomes a dominant channel for liquid inflow, the long-term temporary plugging agent will enter the formation through the first-stage perforation holes along with the fracturing fluid. As the amount of the long-term temporary plugging agent entering the holes increases, the first-stage perforation holes are blocked, so that the pressure is further increased until the second-stage fracturing layer is ruptured, and the fracturing fluid begins to enter the second-stage fracturing layer to create seams.
[0050] like Figure 7 , 8 As shown, in step 7, a 2-inch coiled tubing is lowered to the bottom of the well, and degradation liquid is pumped into the coiled tubing to fill the entire horizontal section, so that the long-acting temporary plugging agent can be fully and effectively immersed in the degradation liquid.
[0051] Example 2
[0052] The present invention discloses a method for long-term temporary plugging of small wells and multi-stage fracturing. The steps are as shown in Example 1, except that in step 1, a 5.5-inch casing (inner diameter 121.36 mm) is used for cementing and completion of the horizontal section of the well.
[0053] Example 3
[0054] The present invention discloses a method for long-term temporary plugging of small wells by staged multi-stage fracturing. The steps are as shown in Example 2, except that in step 3, large-scale fracturing modification is used for construction to form first-level cracks. The amount of sand in the large-scale fracturing modification is 100-150 cubic meters, the displacement is 10.0-12.0 m3 / min, the fracturing fluid is slick water, the liquid volume is 2000-2400 cubic meters, and the scales of other fracturing levels are the same.
[0055] Example 4
[0056] The present invention discloses a method for long-term temporary plugging of small wells by staged multi-stage fracturing. The steps are as shown in Example 3, except that in step 4, a long-term temporary plugging agent is pumped to the temporary plugging perforation holes at a displacement of 3-5 m3 / min.
[0057] Example 5
[0058] The present invention discloses a method for long-term temporary plugging and segmented multi-stage fracturing of a small wellbore, the steps of which are as shown in Example 4, except that in step 4, 80 kg of a long-term temporary plugging agent with a particle size of 3-5 mm is added into the wellbore.
[0059] Example 6
[0060] The present invention discloses a method for long-term temporary plugging of small wells and multi-stage fracturing. The steps are as shown in Example 5, except that in step 7, white oil is replaced to fill the horizontal section.
[0061] Example 7
[0062] The present invention discloses a method for long-term temporary plugging of small wells and multi-stage fracturing. The steps are as shown in Example 5, except that in step 7, diesel is replaced to fill the horizontal section.
[0063] Example 8
[0064] The present invention discloses a method for long-term temporary plugging of small wells and multi-stage fracturing. The steps are as shown in Example 5, except that in step 7, a 2 7 / 8-inch oil pipe is lowered to the bottom of the well, and degradation fluid is replaced to fill the horizontal section.
[0065] The long-acting temporary plugging agent prepared by the present invention: like Fig. 9 As shown, the long-term temporary plugging agent of the present invention can be dispersed in water or water-based fracturing fluid, which is conducive to the plugging operation; and the long-term temporary plugging agent prepared in Examples 9-12 is placed in water or fracturing fluid, and the long-term temporary plugging agent can remain without stratification for more than 20 days, does not degrade for more than one year, and is completely insoluble, which is conducive to the long-term temporary plugging of the perforation hole; at the same time, Fig.10As shown, the long-acting temporary plugging agent of the present invention is not soluble in water or fracturing fluid at 25°C and 110°C; the long-acting temporary plugging agent of the present invention is put into diesel and can be quickly dissolved at 25°C and 110°C, 90% of the long-acting temporary plugging agent can be dissolved in about 1 hour, and the long-acting temporary plugging agent can be completely dissolved in about 6 hours. The fast dissolution speed can quickly unblock the perforation blasthole, which is conducive to the accurate control of the temporary plugging time of the perforation blasthole.
[0066] Pressure bearing capacity test: The pressure bearing capacity test is carried out in accordance with the temporary plugging agent industry standard. The oil-soluble resin is the C5 petroleum resin (softening point is 80°C) of Shandong Qilong Chemical Co., Ltd., and the surfactant is the long-term temporary plugging agent made of Span 20. The specific test data are as follows: Different brands of resins have different softening points. The present invention can obtain long-acting temporary plugging agents with different softening points by adjusting the types of oil-soluble resins, so that they are suitable for reservoir temperatures of 80-180° C. or even higher.
[0067] Note: Due to the limitation of the pressure resistance of the instrument, a higher pressure experiment cannot be performed. The actual plugging strength of the long-acting temporary plugging agent of the present invention is higher than the data in the above table.
[0068] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention, rather than to limit the scope of protection of the present invention. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the essence and scope of the technical solution of the present invention.
Claims
1. A staged multi-stage fracturing method with controllable temporary plugging time. Features: The following steps are involved: 1) Analyze the reservoir geological data, determine the specific perforation location and layer section, and complete the perforation operation of the whole well; 2) According to the ground stress data of different perforated layers, the difficulty of fracture and cracking of the formation is judged, and the perforated layers are ranked from easy to difficult, that is, the layer that is easiest to be fractured is recorded as the first level, and so on until the layer that is most difficult to fracture and cracking is the last level; 3) Start the first-stage perforation layer fracturing construction according to the construction design; 4) After the first-stage perforation layer section fracturing construction is completed, according to the specifications and number of the perforation holes of the first-stage perforation layer section, add a long-term temporary plugging agent into the wellbore and reduce the pumping displacement so that the construction displacement of the pumped long-term temporary plugging agent is less than the displacement of the fracturing of the holes of this stage. When the pumping liquid volume is close to the first-stage fracturing position and rises significantly and then falls back quickly while keeping the pumping displacement unchanged, it means that the long-term temporary plugging agent has blocked the perforation holes of this stage and the next-stage perforation layer section is fractured; 5) Complete the fracturing construction of the next level of formation according to the fracturing construction design. The fracturing construction of the next level of formation is the same as the fracturing construction of the previous level of formation; 6) Repeat the above steps 4) and 5) until the fracturing construction of all perforations is completed; 7) Run the coiled tubing to the toe of the horizontal section of the construction well, and inject organic solvent into the horizontal section through the coiled tubing to fill the entire horizontal section with the organic solvent. After the long-acting temporary plugging agent plugging the perforated holes is degraded, carry out subsequent operations such as blowdown, production and other subsequent operations.
2. A staged multi-stage fracturing method with controllable temporary plugging time according to claim 1, Features: The preparation of the long-acting temporary plugging agent comprises the following steps: heating the oil-soluble resin into a viscous liquid, adding a surfactant under stirring conditions and mixing the mixture uniformly, and then extruding the mixture by a screw, cutting the mixture or crushing the mixture by a pulverizer.
3. A staged multi-stage fracturing method with controllable temporary plugging time according to claim 2, Features: The oil-soluble resin is one or more of C5 petroleum resin, C9 petroleum resin, terpene resin, rosin resin, phenolic resin and coumarone resin.
4. A staged multi-stage fracturing method with controllable temporary plugging time according to claim 2, Features: The surfactant is one or more of Span 20, Span 60, Span 80, oleic acid, alkylbenzene sulfonate, and alkyl sulfonate.
5. A staged multi-stage fracturing method with controllable temporary plugging time according to claim 2, Features: The mass percentages of the oil-soluble resin and the surfactant are as follows: oil-soluble resin: 75%-90%, surfactant: 10-25%.
6. A staged multi-stage fracturing method with controllable temporary plugging time according to claim 1, Features: The organic solvent is diesel or white oil.
