Vertical docking launching system and vertical docking method for erecting tower and star cover assembly

By designing the hoisting mechanism and arm structure of the vertical tower, the vertical docking of the launch vehicle's star cover assembly and the rocket body is achieved, which solves the problems of high cost and cumbersome operation in the existing technology, and improves safety and applicability. .

CN118856992AActive Publication Date: 2024-10-29BEIJING GALAXY POWER EQUIP TECH CO LTD +3
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202410860059.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-29
Estimated Expiration
2044-06-28

AI Technical Summary

Technical Problem

In the existing technology, the vertical launch of the launch vehicle's star cover assembly requires the use of a crane or a service tower, which results in high costs, cumbersome operations, and is not suitable for carrying biological payloads.

Method used

A kind of erecting tower is designed, which includes a tower body, a first arm, a second arm and a hoisting mechanism. The hoisting mechanism is slidably installed on the top of the tower body, and the first arm and the second arm are used to hold the arrow body tightly. And the star cover assembly is lifted vertically to the designated position through the hoisting mechanism to dock with the rocket body to achieve vertical docking.

Benefits of technology

There is no need to use cranes and service towers, which reduces costs, improves safety and ease of operation, and is suitable for vertical docking carrying biological payloads.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118856992A_ABST
    Figure CN118856992A_ABST
Patent Text Reader

Abstract

The invention provides a vertical docking launching system and a vertical docking method for an erecting tower and star cover assembly, and relates to the technical field of rocket launching. The erecting tower comprises a tower body, a first holding arm, a second holding arm and a hoisting mechanism, the two opposite sides of the tower body are provided with a first groove and a second groove respectively, the top of the tower body is provided with a channel communicated with the first groove and the second groove, the first groove is used for containing a rocket body, and the first holding arm and the second holding arm are arranged on the opposite side groove walls of the first groove in an opening and closing mode. The holding plate is used for holding a rocket body; the hoisting mechanism is slidably installed at the top of the tower body, the second groove is used for containing the star cover assembly, the hoisting mechanism is used for hoisting the star cover assembly, and the star cover assembly can penetrate through the channel to be in butt joint with the rocket body along with sliding of the hoisting mechanism relative to the tower body. By means of the erecting tower, the rocket body can be erected, vertical butt joint of the star cover assembly can be achieved, devices such as a crane and a service tower do not need to be used in the vertical butt joint process, cost is low, safety is high, and operation difficulty is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of rocket launching technology, and in particular to a vertical docking launching system and a vertical docking method for an erection tower and a star cover assembly. Background Art

[0002] During the launch of a carrier rocket, the fairing and the satellite form a star-cover assembly. In order to reduce costs and shorten the time of occupying the launch station, most carrier rockets currently use the "three horizontal and one vertical" test and launch mode, namely horizontal assembly, horizontal testing, horizontal transportation, and vertical launch from the launch site. In this test and launch mode, the star-cover assembly needs to be docked with the rocket body in a horizontal state, but many satellites do not have the ability to park horizontally, so this test and launch mode is not suitable for launching such satellites. In addition, the star-cover assembly in the "three horizontal and one vertical" test and launch mode needs to be assembled horizontally a few hours before launch, and no other operations can be performed after assembly. This method is especially not suitable for biological payloads.

[0003] Therefore, many launch operations currently use cranes or service towers to vertically dock the fairing with the rocket body. However, the use of cranes is costly and prone to shaking during the hoisting process, which is less safe and difficult to center when docking with the rocket body; the use of service towers requires the design and manufacture of additional launch equipment, resulting in additional costs and cumbersome operations. Summary of the invention

[0004] The present invention provides a vertical docking launch system and a vertical docking method for a erection tower and a star cover assembly, so as to solve the defects in the prior art that the vertical launch of the star cover assembly requires a crane or a service tower, which is costly and complicated to operate.

[0005] The present invention provides an erection tower, comprising: a tower body, a first holding arm, a second holding arm and a hoisting mechanism, wherein a first groove and a second groove are respectively provided on opposite sides of the tower body, and a channel connecting the first groove and the second groove is provided on the top of the tower body, wherein the first groove is used to accommodate a rocket body, and the first holding arm and the second holding arm can be opened and closed on opposite side groove walls of the first groove to hold the rocket body; the hoisting mechanism can be slidably installed on the top of the tower body, and the second groove is used to accommodate a star cover assembly, and the hoisting mechanism is used to hoist the star cover assembly, and as the hoisting mechanism slides relative to the tower body, the star cover assembly can pass through the channel and dock with the rocket body.

[0006] According to an erection tower provided by the present invention, a first hinge block and a second hinge block are provided on the same side of the tower body, the first hinge block is used for rotationally connecting with the erection seat, and the second hinge block is used for rotationally connecting with the driving end of the erection driving member.

[0007] According to a vertical erection tower provided by the present invention, the hoisting mechanism includes a slide plate, a hoisting rope, a hoisting drive, a hoisting drum, a first pulley, a sling and a second pulley, the slide plate can be slidably installed on the top of the tower body, the hoisting drive is transmission-connected to the hoisting drum, the hoisting drum can be rotatably installed on the slide plate, the sling is used to be connected to the star cover assembly and is located below the slide plate, the second pulley is installed on the sling, one end of the hoisting rope is wound around the hoisting drum, and the other end of the hoisting rope is connected to the side of the slide plate away from the hoisting drum after passing through the first pulley, the slide plate and the second pulley in sequence.

[0008] According to a kind of erection tower provided by the present invention, the sling comprises a frame and a plurality of slings, one end of each of the slings is connected to the frame, and the other end is used to be connected to the sling point on the star cover assembly.

[0009] According to a vertical erection tower provided by the present invention, two groups of slide modules are arranged on the top of the tower body, the two groups of slide modules are arranged in parallel, the slide plate is installed on the slide of the slide module, and the sliding direction of the slide extends from the first groove to the second groove.

[0010] According to a vertical erection tower provided by the present invention, a groove wall of the second groove is provided with a guide rail, and the guide rail is used to cooperate with a limiting member installed on the star cover assembly.

[0011] According to an erection tower provided by the present invention, the first arm and the second arm are both pivotally connected to the tower body and are respectively connected in transmission with an arm driving member.

[0012] The present invention also provides a vertical docking launch system for a star cover assembly, which includes a transport vehicle, an erection drive component, a fixed launch platform, a movable launch platform, an erection seat and the erection tower as described above, wherein the fixed launch platform is fixed at a launch site, the erection seat is fixed to the fixed launch platform, the erection drive component is installed below the fixed launch platform, and is used to drive the erection tower to switch from a horizontal state to a vertical state, the movable launch platform is installed at the end of the rocket body, and the transport vehicle is used to transport the assembly of the erection tower, the movable launch platform and the rocket body to the launch site, so that the erection drive component and the erection seat can dock with the tower body respectively.

[0013] According to a vertical docking launch system for a star cover assembly provided by the present invention, two erection drive members are provided, and the two erection drive members are arranged on opposite sides of the tower body.

[0014] The present invention also provides a method for vertical docking of a star cover assembly, which uses the vertical docking launch system of the star cover assembly as described above, and the method comprises: The arrow body is hoisted horizontally onto the erection tower, the first arm and the second arm hold the arrow body tightly under the action of the arm driving member, and the movable launching platform is vertically hoisted and installed onto the erection tower and connected to the arrow body; The transport vehicle transports the combination of the movable launch platform, the rocket body and the erection tower to the launch site, and the erection tower is docked with the erection seat and the erection drive member respectively; The erection driving member drives the erection tower and the arrow body to erect; A lifting point and a stopper are installed on the outer side of the star cover assembly, the stopper cooperates with the guide rail and the sling is hoisted at the lifting point, and the star cover assembly is vertically lifted to a designated position by means of the hoisting mechanism; The hoisting mechanism slides relative to the tower body to move the star cover assembly to the arrow body side of the tower body, and after the star cover assembly and the arrow body are aligned and fitted, the fasteners between the star cover assembly and the arrow body are manually installed; The first holding arm and the second holding arm are opened, and the erection tower is tilted under the action of the erection driving member.

[0015] The present invention provides an erection tower, a star cover assembly vertical docking launch system and a vertical docking method. The first arm and the second arm cooperate to fix the rocket body in the first groove. A movable hoisting mechanism is provided on the top of the tower body. The hoisting mechanism can be used to vertically lift the hoisting mechanism. After the hoisting is in place, the star cover assembly can be aligned with the rocket body through the sliding of the hoisting mechanism to achieve vertical docking of the star cover assembly. Therefore, with the help of the erection tower, not only the rocket body can be erected, but also the vertical docking of the star cover assembly can be achieved. In the vertical docking process, there is no need to use devices such as cranes and service towers, and the cost is low, the safety is high, and the operation difficulty is low. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is a schematic diagram of the coordination between the erection tower and the arrow body provided by the present invention.

[0018] Figure 2 It is a structural schematic diagram of the vertical docking launch system of the star cover assembly provided by the present invention.

[0019] Figure 3 yes Figure 2 The enlarged view of the vertical docking launch system of the star cover assembly is shown at A.

[0020] Figure 4 It is a schematic structural diagram of the vertical docking launch system of the star cover assembly provided by the present invention after the rocket body is erected.

[0021] Figure 5 It is a structural schematic diagram of the vertical docking launch system of the star cover assembly provided by the present invention preparing to erect the star cover assembly.

[0022] Figure 6 It is an enlarged view of the vertical docking launch system of the star cover assembly provided by the present invention at position B.

[0023] Figure 7 It is a partial structural schematic diagram of the vertical docking launch system of the star cover assembly provided by the present invention.

[0024] Figure 8 yes Figure 7 The cross-sectional view of the vertical docking launch system of the star cover assembly shown is along AA.

[0025] Fig. 9 yes Figure 7 A magnified view of the structure at C.

[0026] Fig.10 It is a schematic diagram of the local structure of the vertical docking launch system of the star cover assembly provided by the present invention after the star cover assembly is hoisted to a designated position.

[0027] Fig.11 yes Fig.10 The cross-sectional view of the vertical docking launch system of the star cover assembly shown is along BB.

[0028] Fig.12 yes Fig.11 An enlarged view of the structure shown in FIG.

[0029] Fig.13 It is a structural schematic diagram of the vertical docking launch system of the star cover assembly provided by the present invention, in which the vertical tower is tilted down after the star cover assembly and the rocket body are docked in place.

[0030] Fig.14 yes Fig.13 An enlarged view of the structure shown in FIG.

[0031] Reference numerals: 10. tower body; 11. first groove; 12. second groove; 13. first hinge block; 14. second hinge block; 15. guide rail; 16. support member; 21. first arm; 22. second arm; 23. arm drive member; 30. hoisting mechanism; 31. slide plate; 311. first slide plate; 312. second slide plate; 32. lifting rope; 33. hoisting drive member; 34. hoisting drum; 35. first pulley; 36. sling; 361. frame; 362. lifting rope; 37. second pulley; 38. slide module; 100. rocket body; 110. star cover assembly; 111. lifting point; 112. limit member; 113. guardrail; 130. transport vehicle; 140. erection drive member; 150. fixed launch platform; 160. movable launch platform; 170. erection seat. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] The term "first" or "second" in the specification and claims of the present application may include one or more of the features explicitly or implicitly. In the description of the present invention, unless otherwise specified, "plurality" means two or more. In addition, "and / or" in the specification and claims means at least one of the connected objects, and the character " / " generally means that the objects connected before and after are in an "or" relationship.

[0034] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0035] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0036] Combine the following Figure 1-Figure 14 The invention discloses a vertical docking launch system of an erection tower and a star cover assembly.

[0037] The present invention provides a kind of erection tower, such as Figures 1 to 4 As shown, it includes a tower body 10, a first arm 21, a second arm 22 and a hoisting mechanism 30. Figure 8 As shown, the tower body 10 is provided with a first groove 11 and a second groove 12 on opposite sides thereof, and the top of the tower body 10 is provided with a passage connecting the first groove 11 and the second groove 12. The first groove 11 is used to receive the arrow body 100, and the first arm 21 and the second arm 22 are closably disposed on the opposite side groove walls of the first groove 11 to hold the arrow body 100. Figure 1 and Figure 8 As shown, the hoisting mechanism 30 can be slidably installed on the top of the tower body 10, the second groove 12 is used to accommodate the star cover assembly 110, and the hoisting mechanism 30 is used to hoist the star cover assembly 110. As the hoisting mechanism 30 slides relative to the tower body 10, the star cover assembly 110 can pass through the channel and dock with the rocket body 100.

[0038] The tower body 10 includes a top plate, a partition plate and two side plates. The two side plates are arranged opposite to each other. The two opposite long sides of the partition plate are vertically connected to the two side plates one by one. The top plate is fixedly connected to the same side ends of the two side plates. The partition plate separates the space between the two side plates to form a first groove 11 and a second groove 12. The gap between the partition plate and the top plate forms a channel connecting the first groove 11 and the second groove 12. Fig.13 and Fig.14 As shown, a support member 16 is installed in the first groove 11 , and the support member 16 has a curved surface that can fit with the outer wall of the arrow body 100 , so as to better position and support the arrow body 100 .

[0039] like Fig.14 As shown, the first arm 21 and the second arm 22 can be opened and closed and are arranged on opposite sides of the first groove 11. The two arms are connected to hold the rocket body 100, so as to facilitate the transfer of the rocket body 100 and the erection tower. When the erection tower is erected and the star cover assembly 110 and the rocket body 100 are connected, the first arm 21 and the second arm 22 are opened, and the erection tower is tilted back to launch the carrier rocket.

[0040] The hoisting mechanism 30 is used to vertically hoist the star cover assembly 110 accommodated in the second groove 12. When hoisted to the specified position, the hoisting mechanism 30 slides along the top plate to move the star cover assembly 110 from the second groove 12 side to the first groove 11 side, so that the star cover assembly 110 is centered with the rocket body 100, and the star cover assembly 110 is vertically docked.

[0041] The erecting tower provided in the embodiment of the present invention, the first arm 21 and the second arm 22 cooperate to fix the rocket body 100 in the first groove 11, and a movable hoisting mechanism 30 is arranged on the top of the tower body 10, with the help of the hoisting mechanism 30, the hoisting mechanism 30 can be vertically hoisted. After being hoisted into place, the star cover assembly 110 and the rocket body 100 can be aligned through the sliding of the hoisting mechanism 30 to achieve vertical docking of the star cover assembly 110. Therefore, with the help of the erecting tower, not only the rocket body 100 can be erected, but also the vertical docking of the star cover assembly 110 can be achieved. In the vertical docking process, there is no need to use devices such as cranes and service towers, which has low cost, high safety and low operation difficulty.

[0042] like Figure 1 As shown, a first hinge block 13 and a second hinge block 14 are provided on the same side of the tower body 10 . The first hinge block 13 is used for rotationally connecting with the erection seat 170 , and the second hinge block 14 is used for rotationally connecting with the driving end of the erection driving member 140 .

[0043] The first hinge block 13 and the second hinge block 14 are both located on the side plate. Specifically, the first hinge block 13 is located near the bottom of the side plate, and the second hinge block 14 is located above the first hinge block 13. The first hinge block 13 and the second hinge block 14 are both convexly arranged on the side of the side plate near the second groove 12.

[0044] There are two first hinge blocks 13 and two second hinge blocks 14, the two first hinge blocks 13 are located on different side panels and at corresponding positions of the two side panels, and the two second hinge blocks 14 are located on different side panels and at corresponding positions of the two side panels.

[0045] like Figure 6 and Fig.12 As shown, the hoisting mechanism 30 includes a slide plate 31, a hoisting rope 32, a hoisting drive 33, a hoisting drum 34, a first pulley 35, a sling 36 and a second pulley 37. The slide plate 31 can be slidably mounted on the top of the tower body 10. The hoisting drive 33 is in transmission connection with the hoisting drum 34, and the hoisting drum 34 can be rotatably mounted on the slide plate 31. The sling 36 is used to be connected to the star cover assembly 110, and the second pulley 37 is installed on the sling 36. One end of the hoisting rope 32 is wound around the hoisting drum 34, and the other end of the hoisting rope 32 passes through the first pulley 35, the slide plate 31 and the second pulley 37 in sequence and is connected to the side of the slide plate 31 away from the hoisting drum 34.

[0046] The slide plate 31 is arranged parallel to the top plate, and the hoisting drive member 33, the hoisting drum 34 and the first pulley 35 are all installed on the side of the slide plate 31 away from the tower body 10. Among them, two ears are arranged on the slide plate 31, and the two ends of the hoisting drum 34 are respectively provided with rotating shafts, and the two rotating shafts are rotatably inserted into the two ears in a one-to-one correspondence. Under the action of the hoisting drive member 33, the hoisting drum 34 can rotate. Optionally, the hoisting drive member 33 is a motor, and the motor shaft is connected to the hoisting drum 34.

[0047] like Fig.12 As shown, the hoisting rope 32 is a load-bearing rope such as a steel wire rope, one end of which is wound around the winch drum 34, and the other end passes through the first pulley 35 and then passes through the slide 31, and passes through the second pulley 37 on the sling 36 located below the slide 31 to connect with the side of the slide 31 facing the tower body 10, so that the sling 36 is suspended below the slide 31 by means of the hoisting rope 32. It can be understood that the top plate is provided with a strip hole, and the extension direction of the strip hole is consistent with the sliding direction of the slide 31. The hoisting rope 32 passes through the strip hole, and during the sliding process of the slide 31, the hoisting rope 32 moves in the strip hole along the extension direction of the strip hole.

[0048] See also Figure 5 , Figure 7 and Fig.10 When the winch drive 33 drives the winch drum 34 to rotate and drives the hoisting rope 32 to contract, the sling 36 drives the star cover assembly 110 to move vertically upward. After the star cover assembly 110 moves to the specified position, the overall state is as follows: Fig.10 As shown, the winch drive member 33 stops driving. The slide plate 31 slides, driving the star cover assembly 110 to move from the second groove 12 side to the first groove 11 side, so that the star cover assembly 110 is aligned with the rocket body 100. At this time, the winch drive member 33 rotates in the opposite direction, driving the star cover assembly 110 to move down and fit with the end of the rocket body 100, and the fasteners are manually installed to connect the star cover assembly 110 with the rocket body 100.

[0049] like Figure 6 As shown, the sling 36 includes a frame 361 and a plurality of slings 362, one end of each sling 362 is connected to the frame 361, and the other end is used to connect to the sling point 111 on the star cover assembly 110. With the help of the plurality of slings 362, the pulling force of the star cover assembly 110 can be balanced, providing a stable force for the upward movement and translation of the star cover assembly 110 to avoid shaking during the movement.

[0050] A plurality of suspension points 111 are arranged around the outer wall of the star cover assembly 110. One end of the suspension rope 362 is connected to the suspension point 111, and the other end is connected to the suspension device 36. A second pulley 37 is installed on the side of the suspension device 36 facing the top of the tower body 10. Specifically, Figure 6As shown, there are four suspension ropes 362 , which are arranged at intervals around the frame 361 circumferentially. The top end of each suspension rope 362 is connected to the frame 361 , and the bottom end is used to connect to the suspension point 111 on the star cover assembly 110 .

[0051] The frame 361 includes a plurality of rods, some of which are connected end to end to form a polygon, and other rods are connected to the center and corners of the polygon to improve the strength of the polygon. The second pulley 37 is installed at the center of the polygon so that the hoisting mechanism 30 can stably pull the vertically hoisted star cover assembly 110.

[0052] Two sets of slide modules 38 are arranged on the top of the tower body 10 . The two sets of slide modules 38 are arranged in parallel. The slide plate 31 is installed on the slides of the slide modules 38 . The sliding direction of the slide extends from the first groove 11 to the second groove 12 .

[0053] like Fig.12 As shown, two sets of slide modules 38 are arranged in parallel and spaced apart, and the opposite sides of the slide plate 31 are respectively connected to a slide module 38. The sliding direction of the slide is along the width direction of the side plate, and the slide plate 31 slides along the slide module 38 to move the star cover assembly 110 from the second groove 12 side to the first groove 11 side and align with the rocket body 100.

[0054] Optionally, to improve the adjustment convenience of the star cover assembly 110, as Fig.12 As shown, the slide plate 31 includes a first slide plate 311 and a second slide plate 312. The cross section of the second slide plate 312 is square, and the two second slide plates 312 are connected to the slides of the two slide modules 38 in a one-to-one correspondence. A guide rail is convexly arranged on the side of the second slide plate 312 away from the slide module 38, and a guide groove cooperating with the guide rail is arranged on one side of the first slide plate 311, and a winch driving member 33, a first pulley 35 and a winch drum 34 are installed on the other side.

[0055] like Figure 8 and Fig. 9 As shown, a guide rail 15 is provided on the groove wall of the second groove 12 , and the guide rail 15 is used to cooperate with a limiting member 112 installed on the star cover assembly 110 .

[0056] The outer wall of the star cover assembly 110 is provided with a limiting member 112, such as Figure 8 and Fig. 9As shown, there are two limit members 112, and the two limit members 112 are symmetrical about the axis of the star cover assembly 110. The opposite side groove walls of the second groove 12 are respectively provided with guide rails 15. When the star cover assembly 110 is accommodated in the second groove 12, the limit members 112 are matched with the guide rails 15 one by one. The hoisting mechanism 30 pulls the star cover assembly 110 to move vertically upward, and the limit members 112 move along the guide rails 15. When the star cover assembly 110 moves to the specified position, the limit members 112 are separated from the guide rails 15, so that the star cover assembly 110 can move from the first groove 11 side to the second groove 12 side as the slide plate 31 slides.

[0057] The first arm 21 and the second arm 22 are both pivotally connected to the tower body 10 and are respectively connected to an arm driving member 23 .

[0058] The first arm 21 and the second arm 22 are both arc-shaped, and the two can be connected to each other to hold the arrow body 100. Specifically, the arm driving member 23 is a linear motor, which is installed on the outer side of the groove wall of the first groove 11, and the driving end of the arm driving member 23 is connected to the outer side of the first arm 21 and the second arm 22. The arm driving member 23 drives the first arm 21 and the second arm 22 to move relative to each other, and together hold the arrow body 100; the arm driving member 23 moves in the opposite direction, driving the first arm 21 and the second arm 22 to open, so as to separate the erection tower and the arrow body 100.

[0059] In addition, Figure 2 As shown, the present invention also provides a vertical docking launch system for a star cover assembly 110, which includes a transport vehicle 130, an erection drive component 140, a fixed launch platform 150, a movable launch platform 160, an erection seat 170 and the erection tower as described above. The fixed launch platform 150 is fixed to the launch site, and the erection seat 170 is fixed to the fixed launch platform 150. The erection drive component 140 is installed below the fixed launch platform 150, and is used to drive the erection tower to switch from a horizontal state to a vertical state. The movable launch platform 160 is installed at the end of the rocket body 100, and the transport vehicle 130 is used to transport the assembly of the erection tower, the movable launch platform 160 and the rocket body 100 to the launch site, so that the erection drive component 140 and the erection seat 170 are docked with the tower body 10 respectively.

[0060] like Figure 2 and Figure 3 As shown, the erection seat 170 is fixed to the fixed launch platform 150 and docked with the first hinge block 13 on the arrow body 100. The erection drive member 140 is connected to the second hinge block 14 on the arrow body 100. Figure 5As shown, two erection driving members 140 are provided, and two recessed mounting positions are provided on the side of the erection seat 170. The two erection driving members 140 are rotatably mounted at the two mounting positions, respectively, and the driving end of each erection driving member 140 is rotatably connected to the corresponding second hinge block 14. The erection driving member 140 is a linear motor or a cylinder, and the erection tower is driven to switch from a horizontal state to a vertical state through the linear feeding of the erection driving member 140.

[0061] The rocket body 100 is hoisted horizontally onto the erection tower, the first arm 21 and the second arm 22 are driven by the arm driving member 23 to hold the rocket body 100 tightly, and the rocket body 100 is firmly fixed on the erection tower, and then the movable launch platform 160 is hoisted vertically onto the erection tower. Figure 2 As shown, two transport vehicles 130 cooperate to transport the assembled erection tower, rocket body 100 and movable launch platform 160 to the launch site, so that the erection seat 170 is docked with the first hinge block 13, and the erection drive member 140 is docked with the second hinge block 14. Driven by the erection drive member 140, the erection tower drives the rocket body 100 and the movable launch platform 160 to switch from a horizontal state to a vertical state, as shown in FIG. Figure 4 As shown. Then Figure 5 , Figure 6 and Fig. 9 As shown, the star cover assembly 110 is installed on the side of the second groove 12, so that the limiter 112 cooperates with the guide rail 15, and the bottom of the suspension rope 362 is suspended on the suspension point 111 of the star cover assembly 110. The suspension device 36 drives the star cover assembly 110 to move upward under the action of the winch drive 33, and the limiter 112 cooperates with the guide rail 15 to provide guidance. Fig.10 As shown, the star cover assembly 110 moves to the specified position, and the stopper 112 separates from the guide rail 15. Then the slide plate 31 slides, driving the star cover assembly 110 to move to the side of the first groove 11, and then the winch drive member 33 drives in the reverse direction, driving the star cover assembly 110 to move down and dock with the rocket body 100, so as to realize the vertical docking of the star cover assembly 110. Fig.13 As shown, the arm driving member 23 drives the first arm 21 and the second arm 22 in reverse to open, and then the tower is erected and then falls down to separate from the carrier rocket.

[0062] The present invention also provides a method for vertically docking a star cover assembly 110, using the above-mentioned star cover assembly 110 vertically docking a launch system, the method for vertically docking a cover assembly comprises: The launch vehicle (except the star cover assembly 110) is hoisted horizontally onto the erection tower, the first arm 21 and the second arm 22 hold the rocket body 100 tightly under the action of the arm driving member 23, and the movable launch platform 160 is vertically hoisted and installed onto the erection tower and connected to the rocket body 100; like Figure 2 and Figure 3As shown, the transport vehicle 130 transports the combination of the movable launch platform 160, the rocket body 100 and the erection tower to the launch site, and the erection tower is docked with the erection seat 170 and the erection drive member 140 respectively; like Figure 4 As shown, the erection drive member 140 drives the erection tower and the arrow body 100 to erect; like Figure 5 , Figure 6 , Figure 7 , Fig.10 and Fig.11 As shown, a lifting point 111 and a stopper 112 are installed on the outer side of the star cover assembly 110, and the lifting device 36 is hoisted on the lifting point 111, and the star cover assembly 110 is vertically lifted to a designated position by means of the hoisting mechanism 30; The hoisting mechanism 30 slides relative to the tower body 10, and the star cover assembly 110 is moved to the rocket body 100 side of the tower body 10. After the star cover assembly 110 and the rocket body 100 are aligned and fitted, the fasteners between the star cover assembly 110 and the rocket body 100 are manually installed. like Fig.13 As shown, the first arm 21 and the second arm 22 are opened, and the erection tower is tilted under the action of the erection drive member 140.

[0063] like Fig.11 As shown, the side wall of the star cover assembly 110 is provided with an operating platform, and the operating platform is surrounded by a guardrail 113. The personnel standing on the operating platform are protected by the guardrail 113. During the vertical upward movement of the star cover assembly 110, the personnel ascend together to install the fasteners of the star cover assembly 110 and the rocket body 100, complete the docking of the two, and can remove the suspension point 111 and the limiter 112 after the docking is completed.

[0064] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A tower erection, characterized in that: include: A tower body, a first holding arm, a second holding arm and a hoisting mechanism, wherein a first groove and a second groove are respectively provided on opposite sides of the tower body, and a channel connecting the first groove and the second groove is provided on the top of the tower body, wherein the first groove is used to accommodate a rocket body, and the first holding arm and the second holding arm can be opened and closed on opposite side groove walls of the first groove to hold the rocket body; the hoisting mechanism can be slidably installed on the top of the tower body, and the second groove is used to accommodate a star cover assembly, and the hoisting mechanism is used to hoist the star cover assembly, and as the hoisting mechanism slides relative to the tower body, the star cover assembly can pass through the channel and dock with the rocket body.

2. The erection tower according to claim 1, characterized in that: A first hinge block and a second hinge block are provided on the same side of the tower body. The first hinge block is used for being rotatably connected to the erecting seat, and the second hinge block is used for being rotatably connected to the driving end of the erecting driving member.

3. The erection tower according to claim 1, characterized in that: The hoisting mechanism includes a slide plate, a hoisting rope, a hoisting drive, a hoisting drum, a first pulley, a sling and a second pulley. The slide plate can be slidably installed on the top of the tower body. The hoisting drive is transmission-connected to the hoisting drum. The hoisting drum can be rotatably installed on the slide plate. The sling is used to be connected to the star cover assembly and is located below the slide plate. The second pulley is installed on the sling. One end of the hoisting rope is wound around the hoisting drum, and the other end of the hoisting rope is connected to the side of the slide plate away from the hoisting drum after passing through the first pulley, the slide plate and the second pulley in sequence.

4. The erection tower according to claim 3, characterized in that: The sling comprises a frame and a plurality of slings, one end of each sling is connected to the frame, and the other end is used to be connected to a sling point on the star cover assembly.

5. The erection tower according to claim 3, characterized in that: Two groups of slide modules are arranged on the top of the tower body, and the two groups of slide modules are arranged in parallel. The slide plate is installed on the slide of the slide module, and the sliding direction of the slide extends from the first groove to the second groove.

6. The erection tower according to claim 1, characterized in that: A guide rail is provided on the groove wall of the second groove, and the guide rail is used to cooperate with a limiting member installed on the star cover assembly.

7. The erection tower according to claim 1, characterized in that: The first arm and the second arm are both pivotally connected to the tower body and are respectively connected to an arm driving member.

8. A satellite cover assembly vertical docking launch system, characterized in that: It includes a transport vehicle, an erection drive component, a fixed launch platform, a movable launch platform, an erection seat and an erection tower as described in any one of claims 1 to 7, wherein the fixed launch platform is fixed to a launch site, the erection seat is fixed to the fixed launch platform, the erection drive component is installed below the fixed launch platform and is used to drive the erection tower to switch from a horizontal state to a vertical state, the movable launch platform is installed at the end of the arrow body, and the transport vehicle is used to transport the combination of the erection tower, the movable launch platform and the arrow body to the launch site so that the erection drive component and the erection seat are respectively docked with the tower body.

9. The vertical docking launch system of the star cover assembly according to claim 1, characterized in that: There are two erecting driving members, and the two erecting driving members are arranged on opposite sides of the tower body.

10. A method for vertically docking a star cover assembly, characterized in that: Using the vertical docking launch system of the star cover assembly as claimed in claim 8 or 9, the method comprises: The arrow body is hoisted horizontally onto the erection tower, the first arm and the second arm hold the arrow body tightly under the action of the arm driving member, and the movable launching platform is vertically hoisted and installed onto the erection tower and connected to the arrow body; The transport vehicle transports the combination of the movable launch platform, the rocket body and the erection tower to the launch site, and the erection tower is docked with the erection seat and the erection drive member respectively; The erection driving member drives the erection tower and the arrow body to erect; A lifting point and a stopper are installed on the outer side of the star cover assembly, the stopper cooperates with the guide rail and the sling is hoisted at the lifting point, and the star cover assembly is vertically lifted to a designated position by means of the hoisting mechanism; The hoisting mechanism slides relative to the tower body to move the star cover assembly to the arrow body side of the tower body, and after the star cover assembly and the arrow body are aligned and fitted, the fasteners between the star cover assembly and the arrow body are manually installed; The first holding arm and the second holding arm are opened, and the erecting tower is tilted under the action of the erecting driving member.

Citation Information

Patent Citations

  • Test launching method of carrier rocket

    CN116242202A

  • Novel three-flat rocket testing and launching mode

    CN117490510A

  • Hoisting device for vertical butt joint of star cover assembly

    CN118062717A

  • Improved three-plumb test launching site system for liquid rocket

    CN118189741A

  • Novel rocket launching system

    CN221077436U