Management method and system for power generation enterprises and power consumption enterprises

By constructing the curve of power transaction data and analyzing the capacity range, the transaction behavior of power generation companies and power consumption companies is managed in a targeted manner, which solves the problem of power supply and price fluctuations in power transactions and achieves more stable power supply and price management.

CN118864152APending Publication Date: 2024-10-29INFORMATION & COMM BRANCH OF STATE GRID JIANGSU ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410764214.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-14
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

The spontaneity of power trading behavior between power generation companies and power consumption companies leads to large fluctuations in market power supply and prices, making it difficult to effectively manage.

Method used

By obtaining the overall transaction data of the power trading center, the power generation capacity data of power generation companies, and the transaction data of power consumption companies, we can construct demand change curves, power generation capacity change curves, individual demand change curves, and individual supply change curves to analyze excess and insufficient capacity intervals. , and guide and manage target enterprises.

Benefits of technology

It effectively reduces the market fluctuations in power supply and electricity prices, and improves the pertinence and success rate of transaction behavior.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118864152A_ABST
    Figure CN118864152A_ABST
Patent Text Reader

Abstract

The invention relates to a management method and system for power generation enterprises and power utilization enterprises. The method comprises the following steps: acquiring total transaction data of a power transaction center in a plurality of time periods, power generation capacity data of a plurality of power generation enterprises, individual transaction data of the plurality of power generation enterprises and individual transaction data of a plurality of power utilization enterprises; and constructing an overall demand change curve, an electricity price fluctuation curve, an overall power generation capacity change curve, an individual demand change curve and an individual supply change curve based on the data. The overall capacity excess interval can be obtained by comparing the overall demand change curve with the overall power generation capacity change curve, and then the capacity insufficient interval is obtained from the electricity price of the electricity price fluctuation curve. And through the individual supply change curve of each power generation enterprise and the individual demand change curve of each power utilization enterprise, a target enterprise causing power supply and electricity price fluctuation can be analyzed and targeted guide management is carried out so that power supply and electricity price fluctuation can be effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power management, and in particular to a management method and system for power generation enterprises and power consumption enterprises. Background Art

[0002] Power generation companies are at the upstream of the power supply chain, responsible for producing electricity through coal, gas, hydropower, nuclear power, wind power, solar power, etc. Power users are at the downstream of the power supply chain, the final consumers of electricity, and use electricity to meet their production, operation or service needs.

[0003] Power generation companies and power users trade electricity through the power market. Power generation companies sell the electricity they produce to the State Grid or the Power Trading Center, which then distributes the electricity to various power users.

[0004] The power generation of power generation enterprises and the power consumption of power users are affected by factors such as season, environment, time, etc. Generally speaking, the power generation of power generation enterprises and the power consumption of power users are affected by various factors and fluctuate. In the prior art, the trading behavior of power generation enterprises and power users is also spontaneous, which easily causes large fluctuations in the power supply and price in the market. Summary of the invention

[0005] In view of this, an object of the present invention is to provide a management method and system for power generation enterprises and power consumption enterprises to solve the problems in the prior art.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] A management method for power generation enterprises and power consumption enterprises of the present invention comprises the following steps:

[0008] Obtaining the overall transaction data of the power trading center in multiple time periods, the power generation capacity data of multiple power generation enterprises in the power trading center, the individual transaction data of multiple power generation enterprises in the power trading center, and the individual transaction data of multiple power users in the power trading center, wherein the overall transaction data and the individual transaction data both include the power supply amount, power supply time period, and price of multiple transactions;

[0009] Based on the overall transaction data, construct an overall demand change curve and electricity price fluctuation curve of the power trading center within a time period; based on the power generation capacity data of the multiple power generation enterprises, construct an overall power generation capacity change curve of the power trading center within a time period; based on the individual transaction data of the multiple power users, construct an individual demand change curve of each power user; and based on the individual transaction data of the multiple power users, construct an individual supply change curve of each power user;

[0010] Compare the transaction power change curve with the overall power generation capacity change curve to obtain the excess capacity interval; and determine the insufficient capacity interval based on the electricity price fluctuation curve;

[0011] Matching the excess capacity interval with the individual demand change curve of each power-consuming enterprise to obtain the target power-consuming enterprise; and matching the insufficient capacity interval with the individual supply change curve of each power-generating enterprise to obtain the target power-generating enterprise;

[0012] Provide guidance and management for the target electricity-consuming enterprises and the target power-generating enterprises.

[0013] In one embodiment of the present application, the overall demand change curve and electricity price fluctuation curve of the power trading center within a time period are constructed based on the overall transaction data, including:

[0014] Creating a two-dimensional coordinate system of a time period, wherein the horizontal axis of the two-dimensional coordinate system is a time axis, the vertical axis of the two-dimensional coordinate system is an electricity quantity axis and an electricity price axis, and the time axis includes multiple unit times;

[0015] Mapping the overall transaction data to the two-dimensional coordinate system to obtain an overall histogram, wherein the overall histogram includes the total demand amount and the average price of multiple unit times;

[0016] The overall histogram is fitted to obtain an overall demand change curve and an electricity price fluctuation curve.

[0017] In one embodiment of the present application, the overall histogram includes an overall demand histogram and an overall electricity price histogram, wherein the overall transaction data is mapped to the two-dimensional coordinate system to obtain an overall histogram, including:

[0018] Dividing the overall transaction data into overall data units of a plurality of time periods, wherein each overall data unit of the time period corresponds to a two-dimensional coordinate system;

[0019] For each transaction data in each overall data unit, its horizontal axis coordinate is determined based on the power supply time period; the power supply is proportionally decomposed into multiple unit times corresponding to the power supply time period to obtain multiple power level line segments; and the power price amplitude is decomposed into multiple unit times corresponding to the power supply time period to obtain multiple power price level line segments;

[0020] The sum of any horizontal line segments of electricity quantity on the same horizontal coordinate is combined to obtain a single-period demand histogram; and the mean of any horizontal line segments of electricity price on the same horizontal coordinate is combined to obtain a single-period electricity price histogram;

[0021] The average values ​​of the horizontal line segments of the electricity quantity at the same horizontal coordinate in multiple single-period demand histograms are merged to obtain the overall demand histogram; and the average values ​​of the horizontal line segments of the electricity price at the same horizontal coordinate in multiple single-period electricity price histograms are merged to obtain the overall electricity price histogram.

[0022] In one embodiment of the present application, a curve of overall power generation capacity change of a power trading center within a time period is constructed based on the power generation capacity data of the plurality of power generation enterprises, including:

[0023] summing the power generation at the same power generation time in the power generation capacity data of the multiple power generation enterprises to obtain multiple power generation times and the total power generation at the multiple times;

[0024] The multiple power generation times and the total power generation at the multiple times are mapped into a two-dimensional coordinate system and fitted to obtain a curve of the overall power generation capacity change of the power trading center within the time period.

[0025] In one embodiment of the present application, constructing an individual demand change curve of each power consuming enterprise based on the individual transaction data of the plurality of power consuming enterprises, or constructing an individual supply change curve of each power generating enterprise based on the individual transaction data of the plurality of power generating enterprises, includes:

[0026] Creating a two-dimensional coordinate system of a time period, wherein the horizontal axis of the two-dimensional coordinate system is a time axis, the vertical axis of the two-dimensional coordinate system is an electric quantity axis, and the time axis includes a plurality of unit times;

[0027] Dividing the individual transaction data of the electricity-consuming enterprise or the individual transaction data of the power generation enterprise into individual data units of multiple time periods, wherein the individual data unit of each time period corresponds to a two-dimensional coordinate system;

[0028] For each transaction data of each individual data unit, its horizontal axis coordinate is determined based on the power supply time period; the power supply amount is proportionally decomposed into multiple unit times corresponding to the power supply time period to obtain multiple power level line segments;

[0029] Sum and merge any horizontal line segments of electricity at the same horizontal coordinate to obtain a single-period individual demand histogram or a single-period individual supply histogram;

[0030] The average values ​​of the horizontal line segments of the electricity at the same horizontal coordinate in multiple single-period individual demand histograms are merged to obtain an individual demand histogram; or the average values ​​of the horizontal line segments of the electricity at the same horizontal coordinate in multiple single-period individual supply histograms are merged to obtain an individual supply histogram;

[0031] The individual demand histogram or the individual supply histogram is fitted to obtain an individual demand change curve or an individual supply change curve.

[0032] In one embodiment of the present application, the transaction power change curve is compared with the overall power generation capacity change curve to obtain the excess capacity interval, including:

[0033] Mapping the transaction power change curve and the overall power generation capacity change curve to the same coordinate system;

[0034] Calculate the difference between the power generation in the overall power generation capacity change curve and the transaction power in the transaction power change curve under the same time period coordinates, and mark the time period coordinates when the difference is greater than a preset threshold;

[0035] When there are multiple marked time period coordinates that are continuous and the total length is greater than a preset time threshold, the multiple marked time period coordinates are used as excess capacity intervals.

[0036] In one embodiment of the present application, determining the insufficient capacity interval based on the electricity price fluctuation curve includes:

[0037] Obtain a reference electricity price, and construct an electricity price reference line based on a specific multiple of the reference electricity price, wherein the specific multiple is greater than 1;

[0038] The electricity price reference line is mapped to the electricity price fluctuation curve, and a time period corresponding to a portion of the electricity price fluctuation curve located above the electricity price reference line is used as a capacity shortage interval.

[0039] In one embodiment of the present application, the excess capacity interval is matched with the individual demand change curve of each power user to obtain a target power user; and the insufficient capacity interval is matched with the individual supply change curve of each power generation enterprise to obtain a target power generation enterprise, including:

[0040] Extracting the trough interval and peak interval of the individual demand change curve of each power-consuming enterprise; and extracting the trough interval and peak interval of the individual supply change curve of each power-generating enterprise;

[0041] The power consuming enterprises whose trough interval of any individual demand change curve overlaps with the excess capacity interval, or whose peak interval overlaps with the insufficient capacity interval, and whose overlapping time exceeds the preset time length threshold are taken as target power consuming enterprises; and the power generating enterprises whose trough interval of any individual supply change curve overlaps with the insufficient capacity interval, or whose peak interval overlaps with the excess capacity interval, and whose overlapping time exceeds the preset time length threshold are taken as target power generating enterprises.

[0042] In one embodiment of the present application, guiding and managing the target electricity-consuming enterprise and the target power-generating enterprise includes:

[0043] Guide and manage the production expansion of the target electricity consuming enterprise in the excess capacity interval, or guide and manage the production contraction of the target electricity consuming enterprise in the insufficient capacity interval; and guide and manage the production expansion of the target power generating enterprise in the insufficient capacity interval, or guide and manage the production contraction of the target power generating enterprise in the excess capacity interval; wherein the guidance and management methods include electricity price adjustment and making expansion suggestions.

[0044] The present application also provides a management system for power generation enterprises and power consumption enterprises, including:

[0045] An acquisition module is used to acquire the overall transaction data of the power trading center in multiple time periods, the power generation capacity data of multiple power generation enterprises in the power trading center, the individual transaction data of multiple power generation enterprises in the power trading center, and the individual transaction data of multiple power users in the power trading center, wherein the overall transaction data and the individual transaction data both include the power supply amount, power supply time period and price of multiple transactions;

[0046] A curve construction module, for constructing an overall demand change curve and an electricity price fluctuation curve of a power trading center within a time period based on the overall transaction data; constructing an overall power generation capacity change curve of a power trading center within a time period based on the power generation capacity data of the multiple power generation enterprises; constructing an individual demand change curve of each power user enterprise based on the individual transaction data of the multiple power users; and constructing an individual supply change curve of each power user enterprise based on the individual transaction data of the multiple power users;

[0047] A comparison module, used to compare the transaction power change curve with the overall power generation capacity change curve to obtain a capacity surplus interval; and determine a capacity shortage interval based on the electricity price fluctuation curve;

[0048] A matching module, used to match the excess capacity interval with the individual demand change curve of each power-consuming enterprise to obtain a target power-consuming enterprise; and to match the insufficient capacity interval with the individual supply change curve of each power-generating enterprise to obtain a target power-generating enterprise;

[0049] A management module is used to guide and manage the target electricity-consuming enterprise and the target power-generating enterprise.

[0050] The present application also provides an electronic device, the electronic device comprising:

[0051] one or more processors;

[0052] A storage device is used to store one or more programs. When the one or more programs are executed by the one or more processors, the electronic device implements a management method for power generation enterprises and power consumption enterprises as described above.

[0053] The present application also provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor of a computer, the computer is enabled to execute a management method for power generation enterprises and power consumption enterprises as described above.

[0054] The beneficial effects of the present invention are as follows: a management method and system for power generation enterprises and power users of the present invention obtains the overall transaction data of the power trading center in multiple time periods, the power generation capacity data of multiple power generation enterprises in the power trading center, the individual transaction data of multiple power generation enterprises in the power trading center, and the individual transaction data of multiple power users in the power trading center; and constructs the overall demand change curve, the electricity price fluctuation curve, the overall power generation capacity change curve, the individual demand change curve and the individual supply change curve based on the above data. By comparing the overall demand change curve and the overall power generation capacity change curve, the overall capacity surplus interval can be obtained, and then the capacity shortage interval can be obtained from the electricity price of the electricity price fluctuation curve. Then, by comparing the individual supply change curve of each power generation enterprise and the individual demand change curve of each power user, the target enterprise that causes power supply and power price fluctuations can be analyzed, and then the target enterprise is targeted for guidance and management, and targeted guidance has a higher success rate, thereby effectively reducing power supply and power price fluctuations in the market. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0056] Figure 1 It is a flow chart of a management method for power generation enterprises and power consumption enterprises shown in one embodiment of the present application;

[0057] Figure 2 A schematic diagram of mapping transaction data into two-dimensional coordinates in an embodiment of the present application;

[0058] Figure 3 is a schematic diagram of a single-cycle demand histogram in an embodiment of the present application;

[0059] Figure 4 A schematic diagram of a periodic electricity price histogram in an embodiment of the present application;

[0060] Figure 5 This is a schematic diagram of the overall demand change curve in an embodiment of the present application;

[0061] Figure 6 Schematic diagram of electricity price fluctuation curve in one embodiment of the present application.

[0062] Figure 7 It is a structural diagram of a management system for power generation enterprises and power consumption enterprises shown in one embodiment of the present application;

[0063] Figure 8 A schematic diagram of the structure of a computer system suitable for implementing an electronic device of an embodiment of the present application is shown. DETAILED DESCRIPTION

[0064] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0065] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show the layers related to the present invention rather than being drawn according to the number, shape and size of the layers in actual implementation. In actual implementation, the type, quantity and proportion of each layer may be changed arbitrarily, and the layer layout may also be more complicated.

[0066] In the following description, numerous details are discussed to provide a more thorough explanation of embodiments of the present invention; however, it is apparent to one skilled in the art that embodiments of the present invention may be practiced without these specific details.

[0067] Figure 1 is a flow chart of a management method for power generation enterprises and power consumption enterprises shown in one embodiment of the present application, such as Figure 1 As shown: A management method for power generation enterprises and power consumption enterprises in this embodiment may include steps S110 to S130:

[0068] S110, obtaining overall transaction data of the power trading center in multiple time periods, power generation capacity data of multiple power generation enterprises in the power trading center, individual transaction data of multiple power generation enterprises in the power trading center, and individual transaction data of multiple power users in the power trading center, wherein the overall transaction data and individual transaction data both include power supply quantity, power supply time period, and price of multiple transactions;

[0069] The power generation of power generation enterprises will show cyclical changes. The total power generation has obvious seasonality. It reaches a peak in January and February every year, mainly because of the high demand for electricity in winter. There is a small peak in July and August every year, which is due to the increase in residents' demand caused by high temperatures, and because the proportion of residents' electricity consumption continues to increase, this demand has been particularly prominent in recent years.

[0070] Electricity users also experience cyclical changes, which are usually related to a variety of factors such as the company's production cycle, economic activity level, seasonal and climatic conditions.

[0071] The time period in this application can be one year, and the overall transaction data, the power generation capacity data of multiple power generation companies, the individual transaction data of multiple power generation companies in the power trading center, and the individual transaction data of multiple power users in the power trading center are counted in units of one year.

[0072] Specifically, power transaction data generally includes the start time and end time of power supply, i.e., the duration of power supply, as well as the total power supply and unit price. Power generation capacity data generally includes power generation per unit time in multiple time periods. The individual transaction data of multiple power generation companies are the transaction data sold by power generation companies to power trading centers, and the individual transaction data of multiple power users are the transaction data sold by power trading centers to power users.

[0073] S120, based on the above data, this process constructs an overall demand change curve, an electricity price fluctuation curve, an overall power generation capacity change curve, an individual demand change curve, and an individual supply change curve; the details are as follows:

[0074] (1) constructing an overall demand change curve and an electricity price fluctuation curve of the power trading center within a time period based on the overall transaction data, including:

[0075] S1201, creating a two-dimensional coordinate system of a time period, wherein the horizontal axis of the two-dimensional coordinate system is a time axis, the vertical axis of the two-dimensional coordinate system is an electricity quantity axis and an electricity price axis, and the time axis includes a plurality of unit times;

[0076] S1202, mapping the overall transaction data to the two-dimensional coordinate system to obtain an overall histogram, wherein the overall histogram includes the total demand amount and average price of multiple unit times;

[0077] Among them, the mapping construction method of the overall histogram includes:

[0078] S12021, dividing the overall transaction data into overall data units of a plurality of time periods, wherein the overall data unit of each time period corresponds to a two-dimensional coordinate system;

[0079] Figure 2 Schematic diagram of mapping transaction data into two-dimensional coordinates in an embodiment of the present application, such as Figure 2 As shown, the horizontal axis of each two-dimensional coordinate system is divided into multiple unit times, which can be one day or one week. Multiple unit times form a time axis with a total length of one year. Thus, a complete overall data unit can be mapped to the two-dimensional coordinate.

[0080] S12022, for each transaction data in each overall data unit, determine its horizontal axis coordinate based on the power supply time period; decompose the power supply amount into multiple unit times corresponding to the power supply time period in equal proportion to obtain multiple power level line segments; and convert the power price amplitude into multiple unit times corresponding to the power supply time period to obtain multiple power price level line segments;

[0081] For example, if a transaction data stipulates that 120,000 kWh of electricity will be supplied from March to April, then in the corresponding coordinate system, the power supply corresponding to February to April is divided into 61 (days) of unit time, and the vertical coordinate of the electricity quantity of the horizontal line segment corresponding to each unit time is 120,000 kWh / 61. Thus, multiple horizontal line segments of electricity quantity are obtained. Since the electricity price is a unit price, the unit price specified in the transaction data is directly used as the vertical coordinate of the electricity price of all horizontal line segments as the unit price. Thus, two sets of histograms reflecting the transaction data electricity quantity and unit price are formed. Since there are multiple transaction data, there may be multiple horizontal line segments of electricity quantity and multiple horizontal line segments of electricity price corresponding to the same unit time.

[0082] S12023, summing and merging any horizontal line segments of electricity quantity on the same horizontal coordinate to obtain a single-cycle demand histogram; and merging any mean values ​​of horizontal line segments of electricity price on the same horizontal coordinate to obtain a single-cycle electricity price histogram;

[0083] Figure 3 is a schematic diagram of a single-cycle demand histogram in an embodiment of the present application, Figure 4 is a schematic diagram of a periodic electricity price histogram in an embodiment of the present application, such as Figure 3-Figure 4 As shown, there may be multiple transaction data in each time period, so this application sums the electricity at the same time coordinate and averages the electricity price to obtain a single-period demand histogram and a single-period electricity price histogram.

[0084] S12024, merge the means of the horizontal line segments of the electricity quantity at the same horizontal coordinate in multiple single-cycle demand histograms to obtain an overall demand histogram; and merge the means of the horizontal line segments of the electricity price at the same horizontal coordinate in multiple single-cycle electricity price histograms to obtain an overall electricity price histogram.

[0085] In each time period, there are two sets of histograms reflecting the electricity volume and unit price of transaction data. This application needs to find the average value of the data of multiple time periods, that is, to find the average value of the data with the same time coordinates in multiple single-cycle demand histograms and multiple single-cycle electricity price histograms, so as to obtain the overall electricity price histogram.

[0086] S1203, fitting the overall histogram to obtain an overall demand change curve and an electricity price fluctuation curve.

[0087] Figure 5Schematic diagram of the overall demand change curve in an embodiment of the present application. Figure 6 Schematic diagram of electricity price fluctuation curve in one embodiment of the present application. Figure 5 and Figure 6 The curve in is fitted based on a histogram of one period.

[0088] In this application, the center point of each line segment in the overall demand histogram and the overall electricity price histogram is first extracted, and then the least squares method is used to fit multiple center points in the overall demand histogram or the overall electricity price histogram to obtain the overall demand change curve and the electricity price fluctuation curve.

[0089] (2) constructing a curve of the overall power generation capacity change of the power trading center within a time period based on the power generation capacity data of the plurality of power generation enterprises, including:

[0090] S1211, summing the power generation at the same power generation time in the power generation capacity data of the multiple power generation enterprises to obtain multiple power generation times and the total power generation at the multiple times;

[0091] Among them, the power generation capacity data refers to the amount of electricity that a power generation enterprise can produce every day. Some enterprises, such as hydropower enterprises, are affected by the flood season and the dry season, and wind power enterprises are also affected by the wind season, so the power generation capacity throughout the year is different. These data can be obtained from enterprise reports.

[0092] S1212, mapping the multiple power generation times and the total power generation at the multiple times into a two-dimensional coordinate system and fitting them to obtain a curve of the overall power generation capacity change of the power trading center within the time period.

[0093] This application calculates the total power generation in units of days, and then maps it to a two-dimensional coordinate system for fitting, so as to obtain the overall power generation capacity change curve of the power trading center within the time period. The fitting method is the same as the previous one, that is, extracting the center point of each line segment, and then fitting multiple center points using the least squares method.

[0094] (3) constructing an individual demand change curve for each power-consuming enterprise based on the individual transaction data of the plurality of power-consuming enterprises; or constructing an individual supply change curve for each power-generating enterprise based on the individual transaction data of the plurality of power-generating enterprises, including:

[0095] S1221, creating a two-dimensional coordinate system of a time period, wherein the horizontal axis of the two-dimensional coordinate system is a time axis, the vertical axis of the two-dimensional coordinate system is an electric quantity axis, and the time axis includes a plurality of unit times;

[0096] S1222, dividing the individual transaction data of the electricity user or the individual transaction data of the power generation enterprise into individual data units of multiple time periods, wherein the individual data unit of each time period corresponds to a two-dimensional coordinate system;

[0097] S1223, for each transaction data of each individual data unit, determine its horizontal axis coordinate based on the power supply time period; decompose the power supply amount into multiple unit times corresponding to the power supply time period in equal proportion, and obtain multiple power level line segments;

[0098] S1224, summing and merging any horizontal line segments of electricity at the same horizontal coordinate to obtain a single-period individual demand histogram or a single-period individual supply histogram;

[0099] S1225, merging the means of the horizontal line segments of the electric quantity at the same horizontal coordinate in the multiple single-period individual demand histograms to obtain the individual demand histogram; or merging the means of the horizontal line segments of the electric quantity at the same horizontal coordinate in the multiple single-period individual supply histograms to obtain the individual supply histogram;

[0100] S1226, fitting the individual demand histogram or the individual supply histogram to obtain an individual demand change curve or an individual supply change curve.

[0101] Among them, the construction of the individual demand change curve and the individual supply change curve is consistent with the construction principle of the overall demand change curve in the previous article. Please refer to the principles described in the previous article for understanding.

[0102] S130, comparing the transaction power change curve with the overall power generation capacity change curve to obtain a capacity surplus interval; and determining a capacity shortage interval based on the electricity price fluctuation curve;

[0103] In the power trading center, power generation companies first connect to the grid to generate electricity and ensure future power supply capacity before trading. Therefore, the amount of electricity traded is actually the demand of the power user. Therefore, by comparing the change curve of the amount of electricity traded with the change curve of the overall power generation capacity, the mismatch interval can be determined from the demand side and the supply side.

[0104] Among them, the mismatched intervals include excess capacity intervals and insufficient capacity intervals. The excess capacity interval refers to the interval where electricity supply is obviously greater than electricity demand, and the insufficient capacity interval refers to the interval where electricity supply is obviously less than electricity demand.

[0105] In the power trading model, power generation enterprises need to connect to the grid before trading. Therefore, it is impossible to obtain the capacity shortage interval through the trading power change curve and the overall power generation capacity change curve. Therefore, in this application, the peak interval of electricity price in the price fluctuation curve is used to determine the capacity shortage interval.

[0106] The specific process of determining the excess capacity range includes:

[0107] S1301, mapping the transaction power change curve and the overall power generation capacity change curve to the same coordinate system;

[0108] S1302, calculating the difference between the power generation in the overall power generation capacity change curve and the transaction power in the transaction power change curve under the same time period coordinates, and marking the time period coordinates when the difference is greater than a preset threshold;

[0109] S1303: When there are multiple marked time period coordinates that are continuous and the total length is greater than a preset time threshold, the multiple marked time period coordinates are used as excess capacity intervals.

[0110] In this embodiment, by scanning the transaction power change curve and the overall power generation capacity change curve, the difference between the overall power generation capacity change curve and the transaction power change curve is calculated coordinate by coordinate, and then the time period when the difference is greater than the preset threshold is regarded as the time period when the power supply is significantly greater than the power demand. Finally, when the time period is continuous and long enough, it is regarded as the excess capacity interval.

[0111] The process of determining the capacity deficit interval includes:

[0112] S1311, obtaining a reference electricity price, and constructing an electricity price reference line based on a specific multiple of the reference electricity price, wherein the specific multiple is greater than 1;

[0113] S1312: Map the electricity price reference line to the electricity price fluctuation curve, and use the time period corresponding to the portion of the electricity price fluctuation curve that is above the electricity price reference line as a capacity shortage interval.

[0114] This application uses a price reference line with a height that is a specific multiple of the reference price to intercept the capacity shortage interval. The time period corresponding to the part where the price rises above the price reference line is taken as the capacity shortage interval.

[0115] S140, matching the excess capacity interval with the individual demand change curve of each power-consuming enterprise to obtain a target power-consuming enterprise; and matching the insufficient capacity interval with the individual supply change curve of each power-generating enterprise to obtain a target power-generating enterprise;

[0116] The specific matching process includes:

[0117] S141, extracting the trough interval and peak interval of the individual demand change curve of each power user; and extracting the trough interval and peak interval of the individual supply change curve of each power generation enterprise;

[0118] The trough interval and the peak interval can be obtained by calculating the gradient of each coordinate, finding the inflection point, and taking the intervals corresponding to the maximum inflection point and the minimum inflection point as the peak interval and the trough interval.

[0119] S142, any power consuming enterprise whose trough interval of any individual demand change curve overlaps with the excess capacity interval, or whose peak interval overlaps with the insufficient capacity interval, and the overlapping time exceeds the preset time length threshold is taken as the target power consuming enterprise; and any power generating enterprise whose trough interval of any individual supply change curve overlaps with the insufficient capacity interval, or whose peak interval overlaps with the excess capacity interval, and the overlapping time exceeds the preset time length threshold is taken as the target power generating enterprise.

[0120] (1) When the low-peak interval and the overcapacity interval of the power user overlap, and the overlapping time exceeds the preset time length threshold, it means that the power user does not produce efficiently during the time period when the power trading center has sufficient electricity. In this case, the target power user may be affected by low-cost electricity and transfer production to the overcapacity interval for production, which can reduce production costs and fill the low-peak period of electricity consumption.

[0121] (2) When the peak interval and the insufficient capacity interval of the power user overlap, and the overlapping time exceeds the preset time length threshold, it means that the power user conducts large-scale production when the power trading center is short of electricity. In this case, the target power user may be affected by low-cost electricity and transfer part of its production out of the insufficient capacity interval to reduce production costs. While reducing production costs, it can also play a role in eliminating peak electricity consumption.

[0122] (3) When the low-peak interval and insufficient-capacity interval of a power generation enterprise overlap, and the overlapping time exceeds the preset time length threshold, it means that the power generation enterprise did not generate large-scale power when the power trading center was in short supply. In this case, the target power generation enterprise may be affected by the high purchase price, increase the power production, increase the power generation enterprise's profits, and fill the low-peak period of power generation.

[0123] (4) When the peak interval of a power generation enterprise overlaps with the excess capacity interval, and the overlapping time exceeds the preset time length threshold, it means that the power generation enterprise is producing efficiently during the time period when the power trading center has sufficient electricity. In this case, the target power generation enterprise may be affected by the high purchase price, reduce the power production, reduce the production cost of the power generation enterprise, and also play the role of eliminating the peak period of power generation.

[0124] S150: guiding and managing the target electricity-consuming enterprise and the target power-generating enterprise.

[0125] Guide management includes:

[0126] Guide and manage the production expansion of the target electricity consuming enterprise in the excess capacity interval, or guide and manage the production contraction of the target electricity consuming enterprise in the insufficient capacity interval; and guide and manage the production expansion of the target power generating enterprise in the insufficient capacity interval, or guide and manage the production contraction of the target power generating enterprise in the excess capacity interval; wherein the guidance and management methods include electricity price adjustment and making expansion suggestions.

[0127] A management method for power generation enterprises and power users of the present invention obtains the overall transaction data of the power trading center in multiple time periods, the power generation capacity data of multiple power generation enterprises in the power trading center, the individual transaction data of multiple power generation enterprises in the power trading center, and the individual transaction data of multiple power users in the power trading center; and constructs the overall demand change curve, the electricity price fluctuation curve, the overall power generation capacity change curve, the individual demand change curve, and the individual supply change curve based on the above data. By comparing the overall demand change curve and the overall power generation capacity change curve, the overall capacity surplus interval can be obtained, and then the capacity shortage interval can be obtained from the electricity price of the electricity price fluctuation curve. Then, by comparing the individual supply change curve of each power generation enterprise and the individual demand change curve of each power user, the target enterprise that causes power supply and power price fluctuations can be analyzed, and then the target enterprise is targeted for guidance and management. Targeted guidance has a higher success rate, thereby effectively reducing power supply and power price fluctuations in the market.

[0128] like Figure 7 As shown, the present application also provides a management system for power generation enterprises and power consumption enterprises, including:

[0129] An acquisition module is used to acquire the overall transaction data of the power trading center in multiple time periods, the power generation capacity data of multiple power generation enterprises in the power trading center, the individual transaction data of multiple power generation enterprises in the power trading center, and the individual transaction data of multiple power users in the power trading center, wherein the overall transaction data and the individual transaction data both include the power supply amount, power supply time period and price of multiple transactions;

[0130] A curve construction module, for constructing an overall demand change curve and an electricity price fluctuation curve of a power trading center within a time period based on the overall transaction data; constructing an overall power generation capacity change curve of a power trading center within a time period based on the power generation capacity data of the multiple power generation enterprises; constructing an individual demand change curve of each power user enterprise based on the individual transaction data of the multiple power users; and constructing an individual supply change curve of each power user enterprise based on the individual transaction data of the multiple power users;

[0131] A comparison module, used to compare the transaction power change curve with the overall power generation capacity change curve to obtain a capacity surplus interval; and determine a capacity shortage interval based on the electricity price fluctuation curve;

[0132] A matching module, used to match the excess capacity interval with the individual demand change curve of each power-consuming enterprise to obtain a target power-consuming enterprise; and to match the insufficient capacity interval with the individual supply change curve of each power-generating enterprise to obtain a target power-generating enterprise;

[0133] A management module is used to guide and manage the target electricity-consuming enterprise and the target power-generating enterprise.

[0134] A management system for power generation enterprises and power users of the present invention obtains the overall transaction data of the power trading center in multiple time periods, the power generation capacity data of multiple power generation enterprises in the power trading center, the individual transaction data of multiple power generation enterprises in the power trading center, and the individual transaction data of multiple power users in the power trading center; and constructs the overall demand change curve, the electricity price fluctuation curve, the overall power generation capacity change curve, the individual demand change curve, and the individual supply change curve based on the above data. By comparing the overall demand change curve and the overall power generation capacity change curve, the overall capacity surplus interval can be obtained, and then the capacity shortage interval can be obtained from the electricity price of the electricity price fluctuation curve. Then, by comparing the individual supply change curve of each power generation enterprise and the individual demand change curve of each power user, the target enterprise that causes power supply and power price fluctuations can be analyzed, and then the target enterprise is targeted for guidance and management. Targeted guidance has a higher success rate, thereby effectively reducing power supply and power price fluctuations in the market.

[0135] Figure 8 The structure diagram of the computer system suitable for implementing the electronic device of the embodiment of the present application is shown. It should be noted that: Figure 8 The computer system 800 of the electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0136] like Figure 8As shown, the computer system 800 includes a central processing unit (CPU) 801, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 802 or the program loaded from the storage part 808 to the random access memory (RAM) 803, such as executing the method in the above embodiment. In the RAM 803, various programs and data required for system operation are also stored. The CPU 801, ROM 802 and RAM 803 are connected to each other through a bus 804. The input / output (I / O) interface 805 is also connected to the bus 804.

[0137] The following components are connected to the I / O interface 805: an input section 806 including a keyboard, a mouse, etc.; an output section 807 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker; a storage section 808 including a hard disk, etc.; and a communication section 809 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 809 performs communication processing via a network such as the Internet. A drive 810 is also connected to the I / O interface 805 as needed. A removable medium 811, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 810 as needed so that a computer program read therefrom is installed into the storage section 808 as needed.

[0138] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a computer program for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication section 809, and / or installed from a removable medium 811. When the computer program is executed by a central processing unit (CPU) 801, various functions defined in the system of the present application are executed.

[0139] It should be noted that the computer-readable medium shown in the embodiment of the present application can be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium can be, for example, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, wherein a computer-readable computer program is carried. This propagated data signal can take a variety of forms, including but not limited to an electromagnetic signal, an optical signal, or any suitable combination of the above. A computer-readable signal medium may also be any computer-readable medium other than a computer-readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. A computer program contained on a computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wired, etc., or any suitable combination of the above.

[0140] The flowchart and block diagram in the accompanying drawings illustrate the possible architecture, functions and operations of the system, method and computer program product according to various embodiments of the present application. Wherein, each box in the flowchart or block diagram can represent a module, a program segment, or a part of the code, and the above-mentioned module, program segment, or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flowchart, and the combination of boxes in the block diagram or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0141] The units involved in the embodiments described in this application may be implemented by software or hardware, and the units described may also be set in a processor. The names of these units do not, in some cases, constitute limitations on the units themselves.

[0142] Another aspect of the present application provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor of a computer, the computer executes the above method. The computer-readable storage medium may be included in the electronic device described in the above embodiment, or may exist independently without being assembled into the electronic device.

[0143] Another aspect of the present application also provides a computer program product or a computer program, which includes a computer instruction stored in a computer-readable storage medium. A processor of a computer device reads the computer instruction from the computer-readable storage medium, and the processor executes the computer instruction, so that the computer device executes the method provided in each of the above embodiments.

[0144] The above embodiments are only preferred embodiments for fully illustrating the present application, and the protection scope of the present application is not limited thereto. Any equivalent substitution or change made by a person skilled in the art based on the present application is within the protection scope of the present application.

Claims

1. A management method for power generation enterprises and power consumption enterprises, characterized in that: Includes steps: Obtaining the overall transaction data of the power trading center in multiple time periods, the power generation capacity data of multiple power generation enterprises in the power trading center, the individual transaction data of multiple power generation enterprises in the power trading center, and the individual transaction data of multiple power users in the power trading center, wherein the overall transaction data and the individual transaction data both include the power supply amount, power supply time period, and price of multiple transactions; Based on the overall transaction data, construct an overall demand change curve and electricity price fluctuation curve of the power trading center within a time period; based on the power generation capacity data of the multiple power generation enterprises, construct an overall power generation capacity change curve of the power trading center within a time period; based on the individual transaction data of the multiple power users, construct an individual demand change curve of each power user; and based on the individual transaction data of the multiple power users, construct an individual supply change curve of each power user; Compare the transaction power change curve with the overall power generation capacity change curve to obtain the excess capacity interval; and determine the insufficient capacity interval based on the electricity price fluctuation curve; Matching the excess capacity interval with the individual demand change curve of each power-consuming enterprise to obtain the target power-consuming enterprise; and matching the insufficient capacity interval with the individual supply change curve of each power-generating enterprise to obtain the target power-generating enterprise; Provide guidance and management for the target electricity-consuming enterprises and the target power-generating enterprises.

2. A management method for power generation enterprises and power consumption enterprises according to claim 1, characterized in that: Based on the overall transaction data, an overall demand change curve and an electricity price fluctuation curve of the power trading center within a time period are constructed, including: Creating a two-dimensional coordinate system of a time period, wherein the horizontal axis of the two-dimensional coordinate system is a time axis, the vertical axis of the two-dimensional coordinate system is an electricity quantity axis and an electricity price axis, and the time axis includes multiple unit times; Mapping the overall transaction data to the two-dimensional coordinate system to obtain an overall histogram, wherein the overall histogram includes the total demand amount and the average price of multiple unit times; The overall histogram is fitted to obtain an overall demand change curve and an electricity price fluctuation curve.

3. A management method for power generation enterprises and power consumption enterprises according to claim 2, characterized in that: The overall histogram includes an overall demand histogram and an overall electricity price histogram, wherein the overall transaction data is mapped into the two-dimensional coordinate system to obtain an overall histogram, including: Dividing the overall transaction data into overall data units of a plurality of time periods, wherein each overall data unit of the time period corresponds to a two-dimensional coordinate system; For each transaction data in each overall data unit, its horizontal axis coordinate is determined based on the power supply time period; the power supply is proportionally decomposed into multiple unit times corresponding to the power supply time period to obtain multiple power level line segments; and the power price amplitude is decomposed into multiple unit times corresponding to the power supply time period to obtain multiple power price level line segments; The sum of any horizontal line segments of electricity quantity on the same horizontal coordinate is combined to obtain a single-period demand histogram; and the mean of any horizontal line segments of electricity price on the same horizontal coordinate is combined to obtain a single-period electricity price histogram; The average values ​​of the horizontal line segments of the electricity quantity at the same horizontal coordinate in multiple single-period demand histograms are merged to obtain the overall demand histogram; and the average values ​​of the horizontal line segments of the electricity price at the same horizontal coordinate in multiple single-period electricity price histograms are merged to obtain the overall electricity price histogram.

4. A management method for power generation enterprises and power consumption enterprises according to claim 1, characterized in that: Constructing a curve of overall power generation capacity change of the power trading center within a time period based on the power generation capacity data of the plurality of power generation enterprises, including: summing the power generation at the same power generation time in the power generation capacity data of the multiple power generation enterprises to obtain multiple power generation times and the total power generation at the multiple times; The multiple power generation times and the total power generation at the multiple times are mapped into a two-dimensional coordinate system and fitted to obtain a curve of the overall power generation capacity change of the power trading center within the time period.

5. A management method for power generation enterprises and power consumption enterprises according to claim 1, characterized in that: Constructing an individual demand change curve for each power consuming enterprise based on the individual transaction data of the plurality of power consuming enterprises, or constructing an individual supply change curve for each power generating enterprise based on the individual transaction data of the plurality of power generating enterprises, including: Creating a two-dimensional coordinate system of a time period, wherein the horizontal axis of the two-dimensional coordinate system is a time axis, the vertical axis of the two-dimensional coordinate system is an electric quantity axis, and the time axis includes a plurality of unit times; Dividing the individual transaction data of the electricity-consuming enterprise or the individual transaction data of the power generation enterprise into individual data units of multiple time periods, wherein the individual data unit of each time period corresponds to a two-dimensional coordinate system; For each transaction data of each individual data unit, determine its horizontal axis coordinate based on the power supply time period; decompose the power supply amount into multiple unit times corresponding to the power supply time period in equal proportion to obtain multiple power level line segments; Sum and merge any horizontal line segments of electricity at the same horizontal coordinate to obtain a single-period individual demand histogram or a single-period individual supply histogram; The average values ​​of the horizontal line segments of the electricity at the same horizontal coordinate in multiple single-period individual demand histograms are merged to obtain an individual demand histogram; or the average values ​​of the horizontal line segments of the electricity at the same horizontal coordinate in multiple single-period individual supply histograms are merged to obtain an individual supply histogram; The individual demand histogram or the individual supply histogram is fitted to obtain an individual demand change curve or an individual supply change curve.

6. A management method for power generation enterprises and power consumption enterprises according to claim 1, characterized in that: Compare the transaction power change curve with the overall power generation capacity change curve to obtain the excess capacity interval, including: Mapping the transaction power change curve and the overall power generation capacity change curve to the same coordinate system; Calculate the difference between the power generation in the overall power generation capacity change curve and the transaction power in the transaction power change curve under the same time period coordinates, and mark the time period coordinates when the difference is greater than a preset threshold; When there are multiple marked time period coordinates that are continuous and the total length is greater than a preset time threshold, the multiple marked time period coordinates are used as excess capacity intervals.

7. A management method for power generation enterprises and power consumption enterprises according to claim 1, characterized in that: Based on the electricity price fluctuation curve, the capacity shortage interval is determined, including: Obtain a reference electricity price, and construct an electricity price reference line based on a specific multiple of the reference electricity price, wherein the specific multiple is greater than 1; The electricity price reference line is mapped to the electricity price fluctuation curve, and a time period corresponding to a portion of the electricity price fluctuation curve located above the electricity price reference line is used as a capacity shortage interval.

8. A management method for power generation enterprises and power consumption enterprises according to claim 1, characterized in that: Matching the excess capacity interval with the individual demand change curve of each electricity user to obtain the target electricity user; And the capacity shortage interval is matched with the individual supply change curve of each power generation enterprise to obtain the target power generation enterprise, including: Extracting the trough interval and the peak interval of the individual demand change curve of each electricity user; and extracting the trough interval and the peak interval of the individual supply change curve of each power generation enterprise; The power consuming enterprises whose trough interval of any individual demand change curve overlaps with the excess capacity interval, or whose peak interval overlaps with the insufficient capacity interval, and whose overlapping time exceeds the preset time length threshold are taken as target power consuming enterprises; and the power generating enterprises whose trough interval of any individual supply change curve overlaps with the insufficient capacity interval, or whose peak interval overlaps with the excess capacity interval, and whose overlapping time exceeds the preset time length threshold are taken as target power generating enterprises.

9. A management method for power generation enterprises and power consumption enterprises according to claim 1, characterized in that: Conducting guidance and management on the target electricity-consuming enterprises and the target power-generating enterprises, including: Guide and manage the production expansion of the target electricity consuming enterprise in the excess capacity interval, or guide and manage the production contraction of the target electricity consuming enterprise in the insufficient capacity interval; and guide and manage the production expansion of the target power generating enterprise in the insufficient capacity interval, or guide and manage the production contraction of the target power generating enterprise in the excess capacity interval; wherein the guidance and management methods include electricity price adjustment and making expansion suggestions.

10. A management system for power generation enterprises and power consumption enterprises, characterized in that: include: An acquisition module is used to acquire the overall transaction data of the power trading center in multiple time periods, the power generation capacity data of multiple power generation enterprises in the power trading center, the individual transaction data of multiple power generation enterprises in the power trading center, and the individual transaction data of multiple power users in the power trading center, wherein the overall transaction data and the individual transaction data both include the power supply amount, power supply time period and price of multiple transactions; A curve construction module, for constructing an overall demand change curve and an electricity price fluctuation curve of a power trading center within a time period based on the overall transaction data; constructing an overall power generation capacity change curve of a power trading center within a time period based on the power generation capacity data of the multiple power generation enterprises; constructing an individual demand change curve of each power user enterprise based on the individual transaction data of the multiple power users; and constructing an individual supply change curve of each power user enterprise based on the individual transaction data of the multiple power users; A comparison module, used to compare the transaction power change curve with the overall power generation capacity change curve to obtain a capacity surplus interval; and determine a capacity shortage interval based on the electricity price fluctuation curve; A matching module, used to match the excess capacity interval with the individual demand change curve of each power-consuming enterprise to obtain a target power-consuming enterprise; and to match the insufficient capacity interval with the individual supply change curve of each power-generating enterprise to obtain a target power-generating enterprise; A management module is used to guide and manage the target electricity-consuming enterprise and the target power-generating enterprise.