Soil water retention sand as well as preparation method and application thereof

By forming a mixed coating of zinc stearate and polyethylene wax on the surface of sandy soil particles and bonding hydrophobic aerogel, hydrophobic granular soil water-retaining sand is prepared, which solves the problem of tree planting in the desert and achieves moisture Retention and soil breathability are improved, suitable for planting of desert or poor water retention soil.

CN118879335APending Publication Date: 2024-11-01HENAN XIANCHUANG MATERIAL R & D CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410904117.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

It is difficult to plant trees and forests in desert environments. The existing water retention agents are poor in breathability and large in use, so they cannot be widely used.

Method used

A kind of soil water-retaining sand is used to form a mixed coating of zinc stearate and polyethylene wax on the surface of sand particles, and bond hydrophobic aerogel to form a hydrophobic granular soil water-retaining sand, maintaining breathability and impermeable water permeability for desert or poor water retention soil cultivation.

Benefits of technology

It realizes effective water retention in the desert, provides the moisture and oxygen required by plants, improves soil breathability, and reduces moisture infiltration. It is suitable for planting deserts or soils with poor water retention, and is used in small amounts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118879335A_ABST
    Figure CN118879335A_ABST
Patent Text Reader

Abstract

The invention discloses soil water retention sand which comprises the following components in parts by mass: 3-8 parts of hydrophobic aerogel, 3-10 parts of polyethylene wax, 5-10 parts of zinc stearate and 1000 parts of sandy soil, wherein a coating layer is arranged on the particle surface of the sandy soil, the coating layer is a mixture of zinc stearate and polyethylene wax, and the hydrophobic aerogel is adhered to the periphery of the coating layer; the sandy soil is granular, and the particle size is 0.25-1.0 mm; the hydrophobic aerogel is powdery, and the particle size of the hydrophobic aerogel is 10 nm to 10 [mu] m. The invention further discloses a preparation method of the soil water retention sand. The preparation method comprises the following steps: adding the sandy soil, the zinc stearate and the polyethylene wax into a stirrer, and heating to 130-140 DEG C while stirring; uniformly adding hydrophobic aerogel powder, and carrying out heat preservation and stirring for 10-15 minutes; and keeping stirring and cooling to 60 DEG C or below, and continuously stirring for 15-20 minutes. The invention further discloses application of the soil water-retaining sand, the soil water-retaining sand is applied to planting in desert or soil with poor water-retaining property, and the soil water-retaining sand is water-retaining, breathable and small in dosage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of desert and soil improvement, and in particular relates to soil water-retaining sand and a preparation method and application thereof. Background Art

[0002] People have taken many measures to transform the desert, but the natural conditions in the desert are harsh, a large amount of water evaporates, and the desert land is extremely loose, and a large amount of water seeps and loses. Therefore, it is extremely difficult to plant trees in such an environment as the desert. It is extremely difficult for trees to survive if they are planted and afforested by conventional methods. For this reason, people have taken many measures to plant trees in the desert, including using agricultural and forestry water retainers. This is a substance containing highly absorbent resin (powder), which can expand hundreds of times its own volume to absorb and lock water and slowly release water. As an organic high molecular polymer with a unique three-dimensional network structure, water retainers can quickly absorb and retain rainwater or irrigation water in the soil, turning it into solid water without flowing or seeping away, maintaining local constant humidity for a long time, and slowly releasing it for plants to use during droughts. It has unique water absorption, water storage, and water retention properties. However, the current water retainers have poor air permeability and large usage, and are not widely used in the field of agriculture and forestry. Summary of the invention

[0003] The purpose of the present invention is to provide a soil water-retaining sand which can keep the water required by plants in the desert, has a small dosage, good air permeability and is beneficial to soil improvement.

[0004] The technical solution of the present invention is:

[0005] A soil water-retaining sand comprises: 3-8 parts by mass of hydrophobic aerogel, 3-10 parts by mass of polyethylene wax, 5-10 parts by mass of zinc stearate, and 1000 parts by mass of sand; wherein the surface of the sand particles is provided with a coating layer, the coating layer is a mixture of the zinc stearate and the polyethylene wax, and the hydrophobic aerogel is bonded to the periphery of the coating layer; the sand is granular with a particle size of 0.25-1.0 mm; and the hydrophobic aerogel is powdery with a particle size of 10 nm-10 μm.

[0006] The main component of the soil water-retaining sand of the present invention is still sand, and it is best to obtain the material locally, and take the original sand from the desired planting site, sieve it to 0.25-1.0mm and use it. The coating layer of the mixture of zinc stearate and polyethylene wax formed on the surface of the sand is hydrophobic, and the powdery hydrophobic aerogel bonded to the periphery of the coating layer is also hydrophobic. Therefore, the soil water-retaining sand of the present invention is still granular and has hydrophobicity. In addition, the powdery hydrophobic aerogel bonded to the periphery of the coating layer is coated with a particle size of 10nm-10μm, so that the soil water-retaining sand particles are stacked on each other and do not stick to each other. After the particles made of sand with a particle size of 0.25-1.0mm are stacked into layers, there are gaps of appropriate size on the surface of the particles, so that the soil water-retaining sand particles stacked on each other form a hydrophobic surface connected to each other, which can maintain good air permeability and impermeability. When in use, a layer of the soil water-retaining sand of the present invention is spread on the bottom of the planting soil, and then the planting soil is spread to plant plants. This can prevent water in the planting soil from seeping down, and at the same time, the soil is breathable, which can provide the oxygen required for the breathing of the plant roots, and is conducive to water-retaining planting in deserts or soils with poor water retention.

[0007] When the soil water-retaining sand of the present invention is used for planting, when a certain number of years is reached, the soil quality of the planting soil can be improved due to the growth and decay of the plant root system, and the growth and decomposition of microorganisms, and the like, and the soil has a water-retaining function. When the soil quality of the planting soil is improved to a certain extent, after a good planting soil layer is formed, the soil can be deeply plowed, and the soil water-retaining sand layer of the present invention is turned over to mix the soil water-retaining sand of the present invention with the original sandy soil. After the soil water-retaining sand is mixed with the original sandy soil, the soil water-retaining sand no longer has a water-impermeable function because the particles are separated from each other. The improved planting soil at this time can already meet the growth of the plants planted, and the excess water in the planting layer can continue to infiltrate to help improve the soil quality of the lower layer, and transform the desert in depth. In addition, after the mutually separated soil water-retaining sand particles are washed and soaked in water for a long time, the coating layer is peeled off, and the zinc stearate therein is gradually degraded by microorganisms after being soaked in water, becoming a fertilizer to nourish plants.

[0008] Preferably, the hydrophobic aerogel is an oxide aerogel and / or an organic aerogel; the oxide aerogel is a silicon dioxide aerogel and / or a metal oxide aerogel.

[0009] Preferably, the metal oxide in the metal oxide aerogel is at least one of aluminum oxide, iron oxide and zinc oxide; and the organic aerogel is at least one of polyurethane aerogel, polyimide aerogel, polypropylene aerogel and polycarbonate aerogel.

[0010] The present invention also provides a method for preparing the soil water-retaining sand, comprising the following steps:

[0011] Step 1: Add sand, zinc stearate and polyethylene wax into a mixer and heat to 130-140°C while stirring; evenly add hydrophobic aerogel powder, maintain the temperature and continue stirring for 10-15 minutes;

[0012] Step 2: Keep stirring and stop heating until the temperature drops below 60°C, and continue stirring for 15-20 minutes.

[0013] In the above-mentioned preparation method of the present invention, in step 1, the sand, zinc stearate and polyethylene wax are heated under stirring. When the temperature reaches 90°C, the polyethylene wax begins to soften and melt, and adheres to the surface of the sand particles under the action of stirring; when the temperature reaches 130°C, the zinc stearate softens and melts, adheres to the surface of the sand particles under the action of stirring and gradually spreads on the surface of the sand particles. The adhered zinc stearate melt changes the wettability of the surface of the sand particles, which is conducive to the polyethylene wax to further spread and spread evenly on its surface and form a covering layer. Therefore, while maintaining the temperature and continuing to stir, a relatively complete melt film of zinc stearate and polyethylene wax is formed on the surface of the sand particles. In the process of uniformly adding hydrophobic aerogel powder in the subsequent sequence, the hydrophobic aerogel powder adheres to the surface of the melt film; the sand particles adhered with the hydrophobic aerogel powder no longer have adhesion, so particles separated from each other are obtained, thereby making sand particles with a coating layer on the surface, the coating layer is a mixture of zinc stearate and polyethylene wax, and the hydrophobic aerogel is bonded to the periphery of the coating layer. After cooling in step 2 and stirring after cooling, the sand particles with the coating layer are squeezed to make the coating layer more solid and tight, and the obtained soil water-retaining sand is piled up in particles. The hydrophobic aerogels on the outer periphery of the coating layer of the soil water-retaining sand particles are connected to each other under the accumulation of particles to form an air-permeable and water-impermeable accumulation surface, so that the soil water-retaining sand of the present invention has good air permeability and is water-impermeable when used.

[0014] Preferably, the hydrophobic aerogel powder is added in step 1 by uniformly dispersing and sprinkling or uniformly sifting, and the adding time is not less than 10 minutes.

[0015] Slowly dispersing and uniformly sprinkling or sieving the hydrophobic aerogel powder by the above method is conducive to the hydrophobic aerogel powder adhering evenly to the surface of the melt film of zinc stearate and polyethylene wax, forming a uniform hydrophobic aerogel surface, and better making the prepared soil water-retaining sand granules non-sticky, thereby having better impermeability and air permeability.

[0016] The present invention also provides an application of the soil water-retaining sand, which is used for planting water in deserts or soils with poor water-retaining properties. The soil water-retaining sand of the present invention can be used for planting trees, vegetables or crops in deserts or soils with poor water-retaining properties.

[0017] Preferably, the application of the soil water-retaining sand comprises the following steps:

[0018] Step 1: dig a hole;

[0019] Step 2: Spread the soil and water-retaining sand on the bottom of the pit, the thickness of which is more than 1 cm;

[0020] Step three: fill planting soil on top of the water-retaining sand and plant in the planting soil.

[0021] When the soil water-retaining sand of the present invention is used, a layer is laid in the dug pit to form a water-impermeable but breathable soil water-retaining sand layer, and then the pit is filled with planting soil. The planting soil can use the soil dug out from the pit, and the required fertilizer can be added thereto; the required nutrient soil can also be used, and then planting and watering are carried out. In this way, after the water is poured in the pit and infiltrates into the soil water-retaining sand layer at the bottom of the pit, the water cannot continue to infiltrate, but stays in the planting soil for plant growth and absorption. The oxygen in the air can enter the planting soil through the soil water-retaining sand layer for plant root breathing. This method is particularly suitable for large-scale planting. When planting trees, the laying thickness of the soil water-retaining sand can be 1-2 cm; when planting vegetables, the laying thickness of the soil water-retaining sand can be 20-30 cm.

[0022] Preferably, a pit is provided in the bottom of the pit, and after the bottom of the pit is covered with soil water-retaining sand, the pit is still a concave part; the thinnest part of the soil water-retaining sand covered on the surface of the concave part is not less than 1 cm thick. This scheme is convenient for small-area planting or single-pit planting, and effectively avoids excessive water seepage from the side of the pit, so that the water is retained in the concave part and will not leak all sideways. Of course, the pit can also be directly dug into a concave pot bottom shape, and the soil water-retaining sand can be evenly laid in a concave shape on the bottom to form a large pit with a complete bottom.

[0023] Preferably, the application of the soil water-retaining sand comprises the following steps:

[0024] Step 1: dig a hole;

[0025] Step 2: Spread a layer of soil and water-retaining sand at the bottom of the pit, with a thickness of at least 1 cm;

[0026] A mesh bag is made of degradable fabric; the soil and water-retaining sand is put into the mesh bag and then covered around the pit, wherein the thickness of the soil and water-retaining sand is at least 1 cm; wherein only the lower part of the pit is fully covered around the pit, and the covering height is 1 / 6-1 / 3 of the pit depth; the gaps between the mesh bags are filled with the soil and water-retaining sand;

[0027] Step three, fill the pit with planting soil and plant in the planting soil.

[0028] The above method is more convenient for laying. Keeping the perimeter 1 / 6-1 / 3 of the pit depth covered can keep water in the lower part of the pit but no water in the upper part, so that part of the plant roots absorb water in the water and part of them absorb oxygen in the planting soil for respiration, which is more conducive to plant growth.

[0029] The beneficial effects of the present invention are:

[0030] The present invention forms a covering layer by adhering zinc stearate and polyethylene wax to the surface of sand particles under heating and stirring, and then uniformly adhering hydrophobic aerogel powder to the surface, thereby forming granular soil water-retaining sand with a coating layer on the surface. The soil water-retaining sand of the present invention is breathable but not water-permeable; and the sand itself is used as the main component during its preparation, and other components are used in small amounts, and local materials can be used, making the preparation convenient. When the soil water-retaining sand of the present invention is applied to deserts or soils with excessive permeability, it only needs to be spread on the bottom layer of the planting soil to retain water, and the amount used is small; forming a breathable and water-impermeable soil water-retaining sand layer at the bottom of the planting soil can prevent the water required by the plants from excessively infiltrating, which is beneficial to the growth of the plants. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 Picture of the drip test of the soil water-retaining sand of the present invention.

[0032] Figure 2 Schematic diagram of the independent planting pit structure used in Application Example 1.

[0033] Figure 3 Schematic diagram of the interconnected planting pit structure used in Application Example 2.

[0034] Figure 4 Schematic diagram of the method of using the soil water-retaining sand used in Application Example 3.

[0035] Figure 5 Schematic diagram of the method of using the water-retaining sand for low-lying soil used in Application Example 4.

[0036] In the figure:

[0037] 1. Planting pit; 2. Planting soil; 3. Soil water-retaining sand layer; 31. Peripheral edge; 4. Mesh bag filled with soil water-retaining sand; 5. Desert sand layer; 6. Big pit. DETAILED DESCRIPTION

[0038] The present invention is described in detail below with reference to the embodiments.

[0039] Example 1

[0040] A soil water-retaining sand is prepared as follows:

[0041] Step 1: Add 1000 parts by mass of sand with a particle size of 0.25-1.0 mm, 8 parts by mass of zinc stearate and 8 parts by mass of polyethylene wax into a mixer, and heat while stirring.

[0042] After heating to 130°C, maintain the temperature at 130°C-140°C, and sieve 5 parts by weight of hydrophobic silica aerogel powder with a particle size of 10 nm-10 μm uniformly for about 12 minutes. Maintain the temperature and continue stirring for 10 minutes.

[0043] Step 2: Keep stirring and stop heating. Continue stirring for 15 minutes after the temperature drops to 50°C to obtain soil water-retaining sand.

[0044] Example 2

[0045] A soil water-retaining sand is prepared as follows:

[0046] Step 1: Add 1000 parts by mass of sand with a particle size of 0.25-1.0 mm, 5 parts by mass of zinc stearate and 10 parts by mass of polyethylene wax into a mixer, and heat while stirring.

[0047] After heating to 130°C, maintain the temperature at 130°C-140°C, and uniformly sprinkle 3 parts by mass of alumina hydrophobic aerogel powder with a particle size of 10nm-10μm for about 15 minutes. Maintain the temperature and continue stirring for 15 minutes.

[0048] Step 2: Keep stirring and stop heating. Continue stirring for 20 minutes after the temperature drops to 60°C to obtain soil water-retaining sand.

[0049] Example 3

[0050] A soil water-retaining sand is prepared as follows:

[0051] Step 1: Add 1000 parts by mass of sand with a particle size of 0.25-1.0 mm, 10 parts by mass of zinc stearate and 3 parts by mass of polyethylene wax into a mixer, and heat while stirring.

[0052] After heating to 130°C, the temperature was maintained at 130°C-140°C, and 1.5 parts by mass of iron oxide hydrophobic aerogel powder and 1.5 parts by mass of zinc oxide hydrophobic aerogel powder with a particle size of 10 nm-10 μm were sieved at a uniform speed for about 11 minutes. The temperature was maintained and stirring was continued for 10 minutes.

[0053] Step 2: Keep stirring and stop heating. Continue stirring for 15 minutes after the temperature drops to 50°C to obtain soil water-retaining sand.

[0054] Example 4

[0055] A soil water-retaining sand was prepared. The only difference between the preparation method and that in Example 1 was that the hydrophobic aerogel powder used was polyurethane aerogel powder.

[0056] Example 5

[0057] A soil water-retaining sand was prepared. The only difference between the preparation method and that in Example 1 was that the hydrophobic aerogel powder used was polyimide aerogel powder.

[0058] Example 6

[0059] A soil water-retaining sand was prepared. The only difference between the preparation method and that in Example 1 was that the hydrophobic aerogel powder used was polypropylene aerogel powder.

[0060] Example 7

[0061] A soil water-retaining sand was prepared. The only difference between the preparation method and that in Example 1 was that the hydrophobic aerogel powder used was polycarbonate aerogel powder.

[0062] Comparative Example 1

[0063] The sand with a particle size of 0.25-1.0 mm used in Example 1 was directly used as a comparative sample sand.

[0064] Comparative Example 2

[0065] A modified sandy soil was prepared. The only difference between the preparation method and Example 1 was that in step 1, no silica hydrophobic aerogel powder was added, and after zinc stearate and polyethylene wax were added and heated to 130° C., the temperature was maintained at 130° C.-140° C. and stirred for 22 minutes.

[0066] Step 2 is exactly the same as in Example 1.

[0067] Comparative Example 3

[0068] A modified sandy soil was prepared. The only difference between the preparation method and Example 1 was that in step 1, zinc stearate was not added, and the remaining steps were exactly the same as in Example 1.

[0069] Comparative Example 4

[0070] A modified sand soil was prepared. The only difference between the preparation method and Example 1 was step 1, in which no polyethylene wax was added, and the remaining steps were exactly the same as those in Example 1.

[0071] 1. Water permeability test

[0072] The water-retaining soil sand prepared in Examples 1 to 7, the comparative sample sand soil taken in Comparative Example 1, and the modified sand soil prepared in Comparative Examples 1 to 4 were tested for water permeability and air permeability according to the following methods, and the test results are recorded in Table 1.

[0073] Water permeability testing method:

[0074] 1) Water dripping test: Place a filter paper soaked in water on the bottom of a pot with holes to prevent sand from leaking out. Then fill the pot with soil water-retaining sand, modified sandy soil or comparative sample sandy soil, and dig a pit in the middle. Use a rubber-tipped dropper to drip water into the pit and observe the changes in the shape of the water droplets and the infiltration. Figure 1 This is a picture of the drip test of the soil water-retaining sand of the present invention. Figure 1 It can be seen that the soil water-retaining sand prepared by the present invention is not infiltrated by water, and the water rolls on the upper surface of the soil water-retaining sand.

[0075] 2) Permeability test: Place a filter paper soaked in water on the bottom of a pot with holes to prevent sand leakage. Then fill the pot with water-retaining sand, modified sand or comparative sample sand, and dig a circular pit in the middle. The diameter of the circular pit is about 20 cm, the depth is 10 cm, and the thickness of the sand left at the bottom is 2 cm.

[0076] Add water slowly, and place a piece of filter paper under the water adding area to prevent the sand from being washed away. Add 1 liter of water, and cover the top of the basin to prevent water from evaporating. Let it stand, observe the water seepage, and record the results in Table 1.

[0077] 2. Air permeability test:

[0078] Test the air permeability according to the 5.5.4 standard method in GB / T 2684-2009, and measure 2000cm 3 The time it takes for air to pass through the sample is shown in Table 1.

[0079] Table 1

[0080]

[0081]

[0082] It can be seen from Table 1 that:

[0083] In the water permeability test of the soil water-retaining sand prepared by the methods of the present invention in Examples 1 to 7, when water drops fall into the pits formed by the soil water-retaining sand, the water drops roll on the surface of the soil water-retaining sand without seeping down. When 1 liter of water is added to the circular pits, the water level does not drop significantly in 24 hours. The soil water-retaining sand of the present invention is impermeable and has excellent water-retaining performance.

[0084] Comparative Example 1 directly uses the sand used in Example 1 (the raw material of Example 1). In the water permeability test, when water drops into the pit formed by it, the water drops seep in immediately; when water is added to the circular pit, the water seeps in immediately, and 1 liter of water seeps in within 2 minutes. It can be seen that the raw material sand has strong water permeability and cannot retain water.

[0085] Comparative Example 2 is a modified raw material sand used in Example 1, but the difference between it and Example 1 is that no silica hydrophobic aerogel is added. In the water permeability test: when water drops fall into the pit formed by it, the water drops cannot be retained, but seeps down and disappears; when 1 liter of water is added to the circular pit, the water immediately seeps down and seeps away within 2 minutes. It can be seen that if there is no hydrophobic aerogel powder on the surface coating of the sand particles, it still cannot prevent water from seeping down well. This may be because the coating layer is not protected by the hydrophobic aerogel during preparation, and the sand adheres to each other after the zinc stearate and polyethylene wax are melted, resulting in irregular particles, and the pores in the pile are too large and permeable.

[0086] Comparative Example 3 also modified the raw material sand used in Example 1, but the difference between it and Example 1 is that zinc stearate was not added. In the water permeability test: when water drops fell into the pit formed by it, the water drops could not be retained, but seeped down immediately; when 1 liter of water was added to the circular pit, the water seeped down immediately and was completely seeped down within 2 minutes. This may be due to the fact that no zinc stearate was added, resulting in poor spreading of the polyethylene wax on the surface of the sand particles and incomplete coating, so that the sand could not be completely wrapped after bonding with the hydrophobic aerogel powder. Therefore, the modified sand is still permeable.

[0087] Comparative Example 4 also modified the raw material sand used in Example 1, but the difference between it and Example 1 is that polyethylene wax is not added. In the water permeability test: when water drops fall into the pit formed by it, the dripping water drops roll without seeping. When 1 liter of water is added to the circular pit, the water does not seep in at first, the water level drops after 12 hours, and the water level drops significantly after 24 hours. This may be because the adhesion of zinc stearate alone is not strong, resulting in the inability of the hydrophobic aerogel powder to completely wrap the sand, so the modified sand is still permeable.

[0088] Application Example 1

[0089] The soil water-retaining sand of the present invention can be used for planting trees in deserts or soils with poor water-retaining properties. Figure 2 The method of planting in the independent planting pit shown is as follows:

[0090] Step 1: first dig independent planting pits 1 in the sand layer 5 of the desert; the size and depth of the planting pits 1 can be designed according to the size of the tree to be planted.

[0091] Step 2: Spread a layer of soil and water-retaining sand at the bottom of the planting pit 1 to form a soil and water-retaining sand layer 3 with a thickness of at least 1 cm. Then use a degradable fabric to make a mesh bag; after filling the mesh bag with soil and water-retaining sand, a mesh bag 4 filled with soil and water-retaining sand is made, wherein the thickness of the soil and water-retaining sand is at least 1 cm, and then multiple mesh bags 4 filled with soil and water-retaining sand are fully spread around the lower part of the periphery of the planting pit 1, and the gaps are preferably filled with soil and water-retaining sand. The circumferential full coverage height of the mesh bag 4 filled with soil and water-retaining sand around the planting pit 1 is 1 / 6-1 / 3 of the depth of the planting pit.

[0092] Step three, fill the planting pit 1 with planting soil 2, and plant trees in the planting soil 2.

[0093] Since planting trees usually requires deeper pits and larger plant spacing, it is suitable to use independent planting pits to reduce the workload. In the method of this application example, water is poured into the planting pit 1 after planting. When the water infiltrates into the soil water-retaining sand layer 3, the water will not continue to infiltrate because the soil water-retaining sand is impermeable; since the mesh bag 4 filled with soil water-retaining sand is also impermeable, it will not leak to the side, but will be stored in the concave planting soil 2 composed of the soil water-retaining sand layer 3 and the mesh bag 4 filled with soil water-retaining sand. Only water that exceeds the height of the mesh bag 4 of the soil water-retaining sand will flow laterally. The water from rain is also properly retained in the same way. Therefore, such a planting pit can retain appropriate water and is breathable, meeting the oxygen and water required for plant growth, and has a high survival rate. In this method of planting trees in the desert, each planting pit is set up independently, and the required amount of soil water-retaining sand is also small, which is conducive to soil improvement.

[0094] Application Example 2

[0095] The soil water-retaining sand of the present invention can be used for growing vegetables or crops in deserts or soils with poor water retention. Figure 3 The method of planting in the interconnected planting pit shown is as follows:

[0096] Step 1: first dig a larger pit in the sand layer 5 of the desert, and then spread soil water-retaining sand at the bottom of the pit with a thickness of 20-30cm, or thicker, such as 50cm, to form a soil water-retaining sand layer 3, and then make several planting pits 1 on the soil water-retaining sand layer 3; the size of the planting pit 1 can be appropriately adjusted according to the type of vegetables to be planted.

[0097] Step 2, fill the planting pit 1 with planting soil 2. The planting soil 2 can be backfilled with original sand from the desert, or backfilled after adding required nutrients, or other special soil, and then grow vegetables or crops in the planting soil 2.

[0098] Since the area for growing vegetables or crops is usually large and the spacing between plants is relatively small, it is suitable to use connected planting pits to reduce the workload.

[0099] In the method of this application example, after planting, water is poured into the planting pit 1. When the water infiltrates into the soil water-retaining sand layer 3, the water will not continue to infiltrate because the soil water-retaining sand is impermeable; and because the planting pit 3 is directly made in the soil water-retaining sand layer 3, the entire operation process is also quite simple and suitable for large-scale planting. Several planting pits 1 are like multiple water storage tanks, preventing water from continuing to infiltrate the desert sand layer 5, intercepting water above the soil water-retaining sand 3 for plant growth, and the soil water-retaining sand 3 has good air permeability, which can meet the breathing needs of plant root growth.

[0100] Application Example 3

[0101] This application example is also suitable for growing vegetables or crops in deserts or soils with poor water retention. Figure 4 As shown, the method of using the soil water-retaining sand used in this application example is:

[0102] First, a relatively large pit 6 is dug in the desert sand layer 5, and then soil water-retaining sand is spread at the bottom of the pit 6, with a thickness of 20-30 cm, or thicker, such as 50 cm, to form a soil water-retaining sand layer 3. Then, near the edge of the pit 6, the soil water-retaining sand layer 3 is extended to the top of the pit 6 with a surrounding edge 31, so as to form a concave water-retaining basin-shaped pit formed by the soil water-retaining sand layer in the pit 6. Then, planting soil 2 is spread in the concave water-retaining basin-shaped pit, and planting is carried out on the planting soil 2.

[0103] In the method of this application example, after the plants are planted, water is poured into the planting pit 1. When the water infiltrates into the soil water-retaining sand layer 3, the water will not continue to infiltrate because the soil water-retaining sand is impermeable; and because the planting pit 3 is formed by extending the edge 31 directly from the soil water-retaining sand layer 3 to the top of the large pit 6, the manufacturing method is simple and suitable for large-scale planting. The entire planting pit 1 is like a large water storage tank, preventing water from continuing to infiltrate the desert sand layer 5, intercepting water above the soil water-retaining sand 3 for plant growth, and the soil water-retaining sand 3 has good air permeability, which can meet the breathing needs of plant root growth.

[0104] Application Example 4

[0105] This application example is suitable for growing vegetables or crops in a small area of ​​low-lying soil with poor water retention. Figure 5 The method of using the low-lying soil water-retaining sand shown is as follows: directly spread a soil water-retaining sand layer 3 on the desert sand layer 5, then spread planting soil 2 on the soil water-retaining sand layer 3, and plant on the planting soil 2.

[0106] The method in this application example is more convenient to directly lay the soil water-retaining sand layer 3 by using the concave land according to the situation. The soil water-retaining sand layer 3 prevents water from continuing to penetrate into the desert sand layer 5 for plant growth, and the soil water-retaining sand 3 has good air permeability, which can meet the breathing needs of plant root growth.

[0107] It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention. In addition, the technical features involved in the various embodiments of the present invention described above can be combined with each other as long as they do not conflict with each other. In addition, the above are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention.

Claims

1. A soil water-retaining sand, characterized in that: include: 3-8 parts by mass of hydrophobic aerogel, 3-10 parts by mass of polyethylene wax, 5-10 parts by mass of zinc stearate, and 1000 parts by mass of sand; wherein the surface of the sand particles has a coating layer, the coating layer is a mixture of the zinc stearate and the polyethylene wax, and the hydrophobic aerogel is bonded to the periphery of the coating layer; the sand is granular with a particle size of 0.25-1.0 mm; the hydrophobic aerogel is powdery with a particle size of 10 nm-10 μm.

2. The soil water-retaining sand according to claim 1, characterized in that: The hydrophobic aerogel is an oxide aerogel and / or an organic aerogel; the oxide aerogel is a silicon dioxide aerogel and / or a metal oxide aerogel.

3. The soil water-retaining sand as claimed in claim 2, characterized in that: The metal oxide in the metal oxide aerogel is at least one of aluminum oxide, iron oxide and zinc oxide; the organic aerogel is at least one of polyurethane aerogel, polyimide aerogel, polypropylene aerogel and polycarbonate aerogel.

4. The method for preparing soil water-retaining sand according to any one of claims 1 to 3, characterized in that: The following steps are involved: Step 1: Add sand, zinc stearate and polyethylene wax into a mixer and heat to 130-140°C while stirring; evenly add hydrophobic aerogel powder, maintain the temperature and continue stirring for 10-15 minutes; Step 2: Keep stirring and stop heating until the temperature drops below 60°C, and continue stirring for 15-20 minutes.

5. The method for preparing soil with low water retention as claimed in claim 4, characterized in that: In step 1, the hydrophobic aerogel powder is added by uniformly dispersing and sprinkling or uniformly sifting, and the adding time is not less than 10 minutes.

6. The use of the soil water-retaining sand according to any one of claims 1 to 3, characterized in that: Used for water conservation in deserts or soils with poor water retention.

7. The use of soil water-retaining sand as claimed in claim 6, characterized in that: The following steps are involved: Step 1: dig a hole; Step 2: Spread the soil water-retaining sand as claimed in any one of claims 1 to 3 on the bottom of the pit, wherein the thickness of the soil water-retaining sand is more than 1 cm; Step three: fill planting soil on top of the water-retaining sand and plant in the planting soil.

8. The use of soil water-retaining sand as claimed in claim 7, characterized in that: A pit is arranged in the bottom of the pit. After the bottom of the pit is covered with soil and water-retaining sand, the pit is still a concave part. The thinnest part of the soil and water-retaining sand covered on the surface of the concave part is not less than 1 cm thick.

9. The use of soil water-retaining sand as claimed in claim 6, characterized in that: The following steps are involved: Step 1: dig a hole; Step 2: Spread a layer of soil water-retaining sand on the bottom of the pit with a thickness of at least 1 cm; Use biodegradable fabrics to make mesh bags; After the soil and water-retaining sand is put into the mesh bag, the mesh bag is covered circumferentially to the periphery of the pit, wherein the thickness of the soil and water-retaining sand is at least 1 cm; wherein only the lower part of the periphery of the pit is fully covered circumferentially, and the covering height is 1 / 6-1 / 3 of the pit depth; the gaps between the mesh bags are filled with the soil and water-retaining sand; Step three, fill the pit with planting soil and plant in the planting soil.