Deep hole blasting method for comprehensively mastering fracture condition

By setting observation holes in deep hole blasting and using water-based fluorescence tracer technology, the crack expansion situation is comprehensively detected, and the problem of inaccurate end overhangs and crack peeping is solved, and safe and effective coal mine blasting and tunnel maintenance are achieved. , improving the safety and efficiency of coal mine production.

CN118882425AActive Publication Date: 2024-11-01SHANXI JINMEI GRP TECH RESEACH INST
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410972687.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-01
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

During the hard top coal mining process, the problem of overhanging the end of the head causes the toxic and harmful gases in the goaf to suddenly squeeze into the coal mining surface, causing safety hazards. The crack peeping results after blasting are inaccurate, which cannot effectively guide the next step of construction, affecting the coal mine Safety production.

Method used

Deep hole blasting method with a comprehensive grasp of the crack situation is adopted. By setting observation holes between the blasting holes and the observation holes, drilling peeper and water-based fluorescence tracer technology are used to conduct comprehensive detection of the crack expansion situation, and drilling parameters and blasting are adjusted. The hole interval method is used to ensure that the blasting effect meets expectations.

Benefits of technology

Effectively solve the problem of overhanging the end head, reduce the maintenance cost of adjacent tunnels, improve the accuracy and reliability of crack detection after blasting, provide effective guidance for the next step of construction, improve the safety of coal mine production safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118882425A_ABST
    Figure CN118882425A_ABST
Patent Text Reader

Abstract

The invention discloses a deep hole blasting method for comprehensively mastering fracture conditions, and belongs to the technical field of coal mine blasting mining. According to the blasting method, the blasting effect can be comprehensively detected after blasting, and the detection result can effectively guide the next site construction. According to the technical scheme, the method comprises the following steps: 1, fully investigating field production geological conditions; secondly, a row of drill holes are formed in the roof rock stratum, and the drill holes comprise blast holes and observation holes; thirdly, drilling is conducted through a drilling machine; 4, observing and recording the development condition of the original fissure in the drill hole by using a drill hole peeping instrument; 5, charging and sealing the blast hole; sixthly, blasting is conducted; 7, observing and recording the expansion conditions of cracks in all observation holes by using a drilling observation instrument; 8, performing water injection observation on all the observation holes; and ninthly, providing reference for drilling and blasting of the next section of roadway according to the observation result, and correcting initial parameters. The method is used for hard roof deep hole blasting pressure relief.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention discloses a deep hole blasting method for comprehensively understanding crack conditions, belonging to the technical field of coal mine blasting mining. Background Art

[0002] my country's coal resources are found in various forms, with hard roofs accounting for more than 30% of coal seams. In hard roof coal mining working faces, due to the support of the side walls of the coal pillars in the mining tunnel and the high-strength support of the tunnel roof at the end, the end roofs are mostly unable to fall off in time, and the end roof is prone to hanging. The sudden collapse of the end roof will suddenly squeeze the toxic and harmful gases in the goaf into the goaf and into the coal mining working face, causing safety problems in the working face; especially for high-gas mines, the gas in the goaf is suddenly squeezed into the coal mining working face, resulting in excessive gas in the working face, causing safety hazards. Seriously affect the safe production of coal mines. At the same time, the end roof suddenly breaks and collapses, and the collision between the falling rock blocks may produce sparks, posing a safety hazard of inducing gas accumulation in the goaf to explode. For working faces with multiple lanes, the end roof will also increase the mine pressure of the overlying rock strata in the goaf and transmit it to the coal pillar direction, resulting in serious deformation of adjacent lanes and heavy maintenance workload, which seriously affects the safe and efficient production of mines.

[0003] In order to solve the problem of hanging top at the end and improve the maintenance status of adjacent tunnels, it is often necessary to blast and relieve pressure on the roof. Deep hole blasting has the advantages of good pre-cracking effect, small dynamic disturbance, no excessive toxic and harmful gases, and good safety. It has gradually been widely used in the treatment of hard roofs. In order to achieve better blasting effects, a part of the blasting holes are constructed first, and the crack conditions are observed after the blasting. It is hoped that the parameters of the next blasting will be corrected according to the observed crack conditions. The current method of blasting crack inspection is to peek into the blasting holes after blasting. Limited by the peeping process and the working environment, the peeping results are often affected by water spraying, coal slag, etc., resulting in unsatisfactory results. The extension range of the cracks cannot be observed, and the crack peeping results cannot effectively guide on-site construction. Summary of the invention

[0004] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a deep hole blasting method for comprehensively understanding the crack conditions. The observation holes set apart from the blasting holes can comprehensively detect the blasting effects after blasting, and the detection results can effectively guide the next step of on-site construction.

[0005] To achieve the above object, the present invention adopts the following technical scheme, a deep hole blasting method for comprehensively understanding the crack conditions, comprising the following steps:

[0006] The first step is to fully investigate the on-site production geological conditions, systematically collect information on the mining and tunnel layout of the adjacent working face, the development of the roof rock layer and its various physical and mechanical properties, etc., to provide a basis for the setting of drilling parameters;

[0007] The second step is to take a 80-150m long tunnel and set a row of drill holes along the tunnel direction on the roof rock layer 700-1500mm away from the side of the tunnel coal pillar. The drill hole spacing is 1-3m. The drill holes include blasting holes and observation holes, and the blasting holes and observation holes are set at intervals.

[0008] The third step is to drill holes with a drill;

[0009] The fourth step is to use a borehole peep instrument to observe and record the development of primary fissures in each borehole, and at the same time, to understand the borehole collapse situation and re-drill the boreholes with collapse;

[0010] Step 5: All blasting holes are charged with blasting energy tubes, which are inserted into the blasting holes at one time and sealed with gun mud;

[0011] Step 6: blasting the blasting hole;

[0012] Step 7: After the harmful gases such as blasting smoke have dissipated, use a borehole peep instrument to observe and record the expansion of the cracks in all observation holes;

[0013] Step 8: Perform water injection observation on all observation holes, mix water-based fluorescent tracers into the water, and after the water injection is completed, use ultraviolet fluorescent lamps to observe the water seepage on the tunnel roof, judge the expansion of the cracks in the blasting holes, and grasp the expansion range of the cracks in the holes;

[0014] Step 9. The observation results of the above steps 4, 7 and 8 provide reference for the drilling parameters of the next section of the tunnel and the spacing of the blasting holes and observation holes. If the results are in line with expectations, drilling and blasting of the next section of the tunnel will be carried out. If there are deviations from expectations, the drilling parameters and the spacing of the blasting holes and observation holes will be corrected before drilling and blasting of the next section of the tunnel.

[0015] Preferably, the spacing of the blasting holes and the observation holes in the second step is as follows: every 3 or 4 blasting holes form a group, one observation hole is arranged between two groups of blasting holes, and no explosives are loaded in the observation hole.

[0016] Preferably, the diameter of the hole drilled in the second step is 40-80 mm, and the hole depth is 3-5 times the mining height.

[0017] Preferably, the borehole has a diameter of 60 mm.

[0018] Preferably, the direction of drilling in the second step is: in the tunnel cross-section view, the angle α between the drill hole and the vertical direction is 0°-15° towards the goaf, and in the tunnel centerline profile view, the angle β between the drill hole and the horizontal direction is 60°-75°.

[0019] Preferably, the charging method in the fifth step is uncoupled continuous charging, and the sealing length is 1 / 3-1 / 2 of the blasting hole depth.

[0020] Preferably, the blasting energy-focusing tube used in the fifth step is a C-type energy-focusing tube.

[0021] Preferably, when blasting the blasting holes in the sixth step, group blasting is performed, and two groups of blasting holes are detonated at one time.

[0022] Preferably, the method for performing water injection observation on the observation hole in the eighth step is:

[0023] A capsule sealer is installed in the observation hole, and water is injected into the capsule sealer. The capsule sealer is tightly attached to the hole wall to seal the observation hole. Then 3-5Mpa high-pressure water mixed with water-based fluorescent tracers is injected into the observation hole for at least 20 minutes.

[0024] Preferably, the method of conducting water injection observation on the observation hole in the eighth step also includes: determining the key observation position according to the observation result of the seventh step, installing a straddle-type expansion packer at the key observation position, first injecting water into the straddle-type expansion packer to seal the hole, and then injecting 3-5Mpa high-pressure water mixed with a water-based fluorescent tracer into the isolation section for at least 20 minutes.

[0025] Compared with the prior art, the present invention has the following beneficial effects.

[0026] 1. The present invention solves the problem of end hanging top by decompression through deep hole blasting, and at the same time protects adjacent tunnels and reduces the maintenance cost of adjacent tunnels.

[0027] 2. In the present invention, an observation hole is set between the two groups of blasting holes. No explosives are loaded in the observation hole. After blasting, the crack conditions and crack expansion range in the observation hole are observed by drilling a hole peephole and injecting water to obtain more comprehensive detection results, which provides effective guidance for the next step of on-site construction blasting.

[0028] 3. In the present invention, during water injection observation, a water-based fluorescent tracer is mixed into the water, and the water seepage of the blasting cracks on the tunnel roof can be easily observed using an ultraviolet fluorescent lamp, which can be clearly distinguished from the water dripping underground, making the detection of the extension range of the cracks after the blasting more accurate. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments are briefly introduced below.

[0030] Figure 1 This is a schematic diagram of the spacing between blasting holes and observation holes in the tunnel cross-section.

[0031] Figure 2 This is a cross-section diagram of the tunnel.

[0032] Figure 3 It is a schematic diagram of sealing and injecting water into the observation hole using a capsule sealer in the present invention.

[0033] Figure 4 It is a schematic diagram of the structure of the capsule hole sealer used in the present invention.

[0034] Figure 5 It is a schematic diagram of using a straddle expansion packer to isolate and inject water into an observation hole in the present invention.

[0035] Figure 6 It is a schematic diagram of the structure of the straddle-type expansion packer used in the present invention.

[0036] Figure 7 It is a cross-sectional view of the C-shaped energy-gathering tube used in the present invention.

[0037] In the figure: 1 is a blasting hole, 2 is an observation hole, 3 is a capsule sealer, 31 is a first capsule body, 32 is a first internal water injection pipe, 33 is a first high-pressure water injection pipe, 4 is a straddle-type expansion packer, 41 is a second capsule body, 42 is a second internal water injection pipe, 43 is a second high-pressure water injection pipe, 5 is a tunnel roof, 6 is a tunnel floor, and 7 is a coal pillar side tunnel wall. DETAILED DESCRIPTION

[0038] The technical solution of the present invention is described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] The present invention provides the following embodiments.

[0040] Embodiment 1

[0041] The present invention provides a deep hole blasting method for comprehensively understanding the crack conditions, comprising the following steps:

[0042] The first step is to fully investigate the on-site production geological conditions, systematically collect information on the mining and tunnel layout of the adjacent working face, the development of the roof rock layer and its various physical and mechanical properties, etc., to provide a basis for the setting of drilling parameters;

[0043] The second step is to take an 80m long tunnel and set a row of drill holes along the tunnel direction on the roof rock layer at a distance of 700mm from the tunnel side wall 7 of the tunnel coal pillar. The drill hole spacing is 1m. The drill holes include blasting holes 1 and observation holes 2. Every three blasting holes 1 form a group. An observation hole 2 is set between two groups of blasting holes 1. No explosives are loaded in the observation hole 2.

[0044] The diameter of the drill hole is 40 mm, and the hole depth is 3 times the mining height. Figure 1 , Figure 2 As shown, the direction of the drilling is: in the tunnel cross-section view, the angle α between the drilling hole and the vertical direction is 15° toward the goaf, and in the tunnel centerline profile view, the angle β between the drilling hole and the horizontal direction is 60°.

[0045] The third step is to drill holes with a drill;

[0046] The fourth step is to use a borehole peep instrument to observe and record the development of primary fissures in each borehole, and at the same time, to understand the borehole collapse situation and re-drill the boreholes with collapse;

[0047] Step 5: All blast holes 1 are drilled using Figure 7 The C-shaped energy-gathering tube shown is uncoupled and continuously charged, inserted into the blasting hole 1 at one time, and sealed with taphole mud, and the sealing length is 1 / 3 of the depth of the blasting hole 1;

[0048] Step 6, blasting the blasting holes 1 in groups, detonating two groups of blasting holes 1 at a time;

[0049] Step 7: After the harmful gases such as blasting smoke have dissipated, use a borehole peep instrument to observe and record the crack expansion in all observation holes 2;

[0050] Step 8: Perform water injection observation on all observation holes 2, mix water-based fluorescent tracer into the water, and after the water injection is completed, observe the water seepage on the tunnel roof with ultraviolet fluorescent light to judge the expansion of the cracks in the blasting hole 1 and grasp the expansion range of the cracks in the hole;

[0051] like Figure 3 As shown, the water injection observation is specifically as follows: a capsule sealer 3 is installed in the observation hole 2, water is injected into the capsule sealer 3, the capsule sealer 3 is tightly attached to the hole wall to seal the observation hole 2, and then 3-5Mpa high-pressure water mixed with a water-based fluorescent tracer is injected into the observation hole 2 for at least 20 minutes;

[0052] like Figure 4 As shown, the capsule sealer 3 includes a first capsule body 31, a first internal water injection pipe 32 and a first high-pressure water injection pipe 33. The first internal water injection pipe 32 is inserted into the first capsule body 31, and the water outlet is located in the first capsule body 31. The first high-pressure water injection pipe 33 runs through the first capsule body 31, and the water outlet is at the other end of the first capsule body 31.

[0053] Step 9: The observation results of the above-mentioned steps 4, 7 and 8 provide reference for the drilling parameters of the next tunnel section and the spacing mode of blasting hole 1 and observation hole 2. If the results meet expectations, the drilling and blasting of the next tunnel section will be carried out. If there is a deviation from expectations, the drilling parameters and the spacing mode of blasting hole 1 and observation hole 2 will be corrected before the drilling and blasting of the next tunnel section will be carried out.

[0054] After adjustment, the spacing between the blasting holes 1 and the observation holes 2 can be: every 2 blasting holes 1 form a group, and one observation hole 2 is set between the two groups of blasting holes 1, or: every 4 blasting holes 1 form a group, and one observation hole 2 is set between the two groups of blasting holes 1.

[0055] Embodiment 2

[0056] The present invention provides a deep hole blasting method for comprehensively understanding the crack conditions, comprising the following steps:

[0057] The first step is to fully investigate the on-site production geological conditions, systematically collect information on the mining and tunnel layout of the adjacent working face, the development of the roof rock layer and its various physical and mechanical properties, etc., to provide a basis for the setting of drilling parameters;

[0058] The second step is to take a 100m long tunnel and set a row of drill holes along the tunnel direction on the roof rock layer at a distance of 1500mm from the tunnel side wall 7 of the tunnel coal pillar. The drill holes are spaced 2m apart. The drill holes include blasting hole 1 and observation hole 2. Figure 1 As shown, every four blasting holes 1 form a group, and an observation hole 2 is set between two groups of blasting holes 1, and no explosives are loaded in the observation hole 2;

[0059] The diameter of the drill hole is 60 mm, and the hole depth is 4 times the mining height. Figure 1 , Figure 2 As shown, the direction of the drilling is: in the tunnel cross-section view, the angle α between the drilling hole and the vertical direction is 0° towards the goaf; in the tunnel centerline cross-section view, the angle β between the drilling hole and the horizontal direction is 70°.

[0060] The third step is to drill holes with a drill;

[0061] The fourth step is to use a borehole peep instrument to observe and record the development of primary fissures in each borehole, and at the same time, to understand the borehole collapse situation and re-drill the boreholes with collapse;

[0062] Step 5: All blast holes 1 are drilled using Figure 7 The C-shaped energy-gathering tube shown is uncoupled and continuously charged, inserted into the blasting hole 1 at one time, and sealed with taphole mud, and the sealing length is 1 / 3 of the depth of the blasting hole 1;

[0063] Step 6, blasting the blasting holes 1 in groups, detonating two groups of blasting holes 1 at a time;

[0064] Step 7: After the harmful gases such as blasting smoke have dissipated, use a borehole peep instrument to observe and record the crack expansion in all observation holes 2;

[0065] Step 8: Perform water injection observation on all observation holes 2, mix water-based fluorescent tracer into the water, and after the water injection is completed, observe the water seepage on the tunnel roof with ultraviolet fluorescent light to judge the expansion of the cracks in the blasting hole 1 and grasp the expansion range of the cracks in the hole;

[0066] like Figure 3 As shown, the water injection observation is specifically as follows: a capsule sealer 3 is installed in the observation hole 2, water is injected into the capsule sealer 3, the capsule sealer 3 is tightly attached to the hole wall to seal the observation hole 2, and then 3-5Mpa high-pressure water mixed with a water-based fluorescent tracer is injected into the observation hole 2 for at least 20 minutes.

[0067] The structure of the capsule hole sealer 3 is the same as that of the first embodiment;

[0068] like Figure 5 As shown, the water injection observation also includes: according to the observation result of the seventh step, determining the key observation position, installing the straddle swellable packer 4 at the key observation position, first injecting water into the straddle swellable packer 4 to seal the hole, and then injecting 3-5Mpa high-pressure water mixed with a water-based fluorescent tracer into the isolation section for at least 20 minutes;

[0069] like Figure 6 As shown, the straddle-type expansion packer 4 includes two second bladders 41, a second internal water injection pipe 42 and a second high-pressure water injection pipe 43. The two second bladders 41 are located in a straight line. The second internal water injection pipe 42 passes through one second bladder 41 and then enters the other second bladder 42. The water outlet is located inside the two second bladders 41. The second high-pressure water injection pipe 43 passes through one second bladder 42 and then is connected to the other second bladder 42. Multiple water outlets are evenly distributed on the pipe body between the two second bladders 41.

[0070] Step 9: The observation results of the above-mentioned steps 4, 7 and 8 provide reference for the drilling parameters of the next tunnel section and the spacing mode of blasting hole 1 and observation hole 2. If the results meet expectations, the drilling and blasting of the next tunnel section will be carried out. If there is a deviation from expectations, the drilling parameters and the spacing mode of blasting hole 1 and observation hole 2 will be corrected before the drilling and blasting of the next tunnel section will be carried out.

[0071] After adjustment, the spacing between the blasting holes 1 and the observation holes 2 can be: every 3 blasting holes 1 form a group, and one observation hole 2 is set between two groups of blasting holes 1, or: every 5 blasting holes 1 form a group, and one observation hole 2 is set between two groups of blasting holes 1.

[0072] Embodiment 3

[0073] The present invention provides a deep hole blasting method for comprehensively understanding the crack conditions, which is characterized by comprising the following steps:

[0074] The first step is to fully investigate the on-site production geological conditions, systematically collect information on the mining and tunnel layout of the adjacent working face, the development of the roof rock layer and its various physical and mechanical properties, etc., to provide a basis for the setting of drilling parameters;

[0075] The second step is to take a 150m long tunnel and set a row of drill holes along the tunnel direction on the roof rock layer at a distance of 1000mm from the tunnel side wall 7 of the tunnel coal pillar. The drill hole spacing is 3m. The drill holes include blasting holes 1 and observation holes 2. Every 4 blasting holes 1 form a group. An observation hole 2 is set between two groups of blasting holes 1. No explosives are loaded in the observation hole 2.

[0076] The borehole diameter is 80 mm and the hole depth is 5 times the mining height. Figure 1 , Figure 2 As shown, the direction of the drilling is: in the tunnel cross-section view, the angle α between the drilling hole and the vertical direction is 10° toward the goaf, and in the tunnel centerline profile view, the angle β between the drilling hole and the horizontal direction is 75°.

[0077] The third step is to drill holes with a drill;

[0078] The fourth step is to use a borehole peep instrument to observe and record the development of primary fissures in each borehole, and at the same time, to understand the borehole collapse situation and re-drill the boreholes with collapse;

[0079] Step 5: All blast holes 1 are drilled using Figure 7 The C-shaped energy-gathering tube shown is uncoupled and continuously charged, inserted into the blasting hole 1 at one time, and sealed with taphole mud, and the sealing length is 1 / 2 of the depth of the blasting hole 1;

[0080] Step 6, blasting the blasting holes 1 in groups, detonating two groups of blasting holes 1 at a time;

[0081] Step 7: After the harmful gases such as blasting smoke have dissipated, use a borehole peep instrument to observe and record the crack expansion in all observation holes 2;

[0082] Step 8: Perform water injection observation on all observation holes 2, mix water-based fluorescent tracer into the water, and after the water injection is completed, observe the water seepage on the tunnel roof with ultraviolet fluorescent light to judge the expansion of the cracks in the blasting hole 1 and grasp the expansion range of the cracks in the hole;

[0083] like Figure 3 As shown, the water injection observation is specifically as follows: a capsule sealer 3 is installed in the observation hole 2, water is injected into the capsule sealer 3, the capsule sealer 3 is tightly attached to the hole wall to seal the observation hole 2, and then 3-5Mpa high-pressure water mixed with a water-based fluorescent tracer is injected into the observation hole 2 for at least 20 minutes.

[0084] The structure of the capsule hole sealer 3 is the same as that of the first embodiment;

[0085] like Figure 5 As shown, the water injection observation also includes: according to the observation result of the seventh step, determining the key observation position, installing the straddle swellable packer 4 at the key observation position, first injecting water into the straddle swellable packer 4 to seal the hole, and then injecting 3-5Mpa high-pressure water mixed with a water-based fluorescent tracer into the isolation section for at least 20 minutes;

[0086] The structure of the straddle-type expansion packer 4 is the same as that of the second embodiment.

[0087] Step 9: The observation results of the above-mentioned steps 4, 7 and 8 provide reference for the drilling parameters of the next tunnel section and the spacing mode of blasting hole 1 and observation hole 2. If the results meet expectations, the drilling and blasting of the next tunnel section will be carried out. If there is a deviation from expectations, the drilling parameters and the spacing mode of blasting hole 1 and observation hole 2 will be corrected before the drilling and blasting of the next tunnel section will be carried out.

[0088] After adjustment, the spacing between the blasting holes 1 and the observation holes 2 can be: every 3 blasting holes 1 form a group, and one observation hole 2 is set between two groups of blasting holes 1, or: every 5 blasting holes 1 form a group, and one observation hole 2 is set between two groups of blasting holes 1.

[0089] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A deep hole blasting method for fully understanding the crack conditions, characterized by The following steps are involved: The first step is to fully investigate the on-site production geological conditions, systematically collect information on the mining and tunnel layout of the adjacent working face, the development of the roof rock layer and its various physical and mechanical properties, etc., to provide a basis for the setting of drilling parameters; The second step is to take a 80-150m long tunnel and set a row of drill holes along the tunnel direction on the roof rock layer 700-1500mm away from the tunnel side wall (7) of the tunnel coal pillar. The drill hole spacing is 1-3m. The drill holes include blasting holes (1) and observation holes (2). The blasting holes (1) and observation holes (2) are set at intervals. The third step is to drill holes with a drill; The fourth step is to use a borehole peep instrument to observe and record the development of primary fissures in each borehole, and at the same time, to understand the borehole collapse situation and re-drill the boreholes with collapse; Step 5: All blasting holes (1) are charged with explosive focusing tubes, which are inserted into the blasting holes (1) at one time and sealed with taphole mud; Step 6: blasting the blasting hole (1); Step 7: After the harmful gases such as blasting smoke have dissipated, use a borehole peep instrument to observe and record the crack expansion in all observation holes (2); Step 8: Perform water injection observation on all observation holes (2), mix water-based fluorescent tracer into the water, and after the water injection is completed, observe the water seepage on the tunnel roof with ultraviolet fluorescent light to determine the expansion of the cracks in the blasting hole (1) and understand the expansion range of the cracks in the hole; Step 9. The observation results of the above-mentioned steps 4, 7 and 8 provide reference for the drilling parameters of the next section of the tunnel and the spacing method of the blasting holes (1) and the observation holes (2). If the results meet expectations, the drilling and blasting of the next section of the tunnel will be carried out. If there are deviations from expectations, the drilling parameters and the spacing method of the blasting holes (1) and the observation holes (2) will be corrected before the drilling and blasting of the next section of the tunnel will be carried out.

2. A deep hole blasting method for fully understanding the crack conditions according to claim 1, characterized in that: In the second step, the blasting holes (1) and the observation holes (2) are spaced in such a manner that three or four blasting holes (1) form a group, one observation hole (2) is arranged between two groups of blasting holes (1), and no explosives are loaded in the observation hole (2).

3. A deep hole blasting method for fully understanding the crack conditions according to claim 1 or 2, characterized in that: The diameter of the drilled hole in the second step is 40-80 mm, and the hole depth is 3-5 times the mining height.

4. A deep hole blasting method for fully understanding the crack conditions according to claim 3, characterized in that: The borehole has a diameter of 60 mm.

5. A deep hole blasting method for fully understanding the crack conditions according to claim 1 or 2, characterized in that: The direction of the drilling in the second step is: in the tunnel cross-section view, the angle α between the drilling hole and the vertical direction is 0°-15° towards the goaf, and in the tunnel centerline profile view, the angle β between the drilling hole and the horizontal direction is 60°-75°.

6. A deep hole blasting method for fully understanding the crack conditions according to claim 1, characterized in that: The charging method in the fifth step is uncoupled continuous charging, and the sealing hole length is 1 / 3-1 / 2 of the depth of the blasting hole (1).

7. A deep hole blasting method for fully understanding the crack conditions according to claim 1 or 6, characterized in that: The blasting energy-focusing tube used in the fifth step is a C-type energy-focusing tube.

8. The deep hole blasting method for fully understanding the crack conditions according to claim 1 is characterized by: When blasting the blasting holes (1) in the sixth step, group blasting is performed, and two groups of blasting holes (1) are detonated at one time.

9. A deep hole blasting method for fully understanding crack conditions according to claim 1, characterized in that: The method for performing water injection observation on the observation hole (2) in the eighth step is: A capsule sealer (3) is installed in the observation hole (2), water is injected into the capsule sealer (3), and the capsule sealer (3) is tightly attached to the hole wall to seal the observation hole (2), and then 3-5Mpa high-pressure water mixed with a water-based fluorescent tracer is injected into the observation hole (2) for at least 20 minutes.

10. A deep hole blasting method for fully understanding the crack conditions according to claim 9, characterized in that: The method for water injection observation of the observation hole (2) in the eighth step also includes: determining a key observation position based on the observation results of the seventh step, installing a straddle-type expansion packer (4) at the key observation position, first injecting water into the straddle-type expansion packer (4) to seal the hole, and then injecting 3-5Mpa high-pressure water mixed with a water-based fluorescent tracer into the isolation section for at least 20 minutes.

Citation Information