Loaded coal rock drilling experiment platform and while-drilling mechanical parameter identification method
By designing the drilling experimental platform for loaded coal rocks and particle swarm optimization algorithm, real-time monitoring and analysis of the drilling process, the lag problem of traditional coal rock mechanics parameter measurement is solved, real-time identification and risk reduction of underground geological anomalies of coal mines is achieved.
Patent Information
- Application Number
- CN202410918916.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-07-10
AI Technical Summary
The traditional coal rock mechanic parameter measurement method has lag problems, making it difficult to directly and efficiently detect on site, and there is a lack of research on drilling and measurement technology, so it is impossible to effectively identify and evaluate the risks of coal and gas outbursts and impact ground pressure accidents.
Design a coal-loaded rock drilling experiment platform, use cement mortar to prepare simulated coal-rock test pieces, monitor the drilling parameters during drilling rig operation in real time through dynamic torque sensors and displacement sensors, and use improved particle swarm optimization algorithm to perform parameters Identification, eliminate measurement lag, and realize real-time data analysis and geological anomaly block recognition.
It realizes the simulation of underground coal rock storage conditions indoors, and real-time monitoring and analysis of the drilling process, improves the efficiency and accuracy of drilling parameters, enhances the safety and stability of coal mining, and reduces the risk of accidents.
Smart Images

Figure CN118883286A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mining, and in particular relates to a loaded coal and rock drilling experimental platform and a method for identifying mechanical parameters while drilling. Background Art
[0002] With the continuous increase in the depth of coal mining, the intensity and frequency of coal and gas outbursts and rock burst disasters are becoming more and more serious. Geological anomalies such as faults and sinkholes will also cause coal seams to break and coal seam conditions to deteriorate, which is also the root cause of coal and gas outbursts and rock burst accidents.
[0003] In order to prevent accidents, it is necessary to conduct an in-depth analysis of the causes of accidents. Only by analyzing the potential causes of accidents can we better identify and assess risks.
[0004] Coal rock mechanical parameters are one of the most important basic parameters of coal rock. Given the variability and complexity of natural rock mass structures, accurately determining coal rock mechanical parameters has always been an important challenge in the field of rock mechanics.
[0005] However, the traditional coal and rock mechanical parameter measurement methods have a lag problem, the project progress is easily disturbed, and it is impossible to conduct direct and efficient on-site testing. In addition, there is a lack of research on drilling and measurement integrated technology, making it difficult to conduct experiments indoors. Summary of the invention
[0006] In view of the problems existing in the prior art, the present invention provides a loaded coal rock drilling experimental platform and a method for identifying mechanical parameters while drilling. Cement mortar is used to manufacture simulated coal rock specimens, and coal rock specimens of different strengths can be prepared according to the experimental requirements; the occurrence conditions of coal rock underground can be simulated by applying confining pressure to the coal rock specimens indoors; dynamic torque sensors and displacement sensors can be used to monitor and obtain key indicators of the drilling rig during operation in real time, including thrust size, torque change, drilling speed, rotation speed and other while drilling parameters; an improved particle swarm optimization algorithm is used to identify the while drilling parameters, and the collected while drilling parameters are used as particles to improve the efficiency and accuracy of while drilling parameter identification; based on the integrated drilling and measurement technology, the present invention can collect and analyze the data generated in the drilling process in real time during the exploration operation, and use these data to invert the mechanical properties of coal rock, eliminate the measurement lag problem, ensure that the project progress is not disturbed, effectively enhance the ability of real-time identification of geological abnormal blocks in underground coal mines, effectively maintain the safety and stability of coal mining, and reduce the risk of accidents.
[0007] In order to achieve the above-mentioned object, the present invention adopts the following technical scheme: a loaded coal rock drilling experimental platform, comprising a loading unit, a drilling unit and a drilling controller; the loading unit and the drilling unit are arranged in parallel;
[0008] The loading unit includes a base, a column, a top beam, a first hydraulic cylinder, a second hydraulic cylinder, a third hydraulic cylinder, a pressure chamber, a support pad, a first pad, a second pad and a third pad; the top beam is horizontally fixedly mounted above the base through the column; the pressure chamber is fixedly mounted at the center of the upper surface of the base; the support pad is located inside the pressure chamber and horizontally fixedly mounted on the center of the upper surface of the bottom plate of the pressure chamber, and the simulated coal and rock sample is placed on the upper surface of the support pad; the first hydraulic cylinder is vertically fixedly mounted at the center of the top beam with the piston rod facing downward, and the piston rod of the first hydraulic cylinder extends downward to the inside of the pressure chamber; the first pad is horizontally arranged, the end of the piston rod of the first hydraulic cylinder is fixedly connected to the center of the upper surface of the first pad, and the lower surface of the first pad is connected to the mold The simulated coal-rock sample is in contact with each other; the second hydraulic cylinder is horizontally fixed on one side plate of the pressure chamber, and the piston rod of the second hydraulic cylinder extends inward to the inside of the pressure chamber; the second pad is vertically arranged, and the end of the piston rod of the second hydraulic cylinder is fixedly connected to the center of the outer surface of the second pad, and the inner surface of the second pad is in contact with the simulated coal-rock sample; the third hydraulic cylinder is horizontally fixed on the other side plate of the pressure chamber, and the third hydraulic cylinder is mirror-symmetrical and coaxially distributed with the second hydraulic cylinder; the third pad is vertically arranged, and the end of the piston rod of the third hydraulic cylinder is fixedly connected to the center of the outer surface of the third pad, and the inner surface of the third pad is in contact with the simulated coal-rock sample; the other two side plates on the pressure chamber are open structures;
[0009] The drilling unit includes a support platform, a feed motor, a slide rail, a nut slide, a lead screw, a drilling motor, a drill rod, a dynamic torque sensor and a laser displacement sensor; the slide rail is horizontally fixed on the upper surface of the support platform; the lead screw is horizontally arranged above the slide rail, the lead screw and the slide rail are distributed in parallel, and one end of the lead screw is connected to the upper surface of the support platform through a bearing seat; the feed motor is horizontally arranged, the feed motor is connected to the upper surface of the support platform through a motor mounting seat, and the motor shaft of the feed motor is coaxially fixed to the other end of the lead screw through a first coupling; the nut slide is arranged between the slide rail and the lead screw, and the nut slide has a linear movement freedom along the slide rail; the drilling motor is horizontally fixed on the upper surface of the nut slide; The dynamic torque sensor is horizontally fixed on the upper surface of the nut slide, the power input shaft of the dynamic torque sensor is coaxially fixedly connected to the motor shaft of the drilling motor through the second coupling, the power output shaft of the dynamic torque sensor is coaxially fixedly connected to one end of the drill rod through the third coupling, and the other end of the drill rod is directly opposite to the simulated coal and rock sample; the laser displacement sensor is fixedly installed on the upper surface of the nut slide, and the laser emitting end of the laser displacement sensor is directly opposite to the motor mounting seat; the drilling controller is fixedly installed on the upper surface of the support platform, and the control end of the feed motor, the control end of the drilling motor, the data output end of the dynamic torque sensor and the data output end of the laser displacement sensor are all electrically connected to the drilling controller.
[0010] A method for identifying mechanical parameters while drilling, using the loaded coal and rock drilling experimental platform, comprises the following steps:
[0011] Step 1: Prepare simulated coal rock samples using cement mortar;
[0012] Step 2: Send the prepared simulated coal and rock sample into the pressure chamber and place it on the upper surface of the support pad, then start the second hydraulic cylinder and the third hydraulic cylinder simultaneously until the simulated coal and rock sample is centered and clamped between the second pad and the third pad in the horizontal direction, and then start the first hydraulic cylinder to make the simulated coal and rock sample centered and clamped between the first pad and the support pad in the vertical direction;
[0013] Step 3: applying a load force to the simulated coal-rock sample through the first hydraulic cylinder, the second hydraulic cylinder and the third hydraulic cylinder until the confining pressure of the simulated coal-rock sample reaches a set value;
[0014] Step 4: Start the feed motor to drive the lead screw to rotate. The rotational motion of the lead screw will be synchronously converted into the linear motion of the nut slide. The drilling motor, drill rod, dynamic torque sensor and laser displacement sensor will synchronously move with the nut slide until the drill rod contacts the surface of the simulated coal and rock sample, and then turn off the feed motor.
[0015] Step 5: Start the drilling motor to drive the drill rod to rotate and reach the set speed, then restart the feed motor to drive the drill rod to move at the set feed speed, so that the drill rod drills into the simulated coal rock sample;
[0016] Step 6: When the drill rod is drilling into the simulated coal-rock sample, the dynamic torque sensor and the laser displacement sensor measure data in real time and synchronously transmit the data to the drilling controller for storage until the drill rod penetrates the simulated coal-rock sample and the drilling motor is turned off;
[0017] Step 7: Start the feed motor in reverse until the drill rod is completely withdrawn from the drill hole of the simulated coal and rock sample, and the nut slide synchronously returns to the initial position, turn off the feed motor, and then complete the unloading of the first hydraulic cylinder, the second hydraulic cylinder and the third hydraulic cylinder, and return the first pad, the second pad and the third pad to their initial positions, and then remove the simulated coal and rock sample from the pressure chamber;
[0018] Step 8: Import the drilling parameter data stored in the drilling controller into the computer, which is loaded with the improved particle swarm optimization algorithm, and its formula is:
[0019]
[0020] χ k+1 = x k +V k+1
[0021]
[0022] In the formula, ω is the nonlinear dynamic inertia weight coefficient, k is the number of particle swarm iterations, V is the particle swarm velocity, X is the particle swarm position, and p is the particle swarm velocity. best is the individual extreme value, g best is the population extreme value, c1 and c2 are learning factors, r1 and r2 are [0, 1] random numbers, ω max is the maximum inertia weight, ω min is the minimum inertia weight, f is the fitness of the current particle position, and f avg is the average fitness of the current particle position, f min is the minimum fitness of the current particle position;
[0023] Taking the drilling parameter data as particles, first initialize the particle swarm parameters, then randomly initialize the position and speed of each particle, and then determine whether the termination condition is met. If the termination condition is met, directly output the optimal solution; if the termination condition is not met, update the position and speed of each particle, then calculate the fitness value of each particle, then update the individual historical optimal fitness and position of each particle, and then update the particle swarm parameters, and then re-determine whether the termination condition is met; repeat the above judgment process until the termination condition is met and output the optimal solution;
[0024] In order to eliminate the adverse effects of differences in collected data samples on the results, 70% of the samples were extracted from the collected data samples as training samples and a sample comparison chart was obtained, and the remaining 30% of the samples were used as test samples and a sample comparison chart was obtained.
[0025] Beneficial effects of the present invention:
[0026] The loaded coal rock drilling experimental platform and the method for identifying mechanical parameters while drilling of the present invention use cement mortar to manufacture simulated coal rock specimens, and can prepare coal rock specimens of different strengths according to experimental requirements; by applying confining pressure to the coal rock specimens indoors, the occurrence conditions of coal rock underground can be simulated; dynamic torque sensors and displacement sensors can be used to monitor and obtain key indicators of the drilling rig during operation in real time, including thrust size, torque change, drilling speed, rotation speed and other while drilling parameters; an improved particle swarm optimization algorithm is used to identify the while drilling parameters, and the collected while drilling parameters are used as particles to improve the efficiency and accuracy of while drilling parameter identification; the present invention is based on the integrated drilling and measurement technology, and can collect and analyze the data generated in the drilling process in real time during the exploration operation, and use these data to invert the mechanical properties of coal rock, eliminate the measurement lag problem, ensure that the project progress is not disturbed, effectively enhance the ability of real-time identification of geological abnormal blocks in underground coal mines, effectively maintain the safety and stability of coal mining, and reduce the risk of accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1It is a structural schematic diagram of a loaded coal and rock drilling experimental platform of the present invention (front view);
[0028] Figure 2 It is a structural schematic diagram of a loaded coal and rock drilling experimental platform of the present invention (top view);
[0029] Figure 3 It is a comparison chart of training set prediction samples of the present invention;
[0030] Figure 4 A comparison chart of test set prediction samples of the present invention;
[0031] In the figure, 1 is a drilling controller, 2 is a base, 3 is a column, 4 is a top beam, 5 is a first hydraulic cylinder, 6 is a second hydraulic cylinder, 7 is a third hydraulic cylinder, 8 is a pressure chamber, 9 is a support pad, 10 is a first pad, 11 is a second pad, 12 is a third pad, 13 is a simulated coal rock sample, 14 is a support table, 15 is a feed motor, 16 is a slide rail, 17 is a nut slide, 18 is a lead screw, 19 is a drilling motor, 20 is a drill rod, 21 is a dynamic torque sensor, 22 is a laser displacement sensor, 23 is a bearing seat, 24 is a motor mounting seat, 25 is a first coupling, 26 is a second coupling, and 27 is a third coupling. DETAILED DESCRIPTION
[0032] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0033] like Figure 1 , 2 As shown, a loaded coal rock drilling experimental platform comprises a loading unit, a drilling unit and a drilling controller 1; the loading unit and the drilling unit are arranged in parallel;
[0034] The loading unit includes a base 2, a column 3, a top beam 4, a first hydraulic cylinder 5, a second hydraulic cylinder 6, a third hydraulic cylinder 7, a pressure chamber 8, a support pad 9, a first pad 10, a second pad 11 and a third pad 12; the top beam 4 is horizontally fixedly mounted above the base 2 through the column 3; the pressure chamber 8 is fixedly mounted at the center of the upper surface of the base 2; the support pad 9 is located inside the pressure chamber 8 and is horizontally fixedly mounted on the center of the upper surface of the bottom plate of the pressure chamber 8, and the simulated coal rock sample 13 is placed on the upper surface of the support pad 9; the first hydraulic cylinder 5 is vertically fixedly mounted at the center of the top beam 4 with the piston rod facing downward, and the piston rod of the first hydraulic cylinder 5 extends downward to the inside of the pressure chamber 8; the first pad 10 is horizontally arranged, and the end of the piston rod of the first hydraulic cylinder 5 is fixedly connected to the center of the upper surface of the first pad 10, and the lower surface of the first pad 10 The surface is in contact with the simulated coal rock sample 13; the second hydraulic cylinder 6 is horizontally fixed on one side plate of the pressure chamber 8, and the piston rod of the second hydraulic cylinder 6 extends inward to the inside of the pressure chamber 8; the second pad 11 is vertically arranged, and the end of the piston rod of the second hydraulic cylinder 6 is fixedly connected to the center of the outer surface of the second pad 11, and the inner surface of the second pad 11 is in contact with the simulated coal rock sample 13; the third hydraulic cylinder 7 is horizontally fixed on the other side plate of the pressure chamber 8, and the third hydraulic cylinder 7 is mirror-symmetrical and coaxially distributed with the second hydraulic cylinder 6; the third pad 12 is vertically arranged, and the end of the piston rod of the third hydraulic cylinder 7 is fixedly connected to the center of the outer surface of the third pad 12, and the inner surface of the third pad 12 is in contact with the simulated coal rock sample 13; the other two side plates on the pressure chamber 8 are open structures;
[0035] The drilling unit includes a support platform 14, a feed motor 15, a slide rail 16, a nut slide 17, a lead screw 18, a drilling motor 19, a drill rod 20, a dynamic torque sensor 21 and a laser displacement sensor 22; the slide rail 16 is horizontally fixed on the upper surface of the support platform 14; the lead screw 18 is horizontally arranged above the slide rail 16, the lead screw 18 is parallel to the slide rail 16, and one end of the lead screw 18 is connected to the upper surface of the support platform 14 through a bearing seat 23; the feed motor 15 is horizontally arranged, the feed motor 15 is connected to the upper surface of the support platform 14 through a motor mounting seat 24, and the motor shaft of the feed motor 15 is coaxially fixed to the other end of the lead screw 18 through a first coupling 25; the nut slide 17 is arranged between the slide rail 16 and the lead screw 18, and the nut slide 17 has a linear movement freedom along the slide rail 16; the drilling motor 19 is horizontally fixed The dynamic torque sensor 21 is fixedly mounted on the upper surface of the nut slide 17; the dynamic torque sensor 21 is fixedly mounted horizontally on the upper surface of the nut slide 17, the power input shaft of the dynamic torque sensor 21 is coaxially fixedly connected with the motor shaft of the drilling motor 19 through the second coupling 26, the power output shaft of the dynamic torque sensor 21 is coaxially fixedly connected with one end of the drill rod 20 through the third coupling 27, and the other end of the drill rod 20 is directly opposite to the simulated coal rock sample 13; the laser displacement sensor 22 is fixedly mounted on the upper surface of the nut slide 17, and the laser emitting end of the laser displacement sensor 22 is directly opposite to the motor mounting seat 24; the drilling controller 1 is fixedly mounted on the upper surface of the support platform 14, and the control end of the feed motor 15, the control end of the drilling motor 19, the data output end of the dynamic torque sensor 21 and the data output end of the laser displacement sensor 22 are all electrically connected to the drilling controller 1. In this embodiment, the feed motor 15 adopts a stepper motor, and the drilling motor 19 adopts a three-phase asynchronous motor.
[0036] A method for identifying mechanical parameters while drilling, using the loaded coal and rock drilling experimental platform, comprises the following steps:
[0037] Step 1: using cement mortar to prepare a simulated coal rock sample 13;
[0038] In this embodiment, river sand, cement and clean water are used as raw materials. Before using the river sand, large-sized stones and impurities in the river sand are first sieved, and then the sieved river sand, cement and clean water are proportioned and evenly mixed according to the strength requirements of the experiment to make cement mortar. The cement mortar is poured into the sample forming mold, and a layer of lubricating grease needs to be applied on the surface of the mold before molding to facilitate subsequent demolding. After molding, the cement mortar is vibrated and compacted by a vibrator to prevent pores from appearing in the cement mortar. After vibration and compaction, it is cured until the cement mortar solidifies to reach the designed strength, and finally a simulated coal rock sample 13 is formed, and the simulated coal rock sample 13 is taken out from the sample forming mold;
[0039] Step 2: Send the prepared simulated coal rock sample 13 into the pressure chamber 8 and place it on the upper surface of the support pad 9, then start the second hydraulic cylinder 6 and the third hydraulic cylinder 7 synchronously until the simulated coal rock sample 13 is centered and clamped between the second pad 11 and the third pad 12 in the horizontal direction, and then start the first hydraulic cylinder 5 to make the simulated coal rock sample 13 centered and clamped between the first pad 10 and the support pad 9 in the vertical direction;
[0040] Step 3: applying a load force to the simulated coal-rock sample 13 through the first hydraulic cylinder 5, the second hydraulic cylinder 6 and the third hydraulic cylinder 7 until the confining pressure of the simulated coal-rock sample 13 reaches a set value;
[0041] Step 4: Start the feed motor 15 to drive the lead screw 18 to rotate. The rotational motion of the lead screw 18 will be synchronously converted into the linear motion of the nut slide 17. The drilling motor 19, the drill rod 20, the dynamic torque sensor 21 and the laser displacement sensor 22 will synchronously follow the movement of the nut slide 17 until the drill rod 20 contacts the surface of the simulated coal and rock sample 13, and then turn off the feed motor 15.
[0042] Step 5: Start the drilling motor 19 to drive the drill rod 20 to rotate and reach a set speed, then restart the feed motor 15 to drive the drill rod 20 to move at a set feed speed, so that the drill rod 20 drills into the simulated coal rock sample 13;
[0043] Step 6: When the drill rod 20 is drilling into the simulated coal rock sample 13, the dynamic torque sensor 21 and the laser displacement sensor 22 measure data in real time and synchronously transmit the data to the drilling controller 1 for storage until the drill rod 20 penetrates the simulated coal rock sample 13, and the drilling motor 19 is turned off;
[0044] Step 7: Start the feed motor 15 in reverse until the drill rod 20 is completely withdrawn from the borehole of the simulated coal and rock sample 13, and the nut slide 17 is synchronously withdrawn to the initial position, and then the feed motor 15 is turned off, and then the first hydraulic cylinder 5, the second hydraulic cylinder 6 and the third hydraulic cylinder 7 are unloaded, and the first pad 10, the second pad 11 and the third pad 12 are returned to the initial position, and then the simulated coal and rock sample 13 is removed from the pressure chamber 8;
[0045] Step 8: Import the drilling parameter data stored in the drilling controller 1 into the computer, and load the improved particle swarm optimization algorithm in the computer, and its formula is:
[0046]
[0047] χ k+1 = x k +V k+1
[0048]
[0049] Where ω is the nonlinear dynamic inertia weight coefficient, k is the number of particle swarm iterations, V is the particle swarm velocity, χ is the particle swarm position, and p is the particle swarm velocity. best is the individual extreme value, g best is the population extreme value, c1 and c2 are learning factors, r1 and r2 are [0, 1] random numbers, ω max is the maximum inertia weight (generally set to 0.9), ω min is the minimum inertia weight (generally set to 0.4), f is the fitness of the current particle position, and f avg is the average fitness of the current particle position, f min is the minimum fitness of the current particle position;
[0050] Taking the drilling parameter data as particles, first initialize the particle swarm parameters (particle swarm size, particle dimension, number of iterations, inertia weight, learning factor, iteration step range), then randomly initialize the position and speed of each particle, and then judge whether the termination condition is met. If the termination condition is met, directly output the optimal solution; if the termination condition is not met, update the position and speed of each particle, and then calculate the fitness value of each particle, then update the individual historical optimal fitness and position of each particle, and then update the particle swarm parameters, and then re-judge whether the termination condition is met; repeat the above judgment process until the termination condition is met and output the optimal solution;
[0051] In order to eliminate the adverse effects of differences in the collected data samples on the results, 70% of the samples were extracted from the collected data samples as training samples and a sample comparison chart was obtained, as shown in Figure 3 As shown; the remaining 30% of the sample is used as a test sample and a sample comparison chart is obtained, as shown Figure 4 As shown in the figure, it can be seen that the improved particle swarm optimization algorithm has a good prediction effect on the identification of drilling parameters.
[0052] The solutions in the embodiments are not intended to limit the protection scope of the present invention. All equivalent implementations or changes that do not deviate from the present invention are included in the protection scope of the present invention.
Claims
1. A loaded coal and rock drilling experimental platform, characterized in that: It includes a loading unit, a drilling unit and a drilling controller; the loading unit and the drilling unit are arranged in parallel; The loading unit includes a base, a column, a top beam, a first hydraulic cylinder, a second hydraulic cylinder, a third hydraulic cylinder, a pressure chamber, a support pad, a first pad, a second pad and a third pad; the top beam is horizontally fixedly mounted above the base through the column; the pressure chamber is fixedly mounted at the center of the upper surface of the base; the support pad is located inside the pressure chamber and horizontally fixedly mounted on the center of the upper surface of the bottom plate of the pressure chamber, and the simulated coal and rock sample is placed on the upper surface of the support pad; the first hydraulic cylinder is vertically fixedly mounted at the center of the top beam with the piston rod facing downward, and the piston rod of the first hydraulic cylinder extends downward to the inside of the pressure chamber; the first pad is horizontally arranged, the end of the piston rod of the first hydraulic cylinder is fixedly connected to the center of the upper surface of the first pad, and the lower surface of the first pad is connected to the mold The simulated coal-rock sample is in contact with each other; the second hydraulic cylinder is horizontally fixed on one side plate of the pressure chamber, and the piston rod of the second hydraulic cylinder extends inward to the inside of the pressure chamber; the second pad is vertically arranged, and the end of the piston rod of the second hydraulic cylinder is fixedly connected to the center of the outer surface of the second pad, and the inner surface of the second pad is in contact with the simulated coal-rock sample; the third hydraulic cylinder is horizontally fixed on the other side plate of the pressure chamber, and the third hydraulic cylinder is mirror-symmetrical and coaxially distributed with the second hydraulic cylinder; the third pad is vertically arranged, and the end of the piston rod of the third hydraulic cylinder is fixedly connected to the center of the outer surface of the third pad, and the inner surface of the third pad is in contact with the simulated coal-rock sample; the other two side plates on the pressure chamber are open structures; The drilling unit includes a support platform, a feed motor, a slide rail, a nut slide, a lead screw, a drilling motor, a drill rod, a dynamic torque sensor and a laser displacement sensor; the slide rail is horizontally fixed on the upper surface of the support platform; the lead screw is horizontally arranged above the slide rail, the lead screw and the slide rail are distributed in parallel, and one end of the lead screw is connected to the upper surface of the support platform through a bearing seat; the feed motor is horizontally arranged, the feed motor is connected to the upper surface of the support platform through a motor mounting seat, and the motor shaft of the feed motor is coaxially fixed to the other end of the lead screw through a first coupling; the nut slide is arranged between the slide rail and the lead screw, and the nut slide has a linear movement freedom along the slide rail; the drilling motor is horizontally fixed on the upper surface of the nut slide; The dynamic torque sensor is horizontally fixed on the upper surface of the nut slide, the power input shaft of the dynamic torque sensor is coaxially fixedly connected to the motor shaft of the drilling motor through the second coupling, the power output shaft of the dynamic torque sensor is coaxially fixedly connected to one end of the drill rod through the third coupling, and the other end of the drill rod is directly opposite to the simulated coal and rock sample; the laser displacement sensor is fixedly installed on the upper surface of the nut slide, and the laser emitting end of the laser displacement sensor is directly opposite to the motor mounting seat; the drilling controller is fixedly installed on the upper surface of the support platform, and the control end of the feed motor, the control end of the drilling motor, the data output end of the dynamic torque sensor and the data output end of the laser displacement sensor are all electrically connected to the drilling controller.
2. A method for identifying mechanical parameters while drilling, using the loaded coal and rock drilling experimental platform of claim 1, characterized in that The steps include: Step 1: Prepare simulated coal rock samples using cement mortar; Step 2: Send the prepared simulated coal and rock sample into the pressure chamber and place it on the upper surface of the support pad, then start the second hydraulic cylinder and the third hydraulic cylinder simultaneously until the simulated coal and rock sample is centered and clamped between the second pad and the third pad in the horizontal direction, and then start the first hydraulic cylinder to make the simulated coal and rock sample centered and clamped between the first pad and the support pad in the vertical direction; Step 3: applying a load force to the simulated coal-rock sample through the first hydraulic cylinder, the second hydraulic cylinder and the third hydraulic cylinder until the confining pressure of the simulated coal-rock sample reaches a set value; Step 4: Start the feed motor to drive the lead screw to rotate. The rotational motion of the lead screw will be synchronously converted into the linear motion of the nut slide. The drilling motor, drill rod, dynamic torque sensor and laser displacement sensor will synchronously move with the nut slide until the drill rod contacts the surface of the simulated coal and rock sample, and then turn off the feed motor. Step 5: Start the drilling motor to drive the drill rod to rotate and reach the set speed, then restart the feed motor to drive the drill rod to move at the set feed speed, so that the drill rod drills into the simulated coal rock sample; Step 6: When the drill rod is drilling into the simulated coal-rock sample, the dynamic torque sensor and the laser displacement sensor measure data in real time and synchronously transmit the data to the drilling controller for storage until the drill rod penetrates the simulated coal-rock sample and the drilling motor is turned off; Step 7: Start the feed motor in reverse until the drill rod is completely withdrawn from the drill hole of the simulated coal and rock sample, and the nut slide synchronously returns to the initial position, turn off the feed motor, and then complete the unloading of the first hydraulic cylinder, the second hydraulic cylinder and the third hydraulic cylinder, and return the first pad, the second pad and the third pad to their initial positions, and then remove the simulated coal and rock sample from the pressure chamber; Step 8: Import the drilling parameter data stored in the drilling controller into the computer, which is loaded with the improved particle swarm optimization algorithm, and its formula is: x k+1 =x k +V k+1 Where ω is the nonlinear dynamic inertia weight coefficient, k is the number of particle swarm iterations, V is the particle swarm velocity, χ is the particle swarm position, and p is the particle swarm velocity. best is the individual extreme value, g best is the population extreme value, c1 and c2 are learning factors, r1 and r2 are [0, 1] random numbers, ω max is the maximum inertia weight, ω min is the minimum inertia weight, f is the fitness of the current particle position, and f avg is the average fitness of the current particle position, f min is the minimum fitness of the current particle position; Taking the drilling parameter data as particles, first initialize the particle swarm parameters, then randomly initialize the position and speed of each particle, and then determine whether the termination condition is met. If the termination condition is met, directly output the optimal solution; if the termination condition is not met, update the position and speed of each particle, then calculate the fitness value of each particle, then update the individual historical optimal fitness and position of each particle, and then update the particle swarm parameters, and then re-determine whether the termination condition is met; repeat the above judgment process until the termination condition is met and output the optimal solution; In order to eliminate the adverse effects of differences in collected data samples on the results, 70% of the samples were extracted from the collected data samples as training samples and a sample comparison chart was obtained, and the remaining 30% of the samples were used as test samples and a sample comparison chart was obtained.
Citation Information
Patent Citations
Multifunctional true triaxial rock drilling test system and test method for characterizing the characteristics of rocks
CN105938070A
Hydraulic cylinder pressure signal-based method for identifying rock hardness and identification platform
CN110836824A
Loaded gas-containing coal body simulation drilling and multi-parameter while-drilling monitoring test system
CN114412437A
Coal roadway side measurement-while-drilling simulation test device and coal stress inversion method
CN115266426A
True triaxial mechanical parameter measurement experiment device and method for coal rock while drilling
CN116359024A
Cited By
Controllable low-temperature drilling simulation experiment platform and experiment method for frozen stratum in cold region
CN121632653A