Through the improved Mamba model and data management capability maturity hierarchy model, combined with the Margin Softmax layer, the problem of inaccurate data management capability evaluation in the existing technology is solved, and accurate evaluation of data management capability and efficient utilization of resources are achieved.
Patent Information
- Application Number
- CN202410939081.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2024-11-01
AI Technical Summary
The existing data management capability evaluation method adopts the weighted average method, which leads to inaccurate evaluation results and large differences between the real value, affecting the efficient use of resources.
Introduce a computing model for the capability maturity evaluation based on the improved Mamba model. By modifying the linear layer and Softmax layer into the linear layer and the Margin Softmax layer, combining the data management capability maturity hierarchy model, the evaluation data is collected and analyzed to evaluate the data management maturity. degree level.
It realizes the accuracy of data management capabilities assessment, ensures efficient use of resources, and solves the problem of inaccurate evaluation results.
Smart Images

Figure CN118886776A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data management technology, and in particular to a data management capability evaluation method, device and readable storage medium. Background Art
[0002] "Data management capability maturity assessment model" (GB / T 36073-2018, Data management capability maturity assessment model, hereinafter referred to as "DCMM") is a national standard jointly compiled by authoritative organizations in the industry. The DCMM standard defines 8 capability domains and 29 capability items, and provides a data management capability maturity assessment model and corresponding maturity levels.
[0003] At present, when government agencies conduct data management capability assessments, they mainly refer to the "Data Management Capability Maturity Assessment Method" (GB / T 42129-2022). Based on the actual implementation of 29 capability items such as data strategy planning and data strategy implementation in the unit, the weighted average method is used to calculate the data management capability assessment level. This results in inaccurate assessment results and large differences from the actual values. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a data management capability evaluation method, device and readable storage medium in view of the above-mentioned shortcomings of the prior art, so as to solve the problem that the existing data management capability evaluation method usually adopts the weighted average method to calculate the data management capability evaluation level, and the evaluation results are inaccurate and have a large difference from the true value.
[0005] In a first aspect, the present invention provides a method for evaluating data management capability.
[0006] The law includes:
[0007] Collect evaluation data of the units to be evaluated based on the pre-built data management capability maturity hierarchy model;
[0008] The evaluation data of the unit to be evaluated is input into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, wherein the capability maturity evaluation calculation model modifies the combination of linear layer and Softmax layer into a combination of linear layer and Margin Softmax layer based on the Mamba model.
[0009] Furthermore, before collecting evaluation data of the unit to be evaluated according to the pre-built data management capability maturity hierarchy model, the method further includes:
[0010] The data management capability maturity hierarchical structure model is constructed according to the DCMM standard. The data management capability maturity hierarchical structure model includes a target layer, a criterion layer and a sub-criterion layer. The criterion layer is composed of eight capability domains, and the sub-criterion layer is composed of capability items corresponding to the corresponding capability domains.
[0011] Furthermore, the evaluation data of the unit to be evaluated is collected according to the pre-built data management capability maturity hierarchy model, specifically including:
[0012] The evaluation data of each capability item of the unit to be evaluated is collected according to the pre-constructed data management capability maturity hierarchy model.
[0013] Furthermore, before inputting the evaluation data of the unit to be evaluated into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, the method further includes:
[0014] The Mamba model is improved by modifying the combination of the linear layer and the Softmax layer into a combination of the linear layer and the MarginSoftmax layer to obtain the capability maturity evaluation calculation model.
[0015] Furthermore, before inputting the evaluation data of the unit to be evaluated into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, the method further includes:
[0016] Collect historical evaluation data for multiple competency domains and competency items;
[0017] The historical evaluation data is used to train a capability maturity assessment calculation model to obtain a trained capability maturity assessment calculation model.
[0018] Furthermore, the calculation formula of the Margin Softmax layer is as follows:
[0019]
[0020] In the formula, represents the value of the loss function, z represents the sample feature vector, c t represents the weight vector of the target category t, τ represents the temperature coefficient, m is a scalar greater than or equal to 0, which is used to control the interval between different categories, C j represents the weight vector of target category j, cos(z,c t ) represents the weight vector c of the sample feature vector z and the target category t t The cosine similarity between j) represents the weight vector C of the sample feature vector z and the target category j j The cosine similarity between .
[0021] In a second aspect, the present invention provides a data management capability evaluation device, the device comprising:
[0022] An evaluation data collection module is used to collect evaluation data of the units to be evaluated based on a pre-built data management capability maturity hierarchy model;
[0023] A capability maturity assessment module is connected to the evaluation data collection module and is used to input the evaluation data of the unit to be assessed into a trained capability maturity assessment calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be assessed, wherein the capability maturity assessment calculation model modifies the combination of the linear layer and the Softmax layer into a combination of the linear layer and the Margin Softmax layer based on the Mamba model.
[0024] Furthermore, the device also includes:
[0025] The hierarchical model construction module is used to construct the data management capability maturity hierarchical model according to the DCMM standard. The data management capability maturity hierarchical model includes a target layer, a criterion layer and a sub-criterion layer. The criterion layer is composed of eight capability domains, and the sub-criterion layer is composed of capability items corresponding to the corresponding capability domains.
[0026] In a third aspect, the present invention provides a data management capability assessment device, comprising a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to implement the data management capability assessment method described in the first aspect.
[0027] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the data management capability evaluation method described in the first aspect is implemented.
[0028] The data management capability evaluation method, device and readable storage medium provided by the present invention. First, the evaluation data of the unit to be evaluated is collected according to the pre-constructed data management capability maturity hierarchy model; then the evaluation data of the unit to be evaluated is input into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, wherein the capability maturity evaluation calculation model modifies the combination of linear layer and Softmax layer into a combination of linear layer and Margin Softmax layer on the basis of the Mamba model. The present invention can obtain accurate evaluation results by introducing the capability maturity evaluation calculation model based on the improved Mamba model to evaluate the data management maturity level, so that the corresponding resources can be efficiently utilized, and solves the problem that the existing data management capability evaluation method usually adopts the weighted average method to calculate the data management capability evaluation level, and the evaluation results are inaccurate and have a large difference from the true value. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a flow chart of a data management capability evaluation method according to Embodiment 1 of the present invention;
[0030] Figure 2 A schematic diagram of the structure of a data management capability maturity hierarchy model according to an embodiment of the present invention;
[0031] Figure 3 A structural diagram of a Mamba block according to an embodiment of the present invention;
[0032] Figure 4 A schematic diagram of the structure of a selective SSM according to an embodiment of the present invention;
[0033] Figure 5 This is a structural diagram of a data management capability evaluation device according to Embodiment 2 of the present invention;
[0034] Figure 6 This is a structural diagram of a data management capability evaluation device according to Embodiment 3 of the present invention. DETAILED DESCRIPTION
[0035] In order to enable those skilled in the art to better understand the technical solution of the present invention, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0036] It should be understood that the specific embodiments and drawings described herein are only used to explain the present invention rather than to limit the present invention.
[0037] It can be understood that, in the absence of conflict, the various embodiments of the present invention and the various features in the embodiments can be combined with each other.
[0038] It can be understood that, for the convenience of description, the drawings of the present invention only show the parts related to the present invention, while the parts irrelevant to the present invention are not shown in the drawings.
[0039] It can be understood that each unit and module involved in the embodiments of the present invention may correspond to only one physical structure, or may be composed of multiple physical structures, or multiple units and modules may be integrated into one physical structure.
[0040] It can be understood that the terms "first", "second", etc. in the embodiments of the present invention are used to distinguish different objects, or to distinguish different processing of the same object, rather than to describe a specific order of objects.
[0041] It can be understood that, in the absence of conflict, the functions and steps marked in the flowcharts and block diagrams of the present invention may occur in an order different from that marked in the drawings.
[0042] It is understood that the flowcharts and block diagrams of the present invention illustrate the possible architectures, functions, and operations of the systems, devices, equipment, and methods according to the various embodiments of the present invention. Each box in the flowchart or block diagram may represent a unit, module, program segment, or code, which contains executable instructions for implementing the specified functions. Moreover, each box or combination of boxes in the block diagram and flowchart may be implemented by a hardware-based system that implements the specified functions, or may be implemented by a combination of hardware and computer instructions.
[0043] It can be understood that the units and modules involved in the embodiments of the present invention can be implemented by software or hardware. For example, the units and modules can be located in a processor.
[0044] Application Overview
[0045] At present, when government agencies conduct data management capability maturity assessment, they mainly refer to GB / T 42129-2022. According to the actual implementation of 29 capability items such as data strategy planning and data strategy implementation in the units, they use the weighted average method or simple rules to calculate the data management capability assessment level. There are two problems:
[0046] First, the evaluation results are inaccurate and differ greatly from the true values. Some units use the geometric mean method to calculate the rating results, which seriously affects the accuracy of the evaluation. The weights of the eight capability domains, such as data strategy, data governance, and data architecture, should be different for different units. For example, for government data management departments, the weights of data strategy and data standard capability domains should be higher; while for non-data management units such as education or civil affairs, the weights of data quality and data life cycle capability domains are more important. There are also some units that refer to the experience of a few data management experts, and measure the maturity of data management capabilities based on rules and simple linear models, resulting in large differences between the evaluation results and the actual situation.
[0047] Second, resources are not used efficiently. When units carry out data management capacity building, they usually "use evaluation to promote construction", and the resources invested in capacity building are limited. Accurate evaluation results are the prerequisite for efficient use of resources.
[0048] In response to the above technical problems, the idea of the present application is to provide a data management capability assessment method, device and readable storage medium. By introducing a capability maturity assessment calculation model based on the improved Mamba model to perform data management maturity level assessment, accurate assessment results can be obtained, so that corresponding resources can be efficiently utilized.
[0049] After introducing the basic principles of the present application, various non-limiting embodiments of the present application will be described in detail with reference to the accompanying drawings.
[0050] Embodiment 1:
[0051] This embodiment provides a data management capability evaluation method, such as Figure 1 As shown, the method includes:
[0052] Step S101: Collect evaluation data of the unit to be evaluated according to the pre-constructed data management capability maturity hierarchy model.
[0053] In this embodiment, the evaluation data of the unit to be evaluated can come from various channels, such as employee self-evaluation, peer review, leadership evaluation, external audit report, etc.
[0054] Optionally, before collecting evaluation data of the unit to be evaluated according to the pre-built data management capability maturity hierarchy model, the method further includes:
[0055] The data management capability maturity hierarchical structure model is constructed according to the DCMM standard. The data management capability maturity hierarchical structure model includes a target layer, a criterion layer and a sub-criterion layer. The criterion layer is composed of eight capability domains, and the sub-criterion layer is composed of capability items corresponding to the corresponding capability domains.
[0056] In this embodiment, the data management capability maturity hierarchy model constructed according to the DCMM standard can be as follows: Figure 2 As shown in the figure, the top layer is the target layer, which is the data management maturity level of the unit to be evaluated; the middle layer is the criteria layer, which consists of eight capability domains; the bottom layer is the sub-criteria layer, which consists of capability items corresponding to the capability domains. The specific capability domains and capability items are shown in Table 1:
[0057] Table 1, Competency domains and competency items
[0058]
[0059]
[0060] Optionally, the collecting of evaluation data of the unit to be evaluated according to the pre-built data management capability maturity hierarchy model specifically includes:
[0061] The evaluation data of each capability item of the unit to be evaluated is collected according to the pre-constructed data management capability maturity hierarchy model.
[0062] In this embodiment, the maturity evaluation data of each capability item indicator in 29 capability items are collected according to the data management capability maturity hierarchy model.
[0063] Step S102: Input the evaluation data of the unit to be evaluated into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, wherein the capability maturity evaluation calculation model modifies the combination of the linear layer and the Softmax layer into a combination of the linear layer and the Margin Softmax layer based on the Mamba model.
[0064] In this embodiment, the capability maturity assessment calculation model can also directly use the existing Mamba model, which has a certain classification accuracy. However, in the process of research and practice of the prior art, the inventor found that modifying the linear and Softmax layer structure to linear+Margin Softmax at the end of the Mamba model can increase the classification accuracy of the model for capability maturity. Therefore, the present invention improves the Mamba model and modifies the combination of the linear layer and the Softmax layer to a combination of the linear layer and the Margin Softmax layer to obtain the capability maturity assessment calculation model.
[0065] Specifically, the capability maturity assessment calculation model is essentially a Mamba model that has been transformed by Softmax. The original pipeline of the Mamba model is as follows: it consists of multiple repeated Mamba blocks, and the input of each block is the high-dimensional vector output of the previous block. The structure of the Mamba block is as follows: Figure 3 As shown. It first enters RMS Norm: RMS (root mean square) normalization is performed on the input sequence to stabilize the training process. Then projection is performed: linear transformation is performed on the input sequence to map it to a high-dimensional space. After that, convolution is performed: a one-dimensional convolution operation is performed on the sequence to extract local features. Then it enters the selective SSM: This is the core part of the Mamba model, and the sequence is modeled using the selective state space model (SSM). After nonlinear processing of the activation function, the output of the Mamba block is obtained.
[0066] Optionally, the calculation formula of the Margin Softmax layer is as follows:
[0067]
[0068] In the formula, represents the value of the loss function, z represents the sample feature vector, c t represents the weight vector of the target category t, τ represents the temperature coefficient, m is a scalar greater than or equal to 0, which is used to control the interval between different categories, C j represents the weight vector of target category j, cos(z,c t ) represents the weight vector c of the sample feature vector z and the target category t t The cosine similarity between j ) represents the weight vector C of the sample feature vector z and the target category j j The cosine similarity between .
[0069] In this embodiment, the original Softmax formula is modified into a Margin Softmax formula. After adding the Margin (interval), the feature is made more compact. Therefore, when facing the maturity classification task, not only the evaluation index is clearer, but also the difference between different scores is increased by the distance m / τ.
[0070] Optionally, before inputting the evaluation data of the unit to be evaluated into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, the method further includes:
[0071] Collect historical evaluation data for multiple competency domains and competency items;
[0072] The historical evaluation data is used to train a capability maturity assessment calculation model to obtain a trained capability maturity assessment calculation model.
[0073] In this embodiment, the historical evaluation data and the corresponding data management maturity level labels are used as training sets to train the capability maturity evaluation calculation model, and the trained capability maturity evaluation calculation model can be obtained. Among them, the data management maturity level is divided into 5 classification levels, with level 1 being the lowest and level 5 being the highest.
[0074] In a specific embodiment, according to the characteristics of the data management capability assessment object, the hierarchical analysis method and the Mamba language model are introduced, and through systematic data collection and analysis, a data management capability maturity assessment calculation model is established to further optimize the data management capability assessment method and improve the data management capability assessment process. The specific assessment steps include:
[0075] S1. Tasks of constructing a data management capability maturity hierarchy model and fine-tuning a language model for supervised classification
[0076] (1) Establish a data management capability maturity hierarchical structure model. According to the characteristics of capability domains and capability items in GB / T42129-2022, analyze and establish a data management capability maturity hierarchical structure model. The structure is as follows: Figure 2 As shown, the top layer is the target layer, that is, the data management maturity level of the unit to be evaluated; the middle layer is the criterion layer, which is composed of eight capability domains; the bottom layer is the sub-criterion layer, which is composed of capability items corresponding to the capability domains.
[0077] (2) Collect the maturity evaluation data of each capability indicator based on the data management capability maturity hierarchy model.
[0078] (3) Construction of supervised management tasks. Because of the linear system characteristics of Mamba's state selection, the assumption of the linear system is a perfect match for the application scenario of the prediction of data management maturity by sub-indicators at various levels. Therefore, the output of the Mamba model is a multi-classification of indicators 1-5 of data management maturity, and the input of the model is the evaluation data of the maturity of each capability indicator in (2).
[0079] S2. Constructing a capability maturity assessment calculation model
[0080] The capability maturity assessment calculation model is essentially a Mamba model that has been transformed by Softmax. The original pipeline of the Mamba model is as follows: It consists of multiple repeated Mamba blocks, and the input of each block is the high-dimensional vector output of the previous block. The structure of the Mamba block is as follows: Figure 3 As shown. It first enters RMS Norm: RMS (root mean square) normalization is performed on the input sequence to stabilize the training process. Then projection is performed: linear transformation is performed on the input sequence to map it to a high-dimensional space. After that, convolution is performed: a one-dimensional convolution operation is performed on the sequence to extract local features. Then it enters the selective SSM: This is the core part of the Mamba model, and the sequence is modeled using the selective state space model (SSM). After nonlinear processing of the activation function, the output of the Mamba block is obtained.
[0081] It should be noted that the present invention modifies the linear and Softmax layer structures into linear+MarginSoftmax at the end of the model to further increase the classification accuracy of the model for capability maturity. The construction of the classification head is based on Margin Softmax, which is a variant of Softmax. Adding margin will make the features more compact. When facing the maturity classification task, it not only makes the evaluation indicators clearer, but also ensures that the difference between different scores increases the distance of m / τ.
[0082] The original Softmax formula is as follows:
[0083]
[0084] The modified Softmax formula is as follows:
[0085]
[0086] In the formula, the meanings of various symbols are as follows:
[0087] The value of the loss function;
[0088] cos(z,c t ): sample feature vector z and weight vector c of target category t t The cosine similarity between ;
[0089] m: margin, a scalar greater than or equal to 0, used to control the interval between different categories;
[0090] τ: Temperature coefficient, used to control the smoothness of the Softmax function;
[0091] j: other categories except the target category t;
[0092] C j represents the weight vector for target category j.
[0093] Among them, Figure 4 As shown, the "Selective SSM" has the following properties:
[0094] (a) Recurrent SSM creates cyclic SSM by discretization
[0095] (b) HiPPO initializes the matrix A to capture long-range dependencies
[0096] (c) Selective scan algorithm selectively compresses information
[0097] (d) Hardware-aware algorithm accelerates computing
[0098] S3. Data management capability maturity assessment
[0099] (1) Data collection: Collect historical and current evaluation data of multiple capability domains (such as data governance, data architecture, data quality, data security, etc.) and capability items (such as data standard setting, metadata management, data quality monitoring, data access control, etc.). Evaluation data can come from a variety of channels, such as employee self-evaluation, peer review, leadership evaluation, external audit reports, etc. Preprocess the evaluation data to obtain the maturity array of the evaluation data for each capability item.
[0100] (2) The maturity array of each capability domain is input into the data management capability maturity hierarchy model. The top layer of the data management capability maturity hierarchy model is the target layer, that is, the data maturity level of the unit to be evaluated; the middle layer is the criterion layer, which is composed of eight capability domains; and the bottom layer is the sub-criterion layer, which is composed of the capability items corresponding to the capability domains.
[0101] (3) Combine the data collected by the capability domain and capability layer arrays in turn, and combine the data with the corresponding collected evaluation basis text again, and input it into the Mamba capability maturity assessment calculation model as needed. The model output result is that each data will get a logits score with a dimension of 5, and the item with the largest logits score corresponds to the capability maturity indicator.
[0102] Specifically, the overall assessment steps of data management capability maturity are divided into three stages: assessment preparation, formal assessment, and result confirmation. Among them, the assessment preparation stage includes standard implementation and self-assessment, and the formal assessment stage includes assessment planning, on-site assessment, calculation and confirmation of assessment results. The overall assessment steps specifically include:
[0103] 1) Implementation of the standards, that is, the assessed party refers to the DCMM standards, conducts learning and application of the DCMM standards within the organization to enhance the organization’s own data management capabilities, establishes and improves its own data management system, and actually carries out various data management activities.
[0104] 2) Self-assessment, i.e. the assessed party conducts self-examination and self-certification in accordance with the DCMM standards, in order to complete the collection of evidence, self-assessment scoring, and identify and improve deficiencies in data management.
[0105] 3) Evaluation planning.
[0106] 4) On-site evaluation.
[0107] 5) Calculate and confirm the assessment results, that is, combine the capability maturity assessment calculation model to calculate the final assessment results.
[0108] 6) Identify gaps from target levels.
[0109] It should be noted that the data management capability evaluation method provided by the present invention has the following characteristics:
[0110] a) Based on the characteristics of the data management capability assessment object, the language model classification task is introduced, and the data management maturity estimation is completed through systematic data collection and analysis;
[0111] b) The Mamba model structure is superior to the traditional transformer model in the classification field. This model structure is based on SSM, a state space model, and is a simple linear system with very good application scenarios in training and reasoning. In addition, it is also based on HiPPO (High-order Polynomial Projection Operators) to store expert scoring information in a finite-dimensional vector, which exceeds the traditional deep network model in terms of interpretability.
[0112] c) Margin Softmax, a scenario-based variant of the Softmax classification head, is used. It is an improvement on the loss function. Logits are constructed in the form of cosine and temperature is introduced as an indicator. This can increase the difference between different classes in the scores of data maturity. An enhanced negative logarithmic loss can improve the scoring accuracy of the model.
[0113] The data management capability evaluation method provided by the embodiment of the present invention first collects evaluation data of the unit to be evaluated according to a pre-constructed data management capability maturity hierarchy model; then the evaluation data of the unit to be evaluated is input into a trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, wherein the capability maturity evaluation calculation model modifies the combination of the linear layer and the Softmax layer into a combination of the linear layer and the Margin Softmax layer on the basis of the Mamba model. The present invention can obtain accurate evaluation results by introducing a capability maturity evaluation calculation model based on the improved Mamba model to evaluate the data management maturity level, so that the corresponding resources can be efficiently utilized, and solves the problem that the existing data management capability evaluation method usually adopts the weighted average method to calculate the data management capability evaluation level, and the evaluation results are inaccurate and have a large difference from the true value.
[0114] Embodiment 2:
[0115] like Figure 5 As shown, this embodiment provides a data management capability evaluation device, which is used to execute the above data management capability evaluation method, including:
[0116] An evaluation data collection module 11 is used to collect evaluation data of the unit to be evaluated according to a pre-built data management capability maturity hierarchy model;
[0117] The capability maturity evaluation module 12 is connected to the evaluation data collection module 11, and is used to input the evaluation data of the unit to be evaluated into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, wherein the capability maturity evaluation calculation model modifies the combination of linear layer and Softmax layer into a combination of linear layer and Margin Softmax layer based on the Mamba model.
[0118] Optionally, the device further comprises:
[0119] The hierarchical model construction module is used to construct the data management capability maturity hierarchical model according to the DCMM standard. The data management capability maturity hierarchical model includes a target layer, a criterion layer and a sub-criterion layer. The criterion layer is composed of eight capability domains, and the sub-criterion layer is composed of capability items corresponding to the corresponding capability domains.
[0120] Optionally, the evaluation data collection module 11 is specifically used for:
[0121] The evaluation data of each capability item of the unit to be evaluated is collected according to the pre-constructed data management capability maturity hierarchy model.
[0122] Optionally, the device further comprises:
[0123] The model improvement module is used to improve the Mamba model by modifying the combination of the linear layer and the Softmax layer into a combination of the linear layer and the Margin Softmax layer to obtain the capability maturity assessment calculation model.
[0124] Optionally, the device further comprises:
[0125] The training set acquisition module is used to collect historical evaluation data of multiple capability domains and capability items;
[0126] The model training module is used to train the capability maturity assessment calculation model using the historical evaluation data to obtain the trained capability maturity assessment calculation model.
[0127] Optionally, the calculation formula of the Margin Softmax layer is as follows:
[0128]
[0129] In the formula, represents the value of the loss function, z represents the sample feature vector, c t represents the weight vector of the target category t, τ represents the temperature coefficient, m is a scalar greater than or equal to 0, which is used to control the interval between different categories, C j represents the weight vector of target category j, cos(z,c t ) represents the weight vector c of the sample feature vector z and the target category t t The cosine similarity between j ) represents the weight vector C of the sample feature vector z and the target category j j The cosine similarity between .
[0130] Embodiment 3:
[0131] refer to Figure 6 This embodiment provides a data management capability evaluation device, including a memory 21 and a processor 22. The memory 21 stores a computer program, and the processor 22 is configured to run the computer program to execute the data management capability evaluation method in Example 1.
[0132] The memory 21 is connected to the processor 22. The memory 21 may be a flash memory, a read-only memory or other memory. The processor 22 may be a central processing unit or a single-chip microcomputer.
[0133] Embodiment 4:
[0134] This embodiment provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the data management capability evaluation method in the above-mentioned embodiment 1 is implemented.
[0135] The computer-readable storage medium includes volatile or non-volatile, removable or non-removable media implemented in any method or technology for storing information (such as computer-readable instructions, data structures, computer program modules or other data). Computer-readable storage media include, but are not limited to, RAM (Random Access Memory), ROM (Read-Only Memory), EEPROM (Electrically Erasable Programmable read only memory), flash memory or other memory technology, CD-ROM (Compact Disc Read-Only Memory), digital versatile disk (DVD) or other optical disk storage, magnetic cassettes, magnetic tapes, magnetic disk storage or other magnetic storage devices, or any other medium that can be used to store the desired information and can be accessed by a computer.
[0136] In summary, the data management capability evaluation method, device and readable storage medium provided by the embodiment of the present invention first collect the evaluation data of the unit to be evaluated according to the pre-constructed data management capability maturity hierarchy model; then input the evaluation data of the unit to be evaluated into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, wherein the capability maturity evaluation calculation model modifies the combination of the linear layer and the Softmax layer into a combination of the linear layer and the Margin Softmax layer on the basis of the Mamba model. The present invention can obtain accurate evaluation results by introducing the capability maturity evaluation calculation model based on the improved Mamba model to evaluate the data management maturity level, so that the corresponding resources can be efficiently utilized, and solves the problem that the existing data management capability evaluation method usually adopts the weighted average method to calculate the data management capability evaluation level, and the evaluation results are inaccurate and have a large difference from the true value.
[0137] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present invention, but the present invention is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and essence of the present invention, and these modifications and improvements are also considered to be within the scope of protection of the present invention.
Claims
1. A data management capability assessment method, It is characterized in that The method comprises: Collect evaluation data of the units to be evaluated based on the pre-built data management capability maturity hierarchy model; The evaluation data of the unit to be evaluated is input into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, wherein the capability maturity evaluation calculation model modifies the combination of linear layer and Softmax layer into a combination of linear layer and MarginSoftmax layer based on the Mamba model.
2. The method according to claim 1, It is characterized in that Before collecting evaluation data of the unit to be evaluated according to the pre-built data management capability maturity hierarchy model, the method further includes: The data management capability maturity hierarchical structure model is constructed according to the DCMM standard. The data management capability maturity hierarchical structure model includes a target layer, a criterion layer and a sub-criterion layer. The criterion layer is composed of eight capability domains, and the sub-criterion layer is composed of capability items corresponding to the corresponding capability domains.
3. The method according to claim 2, It is characterized in that The evaluation data of the unit to be evaluated is collected according to the pre-built data management capability maturity hierarchy model, specifically including: The evaluation data of each capability item of the unit to be evaluated is collected according to the pre-constructed data management capability maturity hierarchy model.
4. The method according to claim 1, It is characterized in that Before inputting the evaluation data of the unit to be evaluated into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, the method further includes: The Mamba model is improved by modifying the combination of the linear layer and the Softmax layer into a combination of the linear layer and the MarginSoftmax layer to obtain the capability maturity evaluation calculation model.
5. The method according to claim 2, It is characterized in that Before inputting the evaluation data of the unit to be evaluated into the trained capability maturity evaluation calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be evaluated, the method further includes: Collect historical evaluation data for multiple competency domains and competency items; The historical evaluation data is used to train a capability maturity assessment calculation model to obtain a trained capability maturity assessment calculation model.
6. The method according to claim 2, It is characterized in that The calculation formula of the Margin Softmax layer is as follows: In the formula, represents the value of the loss function, z represents the sample feature vector, c t represents the weight vector of the target category t, τ represents the temperature coefficient, m is a scalar greater than or equal to 0, which is used to control the interval between different categories, C j represents the weight vector of target category j, cos(z, c t ) represents the weight vector c of the sample feature vector z and the target category t t The cosine similarity between j ) represents the weight vector C of the sample feature vector z and the target category j j The cosine similarity between .
7. A data management capability evaluation device, It is characterized in that The device comprises: An evaluation data collection module is used to collect evaluation data of the units to be evaluated based on a pre-built data management capability maturity hierarchy model; A capability maturity assessment module is connected to the evaluation data collection module and is used to input the evaluation data of the unit to be assessed into a trained capability maturity assessment calculation model based on the improved Mamba model to obtain the data management maturity level corresponding to the unit to be assessed, wherein the capability maturity assessment calculation model modifies the combination of the linear layer and the Softmax layer into a combination of the linear layer and the Margin Softmax layer based on the Mamba model.
8. The device according to claim 7, It is characterized in that The device also includes: The hierarchical model construction module is used to construct the data management capability maturity hierarchical model according to the DCMM standard. The data management capability maturity hierarchical model includes a target layer, a criterion layer and a sub-criterion layer. The criterion layer is composed of eight capability domains, and the sub-criterion layer is composed of capability items corresponding to the corresponding capability domains.
9. A data management capability evaluation device, It is characterized in that The method comprises a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to implement the data management capability evaluation method according to any one of claims 1 to 6.
10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the data management capability evaluation method according to any one of claims 1 to 6 is implemented.
Citation Information
Cited By
Horx process modeling method, device and equipment based on Mama architecture and medium
CN119323007A
Home textile sales data management method and system and storage medium
CN119722134A