Boiler drum high-altitude track sliding in-position construction method

By setting up a sliding device and a hand hoist system above the boiler, the drum is smoothly lifted and slipped, and the problem of poor safety and operability of drum lifting in the prior art is solved, and the feasibility and safety of the drum lifting are improved. , suitable for boiler drum lifting in waste incineration power plants.

CN118894449APending Publication Date: 2024-11-05ZHEJIANG IND EQUIP INSTALLATION GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410936366.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The existing boiler drum lifting method has safety hazards and inconvenience in waste incinerators, especially when the roof beam space is limited, it is difficult to effectively lift and position the drum, resulting in unstable positioning of the incinerator and water-cooled wall. , and the operating platform is insufficient, which affects the safety of the operators.

Method used

The boiler drum high-altitude track sliding positioning method is adopted. By setting up a sliding device above the boiler, a large plate beam composed of multiple vertical beams and cross beams is used, and a hand-pulled hoist and sliding device is combined to achieve horizontal, vertical and stable lifting of the drum and Slowly slip to ensure the drum is in place accurately in the designed position.

Benefits of technology

This method improves the safety and operational feasibility of drum lifting, is suitable for high-altitude lifting of large drums, ensures the safety of operators, and is suitable for lifting boilers in waste incineration power plants, and has great reference value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118894449A_ABST
    Figure CN118894449A_ABST
Patent Text Reader

Abstract

The invention discloses a boiler drum high-altitude track sliding in-place construction method. The method comprises the steps that two sliding devices are arranged on a large plate girder above a boiler; before hoisting, the chain sheet group is connected with the steam pocket assembly, and the steam pocket is bound through a steel wire rope; the hoisting system horizontally, vertically and stably lifts the steam pocket to a horizontal mounting position through a steel wire rope; the hoisting system rotates to enable the steam pocket to move to the hooking position, and the sliding device catches a steel wire rope for hooking and changing on the steam pocket; moving the sliding device, replacing the previous sliding device with another sliding device, and moving the other sliding device to continuously slide towards one side; the sliding device returns to the initial position before moving, the sliding device is used for catching a steel wire rope at the other end used for hooking and changing on the steam pocket, and the steam pocket is moved to the horizontal mounting position; and the steam drum and the boiler are connected through the chain sheet group. The method is suitable for hoisting the boiler drum of the waste incineration power plant, and has great reference value for installation of other hanging type drums.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of boiler drum hoisting, and in particular to a boiler drum high-altitude track sliding positioning method. Background Art

[0002] Due to the complex process and special structure of the garbage incinerator, the waste heat boiler is equipped with a vertical laying channel composed of water-cooled walls. The incinerator is located below the water-cooled wall and the steam drum is located above it. The water-cooled wall and the steam drum are suspended on the boiler roof through a hanger. According to previous practices, the steam drum is first hoisted and placed on the ceiling water-cooled wall, and the steam drum is temporarily supported and fixed by the Z1Z2 column on the left side of the furnace and the crossbeam under the steam drum on the right side of the Z1Z2 column; then the top plate beam is installed, and after the top plate beam is completed, the steam drum is lifted to the designed elevation and fixed. In reality, there are many situations where the steam drum does not arrive at the site in time. In order not to delay the construction period, the top plate beam is hoisted first and then the steam drum. This poses a problem for the steam drum hoisting method. The incinerator and water-cooled wall in place make it impractical to lift the steam drum from the bottom. The space on the top beam is too small. The tilt angle of the steam drum from the top is too large for a steam drum with a length of 16.05 meters and a diameter of 1.7 meters. There is no place to set up an operating platform in the limited space, the safety of the operators cannot be guaranteed, and the operability is poor. Summary of the invention

[0003] In view of the shortcomings existing in the above problems, the present invention provides a method for sliding a boiler drum high-altitude track into place.

[0004] To achieve the above-mentioned purpose, the present invention provides a method for sliding a boiler drum high-altitude track into position, comprising two sliding devices arranged on a large plate beam above the boiler, the large plate beam comprising horizontal beams symmetrically arranged on both sides of the boiler and a plurality of vertical beams arranged between the horizontal beams, the vertical beams comprising at least five; the sliding devices are symmetrically arranged on both sides of one of the vertical beams and the horizontal beams are each provided with a first lifting lug, the first lifting lug is slidably connected to one end of the sliding device through a first hand chain hoist, wherein the sliding device comprises a load-bearing beam, anti-deviation parts symmetrically arranged at both ends of the load-bearing beam, a roller assembly arranged in the anti-deviation part, a second lifting lug arranged in the middle of the load-bearing beam, and a second hand chain hoist connected to the second lifting lug;

[0005] Before lifting, the chain plate group is connected to the steam drum, and the steam drum is tied with a steel wire rope;

[0006] The lifting system uses the steel wire rope to lift the steam drum horizontally and vertically to a horizontal installation position in a stable manner;

[0007] The hoisting system rotates to move the steam drum to the hook connection position, and the second hand chain hoist of the corresponding sliding device is used to catch the wire rope on the steam drum for hook connection and hook replacement;

[0008] Move the first hand chain hoist to make the steam drum slide slowly to one side, and use the second hand chain hoist of another sliding device to replace the second hand chain hoist of the previous sliding device, and move the other sliding device to continue sliding to one side;

[0009] Move the first hand chain hoist to make the previous sliding device return to the initial position, and use the second hand chain hoist of the sliding device to catch the other end of the wire rope on the steam drum for hook connection and hook replacement, and move the first hand chain hoist to move the steam drum to the steam drum design position;

[0010] The steam drum and the boiler are connected via the chain plate group.

[0011] Preferably, the roller assembly includes a base and a plurality of rollers arranged on the base.

[0012] Preferably, the base is an I-beam or an H-beam.

[0013] Preferably, the anti-deviation member is 8# channel steel or I-beam

[0014] Preferably, two second lifting ears are provided in the middle of the load-bearing beam, and each of the lifting ears is correspondingly provided with a second hand winch.

[0015] Preferably, the lifting system is a QUY180 crawler crane.

[0016] Preferably, the steel wire ropes are symmetrically tied to both sides of the steam drum.

[0017] Preferably, a vertical beam is arranged in the middle of the horizontal beam, and the sliding device is symmetrically arranged on the vertical beam in the middle of the horizontal beam.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] The invention is suitable for the hoisting of the boiler drum of a garbage incineration power plant, and also has great reference value for the installation of other hanging type steam drums. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a diagram showing the initial position of the sliding device in the boiler drum high-altitude track sliding position method of the present invention;

[0021] Figure 2 It is a plan view of the sliding device in the boiler drum high-altitude track sliding position method of the present invention;

[0022] Figure 3 It is a structural diagram of the sliding device in the boiler drum high-altitude track sliding position construction method of the present invention;

[0023] Figure 4 It is a schematic diagram of the positioning of the sliding device in the boiler drum high-altitude track sliding positioning method of the present invention. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0026] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0027] The following is combined with Figure 1-4 The present invention is described in further detail:

[0028] like Figure 1 As shown, the present invention provides a method for sliding a boiler drum high-altitude track into position, comprising two sliding devices 3 provided on a large plate beam above the boiler, the large plate beam comprising a horizontal beam 1 symmetrically arranged on both sides of the boiler and a plurality of vertical beams 2 arranged between the horizontal beams 1, the vertical beams 2 comprising at least five;

[0029] Reference Figure 2 , the sliding device 3 is symmetrically arranged on both sides of a vertical beam 2 and a first lifting lug 5 is arranged on each of the horizontal beams 1, the first lifting lug 5 is slidably connected to one end of the sliding device 3 through a first hand chain hoist 4, a vertical beam 2 is arranged in the middle of the horizontal beam 1, and the sliding device 3 is symmetrically arranged on the vertical beam 2 in the middle of the horizontal beam 1;

[0030] Reference Figure 3 and Figure 4 The sliding device 3 includes a load-bearing beam 31, anti-deviation members 35 symmetrically arranged at both ends of the load-bearing beam 31, a roller assembly arranged in the anti-deviation member 35, a second lifting ear 34 arranged in the middle of the load-bearing beam 31, and a second hand chain hoist 37 connected to the second lifting ear 34;

[0031] Before lifting, connect the chain assembly to the steam drum assembly and tie the steam drum with steel wire ropes;

[0032] The lifting system uses steel wire ropes to lift the steam drum horizontally and vertically to a horizontal installation position;

[0033] The hoisting system rotates to move the steam drum to the hook connection position, and the second hand chain hoist 37 of the corresponding sliding device 3 is used to catch the wire rope on the steam drum for hook connection and hook replacement;

[0034] Move the first hand chain hoist 4 to make the steam drum slide slowly to one side, and use the second hand chain hoist 37 of another sliding device 3 to replace the second hand chain hoist 37 of the previous sliding device 3, and move the other sliding device 3 to continue sliding to one side;

[0035] Move the first hand chain hoist 4 to make the previous sliding device 3 return to the initial position, and use the second hand chain hoist 37 of the sliding device 3 to catch the other end of the wire rope on the steam drum for hook connection and hook replacement, and move the first hand chain hoist 4 to move the steam drum to the steam drum design position;

[0036] The steam drum 9 and the boiler are connected by a chain plate group.

[0037] Reference Figure 3 The roller assembly includes a base 32 and a plurality of rollers 33 disposed on the base 32. The base 32 is an I-beam or H-beam, and a reinforcing rib 36 is disposed on the base 32. The anti-deviation member 35 is an 8# channel steel or an I-beam.

[0038] Reference Figure 4 Two second lifting ears 34 are provided in the middle of the load-bearing beam 31 , and a second hand winch 37 is correspondingly provided on each lifting ear.

[0039] In this embodiment, the lifting system is a QUY180 crawler crane. The steel wire ropes are symmetrically tied on both sides of the steam drum.

[0040] Example

[0041] The hoisted equipment is boiler drum 9, which is 16.05 meters long, 1.7 meters in diameter, weighs 37 tons, and has a center elevation of 34.53 meters.

[0042] Install the two sets of sliding devices 3 prepared on the crossbeam 1 by a crane, with the first set close to the vertical beam 2 on the right side of the boiler, and the second set close to the vertical beam 2 on the center line of the boiler; the crawler crane lifts the steam drum 9 from the ground to a height of 34 meters and slowly rotates the boom to the hooking position, and uses the two 20T hand hoists on the first set of moving devices to catch the left side of the steam drum 9. The crawler crane cooperates with the moving device to slowly move the steam drum 9 toward the middle vertical beam 2. After moving to the vicinity of the middle vertical beam 2, use the two 20t hoists on another moving device to hook the left side of the steam drum 9, loosen the 20T hoist of the initial moving device, and continue to move the other moving device with the cooperation of the crawler crane. The initial moving device moves back to the initial position and is ready to hook the right side of the steam drum 9. After the initial moving device hooks the right side of the steam drum 9, the crawler crane releases the hook and moves the two sets of devices synchronously. The steam drum 9 is moved horizontally from left to right for a distance of about 12 meters. After the steam drum 9 is moved to the center position of the left and right hanging devices and aligned, the elevation of the steam drum 9 is adjusted and the pins of the steam drum 9 hanging device are installed and welded. After the steam drum 9 is aligned, the moving device is removed.

[0043] Drum 9 is the largest single piece of equipment in the boiler equipment. It is placed in place by the gantry transport method. The drum 9 needs to be lifted to a high height. When selecting a large crane, the lifting weight within the operating radius must be guaranteed, and the lifting height must be guaranteed. The lifting height should take into account the height of the top plate beam, the diameter of the drum 9, the length of the wire rope and the angle. This project is based on the outer dimensions of the boiler frame: the center distance of the left and right columns is 12000mm, the top plate elevation is 37420mm, and the drum 9 weighs 37T. QUY180 crawler crane is selected to cooperate with the drum 9 lifting. (The selection of this crane should take into account the lifting operations of other large equipment on the entire site). The arm length is 65 meters. The operating performance table is shown in Table 1 below. The arm length is 65 meters, and the lifting weight is 51.1 tons when the turning radius is 13 meters. The lifting capacity meets the requirements.

[0044] Table 1

[0045] Main boom lifting performance table

[0046]

[0047] Selection of wire rope

[0048] The steam drum 9 itself weighs 37t, the chain assembly of the steam drum 9 hanger weighs 1.4t; the wire rope and hoisting equipment weigh an estimated 2t, and the total lifting weight is 40.4t.

[0049] The dynamic load coefficient is 1.1, and the uneven load coefficient is 1.1

[0050] Total calculated load: Qj = Q*K1*K2 = 40.4*1.1*1.1 = 48.89t

[0051] The lifting weight on the wire rope side is: 48.89*(7.5m / 16m)=22.92t; (16m is the total length of drum 9, and the wire rope is 3.75m away from the end of drum 9)

[0052] Wire rope strength calculation

[0053] Force of tying wire rope:

[0054] The breaking force of Φ28mm 6*37+1 alternating lay wire rope is 40.6t at 157Kg / 100m, and the total breaking force of 6 strands is 243.6t. The wire rope has an 8-fold safety factor of 243.6 / 8=30.45t>22.92t (reference is made to GB 8918-2006 Steel Wire Rope for Important Purposes for wire rope selection).

[0055] According to the parallelogram law of force, the gravity force along both sides of the wire rope is less than the calculated gravity. The bearing capacity of the wire rope along the force direction is equal to the calculated bearing capacity (the inherent characteristics of the wire rope remain unchanged).

[0056] The specification of the load-bearing beam 31 is a 400*400*20mm rectangular beam. Without considering the reinforcement, the simplified model is a 400*400*20mm rectangular tube. The basic parameters are shown in Table 2, and the cross-section calculation is shown in Table 3.

[0057] Table 2

[0058]

[0059]

[0060] Table 3

[0061]

[0062] Ultimate bearing capacity state: P = γG × Pgk + γQ × Pqk = 222KN

[0063] Normal use limit state: P'=Pgk+Pqk=180KN

[0064] Bending design

[0065] Mmax=P×L / 8=152.625KN·mσ=Mmax / (γxWx)=43.655N / mm2≤[f]=215N / mm2

[0066] Meet the requirements!

[0067] Shear design

[0068] Vmax=P / 2=111KNτmax=Vmax[bh02-(b-δ)h2] / (8Izδ)=2.226N / mm2≤[τ]=125N / mm2 meets the requirements!

[0069] Deflection Calculation

[0070] νmax=P×L3 / (192×E×Ix)=1.137mm≤[ν]=L / 250=22mm

[0071] Meet the requirements!

[0072] Support reaction

[0073] RA=P / 2=222 / 2=111KN RB=P / 2=222 / 2=111KN

[0074] This calculation is the verification result of a single temporary beam, which meets the requirements for the hoisting force of drum 9.

[0075] The calculation parameters of the lifting eye force are shown in Table 4.

[0076] Table 4

[0077]

[0078]

[0079] Lifting eye verification

[0080] Vertical load of lifting lug: Fv = K × Fk = 22 kN

[0081] Lug lateral load: FH = Fv × tanα = 12.702 kN

[0082] Load in the sling direction: FL = Fv / cosα = 25.403 kN

[0083] Radial bending moment: M = FH × (LR) = 1.651 kN m

[0084] Maximum tensile stress in the sling direction of the lug plate:

[0085] σL=FL / (S(2R-D)+2S2(D1-D))=21.169N / mm2≤[σ]=134.4N / mm2

[0086] Meet the requirements!

[0087] Maximum shear stress in the sling direction of the lug plate:

[0088] τL=FL / 2 / (S(2R-D) / 2+S2(D1-D))=21.169N / mm2≤[τ]=80.6N / mm2

[0089] Meet the requirements!

[0090] Stress check of fillet weld of eye plate:

[0091] Fillet weld area: A = LDP × S = 4500 mm2

[0092] Tensile stress of fillet weld: σa=Fv / A=4.889N / mm2

[0093] Shear stress of fillet weld: τa=FH / A=2.823N / mm2

[0094] Bending stress of fillet weld: σab=6M / (S×LDP2)=14.676N / mm2

[0095] Combined stress: σ=((σa+σab)2+4τa2)0.5=20.363N / mm2≤[σ]=134.4N / mm2

[0096] Meet the requirements!

[0097] The installation and alignment of the large steel structure beams have been completed and the acceptance has been completed.

[0098] Inspection items include: Verticality of columns: Use a theodolite and a steel ruler to re-measure the columns in two directions at 90° to each other. The measured data is less than or equal to 1 / 1000 of the length of the column and less than or equal to 15mm. Diagonal of columns (1 meter elevation and column top): Use a ruler to re-measure the large diagonal and the corresponding small diagonal between each column. The measured data is less than or equal to 1.5 / 1000 of the length of the diagonal and less than or equal to 15mm. Deflection of top plate beam: Pull steel wires at both ends of the top of the plate beam and measure with a steel ruler. The deflection meets the design requirements of f1≤15mm upward and f2≤5mm downward.

[0099] The roads in the hoisting area are unobstructed, the communication is reliable, the fire-fighting facilities are complete, and irrelevant personnel within the hoisting radius are evacuated;

[0100] The drawings and materials required for installation are complete;

[0101] The inspection of steam drum 9 and the hanging device is completed;

[0102] Before installing the drum 9, the interior must be cleaned. Each pipe socket should be free of blockage. Carefully check the welding quality of the fillet weld of the elbow pipe socket. The weld should be free of cracks, slag inclusions, pores and other welding defects, and should be well formed. Find the center mark (gun eye) at both ends of the drum 9, and draw the vertical and horizontal center lines of the cylinder on the cylinder. The surface of the hanging device should be free of damage, cracks, heavy skin and other defects, the surface of the hanging rod thread should be free of dents, and it should be well combined with the nut; the connection form should meet the design requirements, and the length of the screw exposed from the nut should not be less than 3 buckles.

[0103] The lifting equipment and slings are in good condition and can be put into use at any time;

[0104] Before lifting operations, conduct a comprehensive inspection of the lifting machinery, slings, wire ropes, pulleys, hooks, hand hoists and lifting ears.

[0105] Fully meet the requirements of hoisting electricity, and the current and voltage are stable and normal;

[0106] Two DC welding machines and two hand-held grinders are always available, with a total power of approximately W = 40KW. The temporary power voltage on site is U = 380V. The laid cables must be able to withstand the current I = W / U = 105.3A. Copper core wires with a line diameter of at least 16mm2 or aluminum core wires with a diameter of at least 25mm2 should be selected.

[0107] The exposed conductive parts and rotating parts of the welding machine should be equipped with safety protection covers. The power cord on the primary side must be well insulated and must not be dragged at will. Its length should not be greater than 5m. The insulation of the welding tongs must be good. The secondary side lead-out line should use rubber insulated copper core soft cable, and its length should not be greater than 30m.

[0108] Each electrical equipment should be equipped with an independent control box, with the system of "one machine, one switch, one protection box" being the standard. It is strictly forbidden to use one switch to directly control two or more electrical equipment. Each electrical equipment must have good grounding measures.

[0109] Full range of labor, materials and testing tools;

[0110] The lifting plan has been approved and safety technical instructions have been provided to all personnel involved in the operation;

[0111] The sliding device 3 is manufactured after calculation.

[0112] The length of the selected load-bearing beam 31 should be greater than the distance between the outer edges of the two cross beams 1. The I-beam or H-beam is welded to the bottom of the load-bearing beam 31 according to the center distance of the top plate beam. Steel plates are welded on both sides of the I-beam or H-beam to increase the strength. The roller 33 is welded to the bottom of the I-beam or H-beam. The lifting lug is welded in the middle position of the lower part of the load-bearing beam 31. The anti-deviation piece 35 is set according to the width of the top plate beam. The two 20T hand chain hoists for connecting the hooks are hung on the lifting lugs in advance, and the whole is lifted and installed on the top plate beam; after the steam drum 9 is lifted to the position, the hook is connected, and the 5T hand chain hoists at both ends are used to slide the steam drum 9 into place.

[0113] All welds should be inspected for appearance defects and 100% subjected to color or penetrant non-destructive testing.

[0114] After the sliding device 3 is manufactured, the sliding effect should be tested. The load-bearing tank should pass smoothly without jamming, and both sides should be synchronized. The height should meet the requirements and be able to pass over the exposed part of the hanger on the top beam.

[0115] Use a 180T crawler crane to hoist the two sets of sliding devices 3 onto the beam 1, and hang the 20T hoist for hoisting the two sets of sliding devices 3;

[0116] Weld the fixed point lifting lug on the beam 1, connect it with the sliding device 3 with a 5T hand chain hoist, operate both ends at the same time to achieve synchronous action, and provide the sliding device 3 with forward power;

[0117] Before lifting, use a truck crane to lift the chain plate group of the drum 9 and test assemble it with the drum 9 to ensure that the fitting surface between the chain plate group and the drum 9 can meet the requirements;

[0118] The chain piece group of the steam drum 9 is a part of the hanging device of the steam drum 9, wherein the hanging rod has been hoisted into place with the large plate beam, and the chain piece group is hoisted together with the steam drum 9 during the hoisting process of the steam drum 9. After the steam drum 9 slides to the designed position, the hanging rod of the steam drum 9 and the chain piece are connected with the pin shaft, and the pin shaft is welded to fix the hanging device;

[0119] Calculate the position of the drum lifting point 10, use two strands of Φ28mm steel wire rope for traction at the outer lifting point, and use two strands of Φ28mm steel wire rope plus two 20T hand chain blocks for traction at the inner lifting point. The two 20T hand chain blocks can adjust the overall levelness of the drum 9 during the test lifting of the drum 9 off the ground; they play a vital role in the hook connection and hook replacement process. The crawler crane lifts the 20T hand chain block to the lifting and binding position of the drum 9, and the lifting and binding rope of the drum 9 is wrapped around the drum 9 2 times with a Φ28mm steel wire rope;

[0120] After the lifting system is installed and inspected, it can be lifted; start the 180T crawler crane, and stop lifting when the steam drum 9 leaves the support and is no more than 200mm from the ground. Check the stability and braking reliability of the lifting system and crawler crane, and use two 20T hand chain hoists on the hook of the 180T crawler crane to align the horizontality of the steam drum 9. After confirming that it is firm, it can be lifted to the installation position slowly and evenly, and no sudden braking is allowed;

[0121] Check the condition of the wire ropes and whether the tension of each wire rope is uniform.

[0122] Check the hook for slippage.

[0123] During the lifting process, wind ropes are arranged at both ends of the steam drum 9 to artificially control the lifting direction and prevent the steam drum 9 from swinging randomly during the lifting process.

[0124] The crawler crane lifts the steam drum 9 to an elevation of approximately 34,000 mm. The steam drum 9 body and accessories are 30 to 50 mm higher than the elevation of the top connecting beam of the Z1-Z2 column. The crawler crane boom is rotated to extend the left side of the steam drum 9 into the installation channel.

[0125] The 180T crawler crane boom is rotated to horizontally displace the steam drum 9 to the hook connection position, and the two 20T hand chain hoists on the first set of sliding devices 3 are used to catch the wire rope for hook connection and hook replacement on the steam drum 9. Since the ceiling water-cooled wall has been installed, a layer of movable scaffolding can be set up on the upper part of the ceiling water-cooled wall (on both sides of the steam drum 9) for operators to change hooks.

[0126] Slowly loosen the two 20T hand hoists on one side of the 180T crawler crane lifting point, and lift the two 20T hand hoists on the sliding device 3 at the same time. In order to keep the steam drum 9 level, there should be a dedicated person to command and operate in a unified manner during the operation, and no individual work is allowed.

[0127] When the two 20T chain hoists on the 180T crawler crane side are no longer under stress, they should be removed to avoid affecting the subsequent sliding operation. At this time, the two 5T chain hoists should be slowly tightened at the same time, and the 180T crawler crane boom continues to rotate, and the first set of sliding devices slowly slides to the right with the steam drum 9; the chain hoists of the first set of sliding devices 3 are replaced with the 20T chain hoists of the second set of sliding devices 3, and the first set of sliding devices 3 are returned to the initial position.

[0128] The 180T crawler crane cooperates with the second set of sliding devices 3 to continue to translate the steam drum 9 to the right until the wire rope of the outer lifting point of the 180T crawler crane slides to the hook position of the first set of sliding devices 3, and hooks the 20T hand hoists of the first set of sliding devices 32 to the Φ28mm binding rope of the outer lifting point; tighten the hoist and slowly release the crawler crane until the steam drum 9 remains horizontal and the wire rope of the outer lifting point of the 180T crawler crane is not under force, then remove the crawler crane, and at the same time slowly tighten the 4 5T hand hoists on the two sets of sliding devices 3, and the steam drum 9 slides to the corresponding position.

[0129] After the steam drum 9 reaches the designed horizontal installation position, adjust the two sets of sliding devices 3 vertically to the 20T hand winch to complete the connection between the hoisting rod and the chain plate of the steam drum 9 hanging device; draw the steam drum 9 elevation of 34.53 meters on the steel frame, use the horizontal tube to measure the elevation method, slowly loosen or tighten the hand winch until the elevation of the steam drum 9 meets the design requirements, tighten the bolts of the hanging device, and the entire steam drum 9 hoisting work is completed.

[0130] The main acceptance items include: the elevation deviation of drum 9 is less than or equal to ±5mm, and the longitudinal and transverse level deviation is less than or equal to 2mm.

[0131] After passing the acceptance, the sliding device 3 is directly lifted back to the ground with a 180T crawler crane, and the temporary lifting ears and other parts welded on the large plate beam are polished and painted with a grinder, and the construction site is cleaned.

[0132] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A boiler drum high altitude track sliding into place method, characterized in that: include: Two sliding devices are provided on the large plate beam above the boiler, the large plate beam includes horizontal beams symmetrically arranged on both sides of the boiler and multiple vertical beams arranged between the horizontal beams, and the vertical beams include at least five; the sliding devices are symmetrically arranged on both sides of one of the vertical beams and the horizontal beams are each provided with a first lifting lug, the first lifting lug is slidably connected to one end of the sliding device through a first hand chain hoist, wherein the sliding device includes a load-bearing beam, anti-deviation parts symmetrically arranged at both ends of the load-bearing beam, a roller assembly arranged in the anti-deviation part, a second lifting lug arranged in the middle of the load-bearing beam, and a second hand chain hoist connected to the second lifting lug; Before lifting, the chain plate group is connected to the steam drum, and the steam drum is tied with a steel wire rope; The lifting system uses the steel wire rope to lift the steam drum horizontally and vertically to a horizontal installation position in a stable manner; The hoisting system rotates to move the steam drum to the hook connection position, and the second hand chain hoist of the corresponding sliding device is used to catch the wire rope on the steam drum for hook connection and hook replacement; Move the first hand chain hoist to make the steam drum slide slowly to one side, and use the second hand chain hoist of another sliding device to replace the second hand chain hoist of the previous sliding device, and move the other sliding device to continue sliding to one side; Move the first hand chain hoist to make the previous sliding device return to the initial position, and use the second hand chain hoist of the sliding device to catch the other end of the wire rope on the steam drum for hook connection and hook replacement, and move the first hand chain hoist to move the steam drum to the steam drum design position; The steam drum and the boiler are connected via the chain plate group.

2. The boiler drum high altitude track sliding into place method according to claim 1, characterized in that: The roller assembly comprises a base and a plurality of rollers arranged on the base.

3. The boiler drum high altitude track sliding into place method according to claim 2, characterized in that: The base is an I-beam or an H-beam.

4. The boiler drum high altitude track sliding into place method according to claim 3, characterized in that: The anti-deviation member is 8# channel steel or I-beam.

5. The boiler drum high altitude track sliding into place method according to claim 4, characterized in that: Two second lifting ears are arranged in the middle of the load-bearing beam, and one second hand chain hoist is correspondingly arranged on each of the lifting ears.

6. The boiler drum high altitude track sliding into place method according to claim 1, characterized in that: The lifting system is a QUY180 crawler crane.

7. The boiler drum high altitude track sliding into place method according to claim 1, characterized in that: The steel wire ropes are symmetrically tied to both sides of the steam drum.

8. The boiler drum high altitude track sliding into place method according to claim 1, characterized in that: A vertical beam is arranged in the middle of the horizontal beam, and the sliding device is symmetrically arranged on the vertical beam in the middle of the horizontal beam.