Non-contact internal combustion type activated carbon activation integrated equipment
By adopting internal and external double-layer heating and steam recycling methods in carbon activation equipment, the problems of inefficiency and resource waste of existing carbon activation processes are solved, and efficient carbon activation and resource recycling are achieved.
Patent Information
- Application Number
- CN202411252416.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-09-09
AI Technical Summary
The existing carbon activation process has low productivity and cannot fully utilize the waste heat in the cooling zone, resulting in waste of resources.
A non-contact internal combustion activated carbon carbon activation integrated equipment is designed, using an activation furnace and a steam supply unit, and non-combustible activation is carried out through internal and external double heating, and the high-temperature gas is recycled.
The efficiency and product pass rate of activated carbon carbon are improved, and the problem of product pass rate affected by sintering is avoided, while also avoiding resource waste.
Smart Images

Figure CN118894530A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of carbon activation, and more specifically, to a non-contact internal combustion activated carbon integrated activation device. Background Art
[0002] Activated carbon uses bituminous coal or forest waste as raw materials and can be recycled. It is of great significance to improve resource utilization efficiency and reduce dependence on fossil energy, and is in line with the country's low-carbon, green, and circular economic development concept. At the same time, environmental protection and governance have become another major task for my country's macroeconomic growth and structural adjustment, and activated carbon has great prospects in water treatment, air pollution prevention and control, and other fields. In addition, activated carbon has also been developed in recent years as a storage medium for high-energy-density materials and electric energy, and has been applied in many emerging fields such as natural gas adsorption and electric energy storage.
[0003] Coal-based activated carbon is a deep processing industry of coal. Its products are widely used in food industry, water treatment, chemical industry, medical industry, environmental protection industry, metallurgical industry, national defense industry and many other fields.
[0004] The existing carbon activation process has a relatively low production yield and cannot fully utilize the waste heat in the cooling zone, resulting in a waste of resources.
[0005] Therefore, the problems existing in the prior art need to be further improved and developed. Summary of the invention
[0006] (I) Purpose of the invention: In order to solve the problems existing in the above-mentioned prior art, the purpose of the present invention is to provide a non-contact internal combustion activated carbon activation integrated equipment.
[0007] (II) Technical solution: In order to solve the above technical problems, the present technical solution provides a non-contact internal combustion activated carbon activation integrated equipment, including an activation furnace and a steam supply unit, wherein the activation furnace activates the raw material, and the steam supply unit provides water vapor for the activation furnace; The activation furnace is arranged in a vertical direction on the placement plane, and comprises a furnace tube and an inner tube. The inner tube is arranged inside the furnace tube, and a containing space is formed between the inner tube and the furnace tube, which is called the activation space. The material is activated in the activation space; the gas generated in the activation space is burned in the inner tube; A discharge cone hopper is arranged at one end of the activation furnace close to the placement plane, and the discharge cone hopper discharges the activated material in the activation space; a steam inlet is arranged on the furnace tube on the side of the discharge cone hopper away from the placement plane, and the steam supply unit is connected to the steam inlet through a steam duct to pass water vapor into the activation space of the activation furnace.
[0008] It also includes a heating unit, which provides heat for the activation furnace. The outer wall of the activation furnace is provided with an insulation layer, which is connected to the heating unit. The heating unit passes high-temperature gas into the insulation layer.
[0009] Among them, a first gas input port is provided at one end of the activation furnace away from the placement plane, and the first gas input port is used to input a first gas, and the first gas includes air and / or oxygen; the first gas input port is provided with a first gas input pipe, one end of the first gas input pipe is connected to the first gas supply device, and the other end is placed in the activation furnace body and connected to the inner tube of the activation furnace.
[0010] Among them, a protective structure is provided at one end of the inner tube close to the feed bin, and the protective structure is used to prevent materials from entering the inner tube; the central axis of the protective structure is connected to one end of the first gas input pipe placed in the activation furnace.
[0011] Wherein, the protective structure includes a first protective structure, the bottom surface of which is fixedly connected to the inner tube, and a first opening is provided at one end of the first protective structure away from the inner tube, and the gas generated in the activation space of the activation furnace and the first gas enter the inner tube of the activation furnace through the first opening.
[0012] Wherein, the protective structure also includes a second protective structure, which is arranged at one end of the first protective structure close to the feed bin, and the bottom surface of the second protective structure is fixed to the first protective structure through a connecting column.
[0013] Wherein, the unloading cone hopper is connected to the unloading bin, and a third control valve is provided at one end of the unloading cone hopper connected to the unloading bin, and the third control valve is used to control the unloading speed of the activation furnace.
[0014] Wherein, a fourth control valve is provided at one end of the discharge bin away from the discharge cone hopper, and the fourth control valve is used to ensure the sealing state of the material during the activation process.
[0015] There are multiple steam inlets, and the multiple steam inlets are evenly distributed on the furnace tubes of the activation furnace. The multiple steam inlets are arranged on the same plane of the furnace tubes of the activation furnace.
[0016] Wherein, one end of the steam conduit placed in the activation space faces the feed bin, and a protective structure is provided, wherein the protective structure is used to prevent materials from entering the steam conduit.
[0017] (III) Beneficial effects: The present invention provides a non-contact internal combustion activated carbon activation integrated equipment, which activates the material in a non-combustion manner by heating the inner and outer layers of the material, thereby avoiding the problem of product qualification rate being affected by sintering. At the same time, the high-temperature gas generated during the activation process is recycled to avoid waste of resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a perspective structural schematic diagram of a preferred embodiment of an activation furnace in a non-contact internal combustion activated carbon activation integrated device of the present invention; Figure 2 It is a schematic diagram of the gas flow during the activation process of a non-contact internal combustion activated carbon integrated activation device of the present invention; Figure 3 It is a schematic diagram of the steam conduit structure of a non-contact internal combustion activated carbon activation integrated device of the present invention; Figure 4 It is a structural schematic diagram of a discharge cone hopper and a discharge bin of a non-contact internal combustion activated carbon activation integrated device of the present invention; 100-placing plane; 201-inner tube; 202-furnace tube; 2031-insulated outer wall; 2032-insulated channel; 204-unloading cone bucket; 2041-cone bucket slope; 2042-connecting plate; 205-unloading bin; 206-steam duct; 2061-support column; 2062-protective structure; 207-steam inlet; 208-first protective structure; 209-second protective structure; 210-connecting column; 301-feeding bin; 302-feeding pipe. DETAILED DESCRIPTION
[0019] The present invention is further described in detail below in conjunction with preferred embodiments. More details are elaborated in the following description to facilitate a full understanding of the present invention. However, the present invention can obviously be implemented in a variety of other ways different from the description. Those skilled in the art can make similar generalizations and deductions based on actual application situations without violating the connotation of the present invention. Therefore, the protection scope of the present invention should not be limited by the content of this specific embodiment.
[0020] The accompanying drawings are schematic diagrams of embodiments of the present invention. It should be noted that the drawings are only examples and are not drawn to scale, and should not be used to limit the actual protection scope of the present invention.
[0021] A non-contact internal combustion activated carbon activation integrated device, comprising an activation furnace, a heating unit, a steam supply unit, a dust removal unit and a control unit. The control unit is connected to the activation furnace, the heating unit, the steam supply unit and the dust removal unit respectively. The activation furnace activates the raw material, and the heating unit provides heat to the activation furnace to ensure that the activation furnace activates the activated carbon. The steam supply unit will provide the activation furnace with water vapor with a temperature greater than or equal to 800°C. The dust removal unit purifies the exhaust gas generated by the activation furnace and the heating unit, and the control unit controls the operation of the activation furnace, the heating unit, the steam supply unit and the dust removal unit according to the activation situation.
[0022] like Figure 1 As shown, the activation furnace is arranged in a vertical direction on the placement plane, and the material to be activated enters the activation furnace from the feed port at one end of the activation furnace away from the placement plane 100, and the material moves in the activation furnace from top to bottom along the activation furnace. A feed bin 301 is arranged vertically above one end of the activation furnace away from the placement plane 100, and the feed bin 301 is connected to the feed port of the activation furnace away from the placement plane 100 through a feed pipe 302. The material to be activated in the feed bin 301 enters the activation furnace from the feed port. A feed valve is provided on the feed pipe 302, and the feed valve is connected to the control unit for controlling the amount of material entering the activation furnace. The feed valve can also be manually controlled, and no specific limitation is made here.
[0023] The activation furnace is provided with a first gas input port at one end away from the placement plane 100, and the first gas input port is used to input the first gas, and the first gas includes air and / or oxygen. The first gas input port is arranged on the central axis of the activation furnace at one end away from the placement plane 100. Specifically, the first gas input port coincides with the central axis of the activation furnace in the vertical direction. The first input port is provided with a first gas input pipe, one end of which protrudes from the activation furnace and is connected to the supply device of the first gas, and the other end of the first gas input pipe is placed in the activation furnace body and connected to the inner tube 201 of the activation furnace. The first gas input pipe is provided with a first control valve, which is connected to the control unit and is used to control the amount of the first gas entering the activation furnace. The first control valve can also be manually controlled, and there is no specific limitation here.
[0024] The outer wall of the activation furnace is provided with an insulation layer, and the insulation layer is connected to the heating unit. The heating unit passes high-temperature gas into the insulation layer, and the high-temperature gas passed into the insulation layer provides heat for the activation furnace and prevents the activation furnace from losing heat. The insulation layer includes an insulation outer wall 2031 and an insulation channel 2032. The insulation outer wall 2031 is arranged around the outer wall of the activation furnace. The difference between the inner diameter of the insulation outer wall 2031 and the outer diameter of the activation furnace is greater than zero, that is, there is a accommodating space between the insulation outer wall 2031 and the activation furnace, and the accommodating space is called the insulation channel 2032. The insulation channel 2032 is connected to the heating unit, and the high-temperature gas of the heating unit passes into the insulation channel 2032, providing heat to the activation furnace and preventing the activation furnace from losing heat.
[0025] The insulation outer wall 2031 is provided with a first high-temperature gas inlet at one end close to the placement plane 100, and the insulation channel 2032 is provided with a first high-temperature gas outlet at one end away from the placement plane 100, and the second high-temperature gas outlet of the heating unit is connected to the first high-temperature gas inlet through a gas conduit. A second control valve is provided on the gas conduit, and the second control valve is connected to the control unit to control the amount of high-temperature gas entering the insulation channel 2032. The second control valve can also be manually controlled, and no specific restrictions are made here. The first high-temperature gas inlet and the first high-temperature gas outlet can be arranged opposite to each other, so that the high-temperature gas entering the insulation channel 2032 passes through the entire insulation channel 2032 and is discharged from the insulation channel 2032, that is, the high-temperature exhaust gas is discharged from the insulation channel 2032.
[0026] The activation furnace includes a furnace tube 202 and an inner tube 201, wherein the inner tube 201 is placed inside the furnace tube 202, and a containing space is formed between the inner tube 201 and the furnace tube 202, which is called an activation space. The material in the feed bin 301 is introduced into the activation space through the feed tube 302, and the material is activated in the activation space. The furnace tube 202 is coaxially arranged with the inner tube 201. The difference between the radius of the furnace tube 202 and the radius of the inner tube 201 is greater than or equal to 300 mm and less than or equal to 400 mm, and the difference between the radius of the furnace tube 202 and the radius of the inner tube 201 is optimally 350 mm, so as to ensure the activation efficiency of the material between the furnace tube 202 and the inner tube 201. When the difference between the radius of the furnace tube 202 and the radius of the inner tube 201 is too large, the thickness of the accumulated material increases, thereby causing incomplete activation of the material and affecting the quality of material activation. When the difference between the radius of the furnace tube 202 and the radius of the inner tube 201 is too small, the activation efficiency of the activation furnace is reduced, which affects the number of finished products of the activation furnace.
[0027] The activation furnace is preferably a cylindrical structure. In this case, the inner tube 201 and the furnace tube 202 are also cylindrical structures.
[0028] A protective structure is provided at one end of the inner tube 201 close to the feed bin 301, and the protective structure is used to prevent materials from entering the inner tube 201. The central axis of the protective structure is connected to one end of the first gas input pipe placed in the activation furnace.
[0029] The protective structure includes a first protective structure 208, which is a conical structure. The bottom surface of the first protective structure 208 is fixedly connected to the inner tube 201. The first protective structure 208 is provided with a first opening at one end away from the inner tube 201. The gas generated in the activation space of the activation furnace and the first gas introduced into the first gas input port enter the inner tube 201 of the activation furnace through the first opening. The gas generated in the activation space of the activation furnace and the first gas introduced into the first gas input port can be burned in the inner tube 201, thereby ensuring the temperature in the activation space, and then ensuring the activation quality of the material. It should be noted that the gas burns in the inner tube 201, and is ignited and burned by the burner in the early stage. After the temperature is increased in the later stage and reaches the ignition temperature, the gas and air will burn by themselves when they come into contact.
[0030] The protective structure also includes a second protective structure 209, which is arranged at one end of the first protective structure 208 close to the feed bin 301. The second protective structure 209 is a conical structure, and the edge of the bottom surface of the second protective structure 209 is fixed to the first protective structure 208 through a connecting column 210. The central axes of the first protective structure 208, the second protective structure 209, and the inner tube 201 coincide. The diameter of the bottom surface of the second protective structure 209 is larger than the diameter of the first opening and smaller than the diameter of the inner tube 201. The end of the second protective structure 209 away from the first protective structure 208 is connected to the first gas input pipe.
[0031] A negative pressure device is connected to one end of the inner tube 201 of the activation furnace away from the feed bin 301, and the negative pressure device is connected to the control unit. The negative pressure device ensures that the pressure in the inner tube 201 is lower than the pressure in the activation space, thereby ensuring that the gas generated in the activation space of the activation furnace and the first gas introduced from the first gas input port enter the inner tube 201 through the first opening. The negative pressure device can be a fan, which is not specifically limited here.
[0032] A fireproof device may be provided on the inner wall of the inner tube 201, and the fireproof device is used to prevent the inner tube 201 from being damaged due to the combustion of the combustible gas in the inner tube 201. One end of the fireproof device is flush with the end of the inner tube 201 away from the feed bin 301, and the other end is placed on the side of the steam inlet 207 close to the feed bin 301. The fireproof device may be a refractory wall made of refractory bricks and in contact with the inner wall of the inner tube 201.
[0033] The activation furnace is provided with a discharge cone hopper 204 at one end close to the placement plane, and the discharge cone hopper 204 discharges the activated materials in the activation space. The discharge cone hopper 204 is connected to a discharge bin 205, and the discharge bin 205 discharges the activated materials. The steam conduit 206 is placed at one end in the activation furnace, and is placed on the side of the discharge cone hopper 204 away from the placement plane 100, that is, the steam conduit 206 is placed at one end in the activation furnace, and the distance from the discharge cone hopper 204 is greater than zero and less than or equal to 1000 mm.
[0034] A third control valve is provided at one end of the discharge cone hopper 204 connected to the discharge bin 205. The third control valve is connected to the control unit and is used to control the discharge speed of the activation furnace, thereby controlling the activation time of the material in the activation furnace to ensure that the material is activated. The third control valve can also be manually controlled, which is not specifically limited here.
[0035] The end of the material discharge bin 205 away from the material discharge cone hopper 204 is provided with a fourth control valve, which is connected to the control unit and is used to ensure the sealing state of the material during the activation process. The fourth control valve can also be manually controlled, which is not specifically limited here.
[0036] The unloading cone hopper 204 can be arranged at one third of the entire activation furnace close to the placement plane 100, and the end of the furnace tube 202 of the activation furnace away from the feed bin 301 is connected to the end of the unloading cone hopper 204 away from the unloading bin 205, that is, the end of the furnace tube 202 of the activation furnace close to the placement plane 100 is only arranged to the position of the unloading cone hopper 204. The unloading cone hopper 204 is placed on the placement plane 100 through the inner tube 201 of the activation furnace. The outer wall of the inner tube 201 of the unloading cone hopper 204 close to the placement plane 100 is provided with the insulation outer wall 2031, and the difference between the inner diameter of the insulation outer wall 2031 and the outer diameter of this part of the inner tube 201 is greater than or equal to zero. When the difference between the inner diameter of the heat-insulating outer wall 2031 and the outer diameter of the inner tube 201 is equal to zero, the heat-insulating outer wall 2031 is used to insulate the inner tube 201. When the difference between the inner diameter of the heat-insulating outer wall 2031 and the outer diameter of the inner tube 201 is greater than zero, high-temperature gas can also be passed between the heat-insulating outer wall 2031 and the inner tube 201 to further prevent the loss of heat in the inner tube 201.
[0037] One end of the discharge cone hopper 204 connected to the activation furnace matches the activation space formed by the furnace tube 202 and the inner tube 201, ensuring that all the activated materials in the activation space can enter the discharge hopper.
[0038] A steam inlet 207 is provided at one end of the furnace tube 202 of the activation furnace close to the unloading cone 204, that is, a steam inlet 207 is provided on the furnace tube 202 of the activation furnace on the side of the unloading cone 204 away from the placement plane 100. The steam supply unit and the steam inlet 207 pass water vapor into the activation space of the activation furnace through a steam conduit. The steam inlet 207 may include multiple steam inlets 207, and the multiple steam inlets 207 are evenly distributed on the furnace tube 202 of the activation furnace. The multiple steam inlets 207 are arranged on the same plane of the furnace tube 202 of the activation furnace, that is, the multiple steam inlets 207 are at the same distance from the placement plane 100. The steam inlet 207 may be 4, and the four steam inlets 207 are arranged at both ends of two mutually perpendicular diameters of the furnace tube 202. The steam inlet 207 and the first high-temperature gas inlet of the insulation layer are on the same horizontal line, that is, the distance between the steam inlet 207 and the placement plane 100 is equal to the distance between the first high-temperature gas inlet and the placement plane 100. Since the first high-temperature gas inlet is the position where the high-temperature gas is introduced, this position is the highest temperature point.
[0039] The end of the steam conduit connected to the steam inlet 207 enters the furnace tube 202 and is placed in the activation space. Figure 3 As shown, one end of the steam conduit placed in the activation space faces the feed bin 301, and a protective structure 2062 is provided. The protective structure 2062 is connected to the end of the steam conduit placed in the activation space through a support column 2061, and the protective structure 2062 is used to prevent materials from entering the steam conduit. The protective structure 2062 can be a cone structure, and the bottom surface of the protective structure 2062 (i.e., the bottom surface of the cone) is opposite to the end of the steam conduit away from the steam supply unit. The bottom surface of the protective structure 2062 is preferably an open structure, and the diameter of the bottom surface of the protective structure 2062 is larger than the diameter of the steam conduit, thereby preventing materials from entering the steam conduit. At the same time, when water vapor is output from the steam conduit and hits the bottom surface of the protective structure 2062, the water vapor is evenly diffused. The diameter of the bottom surface of the protective structure 2062 and the diameter of the steam conduit differ by 1-2 mm. The central axis of the protective structure 2062 and the central axis of the end of the steam conduit away from the steam supply unit are on the same vertical line.
[0040] Here, a specific embodiment of the unloading cone bucket 204 is described: like Figure 4 As shown, the unloading cone hopper 204 includes a connecting plate 2042 and a cone hopper slope 2041. The furnace tube 202 and the inner tube 201 in the direction of the steam inlet 207 away from the feed bin 301 are respectively connected to the connecting plate 2042, and the connecting plate 2042 takes up the entire space between the furnace tube 202 and the inner tube 201 to ensure that the materials activated in the activation space are all passed into the unloading cone hopper 204. The connecting plates 2042 can be composed of two pairs, each pair includes two connecting plates 2042, and the two connecting plates 2042 in each pair of connecting plates 2042 are of the same shape and equal size. Each pair of connecting plates 2042 is arranged opposite to each other to form a barrel-shaped structure.
[0041] One end of the cone bucket slope 2041 close to the feed bin 301 is connected to the end of the connecting plate 2042 away from the feed bin 301, and the other end is connected to the discharge bin 205. The cone bucket slope 2041 is composed of two pairs, each pair includes two slopes, and the two slopes in each pair of cone bucket slopes 2041 are of the same shape and equal size. Each pair of cone bucket slopes 2041 is arranged opposite to each other to form an inclined funnel structure. The inclination direction of the cone bucket slope 2041 is inclined toward the direction away from the activation furnace, and the inclination angle can be 30 degrees to 60 degrees, ensuring that the discharge cone bucket 204 is placed outside the activation furnace.
[0042] The material discharge bin 205 may be a lantern structure, that is, the diameter of one end of the material discharge bin 205 connected to the material discharge cone 204 and the discharge end of the material discharge bin 205 are respectively smaller than the diameter of the central axis of the material discharge bin 205 in the horizontal direction.
[0043] The end of the inner tube 201 of the activation furnace away from the feed bin 301 is connected to the gas circulation inlet of the heating unit. The negative pressure device can be arranged between the inner tube 201 and the gas circulation inlet of the heating unit, and can also be arranged between the outlet of the steam supply unit and the saturated steam supply unit. At this time, the gas temperature is lower and the service life of the equipment is longer.
[0044] like Figure 2 As shown, the heating unit delivers combustion-supporting gas to the heating unit through an air blower to ensure full combustion of the combustion material in the heating unit.
[0045] The non-contact internal combustion activated carbon integrated activation device also includes a saturated steam supply unit, which heats water to obtain saturated steam. The saturated steam outlet of the steam supply unit is connected to the steam inlet 207 of the steam supply unit, and the steam supply unit continues to heat the saturated steam to obtain water vapor with a temperature greater than or equal to 800°C. The first high-temperature gas outlet of the insulation channel 2032 can transport the high-temperature exhaust gas to the high-temperature fan through the steam supply unit. The high-temperature fan passes part of the high-temperature gas into the insulation channel 2032 through the first high-temperature gas inlet of the insulation channel 2032, and part of the gas is discharged from the integrated carbon activation device through the saturated steam supply unit, thereby increasing the circulating gas volume of the insulation channel 2032 and improving the heat transfer efficiency.
[0046] The distance between the inner tube 201 and the feed bin 301 is greater than the distance between the furnace tube 202 and the feed bin 301 . The first gas input pipe is placed at one end in the activation furnace and connected to the second protective structure 209 .
[0047] The inner tube 201 may be composed of multiple sections, for example, two or three sections. The end of the inner tube 201 close to the placement plane 100 is a high temperature activation zone that is easily burned, so the inner tube 201 may be arranged to be composed of multiple sections. When the end of the inner tube 201 close to the placement plane 100 is damaged, it can be directly replaced to facilitate later maintenance and replacement.
[0048] The multiple sections of the inner tube 201 can be connected by bolts or welding, wherein a support device can be added at the location where the multiple sections of the inner tube 201 are connected to improve the support strength. The support device can be a triangular support plate, which is not specifically limited here.
[0049] A high temperature resistant layer may be provided on the inner wall of the inner tube 201, and the high temperature resistant layer is bonded to the inner wall of the inner tube 201. The high temperature resistant layer may be a nickel plate or other high temperature resistant material, which is not specifically limited here. It should be noted that the high temperature resistant layer is used to avoid / reduce steam corrosion under high temperature. The high temperature resistant layer may be composed of two semicircular high temperature resistant plates, and the two high temperature resistant plates are attached to the inner wall of the inner tube 201, the inner walls of the two high temperature resistant plates overlap each other, and the outer wall is welded to the inner wall of the inner tube 201, so as to avoid corrosion of the furnace tube caused by steam at the joint.
[0050] A non-contact internal combustion activated carbon activation integrated equipment, after placing the material in the activation space, through the double-layer heating of the inner tube and the insulation channel, while ensuring the activation temperature, realizes non-combustion activation of the material, avoiding the problem of sintering affecting the product qualification rate, and at the same time recycles the high-temperature gas generated in the activation process to avoid waste of resources.
[0051] The above content is an explanation of the preferred embodiments of the present invention, which can help those skilled in the art to more fully understand the technical solution of the present invention. However, these embodiments are merely illustrative, and it cannot be determined that the specific implementation methods of the present invention are limited to the description of these embodiments. For ordinary technicians in the technical field to which the present invention belongs, without departing from the concept of the present invention, several simple deductions and transformations can be made, which should be regarded as belonging to the protection scope of the present invention.
Claims
1. A non-contact internal combustion activated carbon activation integrated equipment, characterized in that: It comprises an activation furnace and a steam supply unit, wherein the activation furnace activates the raw material, and the steam supply unit provides water vapor for the activation furnace; The activation furnace is arranged in a vertical direction on the placement plane, and comprises a furnace tube and an inner tube. The inner tube is arranged inside the furnace tube, and a containing space is formed between the inner tube and the furnace tube, which is called the activation space. The material is activated in the activation space; the gas generated in the activation space is burned in the inner tube; A discharge cone hopper is arranged at one end of the activation furnace close to the placement plane, and the discharge cone hopper discharges the activated material in the activation space; a steam inlet is arranged on the furnace tube on the side of the discharge cone hopper away from the placement plane, and the steam supply unit is connected to the steam inlet through a steam duct to pass water vapor into the activation space of the activation furnace.
2. According to claim 1, a non-contact internal combustion activated carbon activation integrated device is characterized in that: It also includes a heating unit, which provides heat for the activation furnace. The outer wall of the activation furnace is provided with a heat-insulating layer, which is connected to the heating unit. The heating unit passes high-temperature gas into the heat-insulating layer.
3. The non-contact internal combustion activated carbon activation integrated device according to claim 1, characterized in that: A first gas input port is provided at one end of the activation furnace away from the placement plane, and the first gas input port is used to input a first gas, and the first gas includes air and / or oxygen; the first gas input port is provided with a first gas input pipe, one end of the first gas input pipe is connected to the first gas supply device, and the other end is placed in the activation furnace body and connected to the inner tube of the activation furnace.
4. The non-contact internal combustion activated carbon activation integrated device according to claim 1, characterized in that: A protective structure is provided at one end of the inner tube close to the feed bin, and the protective structure is used to prevent materials from entering the inner tube; the central axis of the protective structure is connected to one end of the first gas input pipe placed in the activation furnace.
5. A non-contact internal combustion activated carbon activation integrated device according to claim 4, characterized in that: The protective structure includes a first protective structure, the bottom surface of which is fixedly connected to the inner tube, and a first opening is provided at one end of the first protective structure away from the inner tube, and the gas generated in the activation space of the activation furnace and the first gas enter the inner tube of the activation furnace through the first opening.
6. A non-contact internal combustion activated carbon activation integrated device according to claim 5, characterized in that: The protective structure also includes a second protective structure, which is arranged at one end of the first protective structure close to the feed bin, and the bottom surface of the second protective structure is fixed to the first protective structure through a connecting column.
7. The non-contact internal combustion activated carbon activation integrated device according to claim 1, characterized in that: The material discharge cone hopper is connected to the material discharge bin, and one end of the material discharge cone hopper connected to the material discharge bin is provided with a third control valve, and the third control valve is used to control the material discharge speed of the activation furnace.
8. A non-contact internal combustion activated carbon activation integrated device according to claim 7, characterized in that: A fourth control valve is provided at one end of the material discharge bin away from the material discharge cone hopper, and the fourth control valve is used to ensure the sealing state of the material during the activation process.
9. The non-contact internal combustion activated carbon activation integrated device according to claim 1, characterized in that: The steam inlets include a plurality of steam inlets, the plurality of steam inlets are evenly distributed on the furnace tubes of the activation furnace, and the plurality of steam inlets are arranged on the same plane of the furnace tubes of the activation furnace.
10. The non-contact internal combustion activated carbon activation integrated equipment according to claim 1, characterized in that: One end of the steam conduit placed in the activation space faces the feed bin, and a protective structure is provided, wherein the protective structure is used to prevent materials from entering the steam conduit.
Citation Information
Patent Citations
Carbonization activation integrated furnace
CN102963890A
Coal-made activated carbon stove
CN108101057A
Automatic heat supplying integrated rotary kiln for charing and activation
CN201043140Y
Rotary activation furnace
CN208378431U
Reflux activated carbon activation furnace
CN2097826U
