Fabricated bridge structure

By setting up connecting components and early warning mechanisms in the prefabricated bridge structure, monitoring and early warning, the problem of offset or inclination of the prefabricated bridge is solved, automatic monitoring and real-time early warning are realized, saving the time and manpower of the inspectors.

CN118895709APending Publication Date: 2024-11-05CHINA RAILWAY 20TH BUREAU GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410928553.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

Prefabricated bridges are prone to offset or tilt, and the offset or tilt amounts of multi-section bridge segments vary, resulting in the inspection personnel needing to inspect in sequence, which consumes a lot of time and manpower.

Method used

A prefabricated bridge structure is designed, by providing the first and second connecting components on the bottom of the bridge deck panel and the side of the cross beam, respectively, including an early warning mechanism to monitor the connection gap and the displacement of the connecting column, and automatically issue early warning information when the preset size is reached. When the displacement value is used, it can be monitored and warned in real time to avoid offset or tilt caused by uneven deformation.

Benefits of technology

Automatic monitoring and real-time early warning of prefabricated bridge structures are realized, which reduces the regular monitoring needs of inspectors, saves time and manpower, and improves detection efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895709A_ABST
    Figure CN118895709A_ABST
Patent Text Reader

Abstract

The technical scheme discloses an assembly type bridge structure, and relates to the technical field of bridge engineering, the assembly type bridge structure comprises bridge piers, cross beams and bridge deck slabs, the cross beams extend in the transverse direction, and the bridge deck slabs and the bridge piers are supported on the upper sides and the lower sides of the cross beams respectively; two first connecting assemblies are arranged between the bottom of the bridge deck slab and the two sides of the cross beam in the longitudinal direction respectively, and each first connecting assembly comprises a first connecting piece and a second connecting piece; the first anti-seismic damping part extends downwards into the corresponding connecting gap along the longitudinal end, and a first early warning mechanism is connected between the first connecting piece and the second connecting piece. A first connecting column extending transversely is arranged on the pier in a penetrating mode, a plurality of second connecting assemblies are arranged on the first connecting column, and a second early warning mechanism is arranged on the first connecting column. Through the arrangement of the first early warning mechanism and the second early warning mechanism, the deviation or inclination condition of the assembly type bridge structure is automatically monitored and early warned in real time, regular monitoring by detection personnel is not needed, and a large amount of time and manpower can be saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridge engineering, and in particular to an assembled bridge structure. Background Art

[0002] Prefabricated bridges are different from traditional on-site construction methods. For prefabricated bridges, some or all of the components of the prefabricated bridges are processed and formed in a prefabricated component factory, and then transported to the construction site for hoisting and splicing into the main body of the bridge.

[0003] In order to ensure that prefabricated bridges have good seismic performance, seismic dampers need to be installed between the bridge deck and the crossbeam, and between the crossbeam and the piers. At present, seismic dampers are usually made of materials with good elastic deformation or plastic deformation capabilities. After long-term use, seismic dampers are prone to uneven deformation, causing the prefabricated bridge structure to shift or tilt, requiring inspection personnel to regularly inspect the bridge structure. Since the offset or tilt of the multiple bridge segments of the prefabricated bridge is different, for prefabricated bridges with longer lengths, inspection personnel need to inspect each bridge segment in turn, which consumes a lot of time and manpower. Summary of the invention

[0004] The main purpose of the present invention is to propose an assembled bridge structure, which aims to solve the technical problems in the prior art that assembled bridges are prone to displacement or tilt, and the displacement or tilt of multiple bridge segments are different. Inspection personnel need to inspect each bridge segment in turn, which results in a lot of time and manpower consumption.

[0005] To achieve the above-mentioned purpose, the prefabricated bridge structure proposed in the present invention includes piers, beams and bridge decks, wherein the beams extend in the transverse direction, the bridge decks and the piers are supported on the upper and lower sides of the beams respectively, a first seismic damper is provided between the bridge deck and the beams, and a second seismic damper is provided between the beams and the piers; two first connecting components are respectively provided between the bottom of the bridge deck and the two sides of the beams in the longitudinal direction, each of the first connecting components includes a first connecting member and a second connecting member, wherein the first connecting member is connected to the bottom of the bridge deck, the second connecting member is connected to the outer side of the beam, and a connecting gap is formed between the first connecting member and the second connecting member; The first seismic damper extends downward along the longitudinal end to the corresponding connection gap, and a first warning mechanism is connected between the first connecting member and the second connecting member. The first warning mechanism is located in the connection gap, and the first warning mechanism is used to issue a warning message when the first connecting member and the second connecting member are close to each other to reduce the connection gap to a preset size; the bridge pier is penetrated by a first connecting column extending laterally, and the first connecting column is provided with a plurality of second connecting components connected to the bottom of the beam at intervals along its extension direction, and a second warning mechanism is provided on the first connecting column, and the second warning mechanism is used to issue a warning message when the first connecting column swings up and down to a preset displacement value.

[0006] In one embodiment, the first warning mechanism includes a first warning part, a sliding rod, a sleeve, a first conductive component and a second conductive component. The sliding rod is connected to the first connecting part and extends in the longitudinal direction, the sleeve is connected to the second connecting part and extends in the longitudinal direction, and the sleeve is sleeved on the sliding rod and can slide with the sliding rod, the first conductive component is connected to the sliding rod, and the second conductive component is connected to the inner wall of the sleeve; the sliding rod can slide along the sleeve to reduce or expand the connection gap and drive the first conductive component to approach or move away from the second conductive component. When the connection gap is reduced to a preset size, the first conductive component contacts and conducts with the second conductive component to trigger the first warning part to issue a warning message.

[0007] In one embodiment, the first conductive component includes a first fixed rod and a first conductive terminal disposed on the first fixed rod, the first fixed rod is connected to the sliding rod and extends longitudinally, the second conductive component includes a second fixed rod and a second conductive terminal disposed on the second fixed rod, the second fixed rod is connected to the inner wall of the sleeve and extends longitudinally; the sliding rod can slide along the sleeve and drive the first fixed rod to move toward or away from the second fixed rod, and the first conductive terminal can contact and conduct with the second conductive terminal when the connection gap is reduced to the preset size, so as to trigger the first warning component to issue a warning message.

[0008] In one embodiment, the sliding rod is T-shaped, the end of the sliding rod is located in the sleeve and connected to the first fixing rod, and the end of the sleeve is provided with a limit block for preventing the end of the sliding rod from sliding out of the sleeve.

[0009] In one embodiment, the second warning mechanism includes a displacement sensor, a controller and a second warning component, and the controller is electrically connected to the displacement sensor and the second warning component; the displacement sensor is installed on the first connecting column and is used to measure the vertical swing displacement of the first connecting column, and the controller is used to trigger the second warning component to issue a warning message when the vertical swing displacement reaches a preset displacement value.

[0010] In one embodiment, the top of the first connecting member is connected to the bridge deck via a first embedded member buried in the bottom of the bridge deck, and the bottom of the first connecting member is connected to the second connecting member via a locking bolt, and the locking bolt passes through the first connecting member and extends into a locking groove provided on the second connecting member, and the locking bolt is staggered with the first early warning mechanism.

[0011] In one embodiment, the second connecting assembly includes a connecting rod and a clamp, wherein the clamp is sleeved outside the first connecting column, and both ends of the clamp in the longitudinal direction are respectively connected to the bottom of the beam through two connecting rods.

[0012] In one embodiment, each of the connecting rods is connected to the bottom of the beam through a hinge assembly, and the hinge assembly includes a second embedded part, a connecting plate and a hinge seat, the second embedded part is embedded in the bottom of the beam, the bottom of the second embedded part is connected to the connecting plate, the connecting plate is tightly attached to the bottom surface of the beam, the hinge seat is installed on the connecting plate, and the connecting rod is hinged to the hinge seat.

[0013] In one embodiment, a second connecting column is provided on the pier, the second connecting column is in the same direction as the first connecting column and is located below the first connecting column, two first top rods are connected to both ends of the first connecting column, and the top end of each first top rod abuts against the bottom of the beam; two second top rods are connected to both ends of the second connecting column, and the top end of each second top rod abuts against the first connecting column.

[0014] In one embodiment, a positioning piece is disposed on the top of the pier, and a positioning groove for inserting the positioning piece is formed at the bottom of the crossbeam.

[0015] The prefabricated bridge structure proposed by the present invention converts the longitudinal displacement of the bridge deck relative to the cross beam into the connection gap size between the first connector and the second connector by connecting the first connector at the bottom of the bridge deck and connecting the second connector at the side of the cross beam, monitors the connection gap size by setting a first warning mechanism, and issues a warning message when the connection gap size is reduced to a preset size, thereby issuing a warning when the longitudinal inclination or offset of the bridge deck relative to the cross beam is too large. The first connecting column is passed through the bridge pier, and the second connecting assembly is set to connect the first connecting member to the bottom of the cross beam, converts the lateral displacement of the cross beam relative to the bridge pier into the up and down swing of the first connecting column, monitors the swing displacement value of the first connecting column by setting a second warning mechanism, and issues a warning message when the swing displacement value reaches the preset displacement value, thereby issuing a warning when the lateral inclination or offset of the cross beam relative to the bridge pier is too large. The first early warning mechanism can monitor the bridge deck and beams arranged on the upper and lower sides of the first seismic damper, and the second early warning mechanism can monitor the beams and piers arranged on the upper and lower sides of the second seismic damper, thereby automatically monitoring and issuing real-time early warnings when uneven deformation of the seismic damper causes the prefabricated bridge structure to shift or tilt. There is no need for regular monitoring by inspection personnel, which can save a lot of time and manpower. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0017] Figure 1 A schematic diagram of a side view structure of an embodiment of a prefabricated bridge structure provided by the present invention;

[0018] Figure 2 A schematic diagram of a side view of an embodiment of a prefabricated bridge structure provided by the present invention from another perspective;

[0019] Figure 3 for Figure 1 A partial enlarged view of the middle A;

[0020] Figure 4 for Figure 1 A partial enlarged view of point B in the middle.

[0021] Description of Figure Numbers:

[0022] 1. Bridge pier; 2. Crossbeam; 3. Bridge deck; 4. First embedded part; 5. First seismic damper; 6. First connecting part; 7. Second seismic damper; 8. Positioning part; 9. Positioning groove; 10. Second embedded part; 11. Connecting plate; 12. Connecting rod; 13. First connecting column; 14. Hoop; 15. Articulated seat; 16. Second connecting column; 17. Locking part; 18. Second push rod; 19. Auxiliary support column; 20. Second top block; 21. First top block; 22. First top rod; 23. Third embedded part; 24. Second connecting part; 25. Locking groove; 26. Locking bolt; 27. Movable groove; 28. Movable plate; 29. ​​Fixed plate; 30. Sleeve; 31. Sliding rod; 32. Limiting end; 33. First fixed rod; 34. First conductive terminal; 35. Second fixed rod; 36. Second conductive terminal; 37. Battery; 38. Warning light.

[0023] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.

[0026] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features limited to "first" and "second" may explicitly or implicitly include at least one of the features. In addition, if "and / or" or "and / or" appears in the full text, its meaning includes three parallel solutions. Taking "A and / or B" as an example, it includes solution A, solution B, or solutions that satisfy both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0027] The present invention proposes an assembled bridge structure, comprising a pier 1, a cross beam 2 and a bridge deck 3, wherein the cross beam 2 extends in the transverse direction, the bridge deck 3 and the pier 1 are supported on the upper and lower sides of the cross beam 2 respectively, a first seismic damper 5 is provided between the bridge deck 3 and the cross beam 2, and a second seismic damper 7 is provided between the cross beam 2 and the pier 1; two first connecting components are respectively provided between the bottom of the bridge deck 3 and the two sides of the cross beam 2 in the longitudinal direction, each first connecting component comprises a first connecting member 6 and a second connecting member 24, wherein the first connecting member 6 is connected to the bottom of the bridge deck 3, the second connecting member 24 is connected to the outer side of the cross beam 2, and a connecting gap is formed between the first connecting member 6 and the second connecting member 24; An anti-seismic damper 5 extends downward along the longitudinal end to the corresponding connection gap, and a first warning mechanism is connected between the first connecting member 6 and the second connecting member 24. The first warning mechanism is located in the connection gap, and the first warning mechanism is used to issue a warning message when the first connecting member 6 and the second connecting member 24 are close to each other to reduce the connection gap to a preset size; the bridge pier 1 is penetrated by a first connecting column 13 extending laterally, and the first connecting column 13 is provided with a plurality of second connecting components connected to the bottom of the beam 2 at intervals along its extension direction, and a second warning mechanism is provided on the first connecting column 13, and the second warning mechanism is used to issue a warning message when the first connecting column 13 swings up and down to a preset displacement value.

[0028] See also Figure 1 , the first seismic damper 5 extends downward along the longitudinal end and is cushioned between the cross beam 2 and the first connecting member 6, the second connecting member 24 is located below the end of the first seismic damper 5, and a first warning mechanism is arranged between the bottom of the first connecting member 6 and the bottom of the second connecting member 24. When the bridge deck 3 is longitudinally tilted or offset relative to the cross beam 2, the bridge deck 3 drives the first connecting member 6 to move longitudinally relative to the second connecting member 24, and the first connecting member 6 in one of the first connecting components moves toward the direction close to the second connecting member 24, and the connection gap on the same side is reduced; the first connecting member 6 in the other connecting component moves away from the second connecting member 24, and the connection gap on the same side is expanded; when one of the connection gaps is reduced to a preset size, the first alarm mechanism issues a warning message. The first connecting column 13 extends in the transverse direction, and the bottom of the cross beam 2 is connected to the first connecting column 13 through the second connecting component. When the cross beam 2 is transversely tilted or offset relative to the pier 1, the cross beam 2 drives the first connecting column 13 to swing up and down, and when the swing displacement of the first connecting column 13 along the up and down direction reaches the preset displacement value, the second warning mechanism issues a warning message.

[0029] The prefabricated bridge structure proposed by the present invention converts the longitudinal displacement of the bridge deck 3 relative to the cross beam 2 into the connection gap size between the first connector 6 and the second connector 24 by connecting the first connector 6 at the bottom of the bridge deck 3 and connecting the second connector 24 at the side of the cross beam 2, monitors the connection gap size by setting a first warning mechanism, and issues a warning message when the connection gap size is reduced to a preset size, thereby issuing a warning when the longitudinal inclination or offset of the bridge deck 3 relative to the cross beam 2 is too large. The first connecting column 13 is penetrated on the pier 1, and the second connecting assembly is set to connect the first connecting component 6 to the bottom of the cross beam 2, converts the lateral displacement of the cross beam 2 relative to the pier 1 into the swing of the first connecting column 13 up and down, monitors the swing displacement value of the first connecting column 13 by setting a second warning mechanism, and issues a warning message when the swing displacement value reaches the preset displacement value, thereby issuing a warning when the lateral inclination or offset of the cross beam 2 relative to the pier 1 is too large. The first early warning mechanism can monitor the bridge deck 3 and the beam 2 arranged on the upper and lower sides of the first seismic damper 5, and the second early warning mechanism can monitor the beam 2 and the pier 1 arranged on the upper and lower sides of the second seismic damper 7, thereby automatically monitoring and giving real-time early warning when the seismic damper undergoes uneven deformation, causing the prefabricated bridge structure to shift or tilt. There is no need for regular monitoring by inspection personnel, which can save a lot of time and manpower.

[0030] In one embodiment, the first warning mechanism includes a first warning component, a sliding rod 31, a sleeve 30, a first conductive component and a second conductive component. The sliding rod 31 is connected to the first connecting member 6 and extends longitudinally, the sleeve 30 is connected to the second connecting member 24 and extends longitudinally, and the sleeve 30 is sleeved on the sliding rod 31 and can slide with the sliding rod 31. The first conductive component is connected to the sliding rod 31, and the second conductive component is connected to the inner wall of the sleeve 30; the sliding rod 31 can slide along the sleeve 30 to reduce or expand the connection gap and drive the first conductive component to approach or move away from the second conductive component. When the connection gap is reduced to a preset size, the first conductive component contacts and conducts with the second conductive component to trigger the first warning component to issue a warning message.

[0031] See also Figure 4, a movable groove 27 is provided at the bottom of the first connecting member 6, and a movable plate 28 is provided at the bottom of the first connecting member 6, the movable plate 28 passes through the movable groove 27 and extends downward, the movable plate 28 and the second connecting member 24 are spaced longitudinally, the slide bar 31 is connected to the movable plate 28 and extends in the direction of the second connecting member 24, the sleeve 30 is connected to the second connecting member 24 and extends in the direction of the movable plate 28, so that the sleeve 30 is sleeved outside the slide bar 31 and slidably cooperates with the slide bar 31. When the first connecting member 6 is displaced relative to the second connecting member 24 to reduce the connection gap, the slide bar 31 slides along the sleeve 30 and drives the first conductive component to approach the second conductive component; when the connection gap is reduced to a preset size, the first conductive component contacts the second conductive component and conducts the warning circuit, so that the first warning component is energized and sends out a warning message. By setting the sleeve 30 and the sliding rod 31, the first conductive component and the second conductive component are covered in the sleeve 30, so as to provide protection for the first conductive component and the second conductive component, and ensure the accurate and effective operation of the first conductive component and the second conductive component during long-term use; the bottom of the second connecting member 24 is connected to a fixing plate 29, which extends longitudinally and blocks the opening below the connection gap to prevent external contaminants from entering the connection gap, thereby further extending the service life of the first conductive component and the second conductive component.

[0032] In one embodiment, the first conductive component includes a first fixed rod 33 and a first conductive terminal 34 disposed on the first fixed rod 33, the first fixed rod 33 is connected to the sliding rod 31 and extends longitudinally, the second conductive component includes a second fixed rod 35 and a second conductive terminal 36 disposed on the second fixed rod 35, the second fixed rod 35 is connected to the inner wall of the sleeve 30 and extends longitudinally; the sliding rod 31 can slide along the sleeve 30 and drive the first fixed rod 33 to move toward or away from the second fixed rod 35, the first conductive terminal 34 can contact and conduct with the second conductive terminal 36 when the connection gap is reduced to a preset size, so as to trigger the first warning component to issue a warning message.

[0033] See also Figure 4 The first fixing rod 33 and the second fixing rod 35 both extend longitudinally and are spaced apart from each other. The first conductive terminal 34 is arranged at the lower end of the first fixing rod 33, and the second conductive terminal 36 is arranged at the upper end of the second fixing rod 35. When the sliding rod 31 slides relative to the sleeve 30 and reduces the connection gap, the first fixing rod 33 drives the first conductive terminal 34 to gradually approach the second conductive terminal 36. When the connection gap is reduced to a preset size, the first conductive terminal 34 contacts the second conductive terminal 36 to connect the warning circuit, and the first warning component is energized and issues a warning message. By adjusting the longitudinal position of the first conductive terminal 34 set on the first fixing rod 33, the preset size of the connection gap can be adjusted, and the adjustment is convenient.

[0034] It should be noted that the first warning component can adopt the alarm light 38 in the prior art, and when the first warning component adopts the alarm light 38, the alarm light 38 is arranged at the bottom of the second connecting member 24, and a battery 37 for supplying power to the alarm light 38 is buried at the position corresponding to the alarm light 38 on the second connecting member 24.

[0035] In one embodiment, the slide rod 31 is T-shaped, the end of the slide rod 31 is located in the sleeve 30 and connected to the first fixing rod 33 , and the end of the sleeve 30 is provided with a limit block for preventing the end of the slide rod 31 from sliding out of the sleeve 30 .

[0036] Furthermore, the slide bar 31 is T-shaped, and the end of the slide bar 31 with a larger cross-sectional dimension is the limit end 32, which is sleeved in the sleeve 30, and a limit block is provided at one end of the sleeve 30 facing the slide bar 31, and the limit block is arranged in an annular direction, and the limit block encloses to form a sliding channel for the slide bar 31 to pass through, and the cross-sectional width of the sliding channel is smaller than the cross-sectional width of the limit end 32, so that the slide bar 31 slides in the sleeve 30 without sliding out of the sleeve 30. In addition, the limit block can prevent external contaminants from entering the sleeve 30, and further provide protection for the first conductive component and the second conductive component.

[0037] In one embodiment, the second warning mechanism includes a displacement sensor, a controller and a second warning component, and the controller is electrically connected to the displacement sensor and the second warning component; the displacement sensor is installed on the first connecting column 13 and is used to measure the vertical swing displacement of the first connecting column 13, and the controller is used to trigger the second warning component to issue a warning message when the vertical swing displacement reaches a preset displacement value.

[0038] It can be understood that the displacement sensor monitors the vertical swing displacement of the first connecting column 13 in real time, the controller receives the data transmitted by the displacement sensor and compares the vertical swing displacement with the preset displacement value in real time, and when the vertical swing displacement reaches the preset displacement value, it indicates that the lateral displacement value of the beam 2 relative to the pier 1 is too large, and the controller triggers the second warning component to send out a warning message. The second warning mechanism proposed in the present invention can monitor and warn the lateral relative displacement between the beam 2 and the pier 1 of the prefabricated bridge structure in real time, thereby eliminating the need for manual monitoring and saving time and manpower.

[0039] In one embodiment, the top of the first connecting member 6 is connected to the bridge deck 3 through the first embedded member 4 buried in the bottom of the bridge deck 3, and the bottom of the first connecting member 6 is connected to the second connecting member 24 through a locking bolt 26. The locking bolt 26 passes through the first connecting member 6 and extends into the locking groove 25 opened on the second connecting member 24, and the locking bolt 26 is staggered with the first early warning mechanism.

[0040] See also Figure 1 and Figure 4 The first embedded part 4 is arranged vertically, and the bottom of the first embedded part 4 is connected to the top of the first connecting part 6, so that the first connecting part 6 is firmly connected to the bridge deck 3 and can move with the bridge deck 3. The second connecting part 24 is connected to the cross beam 2 through the third embedded part 23 embedded in the side of the cross beam 2, so that the second connecting part 24 can move with the cross beam 2. The locking bolt 26 extends longitudinally and is connected between the first connecting part 6 and the second connecting part 24, so that the width of the connection gap remains fixed when the bridge deck 3 and the cross beam 2 do not move relative to each other.

[0041] In one embodiment, the second connecting assembly includes a connecting rod 12 and a clamp 14 . The clamp 14 is sleeved outside the first connecting column 13 . Both ends of the clamp 14 in the longitudinal direction are connected to the bottom of the beam 2 through two connecting rods 12 .

[0042] It can be understood that multiple second connecting components are distributed at intervals along the lateral direction. When the beam 2 is laterally tilted or offset relative to the pier 1, the beam 2 generates vertical displacement relative to both sides of the pier 1, and the vertical displacement is transmitted to the first connecting column 13 through the second connecting components, causing the first connecting column 13 to swing. By monitoring the swing value of the first connecting column 13, the inclination value or offset value of the beam 2 relative to the pier 1 can be monitored.

[0043] In one embodiment, each connecting rod 12 is connected to the bottom of the beam 2 through an articulated assembly, and the articulated assembly includes a second embedded part 10, a connecting plate 11 and a hinge seat 15. The second embedded part 10 is embedded in the bottom of the beam 2, and the bottom of the second embedded part 10 is connected to the connecting plate 11. The connecting plate 11 is tightly attached to the bottom surface of the beam 2, the hinge seat 15 is installed on the connecting plate 11, and the connecting rod 12 is hinged to the hinge seat 15.

[0044] See also Figure 3 The connecting plate 11 is connected to the bottom of the beam 2 through the second embedded part 10, and the connecting rod 12 is hinged to the bottom of the beam 2 through the hinge seat 15, so that when the beam 2 is tilted or offset relative to the pier 1, the two connecting rods 12 on the same clamp 14 rotate to different degrees. By setting the hinge assembly, the first connecting rod 12 is allowed to swing or twist, so that the tilt or offset of the beam 2 relative to the pier 1 can be monitored and judged through the deformation of the first connecting rod 12, and the observation is intuitive and convenient.

[0045] In one embodiment, a second connecting column 16 is provided on the pier 1. The second connecting column 16 is in the same direction as the first connecting column 13 and is located below the first connecting column 13. Two first top rods 22 are respectively connected to both ends of the first connecting column 13, and the top end of each first top rod 22 abuts against the bottom of the beam 2; two second top rods 18 are respectively connected to both ends of the second connecting column 16, and the top end of each second top rod 18 abuts against the first connecting column 13.

[0046] See also Figure 2 The first connecting column 13 and the second connecting column 16 are spaced apart vertically, and both of them extend horizontally. The two ends of the first connecting column 13 are abutted against the bottom of the beam 2 through two first top rods 22, and the top of the first top rod 22 is provided with a first top block 21. The two ends of the second connecting column 16 are abutted against the first connecting column 13 through two second top rods 18, and the top of the second top rod 18 is provided with a second top block 20, so that the first connecting column 13, the second connecting column 16, the first top rod 22 and the second top rod 18 form an integrated force-bearing structure. When the beam 2 and the column are relatively offset or tilted, the first connecting column 13 will swing or twist accordingly, thereby facilitating intuitive monitoring of the offset or tilt of the beam 2.

[0047] It can be explained that two auxiliary support columns 19 are respectively arranged at the bottom of both ends of the second connection column 16, and the auxiliary support columns 19 provide support for the second connection column 16, so as to keep the second connection column 16 horizontal when the cross beam 2 is not offset. Two locking members 17 are arranged near the first connection column 13 on the pier 1, and the two locking members 17 are respectively connected to the positions of the first connection column 13 on both sides of the pier 1, so as to keep the first connection column 13 horizontal when the cross beam 2 is not offset.

[0048] In one embodiment, a positioning member 8 is disposed on the top of the pier 1 , and a positioning groove 9 for inserting the positioning member 8 is formed at the bottom of the crossbeam 2 .

[0049] It should be noted that, in one embodiment, each component of the prefabricated bridge is made of UHPC material, and the cross beam 2 and the pier 1 are prefabricated and assembled on site. The positioning piece 8 on the top of the pier 1 extends upward, and a through hole is opened at the position of the second seismic damper 7 corresponding to the positioning piece 8. The positioning piece 8 passes through the through hole and extends into the positioning groove 9, so that the cross beam 2 and the pier 1 can be accurately positioned, which is convenient for the on-site assembly of the prefabricated bridge.

[0050] The above description is only an exemplary embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the technical concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. An assembled bridge structure, characterized in that: The assembled bridge structure comprises: a pier, a cross beam and a bridge deck, wherein the cross beam extends in a transverse direction, the bridge deck and the pier are supported on upper and lower sides of the cross beam respectively, a first seismic damper is provided between the bridge deck and the cross beam, and a second seismic damper is provided between the cross beam and the pier; Two first connection components are respectively arranged between the bottom of the bridge deck and the two sides of the cross beam in the longitudinal direction, and each of the first connection components includes a first connection member and a second connection member, wherein the first connection member is connected to the bottom of the bridge deck, the second connection member is connected to the outer side of the cross beam, and a connection gap is formed between the first connection member and the second connection member; the end of the first seismic damper in the longitudinal direction extends downward to the corresponding connection gap, a first warning mechanism is connected between the first connection member and the second connection member, the first warning mechanism is located in the connection gap, and the first warning mechanism is used to issue a warning message when the first connection member and the second connection member are close to each other so that the connection gap is reduced to a preset size; The bridge pier is provided with a first connecting column extending laterally, and a plurality of second connecting components connected to the bottom of the beam are arranged at intervals along the extension direction of the first connecting column. A second early warning mechanism is arranged on the first connecting column, and the second early warning mechanism is used to issue an early warning message when the first connecting column swings up and down to a preset displacement value.

2. The assembled bridge structure according to claim 1, characterized in that: The first warning mechanism includes a first warning part, a sliding rod, a sleeve, a first conductive component and a second conductive component. The sliding rod is connected to the first connecting part and extends longitudinally, the sleeve is connected to the second connecting part and extends longitudinally, and the sleeve is sleeved on the sliding rod and can slide with the sliding rod. The first conductive component is connected to the sliding rod, and the second conductive component is connected to the inner wall of the sleeve; the sliding rod can slide along the sleeve to reduce or expand the connection gap and drive the first conductive component to approach or move away from the second conductive component. When the connection gap is reduced to a preset size, the first conductive component contacts and conducts with the second conductive component to trigger the first warning part to issue a warning message.

3. The assembled bridge structure according to claim 2, characterized in that: The first conductive component includes a first fixed rod and a first conductive terminal arranged on the first fixed rod, the first fixed rod is connected to the sliding rod and extends longitudinally, the second conductive component includes a second fixed rod and a second conductive terminal arranged on the second fixed rod, the second fixed rod is connected to the inner wall of the sleeve and extends longitudinally; the sliding rod can slide along the sleeve and drive the first fixed rod to move toward or away from the second fixed rod, and the first conductive terminal can contact and conduct with the second conductive terminal when the connection gap is reduced to the preset size, so as to trigger the first warning component to issue a warning message.

4. The assembled bridge structure according to claim 2, characterized in that: The slide bar is T-shaped, the end of the slide bar is located in the sleeve and connected to the first fixing rod, and the end of the sleeve is provided with a limit block for preventing the end of the slide bar from sliding out of the sleeve.

5. The assembled bridge structure according to claim 1, characterized in that: The second warning mechanism includes a displacement sensor, a controller and a second warning component, and the controller is electrically connected to the displacement sensor and the second warning component; the displacement sensor is installed on the first connecting column and is used to measure the vertical swing displacement of the first connecting column, and the controller is used to trigger the second warning component to issue a warning message when the vertical swing displacement reaches a preset displacement value.

6. The assembled bridge structure according to any one of claims 1 to 5, characterized in that: The top of the first connecting member is connected to the bridge deck through a first embedded member buried in the bottom of the bridge deck, and the bottom of the first connecting member is connected to the second connecting member through a locking bolt. The locking bolt passes through the first connecting member and extends into a locking groove provided on the second connecting member, and the locking bolt is staggered with the first early warning mechanism.

7. The assembled bridge structure according to any one of claims 1 to 5, characterized in that: The second connecting assembly includes a connecting rod and a clamp. The clamp is sleeved outside the first connecting column. Both ends of the clamp in the longitudinal direction are respectively connected to the bottom of the beam through two connecting rods.

8. The assembled bridge structure according to claim 7, characterized in that: Each of the connecting rods is connected to the bottom of the beam through a hinge assembly, and the hinge assembly includes a second embedded part, a connecting plate and a hinge seat. The second embedded part is embedded in the bottom of the beam, and the bottom of the second embedded part is connected to the connecting plate. The connecting plate is tightly attached to the bottom surface of the beam, and the hinge seat is installed on the connecting plate. The connecting rod is hinged to the hinge seat.

9. The assembled bridge structure according to any one of claims 1 to 5, characterized in that: A second connecting column is provided on the bridge pier, the second connecting column is in the same direction as the first connecting column and is located below the first connecting column, two first top rods are connected to the two ends of the first connecting column respectively, and the top end of each first top rod abuts the bottom of the cross beam; two second top rods are connected to the two ends of the second connecting column respectively, and the top end of each second top rod abuts the first connecting column.

10. The assembled bridge structure according to any one of claims 1 to 5, characterized in that: A positioning piece is arranged on the top of the pier, and a positioning groove for inserting the positioning piece is arranged on the bottom of the crossbeam.