Drilling tool for hydrogeological survey
By designing a hydrogeological survey drill tool that can change the drill bit state through forward and reverse rotation, the problem of cumbersome and time-consuming operation of existing drill tools is solved, efficient and stable operation of drilling and core extraction is achieved, and the drilling tool is simplified. Process of use.
Patent Information
- Application Number
- CN202411183626.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-05
AI Technical Summary
The existing hydrogeological survey drill tools require repeated replacement of drill bits during use, resulting in cumbersome and time-consuming operation, and workers need to perform complex and cumbersome replacement, removal and installation work, which is inconvenient for use.
A drill tool for hydrogeological survey was designed, and the drill bit state was changed through forward and reverse rotation, so that it could both drill and core extraction without cumbersome removal and replacement operations. The second drill bit and the first drill bit were combined, and the power was used. The sleeve and threaded rod cooperate to realize automatic replacement of drill bit status and automatic acquisition and cutting of core.
It improves engineering efficiency, reduces workload for workers, simplifies operations, realizes high-quality collection of cores and the stability of the device, and can simultaneously realize drilling and water withdrawal, making the operation simple and practical.
Smart Images

Figure CN118895928A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of hydrogeological survey, and more particularly to a drilling tool for hydrogeological survey. Background Art
[0002] Hydrogeological survey, also known as "hydrogeological investigation" or "hydrogeological survey", refers to the hydrogeological investigation and research work carried out to find out the hydrogeological conditions of a region; this work aims to understand the causes, distribution and movement of groundwater and surface water, so as to provide a scientific basis for the rational exploitation and utilization of water resources, and the correct design and construction of foundation engineering and piling engineering;
[0003] During hydrogeological surveys, real and reliable samples of underground rock formations can be directly obtained by coring. These samples can directly reflect the physical properties, chemical composition, structural characteristics, etc. of the underground rock formations, and are an important basis for analyzing underground hydrological structures and geological conditions. The samples obtained from coring tests can be used to analyze the structure of rock and soil, understand the mechanical properties and stability of rocks, etc., and thus evaluate the safety and stability of the underground hydrological environment.
[0004] However, when using existing drilling tools, it is usually necessary to use a drilling bit to drill deeply first. When the rock layer to be detected is reached, the drill rod and the drill bit need to be taken out together, and then the drilling bit is replaced with a coring drill bit, and then the drilling channel is drilled again to perform a coring operation. After the coring is completed, the drill rod and the drill bit need to be taken out again and replaced with the drilling bit, and then the drilling channel is drilled again to drill deeper rock layers. In some geological surveys, it is necessary to drill hundreds of meters underground. At this time, repeatedly lifting the drill rod to replace the drill bit will waste a lot of time, and the operation is cumbersome, resulting in a sharp increase in the time spent on drilling, and workers need to perform complicated and cumbersome replacement, removal and installation work, which is inconvenient to use.
[0005] In view of this, in view of the above-mentioned deficiencies, the present invention improves and optimizes the drilling tools in the prior art and develops a drilling tool for hydrogeological survey. Summary of the invention
[0006] In view of the problems existing in the prior art, the purpose of the present invention is to provide a drilling tool for hydrogeological survey, which can change the state of the drill bit by forward and reverse rotation, so that it can perform both drilling and coring without the need for cumbersome removal and replacement operations.
[0007] To solve the above problems, the present invention adopts the following technical solutions.
[0008] A drilling tool for hydrogeological survey, comprising a collection platform and a drill rod body, the collection platform is used to provide power to the drill rod body, the drill rod body comprises an end drill rod and an extended drill rod, the end drill rod comprises a drill rod sleeve, a power sleeve is rotatably installed in the middle of the drill rod sleeve, a first drill bit is provided at the bottom end of the drill rod sleeve, a rotating member is fixedly installed on the upper surface of the first drill bit, the rotating member is rotatably installed at the inner bottom end of the drill rod sleeve, a threaded rod is provided in the power sleeve to be threadedly installed, a limited stopper is fixedly installed at the top end of the threaded rod, the limited stopper is slidably clamped in the threaded rod, a second drill bit is fixedly installed at the bottom end of the threaded rod, a collection groove is provided in the middle of the rotating member, a material storage component is fixedly installed at the bottom end of the power sleeve, the material storage component comprises a lower support plate, two mutually symmetrical guide rails are fixedly installed between the lower support plate and the rotating member, and the guide rails are used to guide the second drill bit to enter and exit the collection groove;
[0009] A collecting component for cutting and pushing the core is installed on one side of the upper surface of the rotating part, and two symmetrical lifting screws are installed on the side of the upper surface of the rotating part away from the collecting component. A lifting component for transferring the cut core is installed between the two lifting screws.
[0010] The cam is provided with a plurality of sliding plates, the plurality of sliding plates are provided with a plurality of sliding plates, the plurality of sliding plates are provided with a plurality of sliding plates, the plurality of sliding plates are provided with a plurality of sliding plates, and the plurality of sliding plates are provided with a plurality of sliding plates.
[0011] Furthermore, the lifting screw rod is provided with a thread, the top end of the lifting screw rod is provided with an upper annular groove, the bottom end of the lifting screw rod is provided with a lower annular groove, and the upper annular groove, the thread and the lower annular groove are connected in sequence.
[0012] Furthermore, the lifting component includes a lifting plate, an arc-shaped baffle is slidably installed on one side of the lifting plate, and ear plates are integrally formed on both sides of the lifting plate corresponding to the two lifting screws. A rotating ring is fixedly installed on the lower surface of the ear plate, and the inner ring of the rotating ring has a protrusion that cooperates with the thread on the lifting screw. The rotating ring is sleeved on the outer surface of the lifting screw, and the ear plate is slidably sleeved on the corresponding outer surface of the lifting screw.
[0013] Furthermore, an upper support plate is provided above the lower support plate, and the lower support plate and the upper support plate are both fixedly mounted on the extended drill rod, a trough for water flow is provided on the upper support plate, a first sponge layer is provided at the outer circle between the lower support plate and the upper support plate, a second sponge layer is provided at the inner circle between the lower support plate and the upper support plate, the first sponge layer is fixedly mounted inside the drill rod sleeve, the second sponge layer is fixedly mounted on the outer surface of the extended drill rod, and a partition is fixedly mounted between the lower support plate and the upper support plate.
[0014] Furthermore, a first spring telescopic rod is fixedly installed on the upper support plate, the telescopic end of the first spring telescopic rod passes through the upper support plate and is fixedly installed with a storage baffle, the storage baffle is used in conjunction with the feed trough, and a blocking block for blocking the arc-shaped baffle is installed at a position corresponding to the lower support plate and the feed trough.
[0015] Furthermore, a retreat groove is provided on the upper surface of the rotating part at a position corresponding to the lifting screw, the lifting screw is rotatably installed inside the retreat groove, a spring 1 is fixedly installed inside the retreat groove, a spring set is arranged at the outer end of the lifting screw, a first gear is rotatably installed inside the retreat groove, and the lifting screw is fixedly installed on the corresponding first gear.
[0016] Furthermore, a first gear ring is fixedly installed at a position of the inner ring of the drill rod sleeve corresponding to the second gear, and a second gear ring is fixedly installed at a position of the inner ring of the drill rod sleeve corresponding to the first gear.
[0017] Furthermore, the extended drill rod includes an extended sleeve, a transmission rod is rotatably installed in the middle part of the extended sleeve, a clamping sleeve is fixedly installed on one end of the transmission rod, and the clamping sleeve is located outside the extended sleeve, a hexagonal clamping block is fixedly installed on the end of the power sleeve away from the second drill bit, and the hexagonal clamping block extends to the outside of the drill rod sleeve, and a hexagonal clamping block is also fixedly installed on the end of the transmission rod away from the clamping sleeve, and a drill rod connecting section for connecting the end drill rod and the extended drill rod is installed between the extended drill rod and the end drill rod.
[0018] Furthermore, the drill rod connecting joint, the extension sleeve and the drill rod sleeve are all provided with through grooves for water flow.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] 1. This solution sets the second drill bit and the first drill bit so that the device can change the state of the drill bit by forward and reverse rotation, thereby realizing the ability to replace the drill bit state without taking out the drill rod and the drill bit. It is easy to use and saves a lot of steps of taking out, replacing and re-entering, thereby improving engineering efficiency and reducing the workload of workers.
[0021] 2. This solution sets up a collection component and a lifting component so that the collection component can automatically cut the core when it reaches a set size, and can transfer the core to prevent it from affecting the next work, so that the core can be stored inside the storage component, which is convenient for multiple collections.
[0022] 3. In this scheme, by setting an arc baffle, the core will be blocked by the arc baffle to prevent it from being affected by centrifugal force, so that the collection of the core is more complete and the collection quality is higher, and the core is prevented from causing damage to the device.
[0023] 4. This solution can not only automatically store the cores, but also arrange the cores neatly by setting up storage components, to prevent the center of gravity of the device from shifting due to the presence of the cores, thereby causing the device to shake during rotation. The cores can be stored for easy subsequent removal, and the stability of the device during operation can be ensured to prevent its life from being affected.
[0024] 5. This device can realize drilling and water extraction at the same time. Water can be extracted without removing the drill rod and drill bit. It can also filter the water quality to reduce the impact of sand on water quality during survey. The operation is simple and practical. You only need to control the forward and reverse rotation of the device to improve the survey efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of the drilling tool for hydrogeological survey of the present invention;
[0026] Figure 2 It is a structural schematic diagram of the drill pipe body in the present invention;
[0027] Figure 3 It is a schematic diagram of the cutaway structure of the end drill rod in the present invention;
[0028] Figure 4 It is a schematic diagram of the cross-section structure of the power sleeve in the present invention;
[0029] Figure 5 It is a schematic diagram of the connection structure between the collecting component and the lifting screw rod in the present invention;
[0030] Figure 6It is a structural schematic diagram of the collection component in the present invention;
[0031] Figure 7 It is a schematic diagram of the structure of the lifting screw rod and the lifting component in the present invention;
[0032] Figure 8 It is a structural schematic diagram of the lifting component in the present invention;
[0033] Fig. 9 It is a structural schematic diagram of the lifting screw in the present invention;
[0034] Fig.10 is a schematic diagram of the cross-section structure of the first drill bit in the present invention;
[0035] Fig.11 It is a structural schematic diagram of the material storage component in the present invention;
[0036] Fig.12 It is a schematic diagram of the cross-section structure of the extension drill rod in the present invention;
[0037] Fig.13 It is a schematic diagram of the cross-section structure of the drill pipe connection section in the present invention;
[0038] Description of the numbers in the figure:
[0039] 1. Collection platform; 2. Drill rod body; 3. End drill rod; 4. Extended drill rod; 5. Power sleeve; 6. First drill bit; 7. Material storage component; 8. Collection component; 9. Lifting screw; 10. Lifting component; 31. Drill rod sleeve; 32. First gear ring; 33. Second gear ring; 41. Extension sleeve; 42. Transmission rod; 43. Snap sleeve; 44. Drill rod connecting section; 45. Through groove; 51. Threaded rod; 52. Second drill bit; 53. Limit stopper; 54. Hexagonal block; 61. Rotating part; 62. Collection slot; 63. Retreat slot; 64. Spring 1; 65. First gear; 66. Guide rail; 71. Lower support plate ;72. Upper support plate;73. First sponge layer;74. Second sponge layer;75. First spring telescopic rod;76. Storage baffle;77. Partition;81. Push block;82. Triangular slider;83. Rotating plate;84. Push sleeve;85. Push screw;86. Second gear;87. Second spring telescopic rod;88. Rotating ring;89. Spring two;91. Upper annular groove;92. Lower annular groove;101. Lifting plate;102. Ear plate;103. Rotating sleeve;104. Bump;105. Arc baffle;711. Feed trough;721. Trough body;811. Slide groove;812. Blade;813. Slide rail. DETAILED DESCRIPTION
[0040] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention; it is obvious that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making creative work are within the scope of protection of the present invention.
[0041] See also Figures 1 to 13 A drilling tool for hydrogeological survey includes a collection platform 1 and a drill rod body 2. The collection platform 1 is used to provide power to the drill rod body 2. The drill rod body 2 includes an end drill rod 3 and an extension drill rod 4. The end drill rod 3 includes a drill rod sleeve 31. A power sleeve 5 is rotatably installed in the middle of the drill rod sleeve 31. A first drill bit 6 is provided at the bottom end of the drill rod sleeve 31. A rotating member 61 is fixedly installed on the upper surface of the first drill bit 6. The rotating member 61 is rotatably installed at the inner bottom end of the drill rod sleeve 31. A threaded rod 51 is installed in the power sleeve 5 through a threaded fitting. A limit stopper 53 is fixedly installed at the top end of the threaded rod 51. The limit stopper 53 is slidably stuck in the inner part of the threaded rod 51. A second drill bit 52 is fixedly installed at the bottom end of the threaded rod 51, a collection groove 62 is opened in the middle of the rotating member 61, and a storage component 7 is fixedly installed at the bottom end of the power sleeve 5. The storage component 7 includes a lower support plate 71, and two mutually symmetrical guide rails 66 are fixedly installed between the lower support plate 71 and the rotating member 61. The guide rails 66 are used to guide the second drill bit 52 to enter and exit the collection groove 62. A collection component 8 for cutting and pushing the core is installed on one side of the upper surface of the rotating member 61, and two symmetrical lifting screws 9 are installed on the side of the upper surface of the rotating member 61 away from the collection component 8, and a lifting component 10 for transferring the cut core is installed between the two lifting screws 9.
[0042] In actual use, the acquisition platform 1 has a motor, which is used to provide power. The acquisition platform 1 also has the ability to grab the drill pipe body 2, can provide downward pressure to the drill pipe body 2 and prevent the drill pipe body 2 from falling, and the grabber can also be used to subsequently remove the drill pipe body 2. The grabber, the motor and the bracket can all use existing devices in the prior art. During hydrogeological exploration, it is often necessary to collect cores to determine whether there is groundwater at the location, and to determine the direction of groundwater at the location. It can also be used to study the conditions for the existence of groundwater. Therefore, core collection is of great significance in hydrogeological surveys. Core collection is required in almost all survey tasks, but the existing When using the drilling tool, it is usually necessary to use the drilling bit to drill deeply first. When the rock layer to be detected is reached, the drill rod and the drill bit need to be taken out together, and then the drilling bit is replaced with a coring drill bit, and then the drilling channel is deepened again to perform coring operations. After the coring is completed, the drill rod and the drill bit need to be taken out again and replaced with the drilling bit, and then the drilling channel is deepened again to drill deeper rock layers. In some geological surveys, it is necessary to go hundreds of meters underground. At this time, repeatedly lifting the drill rod to replace the drill bit will waste a lot of time, and the operation is cumbersome, resulting in a sharp increase in the time spent on drilling work, and workers need to perform complicated and cumbersome replacement, removal and installation work, which is inconvenient to use.
[0043] When the drilling rod 3 is drilled, the motor 52 on the collecting platform 1 is used to drive the power sleeve 5 to rotate in the forward direction, and the threaded rod 51 slides out from the inside of the power sleeve 5. Under continuous rotation, the limit stopper 53 reaches the maximum position. At this time, the limit stopper 53 is pressed against the inside of the power sleeve 5, and the threaded rod 51 cannot be lowered. Under the continuous rotation of the power sleeve 5, the limit stopper 53 is pressed against the power sleeve 5, so that the power sleeve 5 drives the threaded rod 51 to rotate together. At this time, the second drill bit 52 is stuck in the collecting groove 62, and the rotation of the power sleeve 5 can drive the second drill bit 52 and the first drill bit 6 to rotate. The second drill bit 52 and the first drill bit 6 are combined to form a conical drilling drill bit, so that the end drill rod 3 can quickly perform drilling work. When the rock formation to be detected is reached, it is only necessary to control the motor on the collecting platform 1 to drive the power sleeve 5 to rotate in the opposite direction, because at this time the first drill The head 6 is located at the rock formation position, and there are multiple extended drill rods 4 on the end drill rod 3, so the first drill bit 6 will be blocked by the rock formation and cannot rotate. The threaded rod 51 will rise as the power sleeve 5 reverses, thereby driving the second drill bit 52 to rise. The power sleeve 5 continues to reverse so that the limit block 53 reaches the uppermost position inside the power sleeve 5. At this time, the rotation of the power sleeve 5 will drive the second drill bit 52 to reverse, and the second drill bit 52 will transfer the rotational kinetic energy to the first drill bit 6 through the guide rail 66. At this time, the inside of the collection groove 62 is in a hollow state, and as the first drill bit 6 rotates, the core can be collected into the inside of the collection groove 62, thereby realizing the change of state of the drill bit through the forward and reverse rotation of the device, thereby realizing the ability to replace the drill bit state, without taking out the drill rod and the drill bit, and realizing the ability to replace different drill bits underground. It is easy to use, saves a lot of removal, replacement and re-entry operation steps, improves engineering efficiency, and reduces the workload of workers.
[0044] Under the continuous rotation of the first drill bit 6, the core will enter one side of the collection component 8 through the collection slot 62. When the core reaches a certain length, the collection component 8 will work to cut the core and transport the core to the position of the lifting component 10. At this time, the power sleeve 5 is controlled to rotate forward, and the lifting component 10 can lift the core to the storage component 7 for storage, and the collection component 8 will also return to its original position. The forward rotation of the power sleeve 5 will drive the second drill bit 52 to re-enter the collection slot 62, and then resume drilling work. When waiting to move to the next position where collection is required, the power sleeve 5 is controlled to reverse again. At this time, the lifting component 10 moves back to its original position. Then, by setting the collection component 8 and the lifting component 10, the device enables the collection component 8 to automatically cut the core when the core reaches the set size, and can transfer the core to prevent it from affecting the next work, so that the core can be stored in the storage component 7, which is convenient for multiple collections.
[0045] The collecting component 8 includes a pushing block 81, a slide groove 811 is provided at the upper end of the pushing block 81, a triangular slider 82 is provided inside the slide groove 811, a rotating plate 83 is rotatably installed on the lower surface of the triangular slider 82, and slide rails 813 for providing sliding of the pushing block 81 are installed at the lower ends of both sides of the pushing block 81, and the slide rails 813 are fixedly installed on the upper surface of the rotating member 61, and a pushing sleeve 84 is fixedly installed on one side of the triangular slider 82, and a pushing screw 85 is installed inside the pushing sleeve 84 through threaded cooperation, and the pushing screw 85 is away from the pushing sleeve 8 A second gear 86 is fixedly installed at one end of the drill pipe sleeve 31, a first gear ring 32 is fixedly installed at a position corresponding to the second gear 86 at the inner ring of the drill pipe sleeve 31, a second spring telescopic rod 87 is fixedly installed on the upper surface of the rotating member 61, a rotating ring 88 is fixedly installed on the telescopic end of the second spring telescopic rod 87, and the rotating ring 88 is rotatably installed at one end of the pushing screw 85 away from the pushing sleeve 84, a spring 89 is fixedly connected between the second spring telescopic rod 87 and the pushing block 81, and a blade 812 is provided on the side of the pushing block 81 away from the second spring telescopic rod 87.
[0046] When the core enters the drill pipe sleeve 31 to a certain length, the core will push the rotating plate 83. A torsion spring is connected between the rotating plate 83 and the triangular slider 82. Because of the triangular slider 82, the triangular slider 82 will be pushed up, and then the triangular slider 82 will drive the pushing sleeve 84, the rotating ring 88, the pushing screw 85, and the second gear 86 to move up. At this time, the second spring telescopic rod 87 is stretched. When the triangular slider 82 slides to the maximum position, the second gear 86 is meshed with the first gear ring 32, and the second gear 86 is blocked by the inner wall of the drill pipe sleeve 31 in the horizontal direction. Therefore, as the device is reversed, the pushing screw 85 will rotate and move out of the pushing sleeve 84, thereby pushing the triangular slider 82 and the pushing block 81 to move. At this time, the spring 89 is stretched, and the blade 812 can cut the core. Because the first drill bit 6 and the power sleeve 5 are driven to rotate continuously, and the core is fixed, so when the pushing block 81 drives the blade 812 to When cutting, the blade 812 will rotate and cut the core, making cutting easier and improving cutting efficiency. After the core is cut, it will be pushed to the lifting component 10 by the pushing block 81. When the core is transported to the lifting component 10, the control device is reversed, and then under the action of the pushing screw 85 and the pushing sleeve 84, the pushing block 81 will gradually move towards the original position. When the pushing block 81 moves to a certain position, the core loses its support for the rotating plate 83. , and then under the action of the second spring telescopic rod 87, the pushing sleeve 84, the pushing screw 85, and the second gear 86 will return to their original positions. At this time, the second gear 86 loses the connection with the first gear ring 32, and the pushing block 81 has not returned to its original position. At this time, under the contraction of the second spring 89, the pushing screw 85 has a thread groove, and the lead angle of the thread groove is greater than the friction coefficient, and then the pushing sleeve 84 and the pushing sleeve 84 do not have self-locking properties, and can return to their original positions under the pull of the second spring 89.
[0047] The lifting screw 9 is provided with a thread, an upper annular groove 91 is provided at the top of the lifting screw 9, and a lower annular groove 92 is provided at the bottom of the lifting screw 9. The upper annular groove 91, the thread, and the lower annular groove 92 are connected in sequence. The lifting component 10 includes a lifting plate 101, and an arc-shaped baffle 105 is slidably installed on one side of the lifting plate 101. The lifting plate 101 and the two sides corresponding to the two lifting screws 9 are integrally formed with ear plates 102. The lower surface of the ear plate 102 is fixedly installed with a rotating ring 103. The inner ring of the rotating ring 103 has a protrusion 104 used in conjunction with the thread on the lifting screw 9. The rotating ring 1 03 is sleeved on the outer surface of the lifting screw 9, the ear plate 102 is slidably sleeved on the corresponding outer surface of the lifting screw 9, a retreat groove 63 is opened on the upper surface of the rotating member 61 at a position corresponding to the lifting screw 9, the lifting screw 9 is rotatably installed inside the retreat groove 63, a spring 64 is fixedly installed inside the retreat groove 63, the spring 64 is sleeved on the outer end of the lifting screw 9, a first gear 65 is rotatably installed inside the retreat groove 63, a second gear ring 33 is fixedly installed at the position corresponding to the first gear 65 at the inner ring of the drill pipe sleeve 31, and the lifting screw 9 is fixedly installed on the corresponding first gear 65.
[0048] When the cut core is pushed onto the lifting component 10 by the collection component 8, the core is placed on the upper surface of the lifting plate 101. When the core is pushed from the center position to one side, the center of gravity changes due to the change in position, and the core is driven to rotate and is subjected to centrifugal force. Therefore, it is easy to be thrown onto the inner wall of the drill pipe sleeve 31, which causes the core to be worn and broken or causes damage to the device. Therefore, by setting the arc baffle 105, the core will be blocked by the arc baffle 105 to prevent it from being affected by the centrifugal force, so that the core collection is more complete and the collection quality is higher, which prevents the core from damaging the device.
[0049] When the device rotates forward again after collecting the core, the power sleeve 5 drives the first drill bit 6 to rotate, and the rotation of the first drill bit 6 drives the first gear 65 to revolve. Due to the action of the second gear ring 33, the first gear 65 will rotate simultaneously when it revolves, and then the first gear 65 will drive the lifting screw 9 to rotate forward, and then the forward rotation of the lifting screw 9 will drive the rotating ring 103 to rise, and then the rotating ring 103 drives the ear plate 102 and the lifting plate 101 to rise until the lifting part 10 rises to the position of the storage part 7. In this process, the lifting screw 9 is driven by the first drill bit 6 to revolve, and then the lifting part 10 and the core thereon are also driven to revolve, and then the core will always be pressed in the arc by centrifugal force. The inside of the shaped baffle 105 prevents the core from falling during the ascent. When the lifting component 10 rises to the uppermost end of the lifting screw 9, the protrusion 104 will slide out of the thread and enter the upper annular groove 91, so that no matter how the device rotates the lifting component 10, it will not be blocked. When the device is reversed to make the lifting component 10 descend to the lowermost end of the lifting screw 9, the protrusion 104 will slide out of the thread and enter the lower annular groove 92, so that the lifting component 10 can be released at the end and will not continue to rise or fall, preventing the lifting screw 9 from continuously rotating and causing damage to the components, making the device run more stably, and the spring 64 can push the protrusion 104 back into the thread, so as to facilitate the next work.
[0050] An upper support plate 72 is provided above the lower support plate 71. The lower support plate 71 and the upper support plate 72 are both fixedly mounted on the extended drill rod 4. A trough 721 for supplying water flow is provided on the upper support plate 72. A first sponge layer 73 is provided at the outer circle between the lower support plate 71 and the upper support plate 72. A second sponge layer 74 is provided at the inner circle between the lower support plate 71 and the upper support plate 72. The first sponge layer 73 is fixedly mounted inside the drill rod sleeve 31, and the second sponge layer 74 is fixedly mounted on the outer surface of the extended drill rod 4. A partition plate 77 is fixedly mounted between the lower support plate 71 and the upper support plate 72. A first spring telescopic rod 75 is fixedly mounted on the upper support plate 72. The telescopic end of the first spring telescopic rod 75 passes through the upper support plate 72 and is fixedly mounted with a receiving baffle 76. The receiving baffle 76 is used in conjunction with the feed trough 711. A blocking block for blocking the arc baffle 105 is installed at the position corresponding to the lower support plate 71 and the feed trough 711.
[0051] The lifting member 10 will transport the rock core to the interior of the storage member 7 through the feed trough 711. When the rock core enters the feed trough 711, the storage baffle 76 is pushed up, and then the first spring telescopic rod 75 is compressed. At this time, the rock core is located between the lower support plate 71 and the upper support plate 72. Because the lower support plate 71 and the upper support plate 72 are fixedly mounted on the extended drill rod 4, the rock core will also be driven to rotate. When the rock core enters the interior of the storage member 7, it will squeeze the second sponge layer 74 and the first sponge layer 73. Because the second sponge layer 74 and the first sponge layer 73 are sponges, they can undergo elastic deformation, and the first sponge layer 73 is fixedly mounted on the inner wall of the drill rod sleeve 31. Because the drill rod sleeve 31 is fixed and does not rotate, when the rock core enters the storage member 7, one side of it is driven to rotate by the second sponge layer 74, while the other side is clamped and does not rotate. Therefore, the rock core itself will rotate. When the lifting part 10 transports the core to the inside of the storage part 7, the arc baffle 105 will be blocked by the blocking block on the lower support plate 71 and then slide to the bottom of the lifting plate 101. At this time, the core can rotate along the first sponge layer 73 to one side of the partition 77 and be finally blocked by the partition 77. If multiple cores are collected, they can be automatically arranged neatly inside the storage part 7 as the device rotates, and when the lifting part 10 withdraws from the storage part 7, the first spring telescopic rod 75 will push the storage baffle 76 to block the feed trough 711 to prevent the core from falling. The storage part 7 can not only automatically store the core, but also arrange the core neatly to prevent the device from shifting its center of gravity due to the presence of the core, thereby causing the device to shake during rotation. The core can be stored for easy subsequent removal, and the stability of the device during operation can be ensured to prevent its service life from being affected.
[0052] The extended drill rod 4 includes an extended sleeve 41, a transmission rod 42 is rotatably installed in the middle of the extended sleeve 41, a clamping sleeve 43 is fixedly installed at one end of the transmission rod 42, and the clamping sleeve 43 is located outside the extended sleeve 41, a hexagonal clamping block 54 is fixedly installed at one end of the power sleeve 5 away from the second drill bit 52, the hexagonal clamping block 54 extends to the outside of the drill rod sleeve 31, and a hexagonal clamping block 54 is also fixedly installed at one end of the transmission rod 42 away from the clamping sleeve 43. A drill rod connecting section 44 for connecting the end drill rod 3 and the extended drill rod 4 is installed between the extended drill rod 4 and the end drill rod 3, and a through groove 45 for water flow is provided on the drill rod connecting section 44, the extended sleeve 41, and the drill rod sleeve 31.
[0053] If it is necessary to collect groundwater, the device only needs to be reversed. At this time, the second drill bit 52 slides out of the collection groove 62, and the first drill bit 6 is extended into the groundwater. A pumping device is used on the ground to absorb the through groove 45 on the extended drill rod 4. At this time, because the extended drill rod 4 and the end drill rod 3 and the drill rod connecting joint 4 are all provided with through grooves 45, the groundwater will enter the device through the collection groove 62, and the water flow will push the receiving baffle 76 to open the feed groove 711, and then the water flow will enter the interior of the storage component 7, and finally flow out of the storage component 7 through the groove body 721. In this process, the water flow will be filtered by the lower support plate 71 and the second sponge layer 74 to prevent the sand and soil during drilling from flowing with the water flow, so that the collected water flow is purer, and the second sponge layer 74 and the first sponge layer 73 rotate relative to each other, so the filtering efficiency can also be improved. The device can realize drilling and water extraction at the same time, and water extraction can be realized without removing the drill rod and the drill bit. The operation is simple and practical, and only the forward and reverse rotation of the device needs to be controlled to improve the survey efficiency.
[0054] Working principle: when it is necessary to go deeper, it is only necessary to drive the power sleeve 5 to rotate forward through the motor on the collection platform 1. At this time, the threaded rod 51 slides out from the inside of the power sleeve 5. Under continuous rotation, the limit stopper 53 will reach the maximum position. Under the continuous rotation of the power sleeve 5, the limit stopper 53 is resisted, so the power sleeve 5 will drive the threaded rod 51 to rotate together. At this time, the second drill bit 52 is stuck in the collection groove 62, and then the rotation of the power sleeve 5 can drive the second drill bit 52 and the first drill bit 6 to rotate. The second drill bit 52 and the first drill bit 6 are combined to form a conical drilling drill bit, so that the end drill rod 3 can quickly perform drilling work. When the rock formation to be detected is reached, it is only necessary to control the collection platform 1. The motor on the collecting platform 1 drives the power sleeve 5 to rotate in the opposite direction. Because the first drill bit 6 is located at the rock formation at this time, and there are multiple extended drill rods 4 on the end drill rod 3, the first drill bit 6 will be blocked by the rock formation and cannot rotate. The threaded rod 51 will rise as the power sleeve 5 reverses, thereby driving the second drill bit 52 to rise. The power sleeve 5 continues to reverse so that the limit block 53 reaches the uppermost position inside the power sleeve 5. At this time, the rotation of the power sleeve 5 will drive the second drill bit 52 to reverse, and the second drill bit 52 will transfer the kinetic energy of rotation to the first drill bit 6 through the guide rail 66. At this time, the inside of the collection slot 62 is in a hollow state, and the core can be collected into the inside of the collection slot 62 as the first drill bit 6 rotates;
[0055] With the continuous rotation of the first drill bit 6, the core will enter one side of the collection component 8 through the collection slot 62. When the core reaches a certain length, the collection component 8 will work to cut the core and transport the core to the position of the lifting component 10. At this time, the power sleeve 5 is controlled to rotate forward, and the lifting component 10 can lift the core to the storage component 7 for storage, and the collection component 8 will also return to its original position. The forward rotation of the power sleeve 5 will drive the second drill bit 52 to re-enter the collection slot 62, and then resume drilling work. When waiting to move to the next position where collection is required, the power sleeve 5 is controlled to reverse again, and the lifting component 10 moves back to its original position.
[0056] The above is only a preferred specific implementation of the present invention; however, the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and its improved conception within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A drilling tool for hydrogeological survey, comprising a collection platform (1) and a drill rod body (2), characterized in that: The acquisition platform (1) is used to provide power to a drill rod body (2); the drill rod body (2) comprises an end drill rod (3) and an extension drill rod (4); the end drill rod (3) comprises a drill rod sleeve (31); a power sleeve (5) is rotatably mounted in the middle of the drill rod sleeve (31); and a first drill bit (6) is provided at the bottom end of the drill rod sleeve (31); A rotating member (61) is fixedly mounted on the upper surface of the first drill bit (6), and the rotating member (61) is rotatably mounted on the inner bottom end of the drill pipe sleeve (31). A threaded rod (51) is provided in the inner part of the power sleeve (5) for threaded matching. A limit stopper (53) is fixedly mounted on the top end of the threaded rod (51), and the limit stopper (53) is slidably mounted inside the threaded rod (51). A second drill bit (52) is fixedly mounted on the lower end of the threaded rod (51), and a collection groove (62) is provided in the middle of the rotating member (61).
2. A drilling tool for hydrogeological survey according to claim 1, characterized in that: A material storage component (7) is fixedly mounted at the bottom end of the power sleeve (5), and the material storage component (7) comprises a lower support plate (71). Two mutually symmetrical guide rails (66) are fixedly mounted between the lower support plate (71) and the rotating member (61), and the guide rails (66) are used to guide the second drill bit (52) to enter and exit the collection slot (62); A collecting component (8) for cutting and pushing the rock core is installed on one side of the upper surface of the rotating member (61), and two symmetrical lifting screws (9) are installed on the side of the upper surface of the rotating member (61) away from the collecting component (8), and a lifting component (10) for transferring the cut rock core is installed between the two lifting screws (9).
3. A drilling tool for hydrogeological survey according to claim 2, characterized in that: The collecting component (8) comprises a pushing block (81), a sliding groove (811) is provided at the upper end of the pushing block (81), a triangular sliding block (82) is provided inside the sliding groove (811), and a rotating plate (83) is rotatably mounted on the lower surface of the triangular sliding block (82); The lower ends of both sides of the pushing block (81) are both provided with slide rails (813) for providing sliding of the pushing block (81), and the slide rails (813) are fixedly installed on the upper surface of the rotating member (61). A pushing sleeve (84) is fixedly installed on one side of the triangular slider (82), and a pushing screw (85) is installed inside the pushing sleeve (84) through threaded cooperation. A second gear (86) is fixedly installed on one end of the pushing screw (85) away from the pushing sleeve (84). A second spring telescopic rod (87) is fixedly mounted on the upper surface of the moving member (61); a rotating ring (88) is fixedly mounted on the telescopic end of the second spring telescopic rod (87); the rotating ring (88) is rotatably mounted on an end of the pushing screw (85) away from the pushing sleeve (84); a second spring (89) is fixedly connected between the second spring telescopic rod (87) and the pushing block (81); and a blade (812) is provided on the side of the pushing block (81) away from the second spring telescopic rod (87).
4. A drilling tool for hydrogeological survey according to claim 3, characterized in that: The lifting screw rod (9) is provided with a thread, the top end of the lifting screw rod (9) is provided with an upper annular groove (91), the bottom end of the lifting screw rod (9) is provided with a lower annular groove (92), the upper annular groove (91), the thread, and the lower annular groove (92) are sequentially connected, the lifting component (10) comprises a lifting plate (101), one side of the lifting plate (101) is slidably mounted with an arc-shaped baffle plate (105), the lifting plate (101) and Ear plates (102) are integrally formed on both sides corresponding to the two lifting screws (9), and a rotating ring (103) is fixedly installed on the lower surface of the ear plate (102). The inner ring of the rotating ring (103) has a protrusion (104) that cooperates with the thread on the lifting screw (9). The rotating ring (103) is sleeved on the outer surface of the lifting screw (9), and the ear plate (102) is slidably sleeved on the outer surface of the corresponding lifting screw (9).
5. A drilling tool for hydrogeological survey according to claim 4, characterized in that: An upper support plate (72) is provided above the lower support plate (71); the lower support plate (71) and the upper support plate (72) are both fixedly mounted on the extended drill rod (4); a trough (721) for water flow is provided on the upper support plate (72); a first sponge layer (73) is provided at the outer circle between the lower support plate (71) and the upper support plate (72); a second sponge layer (74) is provided at the inner circle between the lower support plate (71) and the upper support plate (72); the first sponge layer (73) is fixedly mounted inside the drill rod sleeve (31); the second sponge layer (74) is fixedly mounted on the outer surface of the extended drill rod (4); and a partition plate (77) is fixedly mounted between the lower support plate (71) and the upper support plate (72).
6. A drilling tool for hydrogeological survey according to claim 5, characterized in that: A first spring telescopic rod (75) is fixedly mounted on the upper support plate (72); the telescopic end of the first spring telescopic rod (75) passes through the upper support plate (72) and is fixedly mounted with a storage baffle (76); the storage baffle (76) is used in conjunction with the feed trough (711); a blocking block for blocking the arc-shaped baffle (105) is mounted at a position corresponding to the feed trough (711) on the lower support plate (71).
7. A drilling tool for hydrogeological survey according to claim 6, characterized in that: A retreat groove (63) is provided on the upper surface of the rotating member (61) at a position corresponding to the lifting screw (9); the lifting screw (9) is rotatably mounted inside the retreat groove (63); a spring (64) is fixedly mounted inside the retreat groove (63); the spring (64) is sleeved on the outer end of the lifting screw (9); a first gear (65) is rotatably mounted inside the retreat groove (63); and the lifting screw (9) is fixedly mounted on the corresponding first gear (65).
8. A drilling tool for hydrogeological survey according to claim 7, characterized in that: A first gear ring (32) is fixedly installed at a position on the inner ring of the drill rod sleeve (31) corresponding to the second gear (86), and a second gear ring (33) is fixedly installed at a position on the inner ring of the drill rod sleeve (31) corresponding to the first gear (65).
9. A drilling tool for hydrogeological survey according to claim 8, characterized in that: The extended drill rod (4) comprises an extended sleeve (41), a transmission rod (42) is rotatably mounted in the middle of the extended sleeve (41), a clamping sleeve (43) is fixedly mounted on one end of the transmission rod (42), and the clamping sleeve (43) is located outside the extended sleeve (41); a hexagonal clamping block (54) is fixedly mounted on one end of the power sleeve (5) away from the second drill bit (52), and the hexagonal clamping block (54) extends to the outside of the drill rod sleeve (31); a hexagonal clamping block (54) is also fixedly mounted on one end of the transmission rod (42) away from the clamping sleeve (43); and a drill rod connecting section (44) for connecting the end drill rod (3) and the extended drill rod (4) is installed between the extended drill rod (4) and the end drill rod (3).
10. A drilling tool for hydrogeological survey according to claim 9, characterized in that: The drill rod connecting joint (44), the extended sleeve (41) and the drill rod sleeve (31) are all provided with a through groove (45) for water flow.
Citation Information
Cited By
Drill rod continuous connection type geological exploration equipment
CN119221843A
A drilling rod continuous connection type geological exploration equipment
CN119221843B
Soil layer surveying device for engineering surveying and method thereof
CN120193769A
