Fresh litchi freeze sleep equipment operation monitoring system and method
By real-time monitoring and analysis of the status of litchi sleeping equipment and adjusting the refrigeration temperature, the problem of nutritional value loss caused by unstable equipment operation is solved, and the efficiency of freezing and preservation of litchi is improved.
Patent Information
- Application Number
- CN202410920156.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing litchi freezing equipment is unstable during use, resulting in an increase in the freezing operation time and affecting the nutritional value of litchi.
A fresh lychee freezing equipment operation monitoring system was designed. Through the data collection module, data processing module and data update module, the status data of lychee and equipment is collected and analyzed in real time, the freezing completion degree is calculated, the refrigeration temperature is adjusted, and the freezing temperature is ensured. Stable operation.
It effectively avoids the loss of nutrients caused by the increase in freezing operation time, improves the nutritional value of lychees, and improves the freezing efficiency and equipment stability through temperature adjustment and initial refrigeration temperature optimization.
Smart Images

Figure CN118896448A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of lychee freezing and hibernation, and in particular to a system and method for monitoring the operation of fresh lychee freezing and hibernation equipment. Background Art
[0002] Lychee freeze hibernation technology uses ultra-low temperature freeze hibernation technology to immediately pre-cool, color-protect, freeze, and preserve the freshly picked lychees. By improving the heat exchange efficiency during freezing, small, dense, and evenly distributed ice crystals are formed during the freezing process, avoiding mechanical damage and cell dehydration caused by ice crystal expansion, protecting the integrity of the cell structure, and putting the cells in a dormant state. After thawing, the cell activity can be better restored to maintain the original color and flavor of the lychees, with a shelf life of up to one year.
[0003] The liquid nitrogen cryotherapy treatment in the process of lychee cryotherapy mainly uses lychee cryotherapy equipment, which can provide a low temperature environment of -196℃ through liquid nitrogen quick freezing, which is the key to achieving rapid cryotherapy of lychees. During the cryotherapy operation, the lychee cryotherapy equipment will refrigerate according to the pre-set temperature to ensure that the lychees quickly enter the cryotherapy state, while reducing the formation and growth of ice crystals in the cells, protecting the cell tissue of the lychees to the greatest extent.
[0004] The common lychee freezing equipment in the prior art will perform refrigeration according to a preset temperature when in use. During the entire freezing operation, if the operating state of the freezing equipment is unstable, its refrigeration effect may change, thereby increasing the freezing operation time of the lychee, and further causing the loss of some nutrients in the lychee, affecting the nutritional value of the lychee. Summary of the invention
[0005] The purpose of the present invention is to provide a system and method for monitoring the operation of fresh lychee freezing equipment to solve the following technical problems:
[0006] How to improve the freezing efficiency of litchi and avoid the loss of its nutrients.
[0007] The purpose of the present invention can be achieved through the following technical solutions:
[0008] A system and method for monitoring the operation of fresh lychee freezing equipment, the system comprising:
[0009] A data acquisition module, including a litchi state acquisition unit and a device state acquisition unit, wherein the litchi state acquisition unit is used to collect state data of litchi during the freezing process;
[0010] The device status acquisition unit is used to acquire the operating status data of the cryosleep device during the cryosleep process;
[0011] The data processing module includes a first data calculation unit and a data analysis unit, wherein the first data calculation unit is used to calculate the freezing completion degree of the litchi at different time points during the freezing process according to the information of the litchi state collection unit;
[0012] The data analysis unit is used to analyze the frozen state of the litchi according to the freezing completion degree of the litchi at different time points during the frozen hibernation process, combined with the preset freezing completion degree thresholds at different time points, to determine whether the freezing completion degree at different time points is qualified;
[0013] The data updating module includes a second data calculating unit, an adjusting unit and an updating unit, wherein the second data calculating unit is used to calculate the adjusted refrigeration temperature according to the equipment operation status data collected by the equipment status collecting unit and the freezing completion degree of the litchi at different time points during the freezing process;
[0014] The adjusting unit is used to adjust the temperature of the refrigeration equipment according to the adjusted refrigeration temperature calculated by the second data calculating unit,
[0015] The updating unit is used to update the initial refrigeration temperature of the refrigeration equipment for the next operation.
[0016] Furthermore, the data collected by the litchi status collection unit includes the temperature, humidity and pressure values of a batch of litchis at different time points during the freezing operation, and the data collected by the equipment status collection unit includes the refrigerant content of the freezing equipment during operation and the temperature and vibration frequency of the compressor.
[0017] Furthermore, the calculation process of the first data calculation unit includes:
[0018] By formula Calculate the freezing completion degree S of litchi at the i-th time point in the freezing operation i ;
[0019] Where i is a data collection at a fixed time interval during the freezing process, H is the humidity of litchi at the i-th time point during the freezing process, and H 0i is the preset standard humidity of litchi at the i-th time point in the freezing operation, H1 is H i The standard value, f c (X) is the defined function. If X>0, then f c (X) = X, if X ≤ 0, then f c (X) = 0, Wd i is the temperature of litchi at the i-th time point during the freezing operation, Wd 0i is the preset standard temperature of litchi at the i-th time point in the freezing operation, Pa i is the pressure on litchi at the i-th time point during the freezing operation, Pa0i is the preset pressure on litchi at the i-th time point during the freezing operation, is the first error adjustment coefficient, which can be set according to empirical fitting, x1 and x2 are weight coefficients, f s (θ) is the influence function of litchi varieties, which can be obtained based on the test according to the influence of different litchi on the degree of freezing completion.
[0020] Furthermore, the analysis process of the data analysis unit includes:
[0021] By calculating the freezing completion degree S of litchi at the i-th time point in the freezing operation i and the preset freezing completion threshold S at the i-th time point xi Make a comparison;
[0022] If S i >S xi The system determines that the freezing completion degree at this time point is low and does not reach the freezing completion passing line at this time point, indicating that the freezing speed of the litchi is slow and the temperature of the freezing equipment needs to be adjusted;
[0023] If S i xi The system determines that the freezing completion degree at this time point is high and reaches the freezing completion passing line at this time point, which means that the freezing speed of the litchi is high and there is no need to adjust the temperature of the freezing equipment.
[0024] Furthermore, the calculation process of the second data calculation unit includes:
[0025] By formula Calculate the adjusted temperature r of the cryosleep device at the i-th time point i ;
[0026] and updating the initial refrigeration temperature of the refrigeration equipment through the updating unit;
[0027] Among them, r 0i is the preset temperature of the cryosleep device at the i-th time point, f L is an adjustment coefficient comparison table function, and the adjustment coefficient comparison table function can be based on The range of values for r i The impact of ZLY is obtained based on the test. i is the refrigerant content of the cryo-hibernation equipment at the i-th time point, ZLY 0i is the preset content of the refrigerant in the cryo-hibernation equipment at the i-th time point, and ZLY1 is ZLY i Standard value, YSJ i is the compressor temperature of the cryosleep equipment at the i-th time point, YSJ 01 The compressor temperature preset for the cryo-hibernation equipment, fk is the compressor vibration frequency influence function, σ i is the compressor vibration frequency of the cryosleep device at the i-th time point. The compressor vibration frequency influence function can be obtained based on the test according to the influence of the compressor vibration frequency on the operating state of the cryosleep device. β is the second error influence coefficient, which can be set according to empirical fitting.
[0028] Furthermore, the process of updating the initial refrigeration temperature of the refrigeration equipment includes:
[0029] By formula Calculate and obtain the discrete coefficient T of the temperature adjustment of the freezing equipment in a freezing operation;
[0030] Where a is any batch of litchi, b is the total number of litchi batches in one freezing operation, SJ a The number of times the temperature was adjusted for any batch of lychees during the freezing operation. For all SJ a The average value of g is the proportionality coefficient, which can be set based on empirical fitting. For all SJ a The maximum value in .
[0031] Furthermore, the process of updating the initial refrigeration temperature of the refrigeration equipment further includes:
[0032] By the formula Q = Q0*f j (T)*δ calculates and obtains the initial refrigeration temperature Q of the refrigeration equipment after adjustment;
[0033] where f j is the influence function of the discrete coefficient of the frozen dormant time of litchi, which can be obtained based on the test on the initial refrigeration temperature of the refrigeration equipment according to the discrete coefficient of the frozen dormant time of litchi. δ is the third error influence coefficient, which can be set according to empirical fitting.
[0034] A method for monitoring the operation of a fresh lychee freezing device, the method comprising:
[0035] S1: collecting state data of litchi during the freezing process and operation state data of the freezing equipment during the freezing process through a data acquisition module;
[0036] S2: calculating, by the first data calculation unit, the freezing completion degree of the litchi at different time points during the freezing process according to the information of the litchi state collection unit;
[0037] S3: Analyzing the frozen dormancy state of the litchi by combining the preset freezing completion thresholds at different time points through the data analysis unit to determine whether the freezing completion at different time points is qualified;
[0038] S4: when it is determined that the frozen hibernation quality of the litchi is poor, the second data calculation unit calculates the adjusted refrigeration temperature according to the device operation status data collected by the device status collection unit and the freezing completion degree of the litchi at different time points during the frozen hibernation process;
[0039] S5: adjusting the temperature of the refrigeration equipment by the adjustment unit according to the adjusted refrigeration temperature calculated by the second data calculation unit;
[0040] S6: The initial refrigeration temperature of the refrigeration equipment when it works next time is updated by the updating unit. Beneficial effects of the present invention:
[0041] (1) The present invention can determine whether the freezing completion degree of litchi at different time points during the freezing process is qualified by calculating the freezing completion degree of the litchi at different time points. When it is determined that the freezing completion degree at a certain time point is unqualified, it means that the operating state of the freezing device is unstable, and timely adjustments are made. Through such a setting, not only the operating state of the freezing device can be monitored, but also the temperature of the freezing device can be adjusted in time when it is determined that the operating state of the freezing device is unstable, thereby avoiding the situation where the freezing operation time increases and causes the loss of some nutrients of the litchi, thereby improving the nutritional value of the litchi.
[0042] (2) The present invention calculates the freezing completion degree S of the litchi at the i-th time point in the freezing operation. i and the preset freezing completion threshold S at the i-th time point xi By comparing, the freezing speed of litchi can be accurately judged. If the freezing speed is slow at a certain point in time, it means that the operating stability of the freezing equipment is poor. Therefore, the refrigeration temperature of the freezing equipment needs to be adjusted in time to avoid the loss of some nutrients in litchi due to increased freezing operation time, thereby improving the nutritional value of litchi.
[0043] (3) The present invention combines the operating status data of the cryosleep device during the cryosleep process at the i-th time point with the freezing completion degree S at the i-th time point. i After that, the adjusted temperature at the i-th time point can be accurately calculated, and the refrigeration temperature of the refrigeration equipment at the time point can be adjusted in time through the adjustment unit, so as to improve the freezing efficiency of litchi, avoid the situation that the freezing efficiency of litchi is reduced due to the unstable operation state of the freezing equipment, and the working time of the entire freezing operation is prolonged, thereby avoiding the loss of some nutrients of litchi and ensuring the nutritional value of litchi.
[0044] (4) The present invention obtains the discrete coefficient T of the temperature adjustment of the freezing hibernation device in a freezing hibernation operation by calculation. Obviously, when the discrete coefficient of the degree data of the temperature adjustment of the freezing hibernation device in a freezing hibernation operation is larger, its volatility is larger, indicating that the freezing hibernation device is in a very unstable state during operation. The system will issue an early warning to the background to remind the staff to repair it. On the contrary, when the discrete coefficient of the degree data of the temperature adjustment of the freezing hibernation device in a freezing hibernation operation is smaller, its volatility is smaller, indicating that the freezing hibernation device is in a relatively stable state during operation and no early warning is issued. The data can reflect the stability of the freezing hibernation device during operation, thereby providing accurate data for subsequent adjustment of the initial refrigeration temperature of the refrigeration device. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] The present invention will be further described below in conjunction with the accompanying drawings.
[0046] Figure 1 It is a schematic block diagram of a fresh lychee freezing equipment operation monitoring system in the present invention;
[0047] Figure 2 It is a flow chart of a method for monitoring the operation of a fresh lychee freezing hibernation device in the present invention; DETAILED DESCRIPTION
[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] See also Figure 1 As shown, in one embodiment, the present application provides a system and method for monitoring the operation of a fresh lychee freezing device, the system comprising:
[0050] A data acquisition module, including a litchi state acquisition unit and a device state acquisition unit, wherein the litchi state acquisition unit is used to collect state data of litchi during the freezing process;
[0051] The device status acquisition unit is used to acquire the operating status data of the cryosleep device during the cryosleep process;
[0052] The data processing module includes a first data calculation unit and a data analysis unit, wherein the first data calculation unit is used to calculate the freezing completion degree of the litchi at different time points during the freezing process according to the information of the litchi state collection unit;
[0053] The data analysis unit is used to analyze the frozen state of the litchi according to the freezing completion degree of the litchi at different time points during the frozen hibernation process, combined with the preset freezing completion degree thresholds at different time points, to determine whether the freezing completion degree at different time points is qualified;
[0054] The data updating module includes a second data calculating unit, an adjusting unit and an updating unit, wherein the second data calculating unit is used to calculate the adjusted refrigeration temperature according to the equipment operation status data collected by the equipment status collecting unit and the freezing completion degree of the litchi at different time points during the freezing process;
[0055] The adjusting unit is used to adjust the temperature of the refrigeration equipment according to the adjusted refrigeration temperature calculated by the second data calculating unit,
[0056] The updating unit is used to update the initial refrigeration temperature of the refrigeration equipment for the next operation;
[0057] Through the above technical solution, this embodiment can collect the state data of the lychees during the freezing process and the operating state data of the freezing equipment during the freezing process by setting a data collection unit, and calculate the freezing completion degree of the lychees at different time points during the freezing process through the first data calculation unit, and then analyze the freezing state of the lychees by combining the preset freezing completion degree thresholds at different time points through the data analysis unit to determine whether the freezing completion degree at different time points is qualified. If it is determined that the freezing completion degree of the lychees at a certain time point is unqualified, the second data calculation unit calculates the adjusted refrigeration temperature for the freezing completion degree of the lychees at the time point according to the equipment operating state data collected by the equipment state collection unit, and timely adjusts the temperature of the refrigeration equipment through the adjustment unit;
[0058] By calculating the freezing completion degree of litchi at different time points during the freezing process, it can be determined whether the freezing completion degree at different time points is qualified. When it is determined that the freezing completion degree at a certain time point is unqualified, it means that the operating state of the freezing equipment is unstable, and timely adjustments are made. By such a setting, not only the operating state of the freezing equipment can be monitored, but also the temperature of the freezing equipment can be adjusted in time when it is determined that the operating state of the freezing equipment is unstable, so as to avoid the situation where the freezing operation time increases and causes the loss of some nutrients of the litchi, thereby improving the nutritional value of the litchi.
[0059] After a freezing operation is completed, the discrete coefficient of the temperature adjustment of the freezing equipment in the freezing operation is analyzed by the updating unit, and the initial temperature of the freezing equipment at the beginning of the next freezing operation is adjusted, thereby optimizing the technical details of the freezing operation and improving the efficiency of the freezing operation.
[0060] The data collected by the litchi status collection unit include the temperature, humidity and pressure values of a batch of litchi at different time points during the freezing operation, and the data collected by the equipment status collection unit include the refrigerant content of the freezing equipment during operation and the temperature and vibration frequency of the compressor;
[0061] Through the above technical scheme, this embodiment provides data collected by the litchi status collection unit, including the temperature, humidity and pressure values of a batch of litchis at different time points in the freezing operation. Through the data, the first data calculation unit can accurately calculate the freezing completion degree of the litchis at the i-th time point in the freezing operation, thereby accurately judging the freezing completion degree of the litchis at different time points, and analyzing whether the operating state of the freezing equipment is stable according to the judgment result. It not only realizes the monitoring of the operating state of the freezing equipment, but also can adjust the temperature of the freezing equipment by combining the refrigerant content of the freezing equipment during operation and the temperature and vibration frequency of the compressor when judging that the freezing qualification degree of the litchi is low at a certain time point, thereby ensuring the normal freezing operation of the litchi.
[0062] The calculation process of the first data calculation unit includes:
[0063] By formula Calculate the freezing completion degree S of litchi at the i-th time point in the freezing operation i ;
[0064] Where i is a data collection at a fixed time interval during the freezing process, H is the humidity of litchi at the i-th time point during the freezing process, and H 0i is the preset standard humidity of litchi at the i-th time point in the freezing operation, H1 is H i The standard value, f c (X) is the defined function. If X>0, then f c (X) = X, if X ≤ 0, then f c (X) = 0, Wd i is the temperature of litchi at the i-th time point during the freezing operation, Wd 0i is the preset standard temperature of litchi at the i-th time point in the freezing operation, Pa i is the pressure on litchi at the i-th time point during the freezing operation, Pa 0i is the preset pressure on litchi at the i-th time point during the freezing operation, is the first error adjustment coefficient, which can be set according to empirical fitting, x1 and x2 are weight coefficients, f s (θ) is the influence function of litchi varieties, which can be obtained based on the test according to the influence of different litchi on the degree of freezing completion;
[0065] Through the above technical solution, this embodiment provides the freezing completion degree S of litchi at the i-th time point in the freezing operation. i , can be obtained by formula It is calculated that, obviously, when the humidity and temperature of the litchi at the i-th time point in the freezing operation are greater than the preset values, and the pressure is smaller than the preset value, the freezing completion degree of the litchi at this time point in the freezing operation is lower, indicating that the freezing progress of the litchi is slow, and the operating stability of the freezing equipment is poor. It is necessary to adjust the temperature of the freezing equipment in time, otherwise it may increase the time for the litchi to complete the freezing operation, resulting in the loss of its nutritional value. On the contrary, when the humidity and temperature of the litchi at the i-th time point in the freezing operation are closer to or higher than the preset value, and the pressure is closer to the preset value, the freezing completion degree of the litchi at this time point in the freezing operation is higher, indicating that the freezing progress of the litchi is fast, the operating stability of the freezing equipment is high, and it will not affect the time for the litchi to complete the freezing operation.
[0066] Through such a setting, the freezing progress of the litchi can be judged according to the freezing completion degree of the litchi at the i-th time point in the freezing operation, and the operating status of the freezing equipment can be analyzed based on the judgment result. If it is judged that the freezing progress of the litchi is slow, it means that the operating status stability of the freezing equipment is poor, and the temperature of the freezing equipment needs to be adjusted in time to ensure that the freezing operation time is not affected.
[0067] The analysis process of the data analysis unit includes:
[0068] By calculating the freezing completion degree S of litchi at the i-th time point in the freezing operation i and the preset freezing completion threshold S at the i-th time point xi Make a comparison;
[0069] If S i >S xi The system determines that the freezing completion degree at this time point is low and does not reach the freezing completion passing line at this time point, indicating that the freezing speed of the litchi is slow and the temperature of the freezing equipment needs to be adjusted;
[0070] If S i xi The system determines that the freezing completion degree at this time point is high and reaches the freezing completion passing line at this time point, indicating that the freezing speed of the litchi is high and there is no need to adjust the temperature of the freezing equipment;
[0071] Through the above technical solution, this embodiment calculates the freezing completion degree S of the litchi at the i-th time point in the freezing operation. i and the preset freezing completion threshold S at the i-th time point xi By comparing, the freezing speed of litchi can be accurately judged. If the freezing speed is slow at a certain point in time, it means that the operating stability of the freezing equipment is poor. Therefore, the refrigeration temperature of the freezing equipment needs to be adjusted in time to avoid the loss of some nutrients in litchi due to increased freezing operation time, thereby improving the nutritional value of litchi.
[0072] The calculation process of the second data calculation unit includes:
[0073] By formula Calculate the adjusted temperature r of the cryosleep device at the i-th time point i ;
[0074] and updating the initial refrigeration temperature of the refrigeration equipment through the updating unit;
[0075] Among them, r 0i is the preset temperature of the cryosleep device at the i-th time point, f L is an adjustment coefficient comparison table function, and the adjustment coefficient comparison table function can be based on The range of values for r i The impact of ZLY is obtained based on the test. i is the refrigerant content of the cryo-hibernation equipment at the i-th time point, ZLY 0i is the preset content of the refrigerant in the cryo-hibernation equipment at the i-th time point, and ZLY1 is ZLY i Standard value, YSJ i is the compressor temperature of the cryosleep equipment at the i-th time point, YSJ 01 The compressor temperature preset for the cryo-hibernation equipment, f k is the compressor vibration frequency influence function, σ is the compressor vibration frequency of the freezing hibernation device at the i-th time point, the compressor vibration frequency influence function can be obtained based on the test according to the influence of the compressor vibration frequency on the operating state of the freezing hibernation device, β is the second error influence coefficient, which can be set according to empirical fitting;
[0076] Through the above technical solution, this embodiment provides the temperature r after the cryosleep device is adjusted at the i-th time point. i , can be obtained by formula It is calculated that, obviously, when the difference between the refrigerant content of the freezing hibernation device and the preset content is greater at the i-th time point, and the compressor temperature and vibration frequency of the freezing hibernation device are higher, the impact on the operating state of the freezing hibernation device is greater; conversely, when the difference between the refrigerant content of the freezing hibernation device and the preset content is smaller at the i-th time point, and the compressor temperature and vibration frequency of the freezing hibernation device are lower, the impact on the operating state of the freezing hibernation device is smaller;
[0077] By setting in this way, the operating status data of the cryosleep equipment during the cryosleep process at the i-th time point and the freezing completion degree S at the i-th time point are combined. i After that, the adjusted temperature at the i-th time point can be accurately calculated, and the refrigeration temperature of the refrigeration equipment at the time point can be adjusted in time through the adjustment unit, so as to improve the freezing efficiency of litchi, avoid the situation that the freezing efficiency of litchi is reduced due to the unstable operation state of the freezing equipment, and the working time of the entire freezing operation is prolonged, thereby avoiding the loss of some nutrients of litchi and ensuring the nutritional value of litchi.
[0078] The process of updating the initial refrigeration temperature of the refrigeration equipment comprises:
[0079] By formula Calculate and obtain the discrete coefficient T of the temperature adjustment of the freezing equipment in a freezing operation;
[0080] Where a is any batch of litchi, b is the total number of litchi batches in one freezing operation, SJ a The number of times the temperature was adjusted for any batch of lychees during the freezing operation. For all SJ a The average value of g is the proportionality coefficient, which can be set based on empirical fitting. For all SJ a The maximum value in ;
[0081] Through the above technical solution, the formula The discrete coefficient T of the temperature adjustment of the freezing hibernation equipment in a freezing hibernation operation is calculated. Obviously, when the discrete coefficient of the degree data of the temperature adjustment of the freezing hibernation equipment in a freezing hibernation operation is larger, its volatility is larger, indicating that the freezing hibernation equipment is in a very unstable state during operation. The system will issue an early warning to the background to remind the staff to repair it. On the contrary, when the discrete coefficient of the degree data of the temperature adjustment of the freezing hibernation equipment in a freezing hibernation operation is smaller, its volatility is smaller, indicating that the freezing hibernation equipment is in a relatively stable state during operation and no early warning is issued. The data can reflect the stability of the freezing hibernation equipment during operation, thereby providing accurate data for the subsequent adjustment of the initial refrigeration temperature of the refrigeration equipment.
[0082] The process of updating the initial refrigeration temperature of the refrigeration equipment further includes:
[0083] By the formula Q = Q0*f j (T)*δ calculates and obtains the initial refrigeration temperature Q of the refrigeration equipment after adjustment;
[0084] where f jis the influence function of the discrete coefficient of the frozen dormant time of litchi, which can be obtained based on the test of the initial refrigeration temperature of the refrigeration equipment according to the discrete coefficient of the frozen dormant time of litchi, and δ is the third error influence coefficient, which can be set according to empirical fitting;
[0085] Through the above technical solution, this embodiment uses the formula Q = Q0*f j (T)*δ is used to calculate the adjusted initial refrigeration temperature Q of the refrigeration equipment, and the initial refrigeration temperature of the refrigeration equipment when it works next time is updated through the updating unit, so as to improve the refrigeration efficiency of the next work, thereby improving the overall efficiency of the lychee freezing operation, and avoiding the situation that the lychee freezing operation time is increased due to the unstable operation state of the freezing equipment, thereby avoiding the loss of some nutrients of the lychee due to long-term processing, thereby affecting the nutritional value of the lychee.
[0086] See also Figure 2 As shown, a method for monitoring the operation of a fresh lychee freezing device, the method comprising:
[0087] S1: collecting state data of litchi during the freezing process and operation state data of the freezing equipment during the freezing process through a data acquisition module;
[0088] S2: calculating, by the first data calculation unit, the freezing completion degree of the litchi at different time points during the freezing process according to the information of the litchi state collection unit;
[0089] S3: Analyzing the frozen dormancy state of the litchi by combining the preset freezing completion thresholds at different time points through the data analysis unit to determine whether the freezing completion at different time points is qualified;
[0090] S4: when it is determined that the frozen hibernation quality of the litchi is poor, the second data calculation unit calculates the adjusted refrigeration temperature according to the device operation status data collected by the device status collection unit and the freezing completion degree of the litchi at different time points during the frozen hibernation process;
[0091] S5: adjusting the temperature of the refrigeration equipment by the adjustment unit according to the adjusted refrigeration temperature calculated by the second data calculation unit;
[0092] S6: Updating the initial refrigeration temperature of the refrigeration equipment when it works next time through the updating unit;
[0093] Through the above technical scheme, when the method of this embodiment is used, first, the state data of the litchi during the freezing process and the operating state data of the freezing equipment during the freezing process are collected through the data acquisition module, and then the freezing completion degree of the litchi at different time points in the freezing process is calculated by the first data calculation unit according to the information of the litchi state collection unit, and the freezing state of the litchi is analyzed by the data analysis unit in combination with the preset freezing completion degree thresholds at different time points to determine whether the freezing completion degree at different time points is qualified. When it is determined that the freezing quality of the litchi is poor, the adjusted refrigeration temperature is calculated by the second data calculation unit according to the equipment operating state data collected by the equipment state collection unit and the freezing completion degree of the litchi at different time points in the freezing process, and the temperature of the refrigeration equipment is adjusted by the adjustment unit according to the adjusted refrigeration temperature calculated by the second data calculation unit, and finally the updating unit updates the initial refrigeration temperature of the refrigeration equipment when it works next time;
[0094] Through such a configuration, the freezing efficiency of the litchi can be judged according to the freezing completion degree at different time points during the freezing process, and the operating status of the freezing equipment can be reflected, so that when the system judges that the freezing quality of the litchi is poor, it can promptly calculate the adjusted refrigeration temperature through the second data calculation unit, and adjust the temperature of the refrigeration equipment according to the adjusted refrigeration temperature calculated by the second data calculation unit through the adjustment unit, thereby ensuring the freshness of some nutrients of the litchi and improving the nutritional value of the litchi.
[0095] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A fresh lychee freezing equipment operation monitoring system, It is characterized in that The system comprises: A data acquisition module, including a litchi state acquisition unit and a device state acquisition unit, wherein the litchi state acquisition unit is used to collect state data of litchi during the freezing process; The device status acquisition unit is used to acquire the operating status data of the cryosleep device during the cryosleep process; The data processing module includes a first data calculation unit and a data analysis unit, wherein the first data calculation unit is used to calculate the freezing completion degree of the litchi at different time points during the freezing process according to the information of the litchi state collection unit; The data analysis unit is used to analyze the frozen state of the litchi according to the freezing completion degree of the litchi at different time points during the frozen hibernation process, combined with the preset freezing completion degree thresholds at different time points, to determine whether the freezing completion degree at different time points is qualified; The data updating module includes a second data calculating unit, an adjusting unit and an updating unit, wherein the second data calculating unit is used to calculate the adjusted refrigeration temperature according to the equipment operation status data collected by the equipment status collecting unit and the freezing completion degree of the litchi at different time points during the freezing process; The adjustment unit is used to adjust the temperature of the refrigeration equipment according to the adjusted refrigeration temperature calculated by the second data calculation unit; The updating unit is used to update the initial refrigeration temperature of the refrigeration equipment for the next operation.
2. A fresh lychee hibernation equipment operation monitoring system according to claim 1, It is characterized in that The data collected by the litchi status collection unit include the temperature, humidity and pressure values of a batch of litchis at different time points during the freezing operation, and the data collected by the equipment status collection unit include the refrigerant content of the freezing equipment during operation and the temperature and vibration frequency of the compressor.
3. A fresh lychee hibernation equipment operation monitoring system according to claim 1, It is characterized in that The calculation process of the first data calculation unit includes: By formula Calculate the freezing completion degree S of litchi at the i-th time point in the freezing operation i ; Among them, i is a data collection at a fixed time interval during the cryosleep process, H i is the humidity of litchi at the i-th time point during the freezing operation, H 0i is the preset standard humidity of litchi at the i-th time point in the freezing operation, H 1 H i The standard value of f c (X) is the defined function. If X>0, then f c (X) = X, if X ≤ 0, then f c (X) = 0, Wd i is the temperature of litchi at the i-th time point during the freezing operation, Wd 0i is the preset standard temperature of litchi at the i-th time point in the freezing operation, Pa i is the pressure on litchi at the i-th time point during the freezing operation, Pa 0i is the preset pressure on litchi at the i-th time point during the freezing operation, is the first error adjustment coefficient, which can be set according to empirical fitting, x1 and x2 are weight coefficients, f s (θ) is the influence function of litchi varieties, which can be obtained based on the test according to the influence of different litchi on the degree of freezing completion.
4. A fresh lychee hibernation equipment operation monitoring system according to claim 3, It is characterized in that The analysis process of the data analysis unit includes: By calculating the freezing completion degree S of litchi at the i-th time point in the freezing operation i and the preset freezing completion threshold S at the i-th time point xi Make a comparison; If S i >S xi The system determines that the freezing completion degree at this time point is low and does not reach the passing line of freezing completion degree at this time point, which means that the freezing speed of litchi is slow and the temperature of the freezing equipment needs to be adjusted; If S i <S xi The system determines that the freezing completion degree at this time point is high and reaches the freezing completion passing line at this time point, which means that the freezing speed of the litchi is high and there is no need to adjust the temperature of the freezing equipment.
5. A fresh lychee hibernation equipment operation monitoring system according to claim 4, It is characterized in that The calculation process of the second data calculation unit includes: By formula Calculate the adjusted temperature r of the cryosleep device at the i-th time point i ; and updating the initial refrigeration temperature of the refrigeration equipment through the updating unit; Among them, r 0i is the preset temperature of the cryosleep device at the i-th time point, f L is an adjustment coefficient comparison table function, the adjustment coefficient comparison table function can be based on The value range of r i The impact of ZLY is based on the test results. i is the refrigerant content of the cryo-hibernation equipment at the i-th time point, ZLY 0i is the preset content of the refrigerant in the cryo-hibernation equipment at the i-th time point, ZLY 1 For ZLY i Standard value, YSJ i is the compressor temperature of the cryosleep equipment at the i-th time point, YSJ 01 The compressor temperature preset for the cryo-hibernation equipment, f k is the compressor vibration frequency influence function, σ i is the compressor vibration frequency of the cryosleep device at the i-th time point. The compressor vibration frequency influence function can be obtained based on the test according to the influence of the compressor vibration frequency on the operating state of the cryosleep device. β is the second error influence coefficient, which can be set according to empirical fitting.
6. A fresh lychee hibernation equipment operation monitoring system according to claim 5, It is characterized in that The process of updating the initial refrigeration temperature of the refrigeration equipment comprises: By formula Calculate and obtain the discrete coefficient T of the temperature adjustment of the freezing equipment in a freezing operation; Where a is any batch of litchi, b is the total number of litchi batches in one freezing operation, SJ a The number of times the temperature was adjusted for any batch of lychees during the freezing operation. For all SJ a The average value of g is the proportionality coefficient, which can be set based on empirical fitting. For all SJ a The maximum value in .
7. A fresh lychee hibernation equipment operation monitoring system according to claim 6, It is characterized in that The process of updating the initial refrigeration temperature of the refrigeration equipment further includes: By the formula Q = Q 0 *f j (T)*δ calculates and obtains the initial refrigeration temperature Q of the refrigeration equipment after adjustment; where f j is the influence function of the discrete coefficient of the frozen dormant time of litchi, which can be obtained based on the test on the initial refrigeration temperature of the refrigeration equipment according to the discrete coefficient of the frozen dormant time of litchi. δ is the third error influence coefficient, which can be set according to empirical fitting.
8. A method for monitoring the operation of a fresh lychee freezing hibernation device, the method using the system for monitoring the operation of a fresh lychee freezing hibernation device as claimed in claim 1, It is characterized in that The method comprises: S1: collecting state data of litchi during the freezing process and operation state data of the freezing equipment during the freezing process through a data acquisition module; S2: calculating, by the first data calculation unit, the freezing completion degree of the litchi at different time points during the freezing process according to the information of the litchi state collection unit; S3: Analyzing the frozen dormancy state of the litchi by combining the preset freezing completion thresholds at different time points through the data analysis unit to determine whether the freezing completion at different time points is qualified; S4: when it is determined that the frozen hibernation quality of the litchi is poor, the second data calculation unit calculates the adjusted refrigeration temperature according to the device operation status data collected by the device status collection unit and the freezing completion degree of the litchi at different time points during the frozen hibernation process; S5: adjusting the temperature of the refrigeration equipment by the adjustment unit according to the adjusted refrigeration temperature calculated by the second data calculation unit; S6: Updating the initial cooling temperature of the refrigeration device when it works next time through the updating unit.
Citation Information
Patent Citations
Liquid nitrogen quick freezing and freezing storage combined litchi preservation method
CN104839318A
Low-frequency ultrasonic-assisted liquefied CO2 quick-freezing device and method based on ice crystal regulation and control
CN114152014A
Method for quick-freezing pre-prepared vegetables or fresh fruits and vegetables through cooperation of ultrahigh pressure and liquid nitrogen
CN116250558A
Litchi quick-freezing system and method based on ultralow-temperature anti-freezing solution
CN117663646A
Device for pre-cooling leechee in original place
CN201795650U