Aircraft hangar maintenance and warehousing transfer cooperative scheduling method
Through the two-layer planning and collaborative optimization mechanism, aircraft hangar maintenance and inlet and transfer scheduling are broken down into two-stage optimization models, solving the problem of low optimization efficiency in the existing technology, and achieving efficient medium and large-scale aircraft scheduling, satisfying the Timeliness and quantitative performance requirements.
Patent Information
- Application Number
- CN202411404290.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-11-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, there are many decision variables and constraints for aircraft hangar maintenance and inlet and transfer scheduling, resulting in low efficiency in optimization process and unable to meet the scheduling timeliness and quantitative efficiency requirements of medium and large-scale aircraft.
Using the collaborative scheduling method of two-layer planning, the upper-level inbound and transfer scheduling model and the lower-level scheduling model are constructed, and the collaborative optimization mechanism is used to decouple and convert it into a two-stage optimization model. The hybrid distribution estimation algorithm and teaching and learning algorithm are used. Perform accurate optimization solutions.
The efficiency of coordinated scheduling of aircraft hangar maintenance and inlet and transfer is improved, the timeliness and quantitative efficiency indicators of the number of medium and large-scale aircraft is met, the calculation efficiency is improved, and the performance of each stage is optimized.
Smart Images

Figure CN118898321A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a coordinated scheduling method for aircraft hangar maintenance and in-warehouse transfer, and belongs to the technical field of aircraft hangar maintenance operation and in-warehouse transfer scheduling. Background Art
[0002] According to the process analysis of shipboard aviation operations, there is a correlation between aircraft storage transfer and aircraft hangar maintenance, and the associated parameters are the entry time of each aircraft. The end time of storage transfer is the earliest time that hangar maintenance can start. The connection between these two stages of operations will directly affect the availability of subsequent aircraft waves.
[0003] In view of the above-mentioned relationship, a feasible solution is integrated scheduling, which is to integrate the two stages into an optimization model and perform integrated optimization on all decision variables. For the integrated scheduling method, since there are many decision variables and constraints in the two stages and the scheduling scale is large, the integrated optimization process lacks specificity and will lead to low optimization efficiency, so its application in the actual scheduling field is limited. Summary of the invention
[0004] The purpose of the present invention is to solve the shortcomings of the prior art, such as the large number of decision variables and constraints, the large scheduling scale and the lack of pertinence in the optimization process, which will lead to low optimization efficiency, and provide a coordinated scheduling method for aircraft hangar maintenance and inbound transportation to meet the needs of optimizing the timeliness and quantitative performance indicators of coordinated scheduling of hangar maintenance and inbound transportation for medium and large numbers of aircraft.
[0005] A coordinated scheduling method for aircraft hangar maintenance and warehouse transfer of the present invention is characterized by comprising the following steps: Step 1: Construct a collaborative scheduling model based on two-level planning, and set optimization objectives and necessary constraints for the upper model (inbound transfer scheduling model) and the lower model (hangar maintenance scheduling model) of the model respectively; Step 2: Use the aircraft hangar maintenance and warehouse transfer collaborative scheduling device to accurately optimize and solve the collaborative scheduling model based on bi-level programming; Step 3: Use the collaborative optimization mechanism to decouple the collaborative scheduling model based on two-level planning and convert it into a two-stage optimization model.
[0006] Preferably, the optimization objectives set by the upper model in step 1 include: (1); in, is the objective function, Indicates minimizing the objective function; It represents the maximum value of the time vector of each aircraft arriving at the target parking position solved by the inbound transfer scheduling model, which is a known quantity; is the transit time for storage, and is a known quantity; The time vector representing the time when each aircraft can start maintenance is a known quantity; It is obtained from the lower model (hangar maintenance scheduling model) under the time vector when each aircraft can start maintenance, and is the intermediate variable for calculation; and are weight coefficients, which are known quantities; the remaining variables are defined as follows: 1) Maximize aircraft wave availability The definition is as follows: (2); In the formula, is the set of aircraft dispatch waves, which is a known quantity; is the weight value of aircraft wave availability, which is a known quantity; is the total number of aircraft, which is a known quantity; sgn is the sign function, which is a known quantity; Gathering for aircraft to be repaired, represents any aircraft, which is a known quantity; Indicates aircraft The maintenance completion time is a known quantity; is the start time of preparation for the dispatch of wave w, which is a known quantity.
[0007] 2) Minimize the variance of maintenance personnel load The definition is as follows: (3); In the formula, Indicates that maintenance personnel are gathering. represents any maintenance personnel, which is a known quantity; Indicates The total maintenance man-hours of each maintenance personnel is a known quantity; Represents the mean maintenance man-hours of maintenance personnel, which is a known quantity.
[0008] 3) Minimize the load variance of the dispatch group The definition is as follows: (4); In the formula, Indicates k ( k ∈ Kz ) type of transport group load variance weight; k ( k ∈ Kz ) l ( l ∈ Lz kThe load of each transfer group is expressed as the weighted sum of the aircraft storage transfer operation time and the transfer time; Indicates Class dispatch group collection, ; (5).
[0009] In the formula, For aircraft i The actual stage task set, ; for Abbreviation for Time by parking space Transfer to warehouse The inbound transit time; Indicates the warehouse transfer process By A transport device is responsible for the transfer; express Corresponding to k Type of dispatching equipment / group; Indicates k ( k ∈ Kz ) The load weight of the transfer time of the transport group relative to the storage and transfer operation time; Indicates the process , and process The same transfer equipment is used during the same storage and transfer stage, and Take precedence over transport; For the k Equipment by process After completion, the parking position is transferred to the process The time of parking before starting; k The average load of the class dispatch group is .
[0010] 4) Transfer time of the transport group The definition is as follows: (6); Indicates the process , and process The same transfer equipment is used during the same storage and transfer stage, and Take precedence over transport; For the k Equipment by process After completion, the parking position is transferred to the process The time of parking before starting; k The average load of the class dispatch group is .
[0011] Preferably, the optimization target set by the lower model in step 1 is characterized by including: (7); in, is the objective function, is the unknown quantity; is the aircraft wave availability, which is a known quantity; is the maintenance personnel load variance, which is a known quantity; is the weight coefficient, which is a known quantity; It represents the maximum value of the time vector of each aircraft arriving at the target parking position solved by the inbound transfer scheduling model, which is a known quantity.
[0012] Preferably, the constraint conditions set by the upper model in step 1 are characterized by including: 1) Exclusive constraints on device allocation: (8); In the formula, Indicates the warehouse transfer process By A transport device is responsible for the transfer, which is a known quantity.
[0013] 2) Aircraft storage and transfer timing constraints: The constraint model is expressed as: (9); (10); In the formula, For the warehouse transfer process The start time of the operation is a known quantity; It represents the transfer time from parking position p to q at time t, which is a known quantity.
[0014] 3) Aircraft storage and transfer collision avoidance constraints: First, for each aircraft inbound transfer operation, the initiation of inbound transfer must first satisfy the constraint of a feasible transfer path, namely: (11); in, for The abbreviation of is a known quantity; For the warehouse transfer process The start time of the operation is a known quantity; For the warehouse transfer process The end time of the operation is a known quantity; For aircraft i The set of tasks in the transportation stage is a known quantity; For the i Aircraft No. j The parking position before the stage of storage and transfer is a known quantity.
[0015] Defining the configuration Indicates i Aircraft position at reference point q The spatial area occupied by the convex hull of the aircraft is , where the coordinates of the convex hull points can be solved by the aircraft posture model. Then the collision avoidance constraints for multiple aircraft inbound transportation are expressed as: (12); 4) Timing constraints for equipment transfer: After completing the previous towing operation, the transfer equipment needs to be transferred to the parking position where the next aircraft to be transferred is located before a new transfer operation can be carried out, namely: (13); Where BM is a real number, which is used for the penalty term of the constraint and objective function and is a known quantity.
[0016] 5) Boolean variable constraints: (14).
[0017] Decision variables , They are all Boolean 0-1 decision variables and are known quantities; For the i Aircraft No. j The set of available transport equipment for stage warehousing transfer is a known quantity.
[0018] Preferably, the constraint conditions set by the lower model in step 1 are characterized by including: 1) Timing constraints of maintenance operation process: (15); (16); In the formula, represents the set of aircraft to be repaired, which is a known quantity; represents the total set of aircraft maintenance processes, which is a known quantity; For maintenance process The maintenance start time is a known quantity; For the The time it takes for an aircraft to be tied up in a warehouse is a known quantity; For process O ih The maintenance work hours are known quantities; For process O ijThe set of immediate predecessor processes is a known quantity.
[0019] 2) Priority constraints for resource conflicts: (17); (18); In the formula, Indicates the process and process Assigned to the same maintenance personnel and Take precedence over Maintenance, for a known quantity; Indicates the process and process Assigned to the same maintenance facility / workshop, and Take precedence over Maintenance, for a known quantity; Take a real number to ensure that the inequality always holds true and is a known quantity.
[0020] 3) Resource allocation constraints: (19); (20); (twenty one); In the formula, represents the set of maintenance personnel, which is a known quantity; Indicates A set of maintenance equipment / workshops is a known quantity; represents the maintenance skill set, which is a known quantity; represents the set of maintenance equipment / workshop categories, which is a known quantity; Indicates maintenance process O ij For The demand for this type of skills is a known quantity; Indicates maintenance process O ij For The demand for this type of maintenance equipment / workshop is a known quantity; Indicates the process Assign to Maintenance personnel, and use Class skills are known quantities; Process Assign to Class Maintenance equipment / workshops is a known quantity.
[0021] 4) Maintenance equipment scope constraints: (twenty two); In the formula, Indicates the maintenance equipment / workshop coverage status. Kind Equipment / workshops can cover parking spaces , ,otherwise , is a known quantity.
[0022] 5) Maintenance station space constraints: (twenty three); In the formula, is the set of station space categories, is a known quantity; Indicates the process O ij For Demand variables for workstation-like spaces, Indicates that there is a demand for workstation space, otherwise , is a known quantity; For the Aircraft No. The number of maintenance personnel that can be accommodated for parallel work at a similar workstation is a known quantity; No. Aircraft at time The set of maintenance operations in execution state is a known quantity.
[0023] 6) Constraints on parallel operations in maintenance workshops: Any workshop can accommodate the corresponding professional maintenance tasks for parallel maintenance. The maintenance equipment can be regarded as a special maintenance workshop with a parallel operation volume of 1. This constraint can be expressed as: (twenty four); In the formula, For the Class l The number of parallel operations that a workshop can accommodate at the same time is a known quantity.
[0024] 7) Boolean type variable constraints: (25); In the formula, the decision variable , , and They are all Boolean 0-1 decision variables and are known quantities.
[0025] Preferably, the specific steps of optimizing and solving the collaborative scheduling model of the two-level planning described in step 2 are as follows: 1) The upper model adopts a mixed distribution estimation algorithm, takes the aircraft storage priority sequence as the encoding of the decision variable, takes the initial fleet storage and deck transfer sequence as input, and obtains the time for the aircraft to arrive at the maintenance parking position; 2) The lower model uses the time for the aircraft to arrive at the maintenance parking space obtained by the upper model to call the lower model to obtain the optimal maintenance plan and optimization index, and then integrates the two-stage operations to obtain a comprehensive optimization index and aircraft storage transfer and maintenance plan; 3) The lower model uses the teaching and learning algorithm to optimize the hangar maintenance scheduling, thereby integrating the upper model's warehouse transfer scheduling and the lower model's hangar maintenance scheduling into a complete solution, deriving the overall optimization index, and returning the relevant optimization index to guide the further iterative optimization of the upper model; 4) The upper-level model then iteratively searches the priority sequence for storage based on comprehensive optimization indicators.
[0026] Preferably, the collaborative optimization mechanism described in step 3 is to convert the two-layer planning model into a two-stage optimization model, the first stage is the warehouse transfer scheduling model, in which the agent wave availability The proxy objective function is expressed as: (26); In the formula, It represents the time span of the key process route of the maintenance project of the i-th aircraft under the condition of sufficient resources, which is a known quantity. Represents the set of aircraft that need to perform hangar maintenance tasks, which is a known quantity. The set of aircraft representing the remaining transfer operations is a known quantity. is the minimum value and is a known quantity. Through this proxy objective function, the inbound and outbound transfer scheduling model and the hangar maintenance scheduling model are decoupled, and the first stage model does not need the lower model to provide the wave availability parameter ,The second stage model is the optimization of the hangar maintenance scheduling model, and its connotation is the same as the lower model.
[0027] The present invention uses a two-layer planning, that is, according to the time sequence characteristics of the two stages, the problem is divided into an upper-layer storage and transportation scheduling model and a lower-layer hangar maintenance scheduling model, and collaborative optimization is performed through hierarchical interactive iteration. The two-layer planning model is a hierarchical model with a master-slave hierarchical structure. The upper and lower models are relatively independent, but at the same time interconnected. The upper model relies on the results of the lower model to optimize the overall goal, and the lower model requires the upper model to provide relevant optimization parameters. At the same time, in order to solve the timeliness problem of collaborative scheduling, this patent also proposes a decoupling mechanism to convert the two-layer planning model into a two-stage optimization model. The collaborative scheduling optimization based on the two-stage decision model only needs to perform the optimization of the storage and transportation scheduling model and the hangar maintenance scheduling optimization in steps, which greatly improves the efficiency of the calculation while satisfying the optimization performance as much as possible. This structure is more conducive to exerting the optimization performance of each stage and can be widely used. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 : Diagram of collaborative scheduling optimization architecture based on the two-stage decision model in the present invention. DETAILED DESCRIPTION
[0029] The specific implementation modes of the present invention are given below with reference to the accompanying drawings to further illustrate the present invention.
[0030] A coordinated scheduling method for aircraft hangar maintenance and warehouse transfer in this embodiment is shown in FIG. Figure 1 , comprising the following steps: A method for coordinated scheduling of aircraft hangar maintenance and warehouse transfer, characterized in that it comprises the following steps: Step 1: Construct a collaborative scheduling model based on two-level planning, and set optimization objectives and necessary constraints for the upper model (inbound transfer scheduling model) and the lower model (hangar maintenance scheduling model) of the model respectively; Step 2: Use the aircraft hangar maintenance and warehouse transfer collaborative scheduling device to accurately optimize and solve the collaborative scheduling model based on bi-level programming; Step 3: Use the collaborative optimization mechanism to decouple the collaborative scheduling model based on two-level planning and convert it into a two-stage optimization model.
[0031] The optimization objectives set by the upper model in step 1 include: (1); in, is the objective function, Indicates minimizing the objective function; It represents the maximum value of the time vector of each aircraft arriving at the target parking position solved by the inbound transfer scheduling model, which is a known quantity; is the transit time for storage, and is a known quantity; The time vector representing the time when each aircraft can start maintenance is a known quantity; It is obtained from the lower model (hangar maintenance scheduling model) under the time vector when each aircraft can start maintenance, and is the intermediate variable for calculation; and are weight coefficients, which are known quantities; the remaining variables are defined as follows: 1) Maximize aircraft wave availability The definition is as follows: (2); In the formula, is the set of aircraft dispatch waves, which is a known quantity; is the weight value of aircraft wave availability, which is a known quantity; is the total number of aircraft, which is a known quantity; sgn is the sign function, which is a known quantity; Gathering for aircraft to be repaired, represents any aircraft, which is a known quantity; Indicates aircraft The maintenance completion time is a known quantity; is the start time of preparation for the dispatch of wave w, which is a known quantity.
[0032] 2) Minimize the variance of maintenance personnel load The definition is as follows: (3); In the formula, Indicates that maintenance personnel are gathering. represents any maintenance personnel, which is a known quantity; Indicates The total maintenance man-hours of each maintenance personnel is a known quantity; Represents the mean maintenance man-hours of maintenance personnel, which is a known quantity.
[0033] 3) Minimize the load variance of the dispatch group The definition is as follows: (4); In the formula, Indicates k ( k ∈ Kz ) type of transport group load variance weight; k ( k ∈ Kz ) l ( l ∈ Lz k The load of each transfer group is expressed as the weighted sum of the aircraft storage transfer operation time and the transfer time; Indicates Class dispatch group collection, ; (5).
[0034] In the formula, For aircraft i The actual stage task set, ; for Abbreviation for Time by parking space Transfer to warehouse The inbound transit time; Indicates the warehouse transfer process By A transport device is responsible for the transfer; express Corresponding to k Type of dispatching equipment / group; Indicates k ( k ∈ Kz ) The load weight of the transfer time of the transport group relative to the storage and transfer operation time; Indicates the process , and process The same transfer equipment is used during the same storage and transfer stage, and Take precedence over transport; For the k Equipment by process After completion, the parking position is transferred to the process The time of parking before starting; k The average load of the class dispatch group is .
[0035] 4) Transfer time of the transport group The definition is as follows: (6); Indicates the process , and process The same transfer equipment is used during the same storage and transfer stage, and Take precedence over transport; For the k Equipment by process After completion, the parking position is transferred to the process The time of parking before starting; k The average load of the class dispatch group is .
[0036] The optimization goal set by the lower model in step 1 is characterized by including: (7); in, is the objective function, is the unknown quantity; is the aircraft wave availability, which is a known quantity; is the maintenance personnel load variance, which is a known quantity; is the weight coefficient, which is a known quantity; It represents the maximum value of the time vector of each aircraft arriving at the target parking position solved by the inbound transfer scheduling model, which is a known quantity.
[0037] The constraint conditions set by the upper model in step 1 are characterized by including: 1) Exclusive constraints on device allocation: (8); In the formula, Indicates the warehouse transfer process By A transport device is responsible for the transfer, which is a known quantity.
[0038] 2) Aircraft storage and transfer timing constraints: The constraint model is expressed as: (9); (10); In the formula, For the warehouse transfer process The start time of the operation is a known quantity; It represents the transfer time from parking position p to q at time t, which is a known quantity.
[0039] 3) Aircraft storage and transfer collision avoidance constraints: First, for each aircraft inbound transfer operation, the initiation of inbound transfer must first satisfy the constraint of a feasible transfer path, namely: (11); in, for The abbreviation of is a known quantity; For the warehouse transfer process The start time of the operation is a known quantity; For the warehouse transfer process The end time of the operation is a known quantity; For aircraft i The set of tasks in the transportation stage is a known quantity; For the i Aircraft No. j The parking position before the stage of storage and transfer is a known quantity.
[0040] Defining the configuration Indicates i Aircraft position at reference point q The spatial area occupied by the convex hull of the aircraft is , where the coordinates of the convex hull points can be solved by the aircraft posture model. Then the collision avoidance constraints for multiple aircraft inbound transportation are expressed as: (12); 4) Timing constraints for equipment transfer: After completing the previous towing operation, the transfer equipment needs to be transferred to the parking position where the next aircraft to be transferred is located before a new transfer operation can be carried out, namely: (13); Where BM is a real number, which is used for the penalty term of the constraint and objective function and is a known quantity.
[0041] 5) Boolean variable constraints: (14).
[0042] Decision variables , They are all Boolean 0-1 decision variables and are known quantities; For the i Aircraft No. j The set of available transport equipment for stage warehousing transfer is a known quantity.
[0043] The constraint conditions set by the lower model in step 1 are characterized by including: 1) Timing constraints of maintenance operation process: (15); (16); In the formula, represents the set of aircraft to be repaired, which is a known quantity; represents the total set of aircraft maintenance processes, which is a known quantity; For maintenance process The maintenance start time is a known quantity; For the The time it takes for an aircraft to be tied up in a warehouse is a known quantity; For process O ih The maintenance work hours are known quantities; For process O ij The set of immediate predecessor processes is a known quantity.
[0044] 2) Priority constraints for resource conflicts: (17); (18); In the formula, Indicates the process and process Assigned to the same maintenance personnel and Take precedence over Maintenance, for a known quantity; Indicates the process and process Assigned to the same maintenance facility / workshop, and Take precedence over Maintenance, for a known quantity; Take a real number to ensure that the inequality always holds true and is a known quantity.
[0045] 3) Resource allocation constraints: (19); (20); (twenty one); In the formula, represents the set of maintenance personnel, which is a known quantity; Indicates A set of maintenance equipment / workshops is a known quantity; represents the maintenance skill set, which is a known quantity; represents the set of maintenance equipment / workshop categories, which is a known quantity; Indicates maintenance process O ij For The demand for this type of skills is a known quantity; Indicates maintenance process O ij For The demand for this type of maintenance equipment / workshop is a known quantity; Indicates the process Assign to Maintenance personnel, and use Class skills are known quantities; Process Assign to Class Maintenance equipment / workshops is a known quantity.
[0046] 4) Maintenance equipment scope constraints: (twenty two); In the formula, Indicates the maintenance equipment / workshop coverage status. Kind Equipment / workshops can cover parking spaces , ,otherwise , is a known quantity.
[0047] 5) Maintenance station space constraints: (twenty three); In the formula, is the set of station space categories, is a known quantity; Indicates the process O ij For Demand variables for workstation-like spaces, Indicates that there is a demand for workstation space, otherwise , is a known quantity; For the Aircraft No. The number of maintenance personnel that can be accommodated for parallel work at a similar workstation is a known quantity; No. Aircraft at time The set of maintenance operations in execution state is a known quantity.
[0048] 6) Constraints on parallel operations in maintenance workshops: Any workshop can accommodate the corresponding professional maintenance tasks for parallel maintenance. The maintenance equipment can be regarded as a special maintenance workshop with a parallel operation volume of 1. This constraint can be expressed as: (twenty four); In the formula, For the Class l The number of parallel operations that a workshop can accommodate at the same time is a known quantity.
[0049] 7) Boolean type variable constraints: (25); In the formula, the decision variable , , and They are all Boolean 0-1 decision variables and are known quantities.
[0050] The specific steps for optimizing and solving the collaborative scheduling model of the two-level planning described in step 2 are as follows: 1) The upper model adopts a mixed distribution estimation algorithm, takes the aircraft storage priority sequence as the encoding of the decision variable, takes the initial fleet storage and deck transfer sequence as input, and obtains the time for the aircraft to arrive at the maintenance parking position; 2) The lower model uses the time for the aircraft to arrive at the maintenance parking space obtained by the upper model to call the lower model to obtain the optimal maintenance plan and optimization index, and then integrates the two-stage operations to obtain a comprehensive optimization index and aircraft storage transfer and maintenance plan; 3) The lower model uses the teaching and learning algorithm to optimize the hangar maintenance scheduling, thereby integrating the upper model's warehouse transfer scheduling and the lower model's hangar maintenance scheduling into a complete solution, deriving the overall optimization index, and returning the relevant optimization index to guide the further iterative optimization of the upper model; 4) The upper-level model then iteratively searches the priority sequence for storage based on comprehensive optimization indicators.
[0051] The collaborative optimization mechanism described in step 3 is to transform the two-level planning model into a two-stage optimization model. The first stage is the inbound transshipment scheduling model, in which the agent wave availability The proxy objective function is expressed as: (26); In the formula, It represents the time span of the key process route of the maintenance project of the i-th aircraft under the condition of sufficient resources, which is a known quantity. Represents the set of aircraft that need to perform hangar maintenance tasks, which is a known quantity. The set of aircraft representing the remaining transfer operations is a known quantity. is the minimum value and is a known quantity. Through this proxy objective function, the inbound and outbound transfer scheduling model and the hangar maintenance scheduling model are decoupled, and the first stage model does not need the lower model to provide the wave availability parameter ,The second stage model is the optimization of the hangar maintenance scheduling model, and its connotation is the same as the lower model.
[0052] The above calculation examples of the present invention are only used to explain the calculation model and calculation process of the present invention in detail, and are not intended to limit the implementation methods of the present invention. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is impossible to list all the implementation methods here. All obvious changes or modifications derived from the technical solution of the present invention are still within the scope of protection of the present invention.
Claims
1. A coordinated scheduling method for aircraft hangar maintenance and inbound transfer, characterized in that The following steps are involved: Step 1: Construct a collaborative scheduling model based on two-level planning, and set optimization objectives and necessary constraints for the upper model and the lower model of the model respectively. The upper model is the warehouse transfer scheduling model, and the lower model is the hangar maintenance scheduling model. Step 2: Use the aircraft hangar maintenance and warehouse transfer collaborative scheduling device to accurately optimize and solve the collaborative scheduling model based on bi-level programming; Step 3: Use the collaborative optimization mechanism to decouple the collaborative scheduling model based on two-level planning and convert it into a two-stage optimization model.
2. A coordinated scheduling method for aircraft hangar maintenance and inbound transfer according to claim 1, characterized in that The optimization objectives set by the upper model in step 1 include: (1); in, is the objective function, Indicates minimizing the objective function; It represents the maximum value of the time vector of each aircraft arriving at the target parking position solved by the inbound transfer scheduling model, which is a known quantity; The transit time for warehousing; The time vector representing the time when each aircraft can start maintenance; It is obtained from the lower model under the time vector of each aircraft when maintenance can start, which is the calculation of intermediate variables; and are weight coefficients respectively; the remaining variables are defined as follows: 1) Maximize aircraft wave availability The definition is as follows: (2); In the formula, Assemble waves for aircraft sorties; is the weight value of aircraft wave availability; is the total number of aircraft; sgn is the sign function; Gathering for aircraft to be repaired, represents any aircraft; Indicates aircraft The time for completion of repairs; Prepare for the start time of wave w; 2) Minimize the variance of maintenance personnel load The definition is as follows: (3); In the formula, Indicates that maintenance personnel are gathering. Indicates any maintenance personnel; Indicates Total maintenance man-hours of each maintenance personnel; It represents the average maintenance man-hours of maintenance personnel; 3) Minimize the load variance of the dispatch group The definition is as follows: (4); In the formula, Indicates k ( k ∈ KZ ) type of transport group load variance weight; k ( k ∈ KZ ) l ( l ∈ Lz k The load of each transfer group is expressed as the weighted sum of the aircraft storage transfer operation time and the transfer time; Indicates Class dispatch group collection, ; (5); In the formula, For aircraft i The actual stage task set, ; for Abbreviation for Time by parking space Transfer to warehouse The inbound transit time; Indicates the warehouse transfer process By A transport device is responsible for the transfer; express Corresponding to k Type of dispatching equipment / group; Indicates k ( k ∈ KZ ) The load weight of the transfer time of the transport group relative to the storage and transfer operation time; Indicates the process , and process The same transfer equipment is used during the same storage and transfer stage, and Take precedence over transport; For the k Equipment by process After completion, the parking position is transferred to the process The time of parking before starting; k The average load of the class dispatch group is ; 4) Transfer time of the transport group The definition is as follows: (6); Indicates the process , and process The same transfer equipment is used during the same storage and transfer stage, and Take precedence over transport; For the k Equipment by process After completion, the parking position is transferred to the process The time of parking before starting; k The average load of the class dispatch group is .
3. A coordinated scheduling method for aircraft hangar maintenance and inbound transfer according to claim 1, characterized in that The optimization objectives set by the lower model in step 1 include: (7); in, is the objective function; is the aircraft wave availability; is the maintenance personnel load variance, which is a known quantity; is the weight coefficient; It represents the maximum value of the time vector of each aircraft arriving at the target parking position solved by the inbound transfer scheduling model.
4. A coordinated scheduling method for aircraft hangar maintenance and inbound transfer according to claim 1, characterized in that The constraints set by the upper model in step 1 include: 1) Exclusive constraints on device allocation: (8); In the formula, Indicates the warehouse transfer process By A transport device is responsible for the transfer; 2) Aircraft storage and transfer timing constraints: The constraint model is expressed as: (9); (10); In the formula, For the warehouse transfer process The start time of the operation is a known quantity; represents the inbound transfer time from parking position p to q at time t; 3) Aircraft storage and transfer collision avoidance constraints: First, for each aircraft inbound transfer operation, the initiation of inbound transfer must first satisfy the constraint of a feasible transfer path, namely: (11); in, for abbreviation of For the warehouse transfer process The start time of the operation; For the warehouse transfer process End time of operation; For aircraft i The amount of tasks in the transportation stage; For the i Aircraft No. j The parking position before the stage of storage and transfer; Defining the configuration Indicates i Aircraft position at reference point q The spatial area occupied by the convex hull of the aircraft is , where the coordinates of the convex hull points can be solved by the aircraft posture model. Then the collision avoidance constraints for multiple aircraft inbound transportation are expressed as: (12); 4) Timing constraints for equipment transfer: After completing the previous towing operation, the transfer equipment needs to be transferred to the parking position where the next aircraft to be transferred is located before a new transfer operation can be carried out, namely: (13); Where BM is a real number, used for the penalty term of the constraint and objective function, and is a known quantity; 5) Boolean variable constraints: (14); Decision variables , All are Boolean 0-1 decision variables; For the i Aircraft No. j The set of available transport equipment for stage inbound transfer.
5. A coordinated scheduling method for aircraft hangar maintenance and inbound transfer according to claim 1, characterized in that The constraints set by the lower model in step 1 include: 1) Timing constraints of maintenance operation process: (15); (16); In the formula, Indicates the collection of aircraft to be repaired; represents the total set of aircraft maintenance processes; For maintenance process The maintenance start time; For the The time when the aircraft is tied up in the warehouse is completed; For process O ih of maintenance work hours; For process O ij The set of immediate predecessor processes; 2) Priority constraints for resource conflicts: (17); (18); In the formula, Indicates the process and process Assigned to the same maintenance personnel and Take precedence over repair; Indicates the process and process Assigned to the same maintenance facility / workshop, and Take precedence over repair; Take real numbers to ensure that the inequality always holds; 3) Resource allocation constraints: (19); (20); (21); In the formula, Indicates the assembly of maintenance personnel; Indicates A collection of maintenance equipment / workshops; represents the maintenance skill set; Represents a collection of maintenance equipment / workshop categories; Indicates maintenance process O ij For The demand for these skills; Indicates maintenance process O ij For The demand for maintenance equipment / workshops; Indicates the process Assign to Maintenance personnel, and use Class skills; Indicates the process Assign to Class Maintenance equipment / workshops; 4) Maintenance equipment scope constraints: (22); In the formula, Indicates the maintenance equipment / workshop coverage status. Kind Equipment / workshops can cover parking spaces , ,otherwise ; 5) Maintenance station space constraints: (23); In the formula, is a collection of station space categories; Indicates the process O ij For Demand variables for workstation-like spaces, Indicates that there is a demand for workstation space, otherwise ; For the Aircraft No. The number of maintenance personnel that can be accommodated by a class of workstations working in parallel; No. Aircraft in A set of maintenance procedures that are always in execution; 6) Constraints on parallel operations in maintenance workshops: Any workshop can accommodate the corresponding professional maintenance tasks for parallel maintenance. The maintenance equipment can be regarded as a special maintenance workshop with a parallel operation volume of 1. This constraint is expressed as: (24); In the formula, For the Class l The number of processes that can be operated in parallel in a workshop; 7) Boolean type variable constraints: (25); In the formula, the decision variable , , and All are 0-1 decision variables of Boolean type.
6. A coordinated scheduling method for aircraft hangar maintenance and inbound transfer according to claim 1, characterized in that The specific steps for optimizing and solving the collaborative scheduling model based on the two-level planning described in step 2 are as follows: 1) The upper model adopts a mixed distribution estimation algorithm, takes the aircraft storage priority sequence as the encoding of the decision variable, takes the initial fleet storage and deck transfer sequence as input, and obtains the time for the aircraft to arrive at the maintenance parking position; 2) The lower model uses the time for the aircraft to arrive at the maintenance parking space obtained by the upper model to call the lower model to obtain the optimal maintenance plan and optimization index, and then integrates the two-stage operations to obtain a comprehensive optimization index and aircraft storage transfer and maintenance plan; 3) The lower model uses the teaching and learning algorithm to optimize the hangar maintenance scheduling, thereby integrating the upper model's warehouse transfer scheduling and the lower model's hangar maintenance scheduling into a complete solution, deriving the overall optimization index, and returning the relevant optimization index to guide the further iterative optimization of the upper model; 4) The upper-level model then iteratively searches the priority sequence for storage based on comprehensive optimization indicators.
7. A coordinated scheduling method for aircraft hangar maintenance and inbound transfer according to claim 1, characterized in that The collaborative optimization mechanism described in step 3 is to transform the two-level planning model into a two-stage optimization model. The first stage is the inbound transshipment scheduling model, in which the agent wave availability The proxy objective function is expressed as: (26); In the formula, represents the time span of the key process route of the maintenance project of the i-th aircraft under the condition of sufficient resources, Represents the set of aircraft that need to perform hangar maintenance tasks. represents the set of aircraft for the remaining transfer operations, The proxy objective function is used to decouple the inbound and outbound transfer scheduling model and the hangar maintenance scheduling model. The first-stage model does not need the lower-level model to provide the wave availability parameter. ,The second stage model is the optimization of the hangar maintenance scheduling model, and its connotation is the same as the lower model.
Citation Information
Patent Citations
Aircraft hangar regular maintenance scheduling method, device, equipment and medium
CN114462136A
Method and system for scheduling maintenance personnel capable of preempting tasks for ship power equipment
CN115564242A
Distributed platform fleet flight and maintenance integrated scheduling method and device
CN115730919A
Double-layer optimization decoupling method and device based on proxy function and computer equipment
CN115983418A
DP-ASRS model solving method and device based on double-layer iteration
CN115983537A
Cited By
Aircraft hangar maintenance and warehousing transfer cooperative scheduling method and device
CN120931041A