Belt pressing device in front of coiling machine and hot continuous rolling equipment
By setting up a belt pressing device in front of the coiler in the hot continuous rolling equipment, using the high-pressure airflow injection assembly to apply pressure to the strip head, the problem of the strip head floating is solved, ensuring that it smoothly enters the pinch roller and improves the Production safety and stability.
Patent Information
- Application Number
- CN202411212948.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-08
AI Technical Summary
In the headless rolling mode, the steel head after the steel casting through the finishing mill of the hot continuous rolling equipment is easily floating before the pinch roller fails to enter the pinch roller in time, resulting in steel pile production accidents.
Design a belt pressing device in front of the winder, including a support frame, connecting structure, communication pipe and injection assembly, and use the air source to output high-pressure airflow. The injection assembly injects high-pressure airflow along the width direction of the strip steel to ensure that the strip steel head is tight Roller to prevent flying.
Effectively prevent the strip steel from floating, ensuring that it enters the pinch roller smoothly, and improving the belt-through operation stability and production safety of the strip steel.
Smart Images

Figure CN118905085A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hot rolling of coiled plates, and in particular to a belt pressing device in front of a coiler and hot continuous rolling equipment. Background Art
[0002] Hot rolling equipment is mainly used for processing and forming metal materials such as strip steel; the pinch rolls of hot rolling equipment are generally arranged at the entrance of the coiler, and the pinch rolls are used to guide the head of the hot-rolled strip into the entrance guide plate of the coiler to ensure that the strip can smoothly enter the coiling stage.
[0003] In the headless rolling mode, after the strip is cast by the last finishing mill in the hot rolling equipment, it is sheared by a high-speed flying shear device in front of the coiler. For thin-gauge strip (for example, less than or equal to 1.0 mm) after rolling by the finishing mill, the curling and threading speed can be as fast as 20 m / s. After the head of the strip is sheared by the flying shear device, before it is sent into the pinch roller, the head of the strip is in a state of losing tension, which can easily cause the head of the strip to fly and collide with the guide plate on the upper part of the pinch roller, causing a steel pile production accident. Summary of the invention
[0004] The problem solved by the invention is how to effectively prevent the head of the strip steel from flying before entering the pinch roller.
[0005] To solve the above problems, in the first aspect, the present invention provides a belt pressing device in front of a coiler, wherein the belt pressing device in front of the coiler is used to be arranged between a flying shear device and a clamping roller of a hot rolling equipment, and the belt pressing device in front of the coiler includes a support frame and a connecting structure, a connecting pipe and an injection assembly arranged on the support frame, wherein the connecting structure is used to connect to an air source, one end of the connecting pipe is connected to the connecting structure, and the other end of the connecting pipe is connected to the injection assembly, and the injection assembly is used to be arranged above the strip and used to spray high-pressure airflow onto the strip.
[0006] Optionally, the injection assembly includes a main pipeline, multiple branch pipelines and multiple nozzles, the multiple branch pipelines are spaced apart along a first direction, the main pipeline is connected to the connecting pipe, the top ends of the multiple branch pipelines are respectively connected to the main pipeline, and the bottom end of each branch pipeline is connected to the multiple nozzles spaced apart along a second direction, and the second direction is perpendicular to the first direction.
[0007] Optionally, the belt pressing device in front of the coiler further includes a driving assembly, the support frame includes a base, a swing arm, a connecting frame and two bearing assemblies, the two bearing assemblies are installed on the base at intervals, the two ends of the connecting structure are respectively connected to the corresponding bearing assemblies, the swing arm is sleeved on the connecting structure, and the connecting frame is fixedly connected to the swing arm, and the connecting pipe and the injection assembly are arranged on the connecting frame;
[0008] The driving end of the driving assembly is connected to the swing arm and is used to drive the swing arm to rotate around the axis of the connecting structure.
[0009] Optionally, the connecting structure includes a sleeve and two rotating shafts spaced apart along the first direction, the swing arm is sleeved in the sleeve, the sleeve is arranged between the two bearing assemblies, parts of the two rotating shafts are respectively embedded in corresponding ends of the sleeve, and the other parts of the two rotating shafts extend out of the sleeve and are respectively passed through the corresponding bearing assemblies.
[0010] Optionally, the connection structure further comprises a pipe joint, one end of which is used to connect to the gas source, and the other end of which is detachably connected to the rotating shaft having the air channel via a flange.
[0011] Optionally, the driving assembly includes a lifting driving device and an articulated frame, the articulated frame is fixedly connected to the bottom of the swing arm, and the driving end of the lifting driving device is sleeved with a pin structure passing through the articulated frame.
[0012] Optionally, the driving assembly further includes an ear shaft bracket and two ear shaft seats, the two ear shaft seats are installed on the base at intervals, the ear shaft bracket is sleeved on the lifting drive device, and the two ends of the ear shaft bracket are respectively passed through the corresponding ear shaft seats.
[0013] Optionally, the bearing assembly includes a bearing body, a fastener and two bearing shells, the two bearing shells are arranged in a vertical direction and installed on the base, the two bearing shells are combined to form a bearing seat, the bearing body is embedded in the bearing seat, the fastener is passed through one bearing shell and connected to the other bearing shell; the two ends of the connecting structure are respectively passed through the corresponding bearing bodies.
[0014] Optionally, the connecting frame includes a frame, a plurality of first protection frames and a second protection frame, the frame and the swing arm are arranged along the second direction and are fixedly connected, the plurality of first protection frames are respectively connected to one end of the frame away from the swing arm, and the plurality of first protection frames are arranged on opposite sides of the branch pipeline;
[0015] The second protective frame is installed at the bottom ends of the plurality of the first protective frames, and the plurality of nozzles are installed in the second protective frame at intervals.
[0016] The beneficial effect of the strip pressing device in front of the coiler of the present invention is that in the hot rolling equipment, after the strip output by the finishing mill is sheared by the flying shear device and before entering the pinch roller, a high-pressure airflow can be output through the air source, and the high-pressure airflow enters the injection assembly through the connecting structure and the connecting pipe in turn. At this time, the high-pressure airflow can be sprayed along a first direction to the surface of the strip below it through the injection assembly, wherein the first direction can be parallel to the width direction of the strip, so that the high-pressure airflow applies uniform pressure on the head surface of the strip to prevent the head of the strip from flying and causing steel piling production accidents, ensure that the head of the strip smoothly enters the pinch roller, and correspondingly ensure the smooth threading operation of the strip.
[0017] In a second aspect, the present invention provides a hot rolling equipment, including a flying shear device, a pinch roller, and a belt pressing device in front of the coiler as described above.
[0018] Therefore, since the hot rolling equipment includes the belt pressing device before the coiler, the hot rolling equipment at least has all the technical effects of the belt pressing device before the coiler, which will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is one of the structural schematic diagrams of the belt pressing device before the winder in an embodiment of the present invention.
[0020] Figure 2 Schematic diagram of the connecting structure of the connecting pipe and the injection assembly in an embodiment of the present invention.
[0021] Figure 3 This is one of the partial structural schematic diagrams of the belt pressing device before the winder in an embodiment of the present invention.
[0022] Figure 4 It is a schematic cross-sectional structure diagram of the swing arm and the connecting structure in an embodiment of the present invention.
[0023] Figure 5 This is the second structural schematic diagram of the belt pressing device before the winder in an embodiment of the present invention.
[0024] Figure 6 This is the second schematic diagram of the partial structure of the belt pressing device before the winder in an embodiment of the present invention.
[0025] Figure 7 for Figure 3 Schematic diagram of the enlarged structure at point A in the middle.
[0026] Figure 8 It is a schematic diagram of the structure of the connecting frame and the injection assembly in an embodiment of the present invention.
[0027] Description of reference numerals:
[0028] 1-support frame; 11-base; 12-swing arm; 13-connecting frame; 131-frame; 132-first protective frame; 133-second protective frame; 14-bearing assembly; 141-bearing body; 142-fastener; 143-bearing shell; 2-connecting structure; 21-sleeve; 211-connecting hole; 22-rotating axis; 23-pipe joint; 3-connecting pipe; 4-injection assembly; 41-main line; 42-branch line; 43-nozzle; 5-driving assembly; 51-lifting driving device; 52-articulated frame; 53-pin structure; 54-ear shaft bracket; 55-ear shaft seat. DETAILED DESCRIPTION
[0029] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. Although certain embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be interpreted as being limited to the embodiments described herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present invention. It should be understood that the drawings and embodiments of the present invention are only for exemplary purposes and are not intended to limit the scope of protection of the present invention.
[0030] The Z axis in the drawings represents the vertical direction, that is, the up and down position, and the positive direction of the Z axis represents the top, and the reverse direction of the Z axis represents the bottom; the X axis in the drawings represents the horizontal direction, and is designated as the left and right position, and the positive direction of the X axis represents the right side, and the reverse direction of the X axis represents the left side; the Y axis in the drawings represents the front and back position, and the positive direction of the Y axis represents the front side, and the reverse direction of the Y axis represents the back side. It should also be noted that the aforementioned Z axis, Y axis, and X axis are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0031] The term "including" and its variations used in this document are open inclusions, that is, "including but not limited to"; the term "based on" means "based at least in part on"; the term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one other embodiment"; the term "some embodiments" means "at least some embodiments"; the term "optionally" means "optional embodiments". The relevant definitions of other terms will be given in the following description. It should be noted that the concepts of "first", "second", etc. mentioned in the present invention are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.
[0032] It should be noted that the modifications of "one" and "plurality" mentioned in the present invention are illustrative rather than restrictive, and those skilled in the art should understand that, unless otherwise clearly indicated in the context, it should be understood as "one or more".
[0033] In view of the problems existing in the above-mentioned related technologies, this embodiment provides a belt pressing device in front of a winder.
[0034] like Figure 1 As shown, an embodiment of the present invention provides a belt pressing device in front of a coiler, which is used to be arranged between a flying shear device and a clamping roller of a hot rolling equipment. The belt pressing device in front of the coiler includes a support frame 1 and a connecting structure 2, a connecting pipe 3 and an injection assembly 4 arranged on the support frame 1. The connecting structure 2 is used to connect to an air source, one end of the connecting pipe 3 is connected to the connecting structure 2, and the other end of the connecting pipe 3 is connected to the injection assembly 4. The injection assembly 4 is used to be arranged above the strip and is used to spray high-pressure airflow onto the strip.
[0035] Specifically, the flying shear device can be arranged at the discharge port of the finishing mill of the hot rolling equipment, so as to facilitate the flying shear device to shear the strip steel after the finishing mill is finished. After the strip head is sheared, before it is sent into the pinch roller, the strip head is in a tension-free state, which is easy to cause the strip head to fly; wherein, a roller table for supporting the strip steel is arranged between the flying shear device and the pinch roller. Therefore, by arranging a belt pressing device before the coiler between the flying shear device and the pinch roller, the belt pressing device before the coiler sprays a high-pressure airflow on the strip head before entering the pinch roller, so as to ensure that the strip head is close to the roller table, and moves in height toward the pinch roller on the roller table, so as to smoothly enter the pinch roller.
[0036] The air source may be a compressor, an air chamber, etc. As long as it can provide an air source with a high-pressure airflow (such as compressed air), it is applicable to the present technical solution and is not specifically limited here.
[0037] The support frame 1 provides an installation basis for the connection structure 2, the connecting pipe 3 and the injection assembly 4, and the injection assembly 4 can be located above the head of the strip.
[0038] Specifically, the injection assembly 4 is extended along a first direction. Figure 1 The X-axis direction in the coordinate system is parallel to the strip width direction, and the moving direction of the strip entering the pinch roller after being sheared by the flying shear device can be understood as Figure 1 The coordinate system is parallel to the Y axis.
[0039] In the present embodiment, after the strip output from the finishing mill in the hot rolling equipment is sheared by the flying shear device and before entering the pinch roller, a high-pressure airflow can be output through the air source, and the high-pressure airflow enters the injection assembly 4 through the connecting structure 2 and the connecting pipe 3 in turn. At this time, the high-pressure airflow can be sprayed along a first direction to the surface of the strip below it through the injection assembly 4, wherein the first direction can be parallel to the width direction of the strip, so that the high-pressure airflow applies uniform pressure on the head surface of the strip to prevent the head of the strip from flying and causing a steel pile production accident. Subsequently, the head of the strip can be close to the roller and move at high speed toward the pinch roller to ensure that the head of the strip enters the pinch roller smoothly, and correspondingly ensure the smooth threading operation of the strip.
[0040] Among them, the smooth strip threading operation means that during the strip rolling process, the strip can pass through the rolling mill smoothly, especially when the strip coil is replaced, the new strip can pass through the working area of the rolling mill without obstacles and connect with the previous strip smoothly without getting stuck, breaking or other problems that affect production efficiency and quality. If the strip is piled up after the rolling process, for example, the head of the strip cannot be smoothly fed into the rear end pinch roller due to flying, causing the strip to pile up between the flying shear device and the pinch roller, it will affect the smooth strip threading operation. The solution of this embodiment can effectively solve this problem.
[0041] Optionally, combined Figure 2 As shown, the injection assembly 4 includes a main pipeline 41, multiple branch pipelines 42 and multiple nozzles 43, the multiple branch pipelines 42 are spaced apart along a first direction, the main pipeline 41 is connected to the connecting pipe 3, the top ends of the multiple branch pipelines 42 are respectively connected to the main pipeline 41, and the bottom ends of the branch pipelines 42 are respectively connected to the multiple nozzles 43 spaced apart along a second direction, and the second direction is perpendicular to the first direction.
[0042] Specifically, the first direction can be Figure 2 The X-axis direction in the coordinate system is parallel, which can be understood as the width direction of the strip, and can be parallel to the extension direction of the main pipeline 41 and the arrangement direction of the plurality of branch pipelines 42. Figure 2 The Y-axis direction in the coordinate system is parallel, which can be understood as the moving direction of the strip, or the length direction of the strip, so the second direction is perpendicular to the first direction.
[0043] Each branch pipeline 42 may be connected to a plurality of nozzles 43 distributed at intervals along the second direction, and the plurality of nozzles 43 may be arranged at intervals along the moving direction of the steel strip.
[0044] In this optional embodiment, the main pipeline 41 is used to connect the connecting pipe 3 and the plurality of branch pipelines 42, so the high-pressure airflow transmitted by the connecting pipe 3 is divided when entering the main pipeline 41, so as to enter the plurality of branch pipelines 42 respectively, and then the plurality of branch pipelines 42 arranged at intervals along the width direction of the strip output the high-pressure airflow through the nozzles 43, and the high-pressure airflow has a certain width to ensure that the high-pressure airflow can cover the entire width of the strip head, so as to avoid the problem of local flying of the strip head in the width direction; furthermore, since the bottom end of each branch pipeline 42 is connected to the plurality of nozzles 43 arranged at intervals along the second direction, the second direction can be the moving direction of the strip (or the length direction). ), so that the high-pressure airflow ejected by the multiple nozzles 43 corresponding to each branch pipe 42 also has a certain length, and correspondingly ensures that the high-pressure airflow ejected by all the nozzles 43 connected to the multiple branch pipes 42 has a certain area, and accordingly increases the area covered by the pressure applied to the head of the strip; since the strip sheared by the flying shear device moves on the roller very quickly (for example, 20m / s), by increasing the area covered by the pressure applied to the head of the strip, not only can the head area adjacent to the strip be prevented from bulging upward, but also the head area of the strip close to the roller can be increased, thereby correspondingly improving the stability of the entire strip entering the clamping roller.
[0045] Optionally, combined Figure 3 and Figure 5 As shown, the belt pressing device in front of the coiler also includes a driving assembly 5, the support frame 1 includes a base 11, a swing arm 12, a connecting frame 13 and two bearing assemblies 14, the two bearing assemblies 14 are installed on the base 11 at intervals, the two ends of the connecting structure 2 are respectively connected to the corresponding bearing assemblies 14, the swing arm 12 is sleeved on the connecting structure 2, and the connecting frame 13 is fixedly connected to the swing arm 12, and the connecting pipe 3 and the injection assembly 4 are arranged on the connecting frame 13;
[0046] The driving end of the driving assembly 5 is connected to the swing arm 12 for driving the swing arm 12 to rotate around the axis of the connecting structure 2 .
[0047] Specifically, two bearing assemblies 14 can be installed on the base 11 at intervals along the first direction, and the two ends of the connecting structure 2 are respectively connected to the corresponding bearing assemblies 14. The swing arm 12 is fixedly sleeved outside the connecting structure 2. The swing arm 12 can drive the connecting structure 2 to rotate. The bottom of the swing arm 12 is placed on the base 11, so the base 11 provides support for the swing arm 12.
[0048] The connecting frame 13 and the swing arm 12 can be arranged in a row along the second direction, for example, the connecting frame 13 can be arranged at the front end of the swing arm 12, and the connecting frame 13 is fixedly connected to the swing arm 12. The connecting pipe 3 and the injection assembly 4 can be installed on the connecting frame 13 to provide an installation foundation for the connecting pipe 3 and the injection assembly 4 through the connecting frame 13.
[0049] The driving component 5 can be installed under the swing arm 12, and the driving end of the driving component 5 can be connected to the swing arm 12 to drive the swing arm 12 to drive the connecting frame 13 and the connecting pipe 3 and the injection component 4 arranged on the connecting frame 13 to rotate around the axis of the connecting structure 2.
[0050] The axis of the connecting structure 2 can be Figure 3 The X-axis is parallel to the coordinate system.
[0051] In this optional embodiment, when the belt pressing device in front of the winder is in working condition, the swing arm 12, the connecting frame 13 and the connecting pipe 3 arranged on the connecting frame 13 are all in a horizontal state, and the injection assembly 4 arranged on the connecting frame 13 can spray high-pressure airflow downward. Since the steel strip cut by the flying shear device passes from under the injection assembly 4, the high-pressure airflow is sprayed on the steel strip through the injection assembly 4 to apply pressure to the surface of the steel strip, which can prevent the head of the steel strip from flying and ensure that the head of the steel strip moves stably on the roller, so as to facilitate the head of the steel strip to bite into the clamping roller smoothly.
[0052] When other devices related to the belt pressing device in front of the coiler, such as clamping rollers, finishing mills, flying shear devices, etc., need to be repaired, it is necessary to first separate the connection between the connecting structure 2 and the air source, and then drive the main structure of the belt pressing device in front of the coiler to leave the working position. Specifically, the driving component 5 works to drive the swing arm 12 to rotate around the axis of the connecting structure 2. Since the connecting pipe 3 and the injection component 4 are fixedly installed on the connecting frame 13, and the connecting frame 13 is fixedly connected to the swing arm 12, the swing arm 12 can drive the connecting frame 13 and the connecting pipe 3 and the injection component 4 arranged on the connecting frame 13 to rotate upward to the maintenance position relative to the base 11, and control the limit through the mechanical structure to prevent the belt pressing device in front of the coiler from tipping over. Therefore, the connecting structure 2 can not only serve as a pipeline structure for the flow of high-pressure airflow, but also has the function of a connecting shaft between the bearing assembly 14 and the swing arm 12, thereby effectively reducing the number of parts of the belt pressing device in front of the coiler and reducing the cost accordingly.
[0053] Optionally, combined Figure 4 As shown, the connection structure 2 includes a sleeve 21 and two rotating shafts 22 spaced apart along the first direction, the swing arm 12 is sleeved in the sleeve 21, the sleeve 21 is arranged between the two bearing assemblies 14, a part of the two rotating shafts 22 is respectively embedded in the corresponding ends of the sleeve 21, and the other part of the two rotating shafts 22 extends out of the sleeve 21 and is respectively passed through the corresponding bearing assemblies 14;
[0054] An air passage is provided inside the rotating shaft 22 , and the air passage is used to connect the air source and the sleeve 21 . The sleeve 21 is connected to one end of the connecting pipe 3 .
[0055] Specifically, the connecting structure 2 may include a sleeve 21 and two rotating shafts 22 arranged at intervals along a first direction. The sleeve 21 is sleeved outside a portion of the two rotating shafts 22. The other portions of the two rotating shafts 22 extend out of the sleeve 21 and are respectively passed through the corresponding bearing assemblies 14. The swing arm 12 can be fixedly sleeved outside the sleeve 21 and can drive the sleeve 21 to rotate relative to the rotating shaft 22.
[0056] The sleeve 21 may be a steel pipe structure with an inner diameter larger than that of the rotating shaft 22. Of the two rotating shafts 22, the rotating shaft 22 closer to the gas source is a hollow tube structure to facilitate communication with the gas source, and both ends of the rotating shaft 22 are inserted into a corresponding bearing assembly 14 and one end of the sleeve 21; the other rotating shaft 22 farther from the gas source may be a solid cylindrical structure, and both ends of the rotating shaft 22 are inserted into the other end of the corresponding sleeve 21 and the other bearing assembly 14, thereby providing sufficient connection strength between the other end of the sleeve 21 and the other bearing assembly 14.
[0057] The air passage is a flow passage through which high-pressure air flows in a rotating shaft 22 .
[0058] Combination Figure 4 As shown, a connecting hole 211 is provided on the sleeve 21 , and the connecting hole 211 is connected to one end of the connecting pipe 3 . In other words, the sleeve 21 can be connected to the connecting pipe 3 through the connecting hole 211 .
[0059] The rotating shaft 22 with an air passage is also connected to the main pipeline of the workshop, so that the high-pressure airflow output by the air source is split after entering the rotating shaft 22. One part enters the injection assembly 4 through the connecting hole 211 and the connecting pipe 3, and the other part can flow to the main pipeline of the workshop, thereby providing high-pressure airflow for the main pipeline of the workshop.
[0060] In this optional embodiment, when the belt pressing device in front of the winder is in working state, the air source and the sleeve 21 are connected through the air passage inside the rotating shaft 22, and the sleeve 21 is connected with the connecting pipe 3, so that the high-pressure airflow (compressed air) output by the air source enters the injection assembly 4 through the rotating shaft 22, the sleeve 21, and the connecting pipe 3 in sequence. Specifically, the high-pressure airflow in the connecting pipe 3 is diverted through the main pipeline 41 to enter each branch pipeline 42 respectively, and then sprayed downward through the corresponding branch pipeline 42 through multiple nozzles 43 to apply pressure to the strip steel below the injection assembly 4 to prevent the head of the strip steel from flying.
[0061] When other devices in the hot rolling equipment that cooperate with the belt pressing device in front of the coiler need to be repaired, it is necessary to adjust the belt pressing device in front of the coiler to the maintenance state. For example, the drive component 5 works to drive the swing arm 12 to rotate around the axis of the rotating shaft 22. Since the swing arm 12 is fixedly mounted outside the sleeve 21, the swing arm 12 can drive the sleeve 21 to rotate together.
[0062] Optionally, combined Figure 4 As shown, the connection structure 2 further includes a pipe joint 23, one end of which is used to connect to the gas source, and the other end of which is detachably connected to the rotating shaft 22 having the gas channel through a flange.
[0063] Specifically, one end of the pipe joint 23, such as the right end, is used to connect to the gas source, and the other end of the pipe joint 23, such as the left end, can be sealed and connected to the rotating shaft 22 with an air passage through a flange, and the sleeve 21 is sleeved outside the two rotating shafts 22 to realize the connection operation between the gas source and the sleeve 21.
[0064] In this optional embodiment, since one end of the pipe joint 23, for example the right end, is connected to the air source, and the other end of the pipe joint 23 is sealed and connected to the rotating shaft 22 through a flange, in other words, the pipe joint 23 can be used as a connecting component between the air source and the sleeve 21. When other devices related to the belt pressing device in front of the coiler in the hot rolling equipment, such as clamping rollers and flying shear devices, need to be repaired, the connection between the air source and the sleeve 21 in the belt pressing device in front of the coiler can be disconnected at the pipe joint 23, for example, the pipe joint 22 can be removed from the rotating shaft 22, or the connection between the pipe joint 23 and the air source can be disconnected, thereby providing convenience for maintenance operations.
[0065] Optionally, combined Figure 5 As shown, the driving assembly 5 includes a lifting driving device 51 and an articulated frame 52 . The articulated frame 52 is fixedly connected to the bottom of the swing arm 12 . The driving end of the lifting driving device 51 is sleeved with a pin structure 53 penetrating the articulated frame 52 .
[0066] Specifically, the lifting drive device 51 can be a vertically arranged linear moving module, for example, it can be an electric push rod, a hydraulic cylinder, a hydraulic electric cylinder, a combination of a rotary motor and a ball screw element, a telescopic cylinder, etc.
[0067] The driving assembly 5 can drive the swing arm 12 to rotate around the axis of the connecting structure 2 in the following manner. For example, the articulated frame 52 is fixedly installed on the bottom end of the swing arm 12. For example, one end of the articulated frame 52 away from the connecting frame 13 is connected to the bottom of the swing arm 12. The lifting drive device 51 is arranged below the swing arm 12. The pin structure 53 passes through the articulated frame 52. The driving end of the lifting drive device 51, such as the end of the piston rod, is sleeved outside the pin structure 53.
[0068] The pin structure 53 is eccentrically arranged relative to the articulated frame 52. Specifically, the articulated frame 52 includes two triangular plates arranged along a first direction, and the pin structure 53 passes through a lower corner of the two triangular plates. At this time, the pin structure 53 is on one side of the center of gravity of the entire articulated frame 52.
[0069] In this optional embodiment, when other devices related to the belt pressing device in front of the coiler in the hot rolling equipment need to be repaired, the main structure of the belt pressing device in front of the coiler needs to leave the working position to switch to the maintenance state. At this time, the lifting drive device 51 can be operated. For example, the piston rod of the lifting drive device 51 extends upward. Since the pin shaft structure 53 is eccentrically arranged relative to the articulated frame 52, when the lifting drive device 51 drives the pin shaft structure 53 to rise, the articulated frame 52 can transmit the upward push force of the lifting drive device 51 to the swing arm 12, so that the articulated frame 52 and the swing arm 12 rotate upward around the axis of the rotating shaft 22 in the connecting structure 2, so as to drive the main structure of the belt pressing device in front of the coiler, such as the connecting frame 13 and the connecting pipe 3 and the injection assembly 4 arranged on the connecting frame 13 to leave the working position.
[0070] Optionally, combined Figure 5 As shown, the driving assembly 5 also includes an ear shaft bracket 54 and two ear shaft seats 55. The two ear shaft seats 55 are installed on the base 11 at intervals. The ear shaft bracket 54 is sleeved on the lifting drive device 51, and the two ends of the ear shaft bracket 54 are respectively passed through the corresponding ear shaft seats 55.
[0071] Specifically, the lifting drive device 51 can be installed on the base 11 in the following manner, for example, two ear shaft seats 55 are installed at intervals along the first direction on the bottom front side of the base 11, and the ear shaft bracket 54 is fixedly sleeved on the fixed end of the lifting drive device 51, such as the middle position of the cylinder, and the two ends of the ear shaft bracket 54 along the first direction are respectively penetrated through the ear shaft seats 55 at corresponding positions. The ear shaft seat 55 can be a bearing seat structure. In other words, the lifting drive device 51 can be rotated around the axis of the ear shaft seat 55 through the ear shaft bracket 54.
[0072] In this optional embodiment, since the lifting drive device 51 is rotatably connected to the ear shaft seat 55 through the ear shaft bracket 54, when the lifting drive device 51 drives the swing arm 12 to rotate around the connecting structure 2 through the articulated frame 52, since the fixed end of the lifting drive device 51, such as the cylinder, has a certain rotation amplitude, the upward rotation angle range of the swing arm 12 driving the connecting frame 13 and the connecting pipe 3 and the injection assembly 4 on the connecting frame 13 is correspondingly increased, thereby providing a larger maintenance space for maintenance operations of other devices in the hot rolling equipment.
[0073] Optionally, combined Figure 6As shown, the bearing assembly 14 includes a bearing body 141, a fastener 142 and two bearing shells 143. The two bearing shells 143 are arranged in a vertical direction and installed on the base 11. The two bearing shells 143 are surrounded to form a bearing seat. The bearing body 141 is embedded in the bearing seat. The fastener 142 is passed through one bearing shell 143 and connected to the other bearing shell 143; the two ends of the connecting structure 2 are respectively passed through the corresponding bearing bodies 141.
[0074] Specifically, the vertical direction can be Figure 6 The Z-axis direction in the coordinate system is parallel; the two bearing shells 143 can be fixed as a bearing seat in the following manner, the two bearing shells 143 can be arranged in the vertical direction, the lower bearing shell 143 is fixedly installed on the base 11, the two bearing shells 143 are surrounded to form a bearing seat, and the bearing body 141 is embedded and installed in the bearing seat; the fastener 142 can be a bolt fastener, which can be vertically penetrated through the upper bearing shell 143 through the fastener 142 and connected and fixed with the lower bearing shell 143, so as to fix the bearing body 141 in the bearing seat.
[0075] The two rotating shafts 22 of the connecting structure 2 are respectively inserted into the bearing bodies 141 of the corresponding bearing assemblies 14 , so that the rotating shafts 22 rotate in the bearing seat through the bearing bodies 141 .
[0076] In this optional embodiment, since the two bearing shells 143 are connected and fixed by the fasteners 142, when the bearing assembly 14 needs to be repaired, it is only necessary to remove the fasteners 142 to separate the two bearing shells 143 and remove and replace the bearing body 141, thereby improving the convenience of disassembly, assembly and maintenance of the bearing assembly 14.
[0077] Optionally, combined Figure 7 and Figure 8 As shown, the connecting frame 13 includes a frame 131, a plurality of first protective frames 132 and a second protective frame 133, the frame 131 and the swing arm 12 are arranged along the second direction and the two are fixedly connected, the plurality of first protective frames 132 are respectively connected to one end of the frame 131 away from the swing arm 12, and the plurality of first protective frames 132 are arranged on opposite sides of the branch pipeline 42;
[0078] The second protective frame 133 is installed at the bottom ends of the first protective frames 132 , and the nozzles 43 are installed in the second protective frame 133 at intervals.
[0079] Specifically, the frame 131 can be a rectangular frame formed by welding multiple channel steel structures. The frame 131 and the swing arm 12 can be arranged along the second direction, and one end of the frame 131, such as the rear end, is fixedly connected to the swing arm 12, and the other end of the frame 131, such as the front end, is connected to multiple first protective frames 132.
[0080] The first protection frame 132 may be a vertically arranged channel steel structure, and a plurality of first protection frames 132 may be fixedly connected to the front bottom of the frame 131. The frame 131 is horizontally arranged and diffracts along the second direction, and the connecting pipe 3 may be installed on the upper part of the frame 131 to support the connecting pipe 3 through the frame 131.
[0081] The first protection frames 132 are respectively disposed on two opposite sides of at least a portion of the branch pipe 42 , such as the front side and the rear side.
[0082] The second protection frame 133 may be a grid-shaped frame, for example, the grid-shaped frame has a plurality of mounting slots arranged in an array, and the plurality of nozzles 43 are respectively located in the corresponding mounting slots. The second protection frame 133 may be connected and fixed to the bottom ends of the plurality of first protection frames 132 .
[0083] In this optional embodiment, the connecting pipe 3 can be installed on the frame 131 to support and fix the connecting pipe 3 through the frame 131; a plurality of first protective frames 132 are arranged on opposite sides of the branch pipe 42, such as the front and rear sides, so as to protect the branch pipe 42 in the second direction, such as the front and rear directions, through the plurality of first protective frames 132, so as to prevent the branch pipe 42 from being collided with by other devices other than the belt pressing device in front of the winder; and a plurality of nozzles 43 are installed at intervals in the second protective frame 133, so as to provide safety protection for the plurality of nozzles 43 on all sides through the second protective frame 133, and accordingly prevent the nozzles 43 from being collided with other devices other than the belt pressing device in front of the winder, so that the safety protection function of the injection assembly 4 is achieved through the first protective frame 132 and the second protective frame 133.
[0084] A hot rolling equipment provided in an embodiment of the present invention comprises a flying shear device, a pinch roller and a belt pressing device in front of the coiler as described in the above embodiment.
[0085] The hot rolling equipment in this embodiment also includes a finishing mill, a roller table, a coiler, etc., wherein a flying shear device can be arranged at the discharge port end of the finishing mill, so as to facilitate the shearing operation of the strip output by the finishing mill through the flying shear device; and a roller table can be arranged between the flying shear device and the pinch roller, so that the strip sheared by the flying shear device can move along the roller table toward the pinch roller; and a belt pressing device in front of the coiler can be arranged between the flying shear device and the pinch roller, and the belt pressing device in front of the coiler is closer to the pinch roller, so as to apply downward pressure to the head of the strip on the roller table through the injection component 4 in the belt pressing device in front of the coiler, so that the head of the strip is close to the roller table, effectively preventing the head of the strip from flying, and then the strip moves at high speed on the roller table and smoothly enters the pinch roller, ensuring smooth threading; and a coiler can be arranged on the side of the pinch roller away from the belt pressing device (for example, the front side of the pinch roller), so as to guide the head of the strip into the coiler through the pinch roller, so as to realize the curling operation of the strip.
[0086] The beneficial effects of the hot rolling equipment of this embodiment relative to the prior art are the same as those of the belt pressing device before the coiler described above, and will not be described in detail here.
[0087] Although the present invention is disclosed as above, the protection scope of the present invention is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications will fall within the protection scope of the present invention.
Claims
1. A belt pressing device before the coiler, It is characterized in that The belt pressing device in front of the coiler is used to be arranged between the flying shear device and the clamping roller of the hot rolling equipment. The belt pressing device in front of the coiler comprises a support frame (1) and a connecting structure (2), a connecting pipe (3) and a spray assembly (4) arranged on the support frame (1). The connecting structure (2) is used to connect to the air source, one end of the connecting pipe (3) is connected to the connecting structure (2), and the other end of the connecting pipe (3) is connected to the spray assembly (4). The spray assembly (4) is used to be arranged above the strip and is used to spray high-pressure airflow onto the strip.
2. The belt pressing device before the coiler according to claim 1, It is characterized in that The injection assembly (4) comprises a main pipeline (41), a plurality of branch pipelines (42) and a plurality of nozzles (43); the plurality of branch pipelines (42) are spaced apart along a first direction; the main pipeline (41) is connected to the connecting pipe (3); the top ends of the plurality of branch pipelines (42) are respectively connected to the main pipeline (41); the bottom end of each branch pipeline (42) is connected to the plurality of nozzles (43) spaced apart along a second direction; the second direction is perpendicular to the first direction.
3. The belt pressing device before the coiler according to claim 2, It is characterized in that It also includes a driving assembly (5), the support frame (1) includes a base (11), a swing arm (12), a connecting frame (13) and two bearing assemblies (14), the two bearing assemblies (14) are installed on the base (11) at intervals, the two ends of the connecting structure (2) are respectively connected to the corresponding bearing assemblies (14), the swing arm (12) is sleeved on the connecting structure (2), and the connecting frame (13) is fixedly connected to the swing arm (12), and the connecting pipe (3) and the injection assembly (4) are arranged on the connecting frame (13); The driving end of the driving assembly (5) is connected to the swing arm (12) and is used to drive the swing arm (12) to rotate around the axis of the connecting structure (2).
4. The belt pressing device before the coiler according to claim 3, It is characterized in that The connection structure (2) comprises a sleeve (21) and two rotating shafts (22) arranged at intervals along the first direction, the swing arm (12) is sleeved in the sleeve (21), the sleeve (21) is arranged between the two bearing assemblies (14), a part of the two rotating shafts (22) is respectively embedded in the corresponding end portions of the sleeve (21), and the other part of the two rotating shafts (22) extends out of the sleeve (21) and is respectively passed through the corresponding bearing assemblies (14); An air passage is provided inside the rotating shaft (22), and the air passage is used to connect the air source and the sleeve (21), and the sleeve (21) is connected to one end of the connecting pipe (3).
5. The belt pressing device before the coiler according to claim 4, It is characterized in that The connection structure (2) further comprises a pipe joint (23), one end of which is used for connecting to the gas source, and the other end of which is detachably connected to the rotating shaft (22) having the gas channel via a flange.
6. The belt pressing device before the coiler according to claim 3, It is characterized in that The driving assembly (5) comprises a lifting driving device (51) and an articulated frame (52), wherein the articulated frame (52) is fixedly connected to the bottom of the swing arm (12), and the driving end of the lifting driving device (51) is sleeved with a pin structure (53) passing through the articulated frame (52).
7. The belt pressing device before the coiler according to claim 6, It is characterized in that The driving assembly (5) further comprises an ear shaft support (54) and two ear shaft seats (55), wherein the two ear shaft seats (55) are installed on the base (11) at intervals, the ear shaft support (54) is sleeved on the lifting driving device (51), and the two ends of the ear shaft support (54) are respectively inserted into the corresponding ear shaft seats (55).
8. The belt pressing device before the coiler according to claim 6, It is characterized in that The bearing assembly (14) comprises a bearing body (141), a fastener (142) and two bearing shells (143); the two bearing shells (143) are arranged in a vertical direction and installed on the base (11); the two bearing shells (143) are combined to form a bearing seat; the bearing body (141) is embedded in the bearing seat; the fastener (142) is passed through one of the bearing shells (143) and connected to the other bearing shell (143); and the two ends of the connection structure (2) are respectively passed through the corresponding bearing body (141).
9. The belt pressing device before the coiler according to claim 3, It is characterized in that The connecting frame (13) comprises a frame (131), a plurality of first protection frames (132) and a second protection frame (133); the frame (131) and the swing arm (12) are arranged along the second direction and are fixedly connected; the plurality of first protection frames (132) are respectively connected to one end of the frame (131) away from the swing arm (12); and the plurality of first protection frames (132) are arranged on opposite sides of the branch pipeline (42); The second protective frame (133) is installed at the bottom ends of the plurality of the first protective frames (132), and the plurality of nozzles (43) are installed in the second protective frame (133) at intervals.
10. A hot rolling equipment, It is characterized in that It comprises a flying shear device, a pinch roller and a belt pressing device in front of the coiler as claimed in any one of claims 1 to 9.
Citation Information
Patent Citations
Hot tandem mill finishing rolling belt steel head part lifting up prevention device
CN2656038Y
Apparatus for preventing upward movement of front part of strip
KR1020120032854A
Guiding appratus for strip
KR1020170064063A
Method and device for stabilizing a movement of a rolled metal band on a roller table
US20190337033A1