Manufacturing method of improved large-section prestressed concrete precast pile
By using fine rolled steel bars and tensioning technology in water transportation projects, combined with vertical rods, storage devices, capsule tube positioning stirrups and steel pressure plates, the problems of insufficient steel bar performance and low production efficiency in the production of large-section prestressed concrete square piles are solved. , achieving higher strength and production efficiency.
Patent Information
- Application Number
- CN202411203337.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The production standards for large-section prestressed concrete square piles in water transportation projects have not yet been formed. Traditional processes have problems such as insufficient steel bar performance, troubles in the production of formwork, and buoyancy of capsule tubes, and low production efficiency of steel cages.
Use fine rolled steel bars and tensioning, use vertical rods and storage devices to improve the verticality of the template and the mold removal efficiency. Use capsule tubes to position stirrups and steel pressure plates to prevent the capsule tube from floating, and use multiple production lines to lift the ash transport rail machine and gantry crane. Production efficiency.
The strength of pre-stressed concrete prefabricated piles with large sections is improved, the formwork storage and demolition process is simplified, the steel cage is prevented from floating, and the production efficiency and transportation efficiency of multiple production lines are improved.
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of manufacturing process of precast piles, and in particular to a method for manufacturing an improved large-section prestressed concrete precast pile. Background Art
[0002] (1) The geological conditions along the coast are special. The use of prestressed concrete square piles in water transport engineering construction can adapt to various geological conditions and has obvious advantages.
[0003] (2) The coastal marine environment is harsh, and prestressed concrete square piles have superior durability and significant economy.
[0004] (3) Large-section prestressed concrete square piles can meet the needs of improving the grade of docks, but their production standards are still blank.
[0005] At present, the prestressed concrete square piles in water transport projects are all within the cross-section of 600mm*600mm. Large-section prestressed concrete square piles with a cross-section of 700mm*700mm and above are relatively rare. However, under the background of deep-water dock construction, complex wave and water flow conditions, large-scale ships, and diversified dock functions, the demand for large-section square piles has emerged. However, the current production standards for large-section (700mm*700mm and above) prestressed concrete square piles in water transport engineering construction are still in a blank stage. Many large-section square pile production processes use traditional production processes, such as the production process of 600*600mm square piles. Therefore, the production process of large-section prestressed concrete square piles needs to be improved.
[0006] The traditional production process has the following defects:
[0007] 1) Insufficient steel bar performance;
[0008] 2) The steel formwork is troublesome to make and inconvenient to store, resulting in economic and demoulding efficiency losses;
[0009] 3) Due to the excessive buoyancy of the capsule tube, it may float up and lift the steel cage, thus affecting the thickness of the square pile steel bar protection layer;
[0010] 4) The production efficiency of multiple production lines is relatively low. Summary of the invention
[0011] In view of this, the present invention aims to solve at least one of the shortcomings of the above-mentioned background technology. The present invention provides a method for improving the production of large-section prestressed concrete precast piles, which adopts fine-rolled steel bars and tensions them to make them more suitable for large-section prestressed concrete precast piles and greatly improve their strength.
[0012] To achieve the above object, the present invention provides the following technical solutions:
[0013] Step (1), using fine-rolled steel bars as prestressed bars in a steel cage;
[0014] Step (2), tensioning the prestressed tendons in the steel cage;
[0015] Step (3), installing the prefabricated pile template;
[0016] Step (4), installation and inflation of capsule tubes: laying uninflated capsule tubes in the hollow section of the steel cage, and after the tensioning work is completed, connecting the air compressor in the site to inflate the capsule tubes and install the valve core, and reserving part of the capsule tubes at the pile tip for extraction;
[0017] Step (5), pouring of precast pile concrete;
[0018] Step (6), dismantling the prefabricated pile template;
[0019] Step (7), precast pile maintenance, loosening, cutting, unloading and defect repair.
[0020] Preferably, in step (2), when the steel bars are tensioned, the initial stress is adjusted to be equal, and in order to reduce the loss of prestress of the steel bars during the production and use of the precast piles, they should also be over-tensioned.
[0021] Preferably, the initial stress is adjusted by a repeated tensioning method, the tensioning force of the repeated tensioning method is 40%-50% of the controlled stress, and the repeated tensioning times are 2-3 times.
[0022] Preferably, the repeated tensioning method is specifically as follows: tighten the nut, start tensioning to 0.4-0.5 times the tensioning control stress, return the stress to zero, re-tighten the nut, and then tension and relax according to the above method, and repeat this 2-3 times.
[0023] Preferably, in step (3), when installing the prefabricated pile formwork, vertical rods and receiving devices are added;
[0024] The vertical rod is used for positioning, calibrating the verticality of the side form, and assisting in anchoring the side form. The upper part is anchored by spiral reinforcement and the lower part is anchored by pins.
[0025] The storage device is used to store vertical rods and wedge blocks, making the template device easy to store, improving the efficiency of demoulding, and reducing the damage and loss rate of the device.
[0026] Preferably, step (4) further includes a process for preventing the airbag from floating up, specifically:
[0027] Add capsule tube positioning stirrups and add steel pressure plates to press on the top surface of the main reinforcement of the steel cage to prevent the capsule tube from lifting the steel cage. After pouring is completed and initial setting, remove the pressure plates and repair the indentations.
[0028] Preferably, in step (5), multiple production lines use two ash transport track machines to operate in coordination, and seamlessly connect and pour through a common track.
[0029] Preferably, in step (6), a gantry crane is used to lift the side form.
[0030] Preferably, in step (7), after the precast piles are cast and initially set, geotextiles are laid and sprayed with equipment and maintained manually. The curing time of the precast piles shall not be less than 28 days, and prestressing may be applied only when the concrete strength of the precast piles reaches more than 80%.
[0031] Preferably, the prefabricated piles are square piles.
[0032] Compared with the prior art, the present invention has the following beneficial effects:
[0033] The improved method for manufacturing large-section prestressed concrete precast piles provided by the present invention adopts fine-rolled steel bars and tensions them, making them more suitable for large-section prestressed concrete precast piles and greatly improving their strength.
[0034] The setting of vertical rods makes the measurement and calibration of the verticality of the template more convenient. The vertical rods are stored on the side templates through L-shaped fixing rods, which greatly improves the equipment storage efficiency when the template is removed and reduces the probability of loss or damage of these devices.
[0035] By adding capsule tube positioning stirrups and adding steel pressure plates to press on the top surface of the main reinforcement of the steel cage, the capsule tube can be effectively prevented from lifting the steel cage.
[0036] The production efficiency of large-section prestressed concrete precast piles in multi-production line mode is improved by using two ash transport track machines.
[0037] Gantry cranes that are adapted to construction sites can improve transportation efficiency. DETAILED DESCRIPTION
[0038] The present invention provides a method for manufacturing an improved large-section prestressed concrete precast pile, comprising the following steps:
[0039] Step (1), using fine rolled steel bars as prestressed bars of the steel cage, wherein the prefabricated piles are preferably 700*700mm large-section prestressed concrete square piles, the entire section of which uses fine rolled steel bars, and the steel bars are prepared in a process of cold drawing, making, tying and installing, and placing the steel skeleton;
[0040] Step (2) tensions the prestressed steel bars in the steel cage. When tensioning the steel bars, based on the large-section precast piles, explore the key parameters and characteristics such as the initial stress adjustment characteristics, the number of repeated tensioning, the repeated tensioning control stress, and the repeated tensioning procedure. The initial stress must be adjusted to be equal. At the same time, in order to reduce the loss of prestressed steel bars during the production and use of the precast piles, they should also be over-tensioned. The repeated tensioning method is used to adjust the initial stress. The tensioning force of the repeated tensioning method is 40%-50% of the control stress, and the repeated tensioning times are 2-3 times.
[0041] Repeated tensioning method: Tighten the nut and start tensioning to 0.4-0.5 times the tensioning control stress, return the stress to zero, re-tighten the nut, and then tension and relax according to the above method, and repeat this 2-3 times.
[0042] Step (3), install the prefabricated pile formwork, wherein the prefabricated pile formwork is composed of a bottom formwork and a side formwork. Among them, the bottom formwork: the net bottom formwork is a steel pedestal with a width of 69.5 cm, and the width is 70 cm after the leak-proof tapes are affixed to both sides of the bottom membrane. The lower part of the bottom membrane is a channel steel cast in place in the cement pedestal, in which a pressure column slot is set, and the spacing is 1.5 meters. Side formwork: Each side formwork is 69.7 cm high and 6 meters long. Each piece can be spliced and anchored. The total length of the side formwork is determined by the length of the square pile.
[0043] When installing precast pile forms, add vertical rods and storage devices;
[0044] The vertical rod is used for positioning, calibrating the verticality of the side form, and assisting in anchoring the side form. The upper part is anchored with spiral reinforcement to adjust and calibrate the verticality of the side form, and the lower part is anchored to the steel pedestal (base) with pins;
[0045] The storage device is used to store vertical rods and wedge blocks, making the template device easy to store, improving the efficiency of demoulding, and reducing the damage and loss rate of the device.
[0046] Among them, the height of the vertical rod is preferably 100 cm and the width is preferably 8 cm.
[0047] A plurality of L-shaped fixing rods (the number is greater than or equal to 2) can be connected to the side template to place the vertical rod, a U-shaped fixing piece is connected to the side template, and the wedge block is placed in the opening of the U-shaped fixing piece for storage.
[0048] Step (4), installing and inflating the capsule tube, laying the uninflated capsule tube in the hollow section of the steel cage (preferably using an on-site ash transport track machine to lay the uninflated capsule tube in the hollow section of the steel cage), after the tensioning work is completed, connecting the air compressor in the site to inflate the capsule tube and install the valve core, and reserving part of the capsule tube at the pile tip for extraction;
[0049] During the concrete pouring process, due to the excessive buoyancy of the capsule tube, it may float up and bring up the steel cage, thus affecting the thickness of the square pile steel bar protection layer. Therefore, the process of preventing the air bag from floating up is also included, specifically:
[0050] Add capsule tube positioning stirrups, the stirrups (U-shaped) are interlocked up and down, and the spacing is preferably 350mm. Add a steel pressure plate to press on the top surface of the main reinforcement of the steel cage to prevent the capsule tube from lifting the steel cage. After the pouring is completed and the initial setting, remove the pressure plate and repair the indentation. The steel pressure plate is added at the top, and the spacing is preferably 1m.
[0051] Step (5), precast pile concrete pouring, preferably multiple production lines use two ash transport track machines to operate in coordination, and pouring is performed by seamlessly docking through a common track, as illustrated below:
[0052] There are 13 production lines in total, with two ash transport track machines. Tracks are laid on each production line. The load-bearing wheels of No. 1 ash transport track machine are on track 1 and track 7, and the load-bearing wheels of No. 2 ash transport track machine are on track 7 and track 13. The two vehicles can be seamlessly connected through track 7. There is a track on the upper part of the ash transport vehicle for the movement of the ash hopper. The ash hopper receives concrete from the unloading port of the mixing station next to track 1, and then moves to any production line through the upper track. The movement of the ash transport vehicle can make the ash hopper move back and forth on this production line. This setting greatly improves the production efficiency during multi-line production.
[0053] The concrete is mixed by a mixer and transported to the designated location for pouring by a ash bucket. The pouring of the pile body must be carried out continuously without leaving construction joints. The concrete is vibrated with an inserted vibrator, and two workers are responsible for vibrating one after the other. The vibrator is inserted vertically into the concrete, inserted quickly and pulled out slowly, and pumped up and down to facilitate uniform compaction. The surface concrete should be smoothed, and the number of smoothing times should reach more than three times to prevent shrinkage cracks.
[0054] Step (6), remove the precast pile formwork. After the precast pile is poured and finally set, remove the pressure column. After the pressure column is removed, the lifting team preferably uses an 80T gantry crane to lift the side formwork and clean the hoisted side formwork. When removing the formwork, the added storage device makes it convenient and quick to store the vertical rods, and it is not easy to lose or damage, which greatly improves the efficiency of demoulding and reduces the economic cost. ;
[0055] Step (7), precast pile maintenance, relaxation, cutting, stacking out of the pit and defect repair. After the precast pile is cast and initially set, geotextile is laid and equipment is used for spraying and manual maintenance. The maintenance time of precast square piles shall not be less than 28 days. Prestress can be applied only when the concrete strength of the pile reaches more than 80%. We use a wedge-type relaxer to relax. After the prestressed steel bars are relaxed, when acetylene is used to cut the steel bars, it should be done from the relaxed end to the non-relaxed end. The piles are then removed from the pit and stored. When stacking precast piles, they should be stacked in layers according to specifications and pile numbers on a flat, solid ground; finally, defects during construction should be repaired.
[0056] The above are only preferred specific implementations of the present invention; however, the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and improved concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A method for manufacturing an improved large-section prestressed concrete precast pile, characterized in that: The steps include: Step (1), using fine-rolled steel bars as prestressed bars in a steel cage; Step (2), tensioning the prestressed tendons in the steel cage; Step (3), installing the prefabricated pile template; Step (4), installation and inflation of capsule tubes: laying uninflated capsule tubes in the hollow section of the steel cage, and after the tensioning work is completed, connecting the air compressor in the site to inflate the capsule tubes and install the valve core, and reserving part of the capsule tubes at the pile tip for extraction; Step (5), pouring of precast pile concrete; Step (6), dismantling the prefabricated pile template; Step (7), precast pile maintenance, loosening, cutting, unloading and defect repair.
2. The method for manufacturing an improved large-section prestressed concrete precast pile according to claim 1, characterized in that: In step (2), when the steel bars are tensioned, the initial stress is adjusted to be equal. At the same time, in order to reduce the loss of prestress of the steel bars during the production and use of the precast piles, they should also be over-tensioned.
3. The method for manufacturing an improved large-section prestressed concrete precast pile according to claim 2, characterized in that: The initial stress is adjusted by repeated tensioning method, the tensioning force of which is 40% - 50% of the controlled stress, and the repeated tensioning is performed 2 - 3 times.
4. The method for manufacturing an improved large-section prestressed concrete precast pile according to claim 3, characterized in that: The repeated tensioning method is specifically as follows: tighten the nut, start tensioning to 0.4-0.5 times the tensioning control stress, return the stress to zero, re-tighten the nut, and then tension and relax according to the above method, and repeat this 2-3 times.
5. The method for manufacturing an improved large-section prestressed concrete precast pile according to claim 1, characterized in that: In step (3), when installing the prefabricated pile formwork, vertical rods and receiving devices are added; The vertical rod is used for positioning, calibrating the verticality of the side form, and assisting in anchoring the side form. The upper part is anchored by spiral reinforcement and the lower part is anchored by pins. The storage device is used to store vertical rods and wedge blocks, making the template device easy to store, improving the efficiency of demoulding, and reducing the damage and loss rate of the device.
6. The method for manufacturing an improved large-section prestressed concrete precast pile according to claim 1, characterized in that: Step (4) also includes a process for preventing the airbag from floating up, specifically: Add capsule tube positioning stirrups and add steel pressure plates to press on the top surface of the main reinforcement of the steel cage to prevent the capsule tube from lifting the steel cage. After pouring is completed and initial setting, remove the pressure plates and repair the indentations.
7. The method for manufacturing an improved large-section prestressed concrete precast pile according to claim 1, characterized in that: In step (5), multiple production lines use two ash transport track machines to operate in coordination, and seamlessly connect and pour through a common track.
8. The method for manufacturing an improved large-section prestressed concrete precast pile according to claim 1, characterized in that: In step (6), a gantry crane is used to lift the side form.
9. The method for manufacturing an improved large-section prestressed concrete precast pile according to claim 1, characterized in that: In step (7), after the precast piles are cast and initially set, geotextiles are laid and sprayed with equipment and maintained manually. The curing time of the precast piles shall not be less than 28 days, and prestressing can be applied only when the concrete strength of the precast piles reaches more than 80%.
10. A method for manufacturing an improved large-section prestressed concrete precast pile according to any one of claims 1 to 9, characterized in that: Precast piles are square piles.