Main control end switching control method and equipment for coupled train and medium

Through the communication and negotiation mechanism between train units, the main control terminals are determined and switched, the problem of multiple main control terminals in the connected train is solved, the uniqueness and safety of single mains are ensured, the wrong closing command is prevented, and the train is improved stability and safety.

CN118907179APending Publication Date: 2024-11-08CASCO SIGNAL LTD

Patent Information

Application Number
CN202411174087.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing switching technology of the main control terminal of the joint-hailing train cannot ensure the uniqueness of the single master, which may cause multiple main control terminals to compete with each other for the main control terminal in the joint-hailing train, affecting the normal operation of the train, especially during peak periods or A wrong shutdown command may result in a special job.

Method used

Through the communication and negotiation mechanism between train units, the main control terminal is determined and switched according to the operation tasks and operation requirements, ensuring that there is only one train unit as the main control terminal in the joint train marshalling, avoiding the occurrence of multiple main control terminals, and opening the door Prevent wrong shutdown commands during jobs.

Benefits of technology

The single-owner uniqueness of the connected train is realized, the stability and safety within the train group is ensured, abnormal situations caused by master-slave switching are avoided, and operational reliability and safety are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118907179A_ABST
    Figure CN118907179A_ABST
Patent Text Reader

Abstract

The invention relates to a main control end switching control method and device for a coupled train and a medium, and the method comprises the steps: after the train completes the coupled operation, determining a main control end of a train marshalling according to the communication content between train units and between the train units and external equipment, and carrying out the switching of the main control end according to the operation task or operation requirement in the operation process. Compared with the prior art, the method has the advantages that the single-owner uniqueness of the coupled vehicle is ensured, and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a train signal control system, and in particular to a main control terminal switching control method, equipment and medium for coupling trains. Background Art

[0002] With the rapid development of urban rail transit technology, urban rail transit has become an important means to improve passenger travel efficiency and alleviate urban traffic pressure. In the traditional urban rail transit system, trains mainly adopt a fixed marshaling method, that is, a train consists of a fixed number of carriages. This method cannot be flexibly adjusted according to the size of passenger flow. It may not be able to meet the large number of passenger flows during peak hours in the morning and evening. During non-peak periods, the passenger flow is small and the full load rate is low, which easily leads to waste of resources.

[0003] In order to solve this problem, a flexible marshaling method can be adopted. For example, during peak hours, two fixed-marshaling trains can be coupled as train units, and the coupled trains can be put into mainline operation after being formed. During off-peak hours, the coupled trains can be decoupled and put into operation according to plan.

[0004] At present, the train's onboard signal system ATC adopts a redundant configuration, that is, there is a set of onboard signal systems at each end of the train. During normal operation, the onboard signal systems at both ends will negotiate one end as the master end to control the train operation, and the other end as the slave end for backup. For coupled trains, in addition to negotiating the master end of the train unit, it is also necessary to negotiate the master end of the entire train formation after coupling, to avoid the onboard signal systems of different train units after coupling competing for the master end, resulting in malfunction.

[0005] After searching, Chinese patent publication number CN115973231A discloses a control right switching method, device and storage medium for the return of coupled trains, which specifically discloses the following steps: Step A: Offline configuration of the VOBC statically associated with the train unit TU; Step B: Check the legality of the location message sent by the VOBC, if legal, record the message, otherwise directly discard the message; Step C: Combine the activation end status and the return status field in the VOBC location information to determine the VOBC dynamically associated with the single train unit TU and whether the VOBC is the master control vehicle; Step D: Combine the status of all TUs in the train formation to determine the master control train in the formation. However, this existing patent is applicable to the control right switching of ZC, but not to other situations. Therefore, how to design a new control technology for the master control terminal switching of coupled trains to ensure the single master uniqueness of coupled vehicles has become a technical problem that needs to be solved. Summary of the invention

[0006] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a master control terminal switching control method, equipment and medium for coupled trains.

[0007] The purpose of the present invention can be achieved by the following technical solutions:

[0008] According to a first aspect of the present invention, a master control terminal switching control method for coupled trains is provided. After the train coupling operation is completed, the method confirms the master control terminal of the train formation based on the communication content between train units and with external equipment, and switches the master control terminal according to the operating task or operation requirements during the operation.

[0009] As a preferred technical solution, the method comprises the following steps:

[0010] Step S1, determining whether the remote train unit is the master control terminal;

[0011] Step S2, determining whether the remote train unit requests to be upgraded to the master control terminal;

[0012] Step S3, judging whether the local train unit requests to be upgraded to the master control terminal;

[0013] Step S4, determining whether the local train unit is the master control terminal;

[0014] Step S5: Based on the master control terminal status of the local train unit, the local train unit informs other train units whether they are allowed to be upgraded to the master control terminal; if the local train unit is the master control terminal, other train units will be prohibited from upgrading to the master control terminal, otherwise they are allowed to be upgraded to the master control terminal.

[0015] As a preferred technical solution, step S1 specifically includes the following steps:

[0016] Step S 11 , if the current train unit is not linked with other train units, it is determined that the remote train unit is not the master control end;

[0017] Step S 12 Otherwise, if both ends of the local train unit are coupled with other train units or the coupling status is unknown, the remote train unit is determined to be the master control end;

[0018] Step S 13 Otherwise, if the local train unit in the coupled train marshaling has not established communication with the remote train unit, it is determined that the remote train unit is not the master control end;

[0019] Step S 14Otherwise, if only one end of the local train unit is connected to other train units and communication has been established with the remote train unit, if the remote train unit prohibits the local train unit from upgrading the main control end, then the remote train unit is judged to be the main control end; if the remote train unit allows the local train unit to upgrade the main control end, then the remote train unit is judged to be not the main control end.

[0020] As a preferred technical solution, step S2 specifically includes the following steps:

[0021] Step S 21 , if communication is established with the remote train unit and the remote train unit is requesting to be upgraded to the master control terminal, it is considered that the remote train unit is requesting to apply to be the master control terminal;

[0022] Step S 22 Otherwise, it is considered that the remote train unit has not requested to be upgraded to the master control terminal.

[0023] As a preferred technical solution, step S3 specifically includes the following steps:

[0024] Step S 31 If both ends of the train unit at this end are not coupled or both ends are coupled, there is no request to upgrade to the master control end.

[0025] Step S 32 Otherwise, when the onboard controller of the local train unit meets the set conditions, when it is determined that the local train unit needs to request to be upgraded to the main control end:

[0026] Step S 33 , when the local train unit determines whether it needs to request to be upgraded to the master control terminal, it needs to inform the remote train unit; if there is a request to upgrade to the master control terminal, the remote train unit is informed that the local train unit requests to be the master control terminal; otherwise, the remote train unit is informed that there is no request to upgrade to the master control terminal.

[0027] As a preferred technical solution, the step S 32 The setting condition is to meet any of the following conditions:

[0028] (1) The train unit at this end has a driver-activated cab;

[0029] (2) When all train units are not performing the wake-up test, the planned running direction in the currently responding train running task is consistent with the non-coupling end direction of the local train unit;

[0030] (3) The train unit at this end is not performing a wake-up test and is outputting a door opening or platform door opening command;

[0031] (4) After the coupled train wakes up from the dormant state, neither the local train unit nor the remote train unit has performed a wake-up test, but the subsystem ID of the local onboard controller is smaller than the subsystem ID of the remote one;

[0032] (5) The train unit at this end is performing a wake-up test;

[0033] (6) The train unit at this end has not yet performed the wake-up test, while the train unit at the other end has completed the wake-up test;

[0034] (7) After the coupling operation is completed, the remote train unit does not request to be upgraded to the master control unit, and the local train unit is in the process of coupling the train.

[0035] As a preferred technical solution, step S4 specifically includes the following steps:

[0036] Step S 41 1. If the local train unit requests to upgrade to the master control end, and the remote train unit is neither the master control end nor has applied to become the master control end, the local train unit is upgraded to the master control end;

[0037] Step S 42 Otherwise, if the local train unit does not request to upgrade to the master control end, and the remote train unit requests to upgrade to become the master control end, then the local train unit is downgraded to the slave end;

[0038] Step S 43 , otherwise, remain unchanged.

[0039] As a preferred technical solution, after the coupling operation is completed and the mechanical hooks and electrical hooks between the train units have been stably connected, the train units will communicate with each other and begin to negotiate the master control end.

[0040] As a preferred technical solution, when the method receives the train operation task status sent by ATS, it decides whether it is necessary to switch the master control end.

[0041] As a preferred technical solution, this method ensures that when the coupled train is performing a door opening operation, an abnormal situation in which a door closing command is erroneously issued due to master-slave switching will not occur.

[0042] According to a second aspect of the present invention, there is provided an electronic device, comprising a memory and a processor, wherein a computer program is stored in the memory, and the method described above is implemented when the processor executes the program.

[0043] According to a third aspect of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein the program implements the method described above when executed by a processor.

[0044] Compared with the prior art, the present invention has the following advantages:

[0045] 1) The present invention is applicable to the scheme of selecting and switching the master control terminal of coupled trains. It is a master-slave negotiation mechanism based on communication and certain arbitration principles, which ensures the single master uniqueness of the coupled vehicles. It is applicable to the negotiation of the master control vehicle between two vehicles with interconnection projects, and has simple implementation and strong applicability.

[0046] 2) The present invention ensures that when communication is established within the train formation, there will be only one train unit as the master control terminal of the train formation, and there will not be multiple master control terminals. Only "single master" and "multiple slaves" situations are allowed, and there will not be a situation where multiple train units snatch the master control terminal from each other, and it has high stability.

[0047] 3) The present invention ensures that when the coupled train is performing a door opening operation, abnormal situations such as erroneous issuance of a door closing command due to master-slave switching will not occur, and thus the present invention has a certain degree of safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 is a flow chart of judging whether a remote train unit is a master control terminal according to the present invention;

[0049] Figure 2 It is a flow chart of whether the remote train unit of the present invention requests to be upgraded to the master control end;

[0050] Figure 3 It is a flow chart of whether the local train unit of the present invention requests to be upgraded to the master control end;

[0051] Figure 4 It is a flow chart of judging whether the local train unit is the main control end according to the present invention;

[0052] Figure 5 It is a schematic diagram of a coupled train scene of the present invention.

[0053] TU is the abbreviation of Train Unit and TF is the abbreviation of Train Formation. DETAILED DESCRIPTION

[0054] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0055] After the train coupling operation is completed, the present invention confirms the main control end of the train formation according to the communication content between train units and with external equipment, and can switch the main control end according to relevant operating tasks or operation requirements during operation.

[0056] After the coupling operation is completed and the mechanical hooks and electrical hooks between the train units are stably connected, the train units will communicate with each other and begin to negotiate the master control end. When a train operation task is received from the ATS (Automatic Train Monitoring System), it is necessary to decide whether to switch the master control end.

[0057] like Figure 1-Figure 4 As shown, the steps of the master control end for negotiating and determining the train formation in the present invention are as follows:

[0058] Step S1: Figure 5 For example, when the two train units TU1 and TU2 have completed the coupling operation, the ATS has not yet issued an operation task and there is no need to perform a wake-up test. The manual coupling and fully automatic unmanned coupling are discussed separately:

[0059] Step S 11 , The steps for manually connecting to the master control end are as follows:

[0060] Step S 111 , after the coupling is completed, it is assumed that only TU1 has the driver's key activated. If TU1 collects the driver's key activation signal, TU1 will request to upgrade to the master control end, and will inform TU2 that this train unit requests to upgrade to the master control end. After TU2 receives TU1's upgrade request, it will determine that TU1 has a master upgrade request and it has no master upgrade request. It will inform TU1 that this unit is not the master end and allow TU1 to activate. After TU1 receives the information that TU2 has no master upgrade request and is not the master end, it will upgrade to the master control end and prohibit TU2 from upgrading to the master control end.

[0061] Step S 12 , The master control end request steps for fully automatic unmanned connection are as follows:

[0062] Step S 121 After the coupling is completed, the coupled train TU2 has no request to upgrade to the master, and will inform TU1. TU1, as the train to be coupled, will request to upgrade to the master control end and inform TU2. Since TU2 has no request to upgrade to the master, after receiving the request to upgrade to the master from TU1, it will set itself as a slave end and allow TU1 to upgrade to the master. After receiving the permission to upgrade to the master from TU2, TU1 determines that TU2 is a slave end and has no request to upgrade to the master, upgrades itself to the master control end, and prohibits TU2 from upgrading to the master control end.

[0063] Step S2: Figure 5 For example, the coupled train does not need to perform a wake-up test. ATS sends the running task to the train formation TF. The task direction is as follows Figure 5shown.

[0064] Step S 21 If the original master control end is TU2, TU2 continues to request to be promoted to master, TU1 has no request to be promoted to master and TU2 is allowed to be promoted to master, and the TF master control end remains unchanged.

[0065] Step S 22 , If the original master is TU1, TU2 starts to request to become the master and informs TU1 of the request. After TU1 receives the request to become the master from TU2, it will downgrade itself to a slave because the direction of the train mission is not consistent with the direction of its non-coupling end, and inform TU2 to allow it to become the master. After TU2 receives the permission to become the master message from TU1, it will upgrade to the master and prohibit TU1 from becoming the master, thus realizing the master-slave switching of the coupled train.

[0066] Step S 23 If TU1 and TU2 each receive a running task that is consistent with the direction of their own non-connected end, both TUs will request to upgrade to the master end, but the original master end will still prohibit the other party from upgrading to the master end. The original slave end still considers the other party as the master end. The original master end will maintain the master end status and the original slave end will not be upgraded to the master end, thus achieving protection against abnormal situations.

[0067] Step S3: The train arrives at the platform according to the operation task, stops steadily and accurately, and issues a door opening command to carry out boarding and alighting operations.

[0068] When the coupled train arrives at the passenger platform according to the task, the old train task will no longer be responded to, and the train will open and close the door to board and disembark passengers. In order to prevent the receiving of the opposite direction train task during boarding and disembarking or other reasons that cause the master-slave switch inside the coupled train, resulting in the wrong issuance of the door closing command or the failure to maintain the door opening command, the train unit that outputs the door opening command needs to maintain the master request and maintain the master end until the door closing time is reached or there is no need to output the door opening command to achieve safety protection.

[0069] Step S4: Figure 5 For example, after the train set TF wakes up in the sleep area, TU1 has not yet performed the wake-up test.

[0070] When the coupled train is awakened in the sleep zone and needs to undergo a wake-up test, it will not respond to any running tasks until the wake-up test is completed. At this time, there are two situations: (1) neither TU1 nor TU2 has undergone a wake-up test; (2) TU1 has not yet been tested but TU2 has completed the test.

[0071] Step S 41, TU1 and TU2 have not been subjected to the wake-up test. After awakening, it is possible that both TU1 and TU2 meet the conditions for the wake-up test. To avoid both train units outputting the wake-up test command to the vehicle, it is necessary to determine the master end and set it so that only the master end will output the wake-up test command to the vehicle. If neither has been subjected to the wake-up test, the unit with the smaller subsystem ID in the on-board controller of the two TUs is upgraded to the master end and the wake-up test is performed first to avoid the problem of both TUs being subjected to the wake-up test.

[0072] Step S 42 TU1 has not been tested but TU2 has completed the test. When TU2 completes the wake-up test, there will be no request to upgrade to the master end, and it will enter the state of maintaining the master end. When TU1 learns that TU2 has completed the wake-up test and meets the conditions for the wake-up test, it will request to upgrade to the master end and inform TU2. After TU2 receives the master upgrade request from TU1, it will be downgraded to a slave end because it has no master upgrade request, and allow TU1 to upgrade to the master. After TU1 receives the message that TU2 allows the master upgrade, it will determine that TU2 is a slave end, and upgrade itself to the master end while prohibiting TU2 from upgrading to the master, thereby performing a wake-up test.

[0073] Step S5: Figure 5 For example, after being awakened in the train formation TF, TU1 is performing a wake-up test.

[0074] When TU1 is performing a wake-up test, if TU2 has not performed a wake-up test and has met the wake-up test conditions, the request will be upgraded to the master end, which will cause a master-slave switch during the wake-up test. Therefore, to prevent this situation, the TU performing the wake-up test will maintain the master upgrade request and remain the master end until the wake-up test of this TU is completed. If the remote TU needs to perform a wake-up test, it will then perform the master upgrade request according to step S. 42 Perform master-slave switching to achieve safety protection.

[0075] The above is an introduction to the method embodiment. The following is a further explanation of the scheme of the present invention through electronic equipment and storage medium embodiments.

[0076] The embodiment of the present invention also provides an electronic device including a central processing unit (CPU), which can perform various appropriate actions and processes according to computer program instructions stored in a read-only memory (ROM) or computer program instructions loaded from a storage unit into a random access memory (RAM). In the RAM, various programs and data required for device operation can also be stored. The CPU, ROM, and RAM are connected to each other via a bus. An input / output (I / O) interface is also connected to the bus.

[0077] Multiple components in the device are connected to the I / O interface, including: input units, such as keyboards, mice, etc.; output units, such as various types of displays, speakers, etc.; storage units, such as disks, optical disks, etc.; and communication units, such as network cards, modems, wireless communication transceivers, etc. The communication unit allows the device to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunication networks.

[0078] The processing unit performs the various methods and processes described above, such as the method of the present invention. For example, in some embodiments, the method of the present invention can be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit. In some embodiments, part or all of the computer program can be loaded and / or installed on the device via a ROM and / or a communication unit. When the computer program is loaded into RAM and executed by the CPU, one or more steps of the method of the present invention described above can be performed. Alternatively, in other embodiments, the CPU can be configured to perform the method of the present invention by any other appropriate means (e.g., by means of firmware).

[0079] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0080] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.

[0081] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0082] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A master control terminal switching control method for coupled trains, characterized in that: After the train coupling operation is completed, the method confirms the main control terminal of the train formation according to the communication content between train units and with external equipment, and switches the main control terminal according to the operation task or operation requirements during the operation.

2. A master control terminal switching control method for coupled trains according to claim 1, characterized in that: The method comprises the following steps: Step S1, determining whether the remote train unit is the master control terminal; Step S2, determining whether the remote train unit requests to be upgraded to the master control terminal; Step S3, judging whether the local train unit requests to be upgraded to the master control terminal; Step S4, determining whether the local train unit is the master control terminal; Step S5: Based on the master control terminal status of the local train unit, the local train unit informs other train units whether they are allowed to be upgraded to the master control terminal; if the local train unit is the master control terminal, other train units will be prohibited from upgrading to the master control terminal, otherwise they are allowed to be upgraded to the master control terminal.

3. A master control terminal switching control method for coupled trains according to claim 2, characterized in that: The step S1 specifically includes the following steps: Step S 11 , if the current train unit is not linked with other train units, it is determined that the remote train unit is not the master control end; Step S 12 Otherwise, if both ends of the local train unit are coupled with other train units or the coupling status is unknown, the remote train unit is determined to be the master control end; Step S 13 Otherwise, if the local train unit in the coupled train marshaling has not established communication with the remote train unit, it is determined that the remote train unit is not the master control end; Step S 14 Otherwise, if only one end of the local train unit is connected to other train units and communication has been established with the remote train unit, if the remote train unit prohibits the local train unit from upgrading the main control end, then the remote train unit is judged to be the main control end; if the remote train unit allows the local train unit to upgrade the main control end, then the remote train unit is judged to be not the main control end.

4. A master control terminal switching control method for coupled trains according to claim 2, characterized in that: The step S2 specifically includes the following steps: Step S 21 , if communication is established with the remote train unit and the remote train unit is requesting to be upgraded to the master control terminal, it is considered that the remote train unit is requesting to apply to be the master control terminal; Step S 22 Otherwise, it is considered that the remote train unit has not requested to be upgraded to the master control terminal.

5. A master control terminal switching control method for coupled trains according to claim 2, characterized in that: The step S3 specifically comprises the following steps: Step S 31 If both ends of the train unit at this end are not coupled or both ends are coupled, there is no request to upgrade to the master control end. Step S 32 Otherwise, when the onboard controller of the local train unit meets the set conditions, when it is determined that the local train unit needs to request to be upgraded to the main control end: Step S 33 , when the local train unit determines whether it needs to request to upgrade to the master control terminal, it needs to inform the remote train unit; if there is a request to upgrade to the master control terminal, the remote train unit is informed that the local train unit requests to become the master control terminal; otherwise, the remote train unit is informed that there is no request to upgrade to the master control terminal.

6. A master control terminal switching control method for coupled trains according to claim 5, characterized in that: The step S 32 The setting condition is to meet any of the following conditions: (1) The train unit at this end has a driver-activated cab; (2) When all train units are not performing the wake-up test, the planned running direction in the currently responding train running task is consistent with the non-coupling end direction of the local train unit; (3) The train unit at this end is not performing a wake-up test and is outputting a door opening or platform door opening command; (4) After the coupled train wakes up from the dormant state, neither the local train unit nor the remote train unit has performed a wake-up test, but the subsystem ID of the local onboard controller is smaller than the subsystem ID of the remote one; (5) The train unit at this end is performing a wake-up test; (6) The train unit at this end has not yet performed the wake-up test, while the train unit at the other end has completed the wake-up test; (7) After the coupling operation is completed, the remote train unit does not request to be upgraded to the master control unit, and the local train unit is in the process of coupling the train.

7. A master control terminal switching control method for coupled trains according to claim 2, characterized in that: The step S4 specifically comprises the following steps: Step S 41 1. If the local train unit requests to upgrade to the master control end, and the remote train unit is neither the master control end nor has applied to become the master control end, the local train unit is upgraded to the master control end; Step S 42 Otherwise, if the local train unit does not request to upgrade to the master control end, and the remote train unit requests to upgrade to become the master control end, then the local train unit is downgraded to the slave end; Step S 43 , otherwise, remain unchanged.

8. A master control terminal switching control method for coupled trains according to claim 1, characterized in that: In this method, after the coupling operation is completed and the mechanical hooks and electrical hooks between the train units have been stably connected, the train units will communicate with each other and begin to negotiate the master control end.

9. A master control terminal switching control method for coupled trains according to claim 1, characterized in that: When the method receives the train operation task status sent by ATS, it decides whether it is necessary to switch the master control end.

10. A master control terminal switching control method for coupled trains according to claim 1, characterized in that: This method ensures that when the coupled train is performing a door opening operation, an abnormal situation in which a door closing command is erroneously issued due to the master-slave switching will not occur.

11. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory, wherein: When the processor executes the program, the method according to any one of claims 1 to 10 is implemented.

12. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 10 is implemented.

Citation Information

Patent Citations

  • Control right switching method and equipment used during turn-back of coupled train and storage medium

    CN115973231A

Cited By

  • Processing method for autonomous operation plan of coupled train, medium and electronic equipment

    CN121536366A

  • Master-control-end switching control method for coupled train, and device and medium

    WO2026044932A1