Anchor pulling and dropping method for semi-submersible barge shallow water area

By using anchoring frames and cranes to assist operations on the anchoring ship, the problem of difficulty in anchoring and anchoring in shallow water areas was solved, and the effective sinking and pulling of the delta anchor was achieved, which improved the floating and operation of the ship. stability.

CN118907304AActive Publication Date: 2024-11-08THE SECOND ENG COMPANY OF CCCC FOURTH HARBOR ENG +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410999958.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-08
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

In shallow water areas, semi-submersible barges are difficult to effectively launch anchors, resulting in the inability to completely throw the delta anchor into the bottom of the water or the anchor chain and anchor body accumulate when starting the anchor, affecting the floating and operating stability.

Method used

The anchoring boat is equipped with an anchor lifting frame and a lifting frame. Through the coordinated operation of the anchor rope and the winch wire rope, the anchoring and anchoring are assisted to ensure that the Delta anchor sinks completely into the bottom of the water and effectively pulls out of the bottom of the water to avoid the accumulation of anchor chains and anchor bodies.

Benefits of technology

Effective anchoring and anchoring of semi-submersible barges is achieved in shallow water areas, ensuring that the delta anchor can be fully anchored to the bottom of the water, improving the stability and operational convenience of the ship, and avoiding the problem of the anchor chain in traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118907304A_ABST
    Figure CN118907304A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of ships, in particular to an anchor pulling and dropping method for a semi-submersible barge shallow water area, which comprises an anchor dropping ship provided with an anchor weighing frame and a hoisting frame, and further comprises an anchor weighing rope connected to a delta anchor, during anchor dropping, the hoisting frame is lumped to a working position, then the delta anchor is suspended to a certain height through the hoisting frame, and then the delta anchor is lifted to a certain height through the hoisting frame. The method comprises the following steps: placing a delta anchor into a crane, connecting an anchor weighing rope with a winch steel wire rope of an anchor weighing frame, then changing the amplitude of the crane frame to a working position for anchoring, moving an anchoring ship after the delta anchor is in contact with the water bottom, enabling the delta anchor to completely sink into the water and be anchored at the water bottom, enabling the delta anchor to be completely positioned at the water bottom, and enabling the delta anchor to be better anchored at the water bottom; the delta anchor can be effectively pulled to be separated from the water bottom through the anchor weighing frame, and then the delta anchor is lifted to be separated from the water bottom through the hoisting frame, so that follow-up sailing of the semi-submersible barge is facilitated, and the situation that in a shallow water area, due to the fact that the ship bottom is close to the water bottom, the delta anchor cannot be completely pulled out of the water bottom through traditional anchor weighing is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of ships, and in particular to a method for lifting and dropping anchors in a shallow water area of ​​a semi-submersible barge. Background Art

[0002] Anchoring is a common way for ships to dock, moor or remain stationary at sea. Usually, ships use anchors to fix themselves to the seabed or riverbed under the water to prevent drifting or drifting. Anchoring can be used in a variety of situations, including docking at a pier, waiting for loading and unloading of cargo, carrying out repairs, and avoiding wind and waves.

[0003] For surface vessels (such as engineering vessels, test vessels, and pontoons) that need to operate at fixed points in deep water and narrow channels, the conventional anchoring solution is to use a winch anchor frame to lift and drop anchors. According to the water depth of different operating points, the anchor is sunk to the bottom of the water to grab the mud and achieve positioning. With the development of water vessels, semi-submersible barges are often used to transport large steel structures, offshore platforms, and movable offshore buildings, and to transport and install caissons. In order to ensure the stability of semi-submersible barges floating on the water, the anchors used are getting larger and larger, such as using delta anchors as anchors. However, if Fig.15 As shown, the semi-submersible barge 40 is connected to the delta anchor 8 through the ship anchor rope 50. When the semi-submersible barge 40 needs to enter the shallow water area, the shallow water area generally refers to the water area with a water depth of 3 meters to 7 meters, and the draft of the semi-submersible barge 40 is relatively large (for example, the semi-submersible barge with a model of 45000DWT has a designed draft of 6.6 meters and a light-load draft of 2.8 meters). When the conventional anchoring method is used to anchor from the bow, such as throwing the delta anchor 8 to the bottom of the water by a winch, in the shallow water area, after the semi-submersible barge 40 is drafted, the bottom of the semi-submersible barge 40 is far from the bottom of the ship. Being close to the water bottom, the delta anchor 8 may not be completely thrown into the water bottom or the anchor chain of the delta anchor may be piled up with the anchor body, resulting in a poor anchoring effect, which makes it impossible for the delta anchor 8 to effectively grab the anchor on the water bottom and difficult to effectively float. In addition, in shallow water areas, even if the anchoring is completed, when it is necessary to raise the anchor, since the bottom of the ship is close to the water bottom, there is a situation where the anchor body is still on the bottom of the water after the anchor chain of the delta anchor 8 is pulled to the deck of the semi-submersible barge 40, resulting in the winch being unable to completely pull the delta anchor 8 out from the bottom of the water, thereby affecting the use and operation of the semi-submersible barge 40. Summary of the invention

[0004] The purpose of the present invention is to provide a method for anchoring a semi-submersible barge in shallow water areas in order to solve the problem that the semi-submersible barge cannot effectively anchor in shallow water areas.

[0005] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:

[0006] A method for anchoring a semi-submersible barge in a shallow water area, comprising an anchoring vessel, wherein the anchoring vessel is provided with an anchoring frame and a lifting frame, wherein the anchoring frame and the lifting frame are installed at the ends of the anchoring vessel;

[0007] Also included is an anchor line connected to the delta anchor;

[0008] The following steps are also included:

[0009] S1: When the semi-submersible barge is anchored, the anchoring vessel is first moved to the anchoring area, and then the crane is luffed to the working position, and then the delta anchor is suspended to a certain height by the crane, and the anchor rope is connected to the winch wire rope of the anchor frame;

[0010] S2: operating the crane to loosen the cable, and the anchor frame to loosen the cable synchronously, so as to place the delta anchor into the water bottom;

[0011] S3: After the delta anchor touches the bottom of the water, the anchoring vessel is moved to make the delta anchor completely sink into the water, and then the crane is separated from the delta anchor, and the anchoring rope is untied from the winch wire rope to complete the anchoring;

[0012] S4: When the semi-submersible barge is anchored, the anchor rope is connected to the winch wire rope, and then the anchor frame is firstly reeled in to make the delta anchor partly separate from the bottom of the water;

[0013] S5: lowering the crane frame, and then connecting the delta anchor to the crane frame;

[0014] S6: The crane is luffed to the working position, the crane is operated to reel in the cable, and the anchoring frame simultaneously releases the cable, so that the delta anchor is lifted to a certain height from the bottom of the water, and the anchoring is completed.

[0015] The present application discloses a method for anchoring a semi-submersible barge in shallow waters, comprising an anchoring vessel, which uses an anchoring frame and a crane to lift a delta anchor, so that the semi-submersible barge can anchor in shallow waters. When anchoring, the anchoring vessel is first moved to the anchoring area, and then the crane is luffed to a working position. The delta anchor is then suspended to a certain height by the crane, and the anchoring rope is connected to the winch wire rope of the anchoring frame, and then the anchoring is performed. After the delta anchor contacts the bottom of the water, the anchoring vessel is moved to make the delta anchor completely sink into the water and anchor it to the bottom of the water, and the anchoring rope is untied from the winch wire rope to separate the delta anchor from the anchoring vessel, and the anchoring is completed. Compared with the traditional method of directly anchoring from the bow of the semi-submersible barge, the anchoring vessel is used to assist in anchoring, and the anchoring frame and the winch wire rope are connected during anchoring. The coordination of the crane enables the semi-submersible barge to effectively drop anchor in shallow water areas. The delta anchor can be completely located on the bottom of the water, and the anchor chain and anchor body of the delta anchor can be spread out, so that the delta anchor can be better anchored on the bottom of the water. When lifting the anchor, the anchoring vessel is used to assist in lifting the anchor, and the anchor lifting frame first reels in the cable to lift the delta anchor off the bottom of the water. Since the anchoring force of the delta anchor on the bottom of the water is large, and the rated load of the anchor lifting frame is large, the delta anchor can be effectively pulled off the bottom of the water by the anchor lifting frame, and then the delta anchor is lifted off the bottom of the water by the crane, and the delta anchor is suspended off the bottom of the water by the crane, which facilitates the subsequent use and operation of the semi-submersible barge and avoids the situation in shallow water areas where the traditional anchoring cannot completely pull the delta anchor out of the water because the bottom of the ship is close to the bottom of the water.

[0016] Preferably, a gravity release device is further included. Before dropping anchor, the lifting wire rope of the lifting frame is first connected to the gravity release device, and then the delta anchor is connected to the gravity release device.

[0017] By setting up a gravity unhooker, in S3, when the delta anchor is completely sunk into the water, the gravity unhooker is not subjected to force and the hook of the gravity unhooker can be automatically opened, so that the gravity unhooker is separated from the delta anchor underwater, avoiding the need for manual separation of the delta anchor and the gravity unhooker. This not only improves construction efficiency, but also ensures construction safety and avoids underwater operations.

[0018] Preferably, the vessel further comprises an anchor drum, wherein the anchor drum is used to be connected to an anchor rope and the anchor drum can float on the water surface.

[0019] By setting up the anchor drum, after completing the anchoring, the anchor drum is connected to the anchor rope, and then the anchor drum is thrown into the water so that the anchor drum and the anchor rope are located in the water and the anchor drum can float on the water surface. When the anchor is subsequently raised, it is convenient to find the anchor and the anchor rope through the anchor drum. At the same time, the anchor drum can also serve as a mark, indicating that there is an anchor near the anchor drum area, reminding other ships not to anchor near this area, and also facilitating other ships to bypass the anchor drum area when sailing.

[0020] Preferably, in S3, after the anchoring rope and the winch wire rope are untied, the anchor drum is connected to the anchoring rope, and the anchor drum is put into water to complete anchoring.

[0021] Preferably, in S4, before raising the anchor, the anchor drum is first pulled onto the anchoring vessel, and then the anchor drum is separated from the anchoring rope, and then the anchoring rope is connected to the winch wire rope.

[0022] Preferably, in S4, before raising the anchor, the longitudinal and transverse inclinations of the anchored vessel are adjusted to within an allowable range, the transverse inclination of the anchored vessel is less than or equal to 3°, and a certain stern inclination is maintained.

[0023] Preferably, the rated load of the anchor frame is not less than 100t, and the rated load of the lifting frame is not less than 35t.

[0024] Preferably, it further comprises a telescopic cylinder, one end of which is hinged to the anchoring vessel, and the other end of which is hinged to the boom of the crane.

[0025] Preferably, one end of the cable is connected to the anchoring vessel, and the other end of the cable is connected to the boom of the crane.

[0026] Preferably, the delta anchor comprises an anchor body and an anchor chain, and when raising and dropping anchor, the anchor body is connected to the anchor rope and the crane.

[0027] By connecting the anchor body with the anchoring rope and the crane, when raising the anchor, the anchor body of the delta anchor is firmly anchored in the mud on the bottom of the water. By directly connecting the anchoring rope to the anchor body, the tension of the anchoring frame can be directly applied to the anchor body, thereby effectively pulling the anchor body to the bottom of the water, avoiding the situation where the anchor body is difficult to completely break away from the bottom of the water when being pulled by the anchor chain. When dropping anchor, since the anchoring rope and the lifting wire rope of the crane are directly connected to the anchor body, the influence of the anchor chain length on the anchor body when dropping anchor is reduced, making it easier to control the suspension state of the anchor body, reduce shaking, and facilitate operation.

[0028] Compared with the prior art, the present invention has the following beneficial effects:

[0029] The present application discloses a method for anchoring a semi-submersible barge in shallow waters, comprising an anchoring vessel, which uses an anchoring frame and a crane to lift a delta anchor, so that the semi-submersible barge can anchor in shallow waters. When anchoring, the anchoring vessel is first moved to the anchoring area, and then the crane is luffed to a working position. The delta anchor is then suspended to a certain height by the crane, and the anchoring rope is connected to the winch wire rope of the anchoring frame, and then the anchoring is performed. After the delta anchor contacts the bottom of the water, the anchoring vessel is moved to make the delta anchor completely sink into the water and anchor it to the bottom of the water, and the anchoring rope is untied from the winch wire rope to separate the delta anchor from the anchoring vessel, and the anchoring is completed. Compared with the traditional method of directly anchoring from the bow of the semi-submersible barge, the anchoring vessel is used to assist in anchoring, and the anchoring frame and the winch wire rope are connected during anchoring. The coordination of the crane enables the semi-submersible barge to effectively drop anchor in shallow water areas. The delta anchor can be completely located on the bottom of the water, and the anchor chain and anchor body of the delta anchor can be spread out, so that the delta anchor can be better anchored on the bottom of the water. When lifting the anchor, the anchoring vessel is used to assist in lifting the anchor, and the anchor lifting frame first reels in the cable to lift the delta anchor off the bottom of the water. Since the anchoring force of the delta anchor on the bottom of the water is large, and the rated load of the anchor lifting frame is large, the delta anchor can be effectively pulled off the bottom of the water by the anchor lifting frame, and then the delta anchor is lifted off the bottom of the water by the crane, and the delta anchor is suspended off the bottom of the water by the crane, which facilitates the subsequent use and operation of the semi-submersible barge and avoids the situation in shallow water areas where the traditional anchoring cannot completely pull the delta anchor out of the water because the bottom of the ship is close to the bottom of the water. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is the anchor indication of this application Figure 1 .

[0031] Figure 2 It is a schematic diagram of the coordination of the anchor frame, the lifting frame and the delta anchor of the present application.

[0032] Figure 3 This is the anchor indication of this application Figure 2 .

[0033] Figure 4 yes Figure 3 A partial enlarged view of point A.

[0034] Figure 5 This is the anchor indication of this application Figure 3 .

[0035] Figure 6 This is the anchor of this application Figure 1 .

[0036] Figure 7 This is the anchor of this application Figure 2 .

[0037] Figure 8 This is the anchor of this application Figure 3.

[0038] Fig. 9 This is a preferred anchoring diagram of the present application. Figure 1 .

[0039] Fig.10 This is a preferred anchoring diagram of the present application. Figure 2 .

[0040] Fig.11 This is a preferred anchoring diagram of the present application. Figure 3 .

[0041] Fig.12 This is a preferred anchoring diagram of the present application. Figure 1 .

[0042] Fig.13 This is a preferred anchoring diagram of the present application. Figure 2 .

[0043] Fig.14 It is a top view of this application.

[0044] Fig.15 It is a schematic diagram of the semi-submersible barge of this application.

[0045] Markings in the figure: 1-anchoring vessel, 2-elastic fender, 3-anchor frame, 4-anchor rope, 5-crane, 6-crane wire rope, 7-gravity unhooker, 8-delta anchor, 81-anchor body, 82-anchor chain, 9-anchor drum, 20-telescopic cylinder, 30-cable, 40-semi-submersible barge, 50-ship anchor rope. DETAILED DESCRIPTION

[0046] The present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0047] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, rather than indicating or implying that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0048] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.

[0049] In addition, the expressions “first”, “second”, “third”, etc. that appear in the terms are merely descriptions used to distinguish the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0050] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0051] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.

[0052] Example 1

[0053] like Figure 1-Figure 8 As shown, a method for anchoring a semi-submersible barge in shallow waters according to the present embodiment is characterized in that it comprises an anchoring vessel 1, on which an anchoring frame 3 and a crane 5 are provided, and the anchoring frame 3 and the crane 5 are installed at the ends of the anchoring vessel 1;

[0054] It also includes an anchor rope 4, which is connected to the delta anchor 8;

[0055] The following steps are also included:

[0056] S1: When the semi-submersible barge 40 drops anchor, the anchoring vessel 1 is first moved to the anchoring area, and then the crane 5 is luffed to the working position, and then the delta anchor 8 is suspended to a certain height by the crane 5, and the anchor rope 4 is connected to the winch wire rope of the anchor frame 3;

[0057] S2: operate the crane 5 to loosen the cable, and the anchor frame 3 to loosen the cable synchronously, and put the delta anchor 8 into the water bottom;

[0058] S3: After the delta anchor 8 touches the bottom of the water, the anchoring vessel 1 is moved to make the delta anchor 8 completely sink into the water, and then the crane 5 is separated from the delta anchor 8, and the anchor rope 4 is untied from the winch wire rope to complete the anchoring;

[0059] S4: When the semi-submersible barge 40 is anchored, the anchor rope 4 is connected to the winch wire rope, and then the anchor frame 3 is firstly reeled in to make the delta anchor 8 partially separate from the bottom of the water;

[0060] S5: lowering the crane 5, and then connecting the delta anchor 8 to the crane 5;

[0061] S6: The crane 5 is luffed to the working position, the crane 5 is operated to reel in the cable, and the anchor frame 3 is simultaneously loosened to lift the delta anchor 8 from the bottom of the water to a certain height, thus completing the anchoring.

[0062] The invention comprises an anchoring vessel 1, wherein the delta anchor 8 is lifted by the anchoring frame 3 on the anchoring vessel 1 in cooperation with the crane 5, so that the semi-submersible barge 40 can be anchored in shallow water areas. When anchoring, the anchoring vessel 1 is first moved to the anchoring area, and then the crane 5 is luffed to the working position, and then the delta anchor 8 is suspended to a certain height by the crane 5, and the anchoring rope 4 is connected with the winch wire rope of the anchoring frame 3, and then the anchoring is carried out. After the delta anchor 8 contacts the bottom of the water, the anchoring vessel is moved to make the delta anchor 8 completely sink into the water and anchor it to the bottom of the water, and the anchoring rope 4 is untied from the winch wire rope to separate the delta anchor 8 from the anchoring vessel 1, and the anchoring is completed. Compared with the traditional method of directly anchoring from the bow of the semi-submersible barge 40, the anchoring vessel 1 is used for auxiliary anchoring, and the anchoring frame 3 and the crane 5 cooperate with each other during anchoring, so that the semi-submersible barge 40 can be anchored directly in the water. The semi-submersible barge 40 can effectively drop anchor in shallow water areas, and the delta anchor 8 can be completely located on the bottom of the water, and the anchor chain 82 and the anchor body 81 of the delta anchor 8 can be spread out, so that the delta anchor 8 can be better anchored on the bottom of the water. When lifting the anchor, the anchoring vessel 1 is used to assist in lifting the anchor, and the anchor frame 3 first reels in the cable to separate the delta anchor 8 from the bottom of the water. Since the anchoring force of the delta anchor 8 on the bottom of the water is relatively large, and the rated load of the anchor frame 3 is relatively large, the anchor frame 3 can effectively pull the delta anchor 8 away from the bottom of the water, and then the delta anchor 8 is lifted off the bottom of the water by the crane 5, and the delta anchor 8 is suspended off the bottom of the water by the crane 5, thereby facilitating the subsequent use and operation of the semi-submersible barge 40, and avoiding the situation in shallow water areas where the traditional anchoring cannot completely pull the delta anchor 8 out of the bottom of the water because the bottom of the ship is close to the bottom of the water.

[0063] In this application, if Fig.15 As shown, the semi-submersible barge 40 is connected to the delta anchor 8 through the ship anchor rope 50. When the semi-submersible barge 40 is anchored in a shallow water area, as shown in FIG. Figure 1-Figure 14 As shown, the delta anchor 8 is thrown by cooperating with the lifting frame 5 on the anchoring vessel 1, so that the semi-submersible barge 40 is connected to the delta anchor 8 through the ship's anchor rope 50, and anchoring can be carried out in shallow water areas. After anchoring, the lifting anchor rope 4 is untied from the winch wire rope to separate the delta anchor 8 from the anchoring vessel 1. At this time, the delta anchor 8 provides traction to the semi-submersible barge 40 through the ship's anchor rope 50 so that the semi-submersible barge 40 can be moored. Further, when the semi-submersible barge 40 needs to move, it is anchored by the anchoring vessel 1, and then the delta anchor 8 is thrown to a new position. The semi-submersible barge 40 retracts the ship's anchor rope 50 to make the semi-submersible barge 40 approach the delta anchor 8 at the new position, thereby realizing position movement.

[0064] In the present application, a winch mechanism is provided on the anchor frame 3, and a winch wire rope is wound around the winch mechanism. The delta anchor 8 is pulled up or lowered by retracting and releasing the winch wire rope.

[0065] like Figure 1-Figure 4 As shown, it also includes a gravity unhooking device 7. Before anchoring, the lifting wire rope 6 of the crane 5 is first connected to the gravity unhooking device 7, and then the delta anchor 8 is connected to the gravity unhooking device 7, wherein, as Figure 2 As shown, the gravity unhooking device 7 is connected to the lifting hook of the lifting frame 5 through the lifting wire rope 6, and the hook of the gravity unhooking device 7 is hung on the anchor chain of the delta anchor 8;

[0066] like Figure 4 As shown, by setting the gravity dehooker, in S3, when the delta anchor 8 is completely sunk into the water, the gravity dehooker 7 is not subjected to force, and the hook of the gravity dehooker 7 can be automatically opened, so that the gravity dehooker 7 and the delta anchor 8 are separated underwater, avoiding the need for manual separation of the delta anchor 8 and the gravity dehooker 7, which not only improves the construction efficiency, but also ensures the construction safety and avoids underwater operations.

[0067] In this embodiment, the model of the gravity unhooking device 7 is T048, and the manufacturer is Yangzhou Lishen Hoisting Equipment Manufacturing Co., Ltd.

[0068] A preferred method is as follows Figure 5 As shown, it also includes an anchor drum 9, which is used to be connected to the anchor rope 4, and the anchor drum 9 can float on the water.

[0069] By setting the anchor drum 9, after completing the anchoring, the anchor drum 9 is connected to the anchor rope 4, and then the anchor drum 9 is thrown into the water so that the anchor drum 9 and the anchor rope 4 are located in the water. The anchor drum 9 can float on the water surface. When the anchor is subsequently raised, it is convenient to find the anchor and the anchor rope 4 through the anchor drum 9. At the same time, the anchor drum 9 can also serve as a mark, indicating that there is an anchor near the anchor drum 9 area, reminding other ships not to anchor near this area, and also facilitating other ships to bypass the area of ​​the anchor drum 9 when sailing.

[0070] like Figure 5 As shown, in S3, after the anchor rope 4 and the winch wire rope are untied, the anchor drum 9 is connected to the anchor rope 4, and the anchor drum 9 is put into the water to complete the anchoring.

[0071] The anchor drum 9 is used to mark the position of the delta anchor 8 on the water so that the position of the delta anchor 8 is known.

[0072] In S4 , before raising the anchor, the anchor drum 9 is first pulled onto the anchoring vessel 1 , and then the anchor drum 9 is separated from the anchor rope 4 , and then the anchor rope 4 is connected to the winch wire rope, so as to facilitate finding the anchor rope 4 through the anchor drum 9 .

[0073] In a preferred manner, in S4, before raising the anchor, the longitudinal and transverse inclinations of the anchored vessel 1 are adjusted to within the allowable range, the transverse inclination of the anchored vessel 1 is less than or equal to 3°, and a certain stern inclination is maintained.

[0074] By adjusting the longitudinal and transverse inclinations of the anchoring vessel 1 to within the allowable range and maintaining a certain range of heel and a certain stern heel, it is ensured that the anchoring vessel 1 is sufficiently stable when raising anchor.

[0075] In a preferred embodiment, the rated load of the anchor frame 3 is not less than 100t, and the rated load of the crane 5 is not less than 35t. Since the anchoring force of the delta anchor 8 after being anchored on the bottom of the water is very large, an anchor frame 3 with a larger rated load is required to carry out anchoring. At the same time, when the delta anchor 8 is out of the water and into the water, a crane 5 with a certain range of load is also required to suspend the delta anchor 8;

[0076] Among them, the specification of the Delta anchor 8 in this embodiment is a CJD-14 large holding force anchor, and the manufacturer is Tengzhou Chengjin Machinery Manufacturing Co., Ltd. When anchored on the bottom of the water, the anchor holding weight ratio can reach 16 to 20 times, so it can provide a larger anchoring force underwater, so a larger anchor frame 3 is required for anchoring.

[0077] A preferred method is as follows Figure 1-Figure 2 As shown, it also includes a telescopic cylinder 20, one end of which is hinged on the anchored vessel 1, and the other end of which is hinged on the big arm of the crane 5, wherein the crane 5 is an A-type crane, and its two supporting legs are hinged on the deck of the anchored vessel 1, so that the crane 5 can rotate around the hinge;

[0078] When the crane 5 needs to be luffed to the working position, such as in S2, before the delta anchor 8 enters the water, the telescopic cylinder 20 is first controlled to extend, driving the boom of the crane 5 to rotate downward around the hinge between the crane 5 and the deck, so that the boom of the crane 5 tilts forward, and the crane 5 drives the delta anchor 8 away from the end of the anchored ship 1, so that the delta anchor 8 is anchored away from the end of the anchored ship 1, avoiding the situation where the delta anchor 8 is directly anchored from the end of the anchored ship 1 and accumulates on the bottom of the water at the end of the anchored ship 1;

[0079] For example, in S4, before the delta anchor 8 is out of the water, the telescopic cylinder 20 is controlled to extend, driving the boom of the crane 5 to rotate downward around the hinge between the crane 5 and the deck, and the crane 5 drives the delta anchor 8 away from the end of the anchored ship 1, so that the delta anchor 8 is anchored away from the end of the anchored ship 1, avoiding the situation where the delta anchor 8 cannot be completely out of the water due to being directly anchored from the end of the anchored ship 1.

[0080] A preferred embodiment further comprises a cable 30 , one end of the cable 30 is connected to the anchor vessel 1 , and the other end of the cable 30 is connected to the boom of the crane 5 .

[0081] When the crane 5 is lifting the delta anchor 8, the crane 5 is pulled by the cable 30, thereby enhancing the safety performance of the crane 5 during lifting.

[0082] In a preferred manner, the delta anchor 8 comprises an anchor body 81 and an anchor chain 82. When the anchor is raised and dropped, the anchor chain 82 is connected to the anchor rope 4 and the crane 5;

[0083] like Figure 1-Figure 4 As shown, when dropping anchor, the anchor rope 4 is connected to the anchor chain 82;

[0084] The lifting frame 5 is connected to the gravity unhooking device 7 through the lifting wire rope 6, and the hook of the gravity unhooking device 7 is hung on the anchor chain 82;

[0085] like Figure 6-Figure 8 As shown, when raising the anchor, the anchor rope 4 is first connected to the anchor chain 82, and the anchor frame 3 pulls the anchor chain 82 by retracting the anchor rope 4, and then pulls the anchor body 81 out of the water bottom through the anchor chain 82. When the delta anchor 8 is out of the water bottom, the lifting frame 5 is connected to the gravity unhooking device 7 through the lifting wire rope 6, and the hook of the gravity unhooking device 7 is also hung on the anchor chain 82.

[0086] A preferred method is as follows Figure 1 , Fig.14 As shown, it also includes an elastic fender 2. The elastic fender 2 is arranged at one end of the anchoring vessel 1 equipped with the anchor frame 3 and the crane 5 to prevent the delta anchor 8 from shaking and colliding with the edge of the anchoring vessel 1 due to the influence of water flow or other reasons during the anchoring process of the crane 5. The elastic fender 2 is made of rubber, polymer material, etc.

[0087] Example 2

[0088] On the basis of Example 1, Figure 9-13 As shown, a method for raising and dropping anchors in shallow water areas of a semi-submersible barge in this embodiment, the delta anchor 8 includes an anchor body 81 and an anchor chain 82. When raising and dropping anchors, the anchor body 81 is connected to the anchor rope 4 and the crane 5.

[0089] By connecting the anchor body 81 with the anchoring rope 4 and the lifting frame 5, when raising the anchor, the anchor body 81 of the delta anchor 8 is firmly anchored in the mud on the bottom of the water. By directly connecting the anchoring rope 4 to the anchor body 81, the tension of the lifting frame 3 can be directly applied to the anchor body 81, thereby effectively pulling the anchor body 81 to the bottom of the water, thus avoiding the situation where the anchor body 81 is difficult to completely leave the bottom of the water when the anchor body 81 is pulled by the anchor chain 82.

[0090] like Figure 9-11 As shown, when dropping anchor, first connect the gravity unhooking device 7 to the lifting hook of the crane 5 through the lifting wire rope 6, then connect the hook of the gravity unhooking device 7 to the anchor body 81, and then drop anchor. Since the lifting wire rope 4 and the lifting wire rope 6 of the crane 5 are directly connected to the anchor body 81, the influence of the length of the anchor chain 82 on the anchor body 81 is reduced during the dropping anchor, which makes it easy to control the suspension state of the anchor body 81, effectively reduces shaking, and is easy to operate.

[0091] like Figure 12-13 As shown, when the anchor is being raised, the anchor frame 3 pulls the anchor body 81 away from the bottom of the water by retracting the anchor rope 4, and then the delta anchor 8 is lifted from the bottom of the water to a certain height by the crane 5. When the anchor is being raised, the anchor body 81 of the delta anchor 8 is firmly anchored in the bottom mud. By directly connecting the anchor rope 4 to the anchor body 81, the pulling force of the anchor frame 3 can be directly applied to the anchor body 81, thereby effectively pulling the anchor body 81 to the bottom of the water, avoiding the situation that the anchor body 81 is difficult to completely leave the bottom of the water when the anchor body 81 is pulled by the anchor chain 82.

[0092] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for anchoring a semi-submersible barge in shallow water areas. It is characterized in that The invention comprises an anchoring vessel (1), wherein the anchoring vessel (1) is provided with an anchor frame (3) and a crane frame (5), wherein the anchor frame (3) and the crane frame (5) are installed at the ends of the anchoring vessel (1); It also includes an anchor rope (4), wherein the anchor rope (4) is connected to the delta anchor (8); The following steps are also included: S1: When the semi-submersible barge (40) is anchored, the anchoring vessel (1) is first moved to the anchoring area, and then the crane (5) is luffed to the working position, and then the delta anchor (8) is suspended to a certain height by the crane (5), and the anchor rope (4) is connected to the winch wire rope of the anchor frame (3); S2: operating the crane (5) to loosen the cable, and the anchor frame (3) to loosen the cable synchronously, so as to place the delta anchor (8) into the water bottom; S3: After the delta anchor (8) touches the bottom of the water, the anchoring vessel (1) is moved to make the delta anchor (8) completely sink into the water, and then the crane (5) is separated from the delta anchor (8), and the anchor rope (4) is untied from the winch wire rope to complete the anchoring; S4: When the semi-submersible barge (40) is anchored, the anchor rope (4) is connected to the winch wire rope, and then the anchor frame (3) is firstly reeled in to make the delta anchor (8) partially separate from the bottom of the water; S5: lowering the crane (5), and then connecting the delta anchor (8) to the crane (5); S6: The crane (5) is luffed to the working position, the crane (5) is operated to reel in the cable, and the anchoring frame (3) simultaneously releases the cable, so that the delta anchor (8) is lifted off the bottom of the water to a certain height, thus completing the anchoring.

2. A method for anchoring a semi-submersible barge in shallow water according to claim 1, It is characterized in that It also includes a gravity unhooking device (7). Before anchoring, the lifting wire rope (6) of the lifting frame (5) is first connected to the gravity unhooking device (7), and then the delta anchor (8) is connected to the gravity unhooking device (7).

3. A method for lifting and dropping anchor in shallow waters of a semi-submersible barge according to claim 1, It is characterized in that It also comprises an anchor drum (9), which is used to be connected with an anchor rope (4), and the anchor drum (9) can float on the water surface.

4. A method for anchoring a semi-submersible barge in shallow water according to claim 3, It is characterized in that In S3, after the anchor rope (4) and the winch wire rope are untied, the anchor drum (9) is connected to the anchor rope (4), and the anchor drum (9) is put into the water to complete anchoring.

5. A method for lifting and dropping anchor in shallow waters of a semi-submersible barge according to claim 3, It is characterized in that In S4, before raising the anchor, the anchor drum (9) is first pulled onto the anchoring vessel (1), then the anchor drum (9) is separated from the anchor rope (4), and then the anchor rope (4) is connected to the winch wire rope.

6. A method for anchoring a semi-submersible barge in shallow water according to claim 1, It is characterized in that In S4, before raising the anchor, the longitudinal and transverse inclinations of the anchored vessel (1) are adjusted to within the allowable range, the transverse inclination of the anchored vessel (1) is less than or equal to 3°, and a certain stern inclination is maintained.

7. A method for lifting and dropping anchor in shallow waters of a semi-submersible barge according to claim 1, It is characterized in that The rated load of the anchor frame (3) is not less than 100 t, and the rated load of the lifting frame (5) is not less than 35 t.

8. A method for lifting and dropping anchor in shallow waters of a semi-submersible barge according to claim 1, It is characterized in that It also comprises a telescopic oil cylinder (20), one end of which is hinged on the anchoring vessel (1), and the other end of which is hinged on the main arm of the crane (5).

9. A method for anchoring a semi-submersible barge in shallow water according to claim 1, It is characterized in that It also comprises a cable (30), one end of which is connected to the anchoring vessel (1), and the other end of which is connected to the boom of the crane (5).

10. A method for anchoring a semi-submersible barge in shallow water according to any one of claims 1 to 9, It is characterized in that The delta anchor (8) comprises an anchor body (81) and an anchor chain (82). When the anchor is raised and dropped, the anchor body (81) is connected to the anchor rope (4) and the crane (5).

Citation Information

Patent Citations

  • Anchor fishing ring device for submarine anchor fishing and application method of anchor fishing ring device

    CN110001868A

  • Multi-point mooring and position-fixing system for floating installation and ship-moving operation and ship-moving method

    CN110217346A

  • Offshore long-distance towing boat with head anchor lifting and dropping function and construction method thereof

    CN117022575A

  • Telescopic anchor lifting and dropping device for tug and tug

    CN117227901A

  • Ship breaks down

    CN205801437U