By using a combined structure of cement soil compressed pile column, cement mixing pile column, gravel cushion layer and base base at the bridge head roadbed, combined with trapezoidal support and shear limit support structure, the settlement differences and lateral direction of bridge head roadbed are solved. The problem of slip has achieved the settlement adaptation and overall stability of the bridge and roadbed.
Patent Information
- Application Number
- CN202411171301.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-08
AI Technical Summary
The connection position between the road and the bridge head leads to differences in settlement due to differences in stiffness, strength, and expansion and contraction between the roadbed, road surface and bridge structure, resulting in vehicle jumping and safety hazards, which are difficult to effectively solve in the existing technology.
The combined structure of cement soil compact pile column, cement mixing pile column, gravel cushion layer, base bed base and pavement layer is adopted, including trapezoidal support structure and shear limit support structure, through which the settlement at the bridge head junction is reduced and Side slippage improves the overall stiffness and bearing capacity of the roadbed.
Significantly reduce the settlement speed of the roadbed at the bridge head junction, adapt to bridge settlement, reduce settlement differences, prevent lateral slippage and vertical displacement of the roadbed, and improve the overall stability and safety of the bridge head roadbed.
Smart Images

Figure CN118910965A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of road and bridge construction, and more specifically, to a bridgehead roadbed structure and a construction method thereof. Background Art
[0002] The junction between the road and the bridgehead usually causes differential settlement of the road surface and the bridge deck due to the different stiffness of the roadbed, pavement and bridge structure, which causes a noticeable bumpy feeling when driving, causing the vehicle to jump, and even safety accidents. The specific reasons are: there are differences in the composition materials, stiffness, strength, expansion and contraction of the bridge, roadbed and pavement; concentrated stress is easily formed when the bridgehead connection is subjected to force. Under the influence of vehicle load, structural deadweight and natural factors, the bridge and road settle at the same time, but the settlement of the two is very different. The settlement of the road is much greater than that of the bridge, forming a misalignment; due to the overall lateral slip of the roadbed, the conical slope protection in front of the platform is basically in an unconfined compression state. Under the influence of its own weight and the impact load of the vehicle, the slope protection will slide down to the inside of the bridge as a whole, causing the roadbed and pavement at the bridgehead to have a large vertical displacement;
[0003] In the prior art, a bridgehead slab is set up, that is, one end of the slab is placed on the leg connected to the bridge back platform, and the other end is placed on the roadbed. The connection between the bridge body and the roadbed is reinforced by the slab to counteract the settlement difference. However, the reality is that there is still a big difference in stiffness between a section of the slab and a section of the untreated roadbed, and a new settlement mutation occurs at the junction of the two, that is, the "secondary jump" phenomenon occurs. In the prior art, treatment measures such as compaction control and the application of geogrids have also been proposed. Although they have played a certain role in improvement, the improvement effect is limited. For the completed road surface, the road surface grouting method is used for treatment. However, during the grouting process, pressure grouting is generally used, which will lateral squeeze the bridgehead cone slope or the highway slope, generate a lateral thrust, and cause secondary settlement of the road surface. It has always been a persistent problem to prevent uneven settlement of the roadbed and the bridge deck during the construction of the bridgehead roadbed. Considering these challenges, those skilled in the art need to continuously innovate the design of the bridgehead roadbed to provide a bridgehead roadbed with improved performance of uneven settlement. Summary of the invention
[0004] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.
[0005] In order to achieve these purposes and other advantages according to the present invention, a bridgehead roadbed structure is provided, comprising:
[0006] A cement soil compaction pile array, comprising a plurality of cement soil compaction piles, wherein the plurality of cement soil compaction piles are arranged in the foundation;
[0007] A cement mixing pile array, comprising a plurality of cement mixing piles, wherein the plurality of cement mixing piles are arranged in the foundation;
[0008] A crushed stone cushion layer is laid on the cement mixing pile array, and a first geogrid layer is sandwiched in the crushed stone cushion layer;
[0009] The base bed bottom layer is laid on the crushed stone cushion layer, and the base bed bottom layer is interspersed with a trapezoidal support structure, a second geogrid layer and a shear limit support structure from bottom to top; wherein,
[0010] The trapezoidal support structure comprises:
[0011] A plurality of ladder frames are arranged at intervals along the transverse direction of the bridge, an odd number of the ladder frames are arranged corresponding to each beam span, and a steel mesh is hung and fixed in the frame of the ladder frames;
[0012] A concrete filling layer, which is poured to fill and cover the ladder frame, wherein a plurality of anchor holes are pre-buried at the bottom of the side wall of the concrete filling layer, and a plurality of anchor rods are anchored on the anchor holes and the bottom of the subgrade below the anchor holes;
[0013] The shear force limiting support structure includes: a transverse base, a pair of supports relatively arranged on the transverse base, and a fence arranged on both sides of the transverse base and away from one end of the beam span, wherein a cylindrical receiving groove is opened in the center of the support, and a plurality of first trapezoidal protrusions with inclined tops are arranged on the support in the circumferential direction of the receiving groove, and a plurality of first trapezoidal protrusions are arranged in sequence along the concentric arc of the receiving groove, a plurality of anchor rods are anchored to the bottom water purifier of the support and the bottom bed of the base below it, and a rubber layer is laid on the surface of the first trapezoidal protrusion and the receiving groove;
[0014] A beam span base is preset at one end of the beam span away from the bridge, a cylindrical abutting end is protruded downward from the bottom of the beam span base, a second trapezoidal protrusion is protruded downward from the periphery of the abutting end on the beam span base and is matched with the first trapezoidal protrusion, the abutting end and the second trapezoidal protrusion are respectively abutted against the receiving groove and the rubber layer of the first trapezoidal protrusion;
[0015] A pavement layer is laid on the top of the beam span and the top of the base bed bottom layer.
[0016] Preferably, the cement-soil compaction piles are arranged in an equilateral triangle, with a spacing of 1 to 1.5 m, a depth of 3 to 6 m, and a diameter of 400 to 650 mm.
[0017] Preferably, the cement mixing piles are arranged in an equilateral triangle, with a spacing of 1.2 to 1.5 m, a depth of less than 15 m, and a diameter of 500 to 850 mm.
[0018] Preferably, the ladder frame includes three rectangular frames whose side lengths decrease from bottom to top and are arranged at intervals, a plurality of longitudinal connecting rods and transverse connecting rods are arranged at intervals in each rectangular frame, a plurality of vertical connecting rods are circumferentially connected to the rectangular frames of two adjacent layers, the longitudinal connecting rods of the rectangular frames of two adjacent layers are staggered, and the longitudinal connecting rods on the upper layer are connected to the longitudinal connecting rods on the lower layer through a plurality of pairs of oblique connecting rods.
[0019] Preferably, it further comprises a plurality of pairs of pulling links, wherein the upper end of each pair of pulling links is hinged to the upper parts of two adjacent ladder frames facing each other, and the lower end of each pair of pulling links is hinged to the lower parts of two adjacent ladder frames facing each other.
[0020] Preferably, the top and bottom of the ladder frame have lateral lengths of 1 to 2 m and 1.5 to 2.5 m respectively, a height of 0.5 to 0.8 m, and a longitudinal length of 3 to 8 m.
[0021] Preferably, the beam span base is cylindrical, with a diameter of 80-100 cm and a height of 10-15 cm; the diameter of the abutting end is 25-30 cm and a height of 20-30 cm; the bottom slope of the second trapezoidal protrusion is 10-30° with the horizontal direction, the height is 10-15 cm, and the radial width of the second trapezoidal protrusion along the abutting end is 25-30 cm;
[0022] The support is cylindrical, with a diameter of 80-100 cm and a height of 20-25 cm.
[0023] A construction method for a bridgehead roadbed structure is provided, comprising the following steps:
[0024] S1. Construction preparation: construct drainage ditches on temporary sites, remove surface vegetation, dig out tree roots, remove the original surface soil, and dig deeper;
[0025] S2. Cement soil compaction piles: On the leveled construction site, the left and right boundaries of the foundation treatment range are laid out. After the pile driver is in place, holes are hammered from the center to the periphery. The cement soil is mixed with a mixer. After the holes are hammered, the mixed cement soil is poured into the holes and compacted.
[0026] S3, cement mixing pile: after the measurement and layout are completed, the pile driver is in place, the verticality of the frame is calibrated with a level ruler, the slurry of the cement mixing pile is prepared according to the test mix ratio, and the mixer is turned on for drilling;
[0027] After passing the test, the poor quality part of the pile top is cut off by a cutting machine;
[0028] S4. Lay a crushed stone cushion layer; a first geogrid is sandwiched between the crushed stone cushion layer, and the crushed stone cushion layer is compacted with a light roller;
[0029] S5. Filling of the base bed bottom layer: Before the construction of each filling layer, the construction layout is carried out, the filling layer center line and filling edge line are laid out, and the filler is spread and compacted;
[0030] Among them, when the layer height is preset, the trapezoidal support structure is hoisted, spliced, anchored, and then the filler is spread and compacted. For the second geogrid layer, the shear limit support structure is hoisted, anchored, and then the filler is spread and compacted;
[0031] S6. Erect the beam span so that the beam span base is aligned with the transverse base;
[0032] S7. Lay the pavement layer.
[0033] The present invention has at least the following beneficial effects:
[0034] First, the concentrated stress is formed when the bridge head connection is subjected to force. When vehicle load, structure deadweight and natural factors act, the bridge head roadbed structure of the present invention can significantly reduce the settlement rate of the roadbed at the bridge head connection, adapt to the bridge settlement, and reduce the settlement difference.
[0035] Second, the trapezoidal support structure, the second geogrid layer and the shear limit support structure in the bottom layer of the subgrade can reduce the overall lateral sliding of the roadbed. By setting up the shear limit support structure and the beam span base, the lateral load (horizontal load) is transferred and digested, thereby reducing the impact of the vehicle's impact load on the slope protection in front of the platform, preventing the soil from sliding down to the inside of the bridge as a whole, and avoiding large vertical displacement of the roadbed and road surface at the bridge head.
[0036] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 A vertical cross-sectional view of a bridgehead roadbed structure in the longitudinal direction of one of the technical solutions of the present invention;
[0038] Figure 2 A vertical cross-sectional view of a bridgehead roadbed structure in a transverse direction according to one of the technical solutions of the present invention;
[0039] Figure 3 A top view of the rectangular frame according to one of the technical solutions of the present invention;
[0040] Figure 4 A schematic structural diagram of the ladder frame according to one of the technical solutions of the present invention;
[0041] Figure 5 A detailed view of the ladder frame according to one of the technical solutions of the present invention;
[0042] Figure 6 A top view of a shear force limiting support structure according to one of the technical solutions of the present invention;
[0043] Figure 7 A vertical cross-sectional view of the transverse base according to one of the technical solutions of the present invention;
[0044] Figure 8 A vertical cross-sectional view of the beam span base according to one of the technical solutions of the present invention;
[0045] Abutment 100, beam span 200, cement-soil compaction pile 1, cement mixing pile 2, crushed stone cushion layer 3, first geogrid layer 4, base bed bottom layer 5, trapezoidal support structure 6, second geogrid layer 7, shear limit support structure 8, trapezoidal frame 61, steel mesh 62, concrete filling layer 63, anchor rod 64, transverse base 81, support 82, enclosure 83, receiving groove 84, first trapezoidal protrusion 85, beam span base 9, abutment end 91, second trapezoidal protrusion 92, pavement layer 10, rectangular frame 65, longitudinal connecting rod 66, transverse connecting rod 67, oblique connecting rod 68, vertical connecting rod 60, and pulling connecting rod 69. DETAILED DESCRIPTION
[0046] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.
[0047] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials are commercially available unless otherwise specified; in the description of the present invention, the orientation or positional relationship indicated by the terms is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0048] Please refer to Figures 1 to 8 The bridgehead roadbed structure disclosed in the present invention comprises:
[0049] The cement soil compaction pile array comprises a plurality of cement soil compaction piles 1, which are arranged in the foundation; the cement compaction piles are used for foundation base treatment, and the cement and soil mixture is formed into cement soil compaction piles 1 with high strength and large modulus through physical and chemical reactions such as ion exchange, pozzolanic reaction, and carbonization and crystallization of cement; after two or three adjacent piles are drilled and compacted, the density of the soil around the piles is further increased, so that the piles and the spaces between the piles together form an artificial composite foundation, thereby improving the soil quality, reducing the original porosity of the soil, and changing the soil from high compressibility to low compressibility, thereby achieving the purpose of eliminating collapsibility, improving bearing capacity, and reducing settlement.
[0050] The cement mixing pile array comprises a plurality of cement mixing piles 2, which are arranged in the foundation; the cement mixing piles 2 use cement as a curing agent, and forcefully mix the soft soil and the curing agent deep in the foundation through a mixing machine, and utilize a series of physical and chemical reactions between the curing agent and the soft soil to harden the soft soil into a high-quality foundation with integrity, water stability and a certain strength, and work together with the cement soil compaction piles 1 to form a composite foundation to improve the bearing capacity; wherein, the reinforcement depth exceeds 5m but does not exceed 15m.
[0051] The crushed stone cushion layer 3 is laid on the cement mixing pile row, and the crushed stone cushion layer 3 is sandwiched with a first geogrid layer 4; the crushed stone cushion layer 3 is used to improve the bearing capacity of the shallow layer of the foundation below the bottom surface of the foundation. The shear failure in the foundation starts from the lower corner of the bottom surface of the foundation, and gradually develops in depth with the increase of the base pressure. Therefore, when the soft soil in the shallow range below the base surface that may be sheared is replaced by a cushion material with greater strength, the bearing capacity can be improved. The crushed stone cushion layer 3 can reduce the settlement. Generally, the proportion of the settlement of the shallow layer under the foundation is relatively large. The settlement caused by the lateral deformation of the soil body is also theoretically accounted for by the shallow part. Replacing the soft soil layer with cushion material can significantly reduce the settlement of this part. The crushed stone cushion layer 3 can also adjust the uneven settlement of the foundation. In the cushion design, sometimes the cushion layer is designed to be of unequal thickness according to the characteristics of the upper load to adjust the differential settlement of the foundation. The crushed stone cushion layer 3 is combined with the first geogrid layer 4 to accelerate the drainage and consolidation of the foundation. Sand and gravel are used as cushion materials. Due to their large permeable layer, they are good drainage surfaces after the foundation is compressed. The pore water pressure under the foundation can be quickly dissipated to avoid plastic damage to the foundation soil, and the consolidation of the soft soil layer under the cushion layer and the improvement of its strength can be accelerated. The first geogrid layer 4 can improve the bearing capacity of the foundation, limit the lateral displacement of the soil, diffuse stress, and significantly control the development of foundation settlement.
[0052] The subgrade bottom layer 5 is laid on the crushed stone cushion layer 3, and the subgrade bottom layer 5 is interspersed with a trapezoidal support structure 6, a second geogrid layer 7 and a shear force limiting support structure 8 from bottom to top; the subgrade bottom layer 5 has sufficient strength, and under the repeated action of vehicle loads, the plastic accumulation deformation is very small, which can avoid excessive uneven sinking and cause uneven road surface. The second geogrid layer 7 is interspersed to provide good drainage, prevent rainwater from infiltrating and causing softening of the roadbed soil, and prevent diseases such as mud bubbling.
[0053] The trapezoidal support structure 6 comprises:
[0054] A plurality of ladder frames 61 are arranged at intervals along the transverse direction of the bridge, and an odd number of the ladder frames 61 are arranged corresponding to each beam span 200, and a steel mesh 62 is hung and fixed in the frame of the ladder frames 61.
[0055] The interior and periphery of 61 are filled and coated with a concrete filling layer 63, and the bottom of the side wall of the concrete filling layer 63 is pre-buried with multiple anchor holes, and multiple anchor rods 64 are anchored on the anchor holes and the subgrade bottom layer 5 below it; the ladder frame 61 is formed by welding I-beams, or screw holes are set and fixed with bolts and nuts. The ladder frame 61 forms a supporting skeleton, and the steel mesh 62 has a mesh structure formed longitudinally and transversely, which can effectively prevent the occurrence of concrete cracks. The steel mesh 62 is combined with the ladder frame 61 to prevent the occurrence of dents. The combination of the ladder frame 61, the steel mesh 62 and the concrete filling layer 63 is supported below one end of the beam span 200 close to the roadbed, which is used to decompose the vertical pressure and evenly apply it to the subgrade bottom layer 5, thereby improving the overall bearing capacity and reducing settlement and uneven settlement.
[0056] The shear force limiting support structure 8 includes: a transverse base 81, a pair of supports 82 arranged on the transverse base 81, and a fence 83 arranged on both sides of the transverse base 81 and away from the end of the beam span 200, wherein:
[0057] A cylindrical receiving groove 84 is provided at the center of the support 82, and a plurality of first trapezoidal protrusions 85 with inclined tops are provided on the support 82 in the circumferential direction of the receiving groove 84. The plurality of first trapezoidal protrusions 85 are arranged in sequence along the concentric arc of the receiving groove 84. A plurality of anchor rods are anchored to the bottom of the support 82 and the base bed bottom layer 5 thereunder, and the first trapezoidal protrusions 85 and the surface of the receiving groove 84 are both paved with a rubber layer.
[0058] The beam span base 9 is preset at one end of the beam span 200 away from the bridge. A cylindrical abutting end 91 is protruding downward from the bottom of the beam span base 9. A second trapezoidal protrusion 92 is protruding downward around the abutting end 91 on the beam span base 9 and is arranged to cooperate with the first trapezoidal protrusion 85. The abutting end 91 and the second trapezoidal protrusion 92 are respectively abutted against the rubber layer of the receiving groove 84 and the first trapezoidal protrusion 85. In addition to bearing vertical loads, the shear limiting support structure 8 is also used to bear and guide horizontal loads and transfer them to the foundation below, especially to the guiding trapezoidal support structure 6, so that the load is evenly distributed and uneven settlement is reduced, while ensuring the stability and integrity of the shear limiting support structure 8 itself. Specifically, the receiving groove 84 is used to limit the connection with the abutting end 91 of the beam span base 9. The rubber layer here provides a seismic isolation effect, which can reduce the damage between the abutting end 91 and the receiving groove 84 under the action of seismic load. The first trapezoidal protrusion 85 and the second trapezoidal protrusion 92 are covered and abutted, and are annularly abutted, which can bear horizontal stress in all directions. The rubber layer here provides a buffering effect, which provides a buffer for horizontal stress to adapt to the load changes when multiple channels and multiple vehicles pass through the bridge at the same time, and reduce the lateral displacement of the beam span 200. The load of the beam span 200 is transmitted downward to the underlying subgrade 5 through the beam span base 9, the support 82 and the transverse base 81.
[0059] The pavement layer 10 is laid on the top of the beam span 200 and the top of the subgrade bottom layer 5. The pavement layer 10 can be a cement pavement or an asphalt pavement, which directly contacts the vehicle and guides the load to the structure below.
[0060] In the present technical solution, before the abutment 100, when the bridge head connection is subjected to stress, the concentrated stress is formed, and when the vehicle load, the deadweight of the structure, and natural factors act, the bridge head roadbed structure of the present invention can significantly reduce the settlement rate of the roadbed at the bridge head connection, adapt to the bridge settlement, reduce the settlement difference, and avoid the formation of misaligned abutments. The trapezoidal support structure 6, the second geogrid layer 7, and the shear limit support structure 8 are sandwiched in the base bed bottom layer 5 to reduce the overall lateral slip of the roadbed. By providing the shear limit support structure 8 and the beam span base, the lateral load (horizontal load) is transferred and digested, thereby reducing the impact of the vehicle's impact load on the slope protection in front of the abutment, avoiding the overall sliding of the soil toward the inside of the bridge, and avoiding large vertical displacements of the roadbed and road surface at the bridge head.
[0061] Specifically, it can be set as follows: the beam span base is cylindrical, the beam span base 9 has a diameter of 80-100 cm and a height of 10-15 cm; the abutment end 91 has a diameter of 25-30 cm and a height of 20-30 cm; the bottom slope of the second trapezoidal protrusion 92 is 10-30° with the horizontal direction, the height is 10-15 cm, and the radial width of the second trapezoidal protrusion 92 along the abutment end 91 is 25-30 cm;
[0062] The support 82 is cylindrical, with a diameter of 80-100 cm and a height of 20-25 cm.
[0063] In addition, the cement soil compaction piles are arranged in an equilateral triangle, with a spacing of 1 to 1.5 m, a depth of 3 to 6 m, and a diameter of 400 to 650 mm. After compaction, the bearing capacity of the formed composite foundation can reach more than 150 kPa.
[0064] The cement mixing piles are arranged in an equilateral triangle, with a spacing of 1.2 to 1.5 m, a depth of less than 15 m, and a diameter of 500 to 850 mm. After compaction, the bearing capacity of the formed composite foundation can reach more than 200 kPa.
[0065] Please refer to Figure 3 to Figure 5 The ladder frame 61 includes three rectangular frames 65 whose side lengths decrease from bottom to top and are arranged at intervals. A plurality of longitudinal connecting rods 66 and transverse connecting rods 67 are arranged at intervals in each rectangular frame 65. A plurality of vertical connecting rods 60 are connected to the circumference of the two adjacent layers of rectangular frames 65. The longitudinal connecting rods 66 of the two adjacent layers of rectangular frames 65 are staggered. The longitudinal connecting rods 66 on the upper layer are connected to the longitudinal connecting rods 66 on the lower layer through a plurality of pairs of oblique connecting rods 68. Under the premise of saving steel bar materials, the supporting force of the ladder frame 61 is optimized through the combined action of the vertical connecting rods 60, the transverse connecting rods 67 and the oblique connecting rods 68.
[0066] In addition, it also includes a plurality of pairs of pulling links 69, the upper end of each pair of pulling links 69 is hinged to the upper parts of two adjacent ladder frames 61, and the lower end of each pair of pulling links 69 is hinged to the lower parts of two adjacent ladder frames 61. A hinge seat is pre-embedded in the ladder frame 61. After the ladder frame 61 is hoisted to the designed position, the pulling links 69 are connected to the hinge seat by bolts and nuts to form an "X" shape, so that the multiple ladder frames 61 form a whole, and the ability to prevent lateral sliding is improved.
[0067] Specifically, it can be configured as follows: the lateral lengths of the top and bottom of the ladder frame 61 are 1-2 m and 1.5-2.5 m respectively, the height is 0.5-0.8 m, and the longitudinal length is 3-8 m.
[0068] The present invention provides a construction method for a bridgehead roadbed structure, comprising the following steps:
[0069] S1. Construction preparation: construct temporary site drainage ditches, remove surface vegetation, dig out tree roots, remove the original surface soil, and dig down, for example, 50cm;
[0070] S2, cement soil compaction pile 1: On the leveled construction site, the left and right boundaries of the foundation treatment range are laid out, piles are arranged in an equilateral triangle, and bamboo piles are driven into the center of the pile position; the pile spacing is 1m, and the pile depth is 3-6m; after the pile driver is in place, holes are hammered from the middle to the periphery at intervals, and the cement soil is mixed with a mixer. After the holes are hammered, the mixed cement soil is poured into the holes and compacted with a plywood tamping machine; the pile top is 80cm lower than the original ground; 7-14 days after the pile is formed, a heavy dynamic penetration test and a coring test are carried out, and 28 days after the pile is formed, a static load test is carried out;
[0071] After the pile foundation is qualified, an 80cm thick Panax notoginseng lime soil cushion layer is laid on the top of the pile; a layer of bidirectional geogrid is sandwiched in the lime soil cushion layer and compacted with a light roller; an 80cm thick Panax notoginseng lime soil cushion layer is laid on the top of the pile to make the top of the pile flush with the original ground.
[0072] S3, cement mixing pile 2: after the measurement and layout are completed, the pile driver is in place, the verticality of the frame is calibrated with a level ruler, the slurry of the cement mixing pile 2 is prepared according to the test mix ratio, the mixer is turned on for drilling, and the two-spraying and two-mixing process is adopted to ensure that the soft soil and the cement slurry are evenly mixed;
[0073] After 7 days of pile construction, check the mixing uniformity and measure the pile diameter. After 28 days of pile construction, conduct core sampling test and static load test. After the pile foundation is qualified, use a cutting machine to cut off the poor quality part of the pile top.
[0074] S4, gravel cushion layer 3: a layer of bidirectional geogrid (first geogrid layer) is sandwiched in the gravel cushion layer 3, and the gravel cushion layer 3 is compacted by a light roller;
[0075] S5 base bed bottom layer 5: filler preparation combines local resources, filler is made by excavation and filling and screening, and screening is carried out by a drum screening machine; the maximum particle size of the filler of the base bed bottom layer 5 is less than 60mm, and the maximum particle size of the embankment filler below the base is less than 75mm; before the construction of each filling layer, construction layout is carried out to lay out the center line and filling edge line of the filling layer; the layered filling thickness is determined on site according to the virtual paving thickness obtained from the process test, and the virtual paving thickness is controlled by measures such as setting up benchmarks and red construction ropes on both sides of the roadbed; when paving the filler, a grid is set on the compacted roadbed surface (sprinkling lime) to control the amount of filler paving; compaction control uses a roller of more than 22t, and installs a continuous compaction system, and is carried out in four steps: static pressure, weak vibration, strong vibration, and static pressure; during the construction process, in order to avoid rainwater scouring the roadbed slope, a temporary concrete drainage ditch and a water retaining embankment are used on the slope to centrally drain the rainwater;
[0076] When the base bed bottom layer 5 is laid to a preset thickness, the trapezoidal support structure 6 is hoisted, spliced, anchored, and then the filler is spread and compacted. When a certain thickness is reached, a layer of bidirectional geogrid (the second geogrid layer) is laid, and then the shear limit support structure 8 is hoisted, anchored, and then the filler is spread and compacted;
[0077] S6, erecting the beam span 200, aligning the beam span base 9 with the transverse base 81;
[0078] S7. Laying the road surface layer 10.
[0079] In this technical solution, the trapezoidal support structure 6 and the shear limit support structure 8 are both prefabricated. During the roadbed construction, they only need to be hoisted to the designed position and simply positioned and spliced, which significantly improves the construction efficiency.
[0080] In addition, for some special sections, such as the bridgehead roadbed structure is high and has a large height difference with the surrounding environment, the following structural construction can also be carried out, including:
[0081] T1. Slope protection: Before the slope protection is constructed, its base should be stable and the slope surface should be flat and dense. The groove of the slope protection framework is excavated with artificial belt lines, and over-excavation is not allowed to prevent disturbance to the original state of the slope. The slope protection adopts C25 concrete arched water-cutting slide frame protection, and hollow bricks in the framework are filled with soil and grass and shrubs are planted. The masonry concrete prefabricated block slope protection should be closely attached to the slope without voids. A PVC pipe drainage hole with a diameter of 0.1m is installed along the slope of the main framework. For the convenience of maintenance, a stepped step is set at an appropriate position.
[0082] T2. Drainage facilities: A trapezoidal drainage ditch is set 2m outside the foot of the embankment slope. The ditch is excavated by an excavator, smoothed with M10 cement mortar, and spliced with C30 reinforced concrete slabs. The joints of the precast slabs are filled with M15 cement mortar;
[0083] T3. Protective fence: The protective fence is prefabricated with C30 concrete and is set 0.5m inside the boundary of the site. The foundation is cast with C25 concrete. After the protective fence is installed, the gaps between the upper and lower sills and the railings are filled with M30 cement mortar to form a solid whole.
[0084] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.
Claims
1. The bridgehead roadbed structure is characterized by: include: A cement soil compaction pile array, comprising a plurality of cement soil compaction piles, wherein the plurality of cement soil compaction piles are arranged in the foundation; A cement mixing pile array, comprising a plurality of cement mixing piles, wherein the plurality of cement mixing piles are arranged in the foundation; A crushed stone cushion layer is laid on the cement mixing pile array, and a first geogrid layer is sandwiched in the crushed stone cushion layer; The base bed bottom layer is laid on the crushed stone cushion layer, and the base bed bottom layer is interspersed with a trapezoidal support structure, a second geogrid layer and a shear limit support structure from bottom to top; wherein, The trapezoidal support structure comprises: A plurality of ladder frames are arranged at intervals along the transverse direction of the bridge, an odd number of the ladder frames are arranged corresponding to each beam span, and a steel mesh is hung and fixed in the frame of the ladder frames; A concrete filling layer, which is poured to fill and cover the ladder frame, wherein a plurality of anchor holes are pre-buried at the bottom of the side wall of the concrete filling layer, and a plurality of anchor rods are anchored on the anchor holes and the bottom of the subgrade below the anchor holes; The shear force limiting support structure includes: a transverse base, a pair of supports relatively arranged on the transverse base, and a fence arranged on both sides of the transverse base and away from one end of the beam span, wherein a cylindrical receiving groove is opened in the center of the support, and a plurality of first trapezoidal protrusions with inclined tops are arranged on the support in the circumferential direction of the receiving groove, and a plurality of first trapezoidal protrusions are arranged in sequence along the concentric arc of the receiving groove, a plurality of anchor rods are anchored to the bottom water purifier of the support and the bottom bed of the base below it, and a rubber layer is laid on the surface of the first trapezoidal protrusion and the receiving groove; A beam span base is preset at one end of the beam span away from the bridge, a cylindrical abutting end is protruded downward from the bottom of the beam span base, a second trapezoidal protrusion is protruded downward from the periphery of the abutting end on the beam span base and is matched with the first trapezoidal protrusion, the abutting end and the second trapezoidal protrusion are respectively abutted against the receiving groove and the rubber layer of the first trapezoidal protrusion; A pavement layer is laid on the top of the beam span and the top of the base bed bottom layer.
2. The bridgehead roadbed structure according to claim 1, characterized in that: The cement soil compaction piles are arranged in a regular triangle, with a spacing of 1 to 1.5 m, a depth of 3 to 6 m, and a diameter of 400 to 650 mm.
3. The bridgehead roadbed structure according to claim 1, characterized in that: The cement mixing piles are arranged in an equilateral triangle, with a spacing of 1.2 to 1.5 m, a depth of less than 15 m, and a diameter of 500 to 850 mm.
4. The bridgehead roadbed structure according to claim 1, characterized in that: The ladder frame includes three rectangular frames whose side lengths decrease from bottom to top and are arranged at intervals. A plurality of longitudinal connecting rods and transverse connecting rods are arranged at intervals in each rectangular frame. A plurality of vertical connecting rods are circumferentially connected to the rectangular frames of two adjacent layers. The longitudinal connecting rods of the rectangular frames of two adjacent layers are staggered. The longitudinal connecting rods on the upper layer are connected to the longitudinal connecting rods on the lower layer through a plurality of pairs of oblique connecting rods.
5. The bridgehead roadbed structure according to claim 4, characterized in that: It also includes a plurality of pairs of pulling links, wherein the upper end of each pair of pulling links is hinged to the upper parts of two adjacent ladder frames facing each other, and the lower end of each pair of pulling links is hinged to the lower parts of two adjacent ladder frames facing each other.
6. The bridgehead roadbed structure according to claim 1, characterized in that: The top and bottom of the ladder frame have lateral lengths of 1 to 2 m and 1.5 to 2.5 m respectively, a height of 0.5 to 0.8 m, and a longitudinal length of 3 to 8 m.
7. The bridgehead roadbed structure according to claim 1, characterized in that: The beam span base is cylindrical, with a diameter of 80-100 cm and a height of 10-15 cm; the diameter of the abutment end is 25-30 cm and a height of 20-30 cm; the bottom slope of the second trapezoidal protrusion is 10-30° with the horizontal direction, the height is 10-15 cm, and the radial width of the second trapezoidal protrusion along the abutment end is 25-30 cm; The support is cylindrical, with a diameter of 80-100 cm and a height of 20-25 cm.
8. The construction method of the bridgehead roadbed structure according to claim 7, characterized in that: The following steps are involved: S1. Construction preparation: construct drainage ditches on temporary sites, remove surface vegetation, dig out tree roots, remove the original surface soil, and dig deeper; S2. Cement soil compaction piles: On the leveled construction site, the left and right boundaries of the foundation treatment range are laid out. After the pile driver is in place, holes are hammered from the center to the periphery. The cement soil is mixed with a mixer. After the holes are hammered, the mixed cement soil is poured into the holes and compacted. S3, cement mixing pile: after the measurement and layout are completed, the pile driver is in place, the verticality of the frame is calibrated with a level ruler, the slurry of the cement mixing pile is prepared according to the test mix ratio, and the mixer is turned on for drilling; After passing the test, the poor quality part of the pile top is cut off by a cutting machine; S4. Lay a crushed stone cushion layer; a first geogrid is sandwiched between the crushed stone cushion layer, and the crushed stone cushion layer is compacted with a light roller; S5. Filling of the base bed bottom layer: Before the construction of each filling layer, the construction layout is carried out, the filling layer center line and filling edge line are laid out, and the filler is spread and compacted; Among them, when the layer height is preset, the trapezoidal support structure is hoisted, spliced, anchored, and then the filler is spread and compacted. For the second geogrid layer, the shear limit support structure is hoisted, anchored, and then the filler is spread and compacted; S6. Erect the beam span so that the beam span base is aligned with the transverse base; S7. Lay the pavement layer.
Citation Information
Patent Citations
Non-bridgehead-conical-slope cast-in-situ baffle foam concrete light embankment structure and construction method
CN106087628A
Road and bridge connecting structure
CN116180567A
Structure for preventing vehicle bump at bridge head
CN204401447U
Bridge abutment-roadbed transition structure
CN220166557U
Prestressed bridge with abuttment
KR101787321B1