Positioning and fixing structure of annular prefabricated part in circular foundation pit and construction method of positioning and fixing structure

By using the positioning and fixing structure of steel vertical poles and arc-shaped prefabricated components in deep foundation pits, the problems of positioning error and construction difficulty of ring-shaped prefabricated components in circular foundation pits are solved, accurate positioning and stability are achieved, and construction is simplified process reduces construction period and costs.

CN118911154APending Publication Date: 2024-11-08SHANGHAI MUNICIPAL ENG DESIGN INST (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411081367.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In deep foundation pits, there are cumulative errors in positioning and assembly of annular prefabricated components in circular foundation pits, and the construction is difficult and the construction period is long. Especially the connection with the foundation pit enclosure structure is complicated, resulting in low construction efficiency.

Method used

The arc-shaped prefabricated members are positioned and fixed by the steel pole evenly distributed along the annular shape. They are connected through the entrance section and the straight section of the steel pole. The arc-shaped prefabricated members are spliced ​​between the steel pole, and positioning holes and positioning slips are used. The grooves are precisely positioned and fixed, and the verticality and reuse of steel poles are improved through PVC sleeves.

Benefits of technology

It effectively avoids the accumulation of positioning errors, reduces construction difficulty, improves the stability and safety of the structure, simplifies the construction process, adapts to different vertical spacing designs, and the steel vertical poles can be recycled in sections, making the engineering economical.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911154A_ABST
    Figure CN118911154A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of deep foundation pit supporting structures, and particularly relates to a positioning and fixing structure of an annular prefabricated part in a circular foundation pit and a construction method of the positioning and fixing structure. Comprising the steps that a plurality of steel vertical rod structures are annularly and evenly distributed in the circular foundation pit, the tops of the steel vertical rods are anchored into a top beam of the foundation pit, the bottoms of the steel vertical rods extend to the lower portion of a lowermost annular prefabricated part, and after the steel vertical rod structures are inserted firstly, arc-shaped prefabricated parts are embedded among the steel vertical rods to be spliced into an annular structure. The steel vertical rod is prefabricated in sections and is divided into a section with a tongue-and-groove and a linear section without the tongue-and-groove, and the adjacent sections are connected through a straight thread sleeve. A positioning hole and a positioning sliding groove are reserved in the two ends of the arc-shaped prefabricated part respectively, the section size and shape of the arc-shaped prefabricated part are consistent with those of the tongue-and-groove section of the steel vertical rod, the prefabricated part can be embedded into the steel vertical rod, and accurate positioning and fixing of the arc-shaped prefabricated part in the foundation pit are achieved. The structural system can be recycled according to use requirements, and has the advantages of being high in economical efficiency, low in construction difficulty, accurate in positioning, high in safety and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of deep foundation pit supporting structures, and in particular relates to a positioning and fixing structure of an annular prefabricated component in a circular foundation pit and a construction method thereof. Background Art

[0002] Circular foundation pit is one of the most commonly used foundation pit shapes in the field of deep foundation pit support because of its advantages such as reasonable force system, small structural deformation and low construction difficulty. The force of circular foundation pit is mainly circumferential compression. Under uniform load, the bending moment of the annular component is almost negligible, which is in line with the characteristics of prefabricated structure with weak bending capacity at the connection node but strong overall compression capacity. Therefore, the application of annular prefabricated components in circular foundation pit is relatively wide, including prefabricated ring beam support structure, prefabricated lining support structure, prefabricated side wall permanent structure, etc.

[0003] The above-mentioned prefabricated components are often composed of multiple arc-shaped prefabricated components spliced ​​into a ring, and the positioning and assembly of the arc-shaped prefabricated components in the deep foundation pit are often carried out on the basis of the structure that has been positioned in the previous step, so there is a problem that the assembly error will gradually accumulate. At the same time, during the foundation pit excavation stage, the prefabricated components often need to be connected to the foundation pit retaining structure with steel bars. The retaining structure bears the deadweight of the prefabricated components to ensure its vertical stability. Therefore, it is necessary to reserve steel bar connectors or perform embedded steel bar connections in advance at the corresponding positions of the retaining structure, which leads to greater construction difficulty and long construction period. Summary of the invention

[0004] In order to reduce the construction difficulty and error accumulation, the present invention provides a positioning and fixing structure for annular prefabricated components in a circular foundation pit and a construction method thereof.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] A positioning and fixing structure for annular prefabricated components in a circular foundation pit, characterized in that: a plurality of steel uprights are evenly distributed along a ring inside the circular foundation pit, the tops of the steel uprights are anchored in the crown beams of the foundation pit, and the bottoms extend under the lowest annular prefabricated components, and arc-shaped prefabricated components are embedded between the steel uprights to be spliced ​​into an annular structure; the steel uprights include tongue-and-groove sections and straight sections, and adjacent sections are connected by straight threaded sleeves.

[0007] Furthermore, positioning holes and positioning grooves are reserved at both ends of the arc-shaped prefabricated component, and their cross-sectional dimensions and shapes are consistent with the tongue-and-groove sections of the steel uprights, so that the arc-shaped prefabricated component can be embedded in the steel uprights, thereby achieving accurate positioning and fixation of the prefabricated component in the foundation pit.

[0008] Correspondingly, a construction method for positioning and fixing a structure of an annular prefabricated component in a circular foundation pit, used for constructing a positioning and fixing structure of an annular prefabricated component in a circular foundation pit as claimed in the claim or as described, comprises a first construction stage and a second construction stage;

[0009] The first stage of the construction is to construct the external enclosure structure of the circular foundation pit, the plane positioning of the steel poles and the sinking of the PVC casing after pre-forming holes at the steel poles; then the cast-in-place reinforced concrete ring beam at the top of the foundation pit is constructed to ensure that the steel poles are firmly anchored therein;

[0010] The second stage includes excavating the soil in the pit and installing the annular prefabricated components; the annular prefabricated components are embedded in the positioning holes and slide grooves between the two steel poles through rotation and translation to achieve precise positioning and fixation.

[0011] Further, the first phase of construction includes the following steps:

[0012] S 11 :Construction of external retaining structures of circular foundation pits (such as underground continuous walls, pile rows, etc.);

[0013] S 12 : Carry out plane positioning of annular prefabricated components and steel poles;

[0014] S 13 : After pre-forming a hole at the steel pole, sink the PVC casing into it, and put the steel pole into the casing; this will improve the verticality of the steel pole;

[0015] S 14 :A cast-in-place reinforced concrete ring beam is constructed on the top of the foundation pit, and the part of the steel upright anchored into the ring beam is firmly welded to the ring beam steel bars.

[0016] Furthermore, the second phase of construction includes the following steps:

[0017] S 21 : Excavate the soil in the pit to the specified elevation, remove the external PVC sleeves of the steel poles above the pit bottom elevation, and hang the arc-shaped prefabricated components into the pit bottom;

[0018] S 22 : The arc-shaped prefabricated components are translated and rotated in the foundation pit to be embedded between the steel poles;

[0019] S 23 :After multiple arc-shaped prefabricated components are spliced ​​into annular components, the excavation of the lower soil layer and the installation of the lower annular prefabricated components are continued until the foundation pit construction is completed.

[0020] Furthermore, the arc-shaped prefabricated component is translated and rotated to be embedded between the steel poles, which specifically includes the following steps:

[0021] (1) Position the arc-shaped prefabricated component slideway against the tongue and groove section of the upper steel pole;

[0022] (2) Translate the arc-shaped prefabricated component until the steel upright slides into the middle of the positioning slot;

[0023] (3) Rotate the arc-shaped prefabricated component clockwise with the tongue and groove section of the steel pole as the center;

[0024] (4) Translate the arc-shaped prefabricated component until the steel pole slides into the bottom of the positioning slide groove;

[0025] (5) Rotate the arc-shaped prefabricated component clockwise again with the tongue and groove section of the steel pole as the center;

[0026] (6) The arc-shaped prefabricated component is translated until the positioning hole engages with the tongue-and-groove section of another steel vertical pole to complete the fixation of the arc-shaped prefabricated component.

[0027] Furthermore, for permanent annular prefabricated components, after the foundation pit is excavated to the bottom, the gaps in the positioning slide grooves are filled and compacted by grouting, and the steel uprights become part of the permanent structure; for temporary annular prefabricated components, during the process of backfilling or backbuilding the foundation pit, the steel upright segments and straight threaded connecting sleeves are gradually removed and recycled for reuse.

[0028] The present invention has the following beneficial effects:

[0029] Through the precise coordination between the steel poles and prefabricated components, each arc-shaped prefabricated component can be accurately positioned and fixed during the construction process, effectively avoiding the accumulation of positioning errors and ensuring the stability and safety of the structure.

[0030] A PVC casing is set outside the steel pole. During construction, the PVC casing is first sunk and then the steel pole is placed in the casing, thereby improving the verticality of the steel pole and the positioning accuracy of each arc-shaped prefabricated component. At the same time, the casing can prevent the steel pole from direct contact with the soil and corrosion and rust, thereby increasing the reuse rate of the steel pole.

[0031] After the steel pole tongue and groove are engaged with the reserved positioning holes and positioning grooves at both ends of the arc-shaped prefabricated components, each arc-shaped prefabricated component is fixed; at the same time, after the arc-shaped prefabricated components are spliced ​​into a ring, the annular structure system is compressed in the annular direction to press the steel poles, which will also increase the stability of the steel pole structure system. Therefore, as the foundation pit is excavated downward and multiple annular prefabricated components are assembled, the stability of the annular prefabricated components and their positioning and fixing system will gradually increase.

[0032] The steel poles are installed in sections, and adjacent sections are connected with straight threaded sleeves, so that the tongue-and-groove elevation of the steel poles can be adjusted accordingly according to the elevation of the arc-shaped prefabricated components, which can adapt to the design requirements of different vertical spacings of arc-shaped prefabricated components. At the same time, in temporary annular prefabricated components, the steel poles can be recycled in sections, and the project economy is relatively high.

[0033] The deadweight of the annular prefabricated component is transferred to the top ring beam of the foundation pit by the steel vertical pole. Compared with the conventional prefabricated deconstruction method of anchoring steel bars into the retaining structure, there is no need to destroy the retaining structure for the second time or reserve dowel bars in it, which reduces the difficulty of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a structural schematic diagram of a certain implementation of the present invention;

[0035] Figure 2 It is a schematic diagram of the steel pole structure in a certain embodiment of the present invention;

[0036] Figure 3 It is a schematic diagram of the positioning hole at one end of the arc-shaped prefabricated component;

[0037] Figure 4 It is a schematic diagram of a positioning slide groove at one end of an arc-shaped prefabricated component;

[0038] Figure 5 A plan projection diagram of a certain embodiment of the present invention;

[0039] Figure 6 A view along the direction A in a certain embodiment of the present invention;

[0040] Figure 7 It is a cross-sectional view taken along line BB in a certain embodiment of the present invention;

[0041] Figure 8 For the second stage S 22 Schematic diagram of construction steps; Figures (1) to (6) are schematic diagrams of translation and rotation of curved precast beams;

[0042] The numbers in the figure are: 1. Enclosure structure; 2. Annular prefabricated component; 3. Positioning hole; 4. Positioning slide groove; 5. Straight section; 6. Tongue and groove section; 7. PVC sleeve; 8. Straight thread sleeve; 9. Crown beam. DETAILED DESCRIPTION

[0043] The terms "invention", "present invention" and "the present invention" used in this specification are intended to refer broadly to all subject matter of this specification and any patent claims below. Statements containing these terms should not be understood to limit the subject matter described herein or to limit the meaning or scope of any patent claim below. In addition, this specification does not attempt to describe or limit the subject matter covered by any claim of any specific component, paragraph, statement or figure of this application. The subject matter should be understood with reference to the entire specification, all drawings and any claims below. The present invention may have other embodiments and be practiced or implemented in other ways. Moreover, it should be understood that the words and terms used herein are for illustrative purposes and should not be considered as limiting.

[0044] The details of the present invention will now be discussed with reference to the accompanying drawings which illustrate the present invention by way of example only. In the accompanying drawings, similar features or components may be marked with the same reference numerals.

[0045] The use of "including," "having," and "comprising" and variations thereof herein is meant to encompass the items listed thereafter and their equivalents and additional items. Although reference may be made to directions such as above, below, upward, downward, rearward, bottom, top, front, rear, etc., in describing the drawings, for convenience, reference is made relative to the drawings. These directions are not intended to literally accept or limit the present invention in any form. In addition, terms such as "first," "second," "third," etc., are used herein for illustrative purposes and are not intended to indicate or imply importance or significance.

[0046] See also Figure 1 As shown, the positioning and fixing structure of the annular prefabricated component is composed of multiple steel vertical poles, the top of which is anchored in the foundation pit crown beam 9, and the bottom extends under the lowest arc-shaped prefabricated component 2. Multiple arc-shaped prefabricated components 2 are connected and spliced ​​into an annular internal support structure system, and each arc-shaped prefabricated component 2 is embedded between two steel vertical poles, realizing the accurate positioning of the arc-shaped prefabricated component in the foundation pit.

[0047] See also Figure 2 As shown, in a preferred embodiment of the present invention, each steel vertical pole is prefabricated in sections, which are divided into two sections: a tongue-and-groove section 6 and a straight section 5 without a tongue-and-groove, and adjacent sections are connected by a straight threaded sleeve 8. By adjusting the length of the straight section 5 of the steel vertical pole without a tongue-and-groove, the tongue-and-groove top surface elevation of the tongue-and-groove section 6 of the steel vertical pole can be adjusted to align with the center elevation of the arc-shaped prefabricated component 2, so that the arc-shaped prefabricated component 2 can be embedded between the two steel vertical poles. The top of the tongue-and-groove of the steel vertical pole is a plane, and the prefabricated arc-shaped component 2 is placed on the top plane of the tongue-and-groove, and the weight of the prefabricated arc-shaped component 2 is borne by the steel vertical pole; the bottom of the tongue-and-groove is an inclined surface to increase the ability of the tongue-and-groove node to bear vertical loads. The part of the steel vertical pole anchored into the top cast-in-place ring beam is firmly welded to the ring beam steel bars to ensure that the ring beam can bear all vertical forces transmitted from the steel vertical pole.

[0048] See also Figure 3 and Figure 4 As shown, in the preferred embodiment of the present invention, a positioning hole 3 and a positioning slot 4 are reserved at both ends of each arc-shaped prefabricated component. The cross-sectional dimensions and shapes of the positioning hole 3 and the positioning slot 4 are completely consistent with the tongue and groove of the steel vertical pole tongue and groove segment 6, so as to ensure that the steel vertical pole can move in the positioning slot and can also be embedded in the positioning hole. The length of the positioning slot 4 is calculated and determined according to the diameter of the circular well and the length of the arc-shaped prefabricated component 2. A single arc-shaped prefabricated component 2 can be embedded between two steel vertical poles by rotating and translating in the foundation pit.

[0049] See also Figure 5 and Figure 6As shown, each steel pole is located on the connection surface of two arc-shaped prefabricated components. A PVC sleeve 7 is provided outside the steel pole 2, and the sleeve is gradually removed as the foundation pit is excavated and the arc-shaped prefabricated components 2 are installed.

[0050] See also Figure 7 As shown, all arc-shaped prefabricated components are engaged with the steel pole tongue-and-groove sections 6 through the reserved positioning holes 3 and positioning slots 4, thereby achieving the fixation of the arc-shaped prefabricated components; the deadweight of the arc-shaped prefabricated components is transmitted to the foundation pit crown beam 9 through the steel pole tongue-and-groove sections 6, thereby achieving the vertical stability of the arc-shaped prefabricated components. After the arc-shaped prefabricated components are subjected to uniform confining pressure, they shrink and deform inward to press the steel pole tongue-and-groove sections 6, thereby enhancing the overall stability of the steel pole structure system.

[0051] Specifically, in the first stage of construction of the embodiment of the present invention, the circular foundation pit external enclosure structure 1 is first constructed, the arc-shaped prefabricated components 2 and the steel poles 5 and 6 are positioned in plane, the PVC sleeve 7 is sunk into the steel poles after pre-forming holes, and the steel poles 5 and 6 are placed in the PVC sleeve 7. Then, the cast-in-place reinforced concrete ring beam 9 is constructed at the top of the foundation pit, and the part of the steel pole 5 anchored in the ring beam 9 is firmly welded to the ring beam steel bar.

[0052] In the second stage of construction, the earthwork in the foundation pit is excavated to below the design elevation of the arc-shaped prefabricated component 2, the PVC sleeve 7 above the excavation surface is removed, and the arc-shaped prefabricated component 2 is installed in place in the foundation pit so that the arc-shaped prefabricated component 2 is embedded between the tongue-and-groove sections 6 of the two steel poles. Figure 8 The six steps shown are completed:

[0053] (1) Leaning: The arc-shaped prefabricated component 2 is positioned so that the slide groove 4 is against the tongue-and-groove section 6 of the steel vertical pole;

[0054] (2) Shift: Shift the arc-shaped prefabricated component 2 until the steel upright slides into the middle of the positioning slot 4;

[0055] (3) Rotation: Rotate the arc-shaped prefabricated component 2 clockwise around the tongue-and-groove section 6 of the steel upright;

[0056] (4) Shift: Shift the arc-shaped prefabricated component 2 until the steel upright slides into the bottom of the positioning slot 4;

[0057] (5) Rotation: Rotate the arc-shaped prefabricated component 2 clockwise again with the steel pole tongue and groove section 6 as the center;

[0058] (6) Shifting: Shift the arc-shaped prefabricated component 2 in parallel until the positioning hole 3 engages with the tongue-and-groove section 6 of another steel vertical pole, thereby completing the fixation of the arc-shaped prefabricated component 2.

[0059] During the backfilling process of the foundation pit, the steel uprights 5, 6 and the straight threaded sleeve 8 can be gradually dismantled and recycled as the earthwork is backfilled.

[0060] In the description, the annular prefabricated components are illustrated by taking the prefabricated ring beam support structure of a preferred embodiment of the present invention as an example; in addition to the prefabricated ring beam inner support structure shown in the accompanying drawings, other annular prefabricated components such as annular prefabricated lining support structure, annular prefabricated side wall permanent structure, etc. can also be installed and constructed using the positioning and fixing structure described in the present invention.

[0061] The positioning and fixing structure of the annular prefabricated components in the circular foundation pit proposed in this case is simple in structure and convenient in construction. It has the characteristics of high economy, low construction difficulty, accurate structural positioning and high safety. The construction process has the advantages of energy saving, environmental protection and low carbon, and has good social and economic effects.

[0062] The above are only preferred embodiments of the present invention, and are not intended to limit the implementation methods and protection scope of the present invention. Those skilled in the art should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the description and illustrations of the present invention should be included in the protection scope of the present invention.

Claims

1. A positioning and fixing structure for annular prefabricated components in a circular foundation pit, characterized in that: A plurality of steel uprights are evenly distributed along a ring inside a circular foundation pit, the tops of the steel uprights are anchored in a foundation pit crown beam (9), and the bottoms extend below the lowest circular prefabricated components, and arc-shaped prefabricated components (2) are embedded between the steel uprights to form a ring structure; the steel uprights include a tongue-and-groove section (6) and a straight section (5), and adjacent sections are connected by a straight threaded sleeve (8).

2. A positioning and fixing structure for annular prefabricated components in a circular foundation pit as claimed in claim 1, characterized in that: Positioning holes (3) and positioning grooves (4) are reserved at both ends of the arc-shaped prefabricated component (2), and their cross-sectional dimensions and shapes are consistent with the tongue-and-groove sections (6) of the steel upright poles, so that the arc-shaped prefabricated component (2) can be embedded in the steel upright poles, thereby realizing accurate positioning and fixing of the prefabricated component in the foundation pit.

3. A construction method for positioning and fixing a ring-shaped prefabricated component in a circular foundation pit, used for constructing the positioning and fixing structure of a ring-shaped prefabricated component in a circular foundation pit as claimed in claim 1 or 2, characterized in that: Includes construction phases 1 and 2; The first stage of the construction is to construct the external enclosure structure of the circular foundation pit, the plane positioning of the steel poles and the sinking of the PVC casing after pre-forming holes at the steel poles; then the cast-in-place reinforced concrete ring beam at the top of the foundation pit is constructed to ensure that the steel poles are firmly anchored therein; The second stage includes excavating the soil in the pit and installing the annular prefabricated components; the annular prefabricated components are embedded in the positioning holes and slide grooves between the two steel poles through rotation and translation to achieve precise positioning and fixation.

4. The construction method for positioning and fixing the annular prefabricated component in a circular foundation pit according to claim 3, characterized in that: The first phase of construction includes the following steps: Construct the external retaining structure of circular foundation pit; Carry out plane positioning of annular prefabricated components and steel poles; After pre-forming a hole at the steel pole, sink the PVC casing into it and put the steel pole into the casing; A reinforced concrete ring beam is cast in place on the top of the construction pit, and the part of the steel upright anchored into the ring beam is firmly welded to the ring beam steel bars.

5. The construction method for positioning and fixing the annular prefabricated component in a circular foundation pit according to claim 3, characterized in that: The second phase of construction includes the following steps: Excavate the soil in the pit to the specified elevation, remove the external PVC sleeves of the steel poles above the pit bottom elevation, and hoist the arc-shaped prefabricated components into the pit bottom; The arc-shaped prefabricated components are translated and rotated in the foundation pit to be embedded between the steel poles; After multiple arc-shaped prefabricated components are spliced ​​into annular components, the excavation of the lower soil layer and the installation of the lower annular prefabricated components are continued until the foundation pit construction is completed.

6. The construction method for positioning and fixing the annular prefabricated component in a circular foundation pit according to claim 5, characterized in that: The arc-shaped prefabricated components are translated and rotated to be inserted between the steel poles, which specifically includes the following steps: Place the arc-shaped prefabricated component positioning slide groove against the tongue-and-groove section of the upper steel pole; Translate the arc-shaped prefabricated component until the steel pole slides into the middle of the positioning slide groove; Rotate the arc-shaped prefabricated component clockwise with the tongue-and-groove section of the steel pole as the center; Translate the arc-shaped prefabricated component until the steel pole slides into the bottom of the positioning slide groove; Rotate the arc-shaped prefabricated component clockwise again with the tongue-and-groove section of the steel pole as the center; The arc-shaped prefabricated component is translated until the positioning hole engages with the tongue-and-groove section of another steel vertical pole to complete the fixation of the arc-shaped prefabricated component.

7. The construction method for positioning and fixing the annular prefabricated component in a circular foundation pit according to claim 3, characterized in that: For permanent annular prefabricated components, after the foundation pit is excavated to the bottom, the gaps in the positioning slide grooves are filled densely with grouting, and the steel uprights become part of the permanent structure; for temporary annular prefabricated components, during the process of backfilling or backbuilding the foundation pit, the steel upright segments and straight threaded connecting sleeves are gradually removed and recycled for reuse.