Energy-saving noise-reduction drainage channel for metal roof and construction method of energy-saving noise-reduction drainage channel
By designing a drainage tank system with multi-layer components on metal roofs, the problems of noise reduction and energy saving of metal roof drainage tanks are solved, and effective static drainage and waterproof performance are improved.
Patent Information
- Application Number
- CN202411111069.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-08
AI Technical Summary
The existing metal roof drainage tank has problems in noise reduction and energy saving, which affects the safety of the top decoration surface and use stage of the building.
Design an energy-saving and silence drainage tank including a surface groove member, a U-shaped first support plate, a thermally insulating rock wool board, a sound insulation layer, a second support plate, a waterproof layer and a fireproof layer, and install these components in a reserved gap in the roof structure. , realize orderly static drainage and noise isolation, and fix the two ends of the material to the roof structure to enhance waterproofing performance.
Effectively reduce roof noise, prevent water accumulation in the drain tank from penetrating, and significantly improve the waterproof performance and energy-saving effect of the drain tank.
Smart Images

Figure CN118911361A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of construction engineering, in particular to an energy-saving and sound-absorbing drainage ditch for metal roofs and a construction method thereof. Background Art
[0002] The design of roof slotted metal panels is becoming more and more common in today's architectural design. With the continuous expansion of the scale of large public buildings in my country and the increasing demand for building energy conservation, higher requirements are also placed on the design and construction technology of guttering. Without a reasonable design node, the drainage system of the entire building top decorative surface will be affected and many hidden dangers will be buried in the use stage. Therefore, the present invention specifically solves the problems of gutter design, energy saving, noise reduction, etc. of metal roofs, and proposes an energy-saving and sound-absorbing gutter for metal roofs and a construction method thereof. Summary of the invention
[0003] The purpose of the present invention is to overcome the defects of the prior art, provide an energy-saving and sound-absorbing gutter for metal roofs and a construction method thereof, and solve the problems existing in the existing metal roof gutter in terms of noise reduction, energy saving, etc.
[0004] The present invention provides an energy-saving and sound-absorbing drainage trough for a metal roof, and its technical solution is: it is installed at a reserved gap in a roof structure, comprising: a surface groove member arranged in the reserved gap, and the surface groove member is arranged along the entire length of the reserved gap; a first support plate in a U shape fixed to the bottom of the reserved gap, and the first support plate is located below the surface groove member; an insulating rock wool board arranged on the upper side of the first support plate, and the insulating rock wool board is in a U shape and is tightly attached to the first support plate; and a sound insulation layer arranged between the insulating rock wool board and the surface groove member.
[0005] Furthermore, both ends of the surface groove and the sound insulation layer extend out of the reserved gap and are fixedly connected to the roof structure.
[0006] Furthermore, it also includes a second support plate arranged on the upper side of the thermal insulation rock wool board, and the two ends of the second support plate extend out of the reserved gap and are fixedly connected to the roof structure.
[0007] Furthermore, it also includes a waterproof layer arranged between the second supporting plate and the sound insulation layer.
[0008] Furthermore, it also includes a fireproof layer arranged between the sound insulation layer and the surface groove member.
[0009] The present invention also provides a construction method for an energy-saving and sound-absorbing drainage trough for a metal roof, which specifically includes the following steps: when installing the roof structure, reserving a gap for installing the drainage trough; installing a first support plate at the bottom of the reserved gap; laying an insulating rock wool board on the upper side of the first support plate; installing a sound insulation layer on the upper side of the insulating rock wool board; and installing a surface groove member on the upper side of the sound insulation layer.
[0010] Furthermore, when installing the sound insulation layer and the surface groove parts, the two ends are extended out of the drainage groove and fixedly connected to the roof structure.
[0011] Furthermore, after the thermal insulation rock wool board is installed, a second support plate is provided, and the second support plate is installed on the upper side of the thermal insulation rock wool board.
[0012] Furthermore, after the second support plate is installed, a waterproof layer is provided and installed on the upper side of the second support plate.
[0013] Furthermore, after the sound insulation layer is installed, a fireproof layer is provided and installed on the upper side of the sound insulation layer.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] The sound insulation layer and surface grooves are used to achieve orderly static drainage of the roof slotted metal panel system, effectively reducing roof noise.
[0016] By extending the two ends of the multi-layer material out of the gutter and fixedly connecting them to the roof structure, the accumulated water in the gutter is prevented from penetrating into the material, thereby further enhancing the waterproof performance of the gutter. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 The exploded view of the energy-saving and sound-absorbing drainage trough for metal roofing of the present invention is shown.
[0018] Figure 2 It is a cross-sectional view of the energy-saving and sound-absorbing drainage ditch used for metal roofs according to the present invention.
[0019] Legend: 1. Roof structure; 2. Surface grooves; 3. Fire-proof and crack-resistant mortar; 4. Square tubes; 5. Angle steel; 6. Frame; 7. Support keel; 8. First support plate; 9. Insulating rock wool board; 10. Second support plate; 11. TPO waterproof material; 12. Polyurethane layer. DETAILED DESCRIPTION
[0020] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0021] See also Figure 1The present invention provides an energy-saving and sound-absorbing gutter for metal roofs and a construction method thereof, which solves the problems existing in existing metal roof gutter in terms of noise reduction and energy saving. The sound insulation layer and the surface groove parts are used to achieve orderly static drainage of the roof seam metal panel system, effectively reducing the roof noise. By extending the two ends of the multi-layer material out of the gutter and fixedly connecting it to the roof structure, the accumulated water in the gutter is prevented from penetrating into the material, and the waterproof performance of the gutter is further enhanced.
[0022] The energy-saving and sound-absorbing drainage trough for metal roof and the construction method thereof of the present invention are described below in conjunction with the accompanying drawings.
[0023] See also Figure 1 , showing an exploded view of the energy-saving and sound-absorbing gutter for metal roofs of the present invention. Figure 2 , showing a cross-sectional view of the energy-saving and sound-absorbing gutter for metal roofs of the present invention. Figure 1 and Figure 2 , an energy-saving and sound-absorbing drainage trough for a metal roof and a construction method thereof are described in the present invention.
[0024] like Figure 1 and Figure 2 As shown, an energy-saving and sound-absorbing drainage trough for metal roofs of the present invention is installed at the reserved gap of the roof structure 1, and includes: a surface groove member 2 arranged in the reserved gap, and the surface groove member 2 is arranged along the full length of the reserved gap; a first support plate 8 fixedly arranged at the bottom of the reserved gap in a U shape, and the first support plate 8 is located below the surface groove member 2; a thermal insulation rock wool board 9 arranged on the upper side of the first support plate 8, and the thermal insulation rock wool board 9 is U-shaped and tightly attached to the first support plate 8; and a sound insulation layer arranged between the thermal insulation rock wool board 9 and the surface groove member 2. By providing the surface groove member 2 and the sound insulation layer, the multi-layer design is used to achieve effective waterproofing, and the effect of heat preservation is also achieved; by providing the sound insulation layer, the noise in the drainage trough is isolated.
[0025] In a preferred embodiment, the surface groove member 2 is made of a 2 mm stainless steel plate.
[0026] In a specific embodiment, the two ends of the surface groove member 2 and the sound insulation layer extend out of the reserved gap and are fixedly connected to the roof structure 1. By fixing the two ends of each material to the roof structure 1, the accumulated water in the drainage trough is prevented from penetrating the material, and the waterproof effect is further enhanced.
[0027] In a specific embodiment, it also includes a second support plate 10 arranged on the upper side of the thermal insulation rock wool board 9 , and both ends of the second support plate 10 extend out of the reserved gap and are fixedly connected to the roof structure 1 .
[0028] In a specific embodiment, a waterproof layer is further included between the second support plate 10 and the sound insulation layer.
[0029] In a specific embodiment, it also includes a fireproof layer disposed between the sound insulation layer and the surface groove member.
[0030] In a specific embodiment, the first support plate 8 and the second support plate 10 are galvanized steel plates.
[0031] In a specific embodiment, the waterproof layer is a TPO waterproof material 11; the sound insulation layer is a polyurethane layer 12; and the fireproof layer is a fireproof and crack-resistant mortar 3. TPO waterproof material is a sheet-like thermoplastic rubber elastic waterproof material made of ethylene resin as a base material, using advanced polymerization technology and a specific formula. It has the comprehensive characteristics of high tensile strength, good wear resistance, strong UV resistance, smooth surface, high reflectivity and pollution resistance. The full name of polyurethane 12 is polyurethane, which is a polymer material with excellent mechanical properties formed by polyols and polyisocyanates through polycondensation reaction. It has extremely strong plasticity. The cured foam layer formed by the polyurethane layer 12 has the functions of sealing, sound absorption, and heat insulation. The fireproof and crack-resistant mortar 3 has high tensile strength and is a high-quality environmentally friendly material that is easy to construct and resistant to freezing. It can effectively solve the problem of fracture of the thermal insulation and waterproof layer.
[0032] In a preferred embodiment, the thickness of the TPO waterproof material 11 is 2 mm; the thickness of the polyurethane layer 12 is 20 mm; and the thickness of the fire-proof and crack-resistant mortar 3 is 10 mm.
[0033] In a specific embodiment, the roof structure 1 includes a frame 6 and a supporting keel 7 fixed on the frame 6, and the frame 6 and the supporting keel 7 are arranged along the direction of the reserved gap.
[0034] In a specific embodiment, angle steels 5 are installed at the bottom of the two frames 6 by self-tapping screws, and the first support plate 8 is fixedly connected to the angle steels 5 by self-tapping screws.
[0035] In a preferred embodiment, the length of two sides of the angle steel 5 is 30 mm, and the thickness is 3 mm.
[0036] In a specific embodiment, a square tube 4 is fixedly disposed at one end of two adjacent frames 6 close to each other, and the angle steel 5 is fixedly disposed on the corresponding square tube 4. By disposing the square tube 4, the first support plate 8 can be installed by using self-tapping screws and the angle steel 5.
[0037] In a specific embodiment, the square tube 4 is welded and fixed to the end of the corresponding frame 6. The height of the square tube 4 is consistent with the thickness of the frame 6, and the thickness of the square tube 4 is 4 mm.
[0038] The present invention also discloses a construction method for an energy-saving and sound-absorbing drainage trough for a metal roof, which specifically comprises the following steps: when installing a roof structure 1, a gap for installing the drainage trough is reserved; a first support plate 8 is installed at the bottom of the reserved gap; an insulating rock wool board 9 is laid flat on the upper side of the first support plate 8; a sound insulation layer is installed on the upper side of the insulating rock wool board 9; and a surface groove part 2 is installed on the upper side of the sound insulation layer.
[0039] In a specific embodiment, when the sound insulation layer and the surface groove member 2 are installed, the two ends are extended out of the drainage groove and fixedly connected to the roof structure 1.
[0040] In a specific implementation, after the thermal insulation rock wool board 9 is installed, a second support plate 10 is provided, and the second support plate 10 is installed on the upper side of the thermal insulation rock wool board 9 .
[0041] In a specific embodiment, after the second support plate 10 is installed, a waterproof layer is provided and installed on the upper side of the second support plate 10 .
[0042] In a specific embodiment, after the sound insulation layer is installed, a fireproof layer is provided and installed on the upper side of the sound insulation layer.
[0043] The construction process of the energy-saving and sound-absorbing drainage trough for metal roofs of the present invention is described in detail below.
[0044] The roof structure 1 is installed, and during the installation, a gap for installing the drainage trough is reserved between two adjacent frames 6.
[0045] The square tube 4 is welded to the end of the corresponding frame 6, and then the angle steel 5 is fixed to the bottom of the frame 6 by self-tapping screws, and the end of the U-shaped first support plate 8 is aligned with the corresponding angle steel 5, and the first support plate 8 is fixedly connected to the angle steel 5 by self-tapping screws.
[0046] Then, a thermal insulation rock wool board 9 is laid flat on the inner side of the first support board 8 , a second support board 10 is installed on the upper side of the thermal insulation rock wool board 9 , and both ends of the second support board 10 are fixedly connected to the corresponding support keels 7 .
[0047] Then, TPO waterproof material 11 , polyurethane layer 12 , fireproof and crack-resistant mortar 3 and surface groove member 2 are sequentially installed on the upper side of the second supporting plate 10 , and both ends of the multi-layer protective material are fixedly connected to the corresponding supporting keels 7 .
[0048] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.
Claims
1. An energy-saving and sound-absorbing drainage trough for metal roofs, installed at a reserved gap of a roof structure (1), characterized in that: include: A surface groove member (2) is arranged in the reserved gap, and the surface groove member (2) is arranged along the entire length of the reserved gap; A first U-shaped support plate (8) is fixedly mounted at the bottom of the reserved gap, wherein the first support plate (8) is located below the surface groove member (2); a thermal insulation rock wool board (9) provided on the upper side of the first support board (8), the thermal insulation rock wool board (9) being U-shaped and being in close contact with the first support board (8); A sound insulation layer is provided between the thermal insulation rock wool board (9) and the surface groove member (2).
2. The energy-saving and sound-absorbing drainage trough for metal roof according to claim 1, characterized in that: The two ends of the surface groove (2) and the sound insulation layer extend out of the reserved gap and are fixedly connected to the roof structure (1).
3. The energy-saving and sound-absorbing drainage trough for metal roof according to claim 1, characterized in that: It also comprises a second support plate (10) arranged on the upper side of the thermal insulation rock wool plate (9), wherein the two ends of the second support plate (10) extend out of the reserved gap and are fixedly connected to the roof structure (1).
4. The energy-saving and sound-absorbing drainage trough for metal roof according to claim 3, characterized in that: It also includes a waterproof layer arranged between the second supporting plate (10) and the sound insulation layer.
5. The energy-saving and sound-absorbing drainage trough for metal roof according to claim 1, characterized in that: It also includes a fireproof layer arranged between the sound insulation layer and the surface groove member (2).
6. A construction method for an energy-saving and sound-absorbing drainage ditch for a metal roof according to claim 1, characterized in that: The specific steps include: When installing the roof structure (1), a gap is reserved for installing the drainage groove; Installing the first support plate (8) at the bottom of the reserved gap; Laying a thermal insulation rock wool board (9) on the upper side of the first support board (8); Installing a sound insulation layer on the upper side of the thermal insulation rock wool board (9); A surface groove member (2) is installed on the upper side of the sound insulation layer.
7. The construction method of the energy-saving and sound-absorbing drainage trough for metal roof according to claim 6, characterized in that: When installing the sound insulation layer and the surface groove member (2), the two ends are extended out of the drainage groove and fixedly connected to the roof structure (1).
8. The construction method of the energy-saving and sound-absorbing drainage trough for metal roof according to claim 6, characterized in that: After the thermal insulation rock wool board (9) is installed, a second support board (10) is provided, and the second support board (10) is installed on the upper side of the thermal insulation rock wool board (9).
9. The construction method of the energy-saving and sound-absorbing drainage trough for metal roof according to claim 8, characterized in that: After the second support plate (10) is installed, a waterproof layer is provided and installed on the upper side of the second support plate (10).
10. The construction method of energy-saving and sound-absorbing drainage trough for metal roof according to claim 6, characterized in that: After the sound insulation layer is installed, a fireproof layer is provided and installed on the upper side of the sound insulation layer.