Engineering communication tower connecting device and method

Through the combination of the adjustment mechanism and the fixing mechanism, the stable fixation of the engineering communication tower is achieved, which solves the problem of insufficient installation stability in the prior art and enhances the installation safety and applicability of the communication tower.

CN118911513APending Publication Date: 2024-11-08QINGDAO HUANGHAI UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411083166.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing engineering communication tower installation methods are insufficient instability, and the length of the connection device is fixed and cannot be adjusted according to actual conditions, resulting in unstable installation and poor use.

Method used

The combination of adjustment mechanism and fixing mechanism is adopted, and the angle adjustment and fixation of the engineering communication tower is realized through parts such as moving parts, bidirectional threaded rods, synchronous wheels, fixed gears and limit rods. The installation motor and fixed motor drive are used to cooperate with Wan The wheels and sliding plates are adapted to the communication towers of different specifications for stable fixation.

Benefits of technology

It improves the installation stability and applicability of the engineering communication tower, can be fixed according to different specifications, and enhances the safety and practicality of installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911513A_ABST
    Figure CN118911513A_ABST
Patent Text Reader

Abstract

The invention discloses an engineering communication tower connecting device and method. The engineering communication tower connecting device comprises a fixed box body, and four universal wheels are fixedly connected to the bottom of the fixed box body; the adjusting mechanism comprises an adjusting component and a moving component, the moving component is arranged on the fixed box body, and the adjusting component is arranged on the moving component and the fixed box body; the fixing mechanism comprises a power part, four fixing parts and four reinforcing parts, through cooperation of the adjusting mechanism and the stabilizing mechanism, the mounting rod pushes the fixing plate and the fixing protrusion to be fixed into the ground, the fixing rod is hammered into the ground, and the fixing cone is fixed into the ground along with movement of the fixing rod; and then the engineering communication tower is installed on the butt joint plate, so that the engineering communication tower is fixed, the installation stability of the engineering communication tower can be improved, through cooperation of the adjusting mechanism and the fixing mechanism, the position of the butt joint plate is adjusted, the engineering communication tower can be fixed according to engineering communication towers of different specifications, and the practicability of the engineering communication tower is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of engineering communication, and specifically relates to an engineering communication tower connection device and method. Background Art

[0002] Communication tower is a kind of signal transmission tower, also called signal transmission tower or signal tower. Its main function is to support signal transmission and provide support for signal transmission antenna. It is used in communication department. When installing engineering communication tower, you need to use engineering communication tower connection device. The engineering communication tower connection device is used to connect communication tower. In the construction of modern communication infrastructure, engineering communication tower is an important communication signal transmission equipment. The stability and safety of its installation are crucial to the normal operation of the entire communication network.

[0003] Some existing engineering communication tower installation methods mostly use a method of directly fixing them on the ground. This method is easily affected by external factors such as ground conditions and wind during the installation process, resulting in insufficient installation stability, thereby affecting the use effect and safety of the communication tower. Some existing engineering communication tower connection devices have a fixed length and cannot be adaptively adjusted according to actual conditions, resulting in poor practicality. Summary of the invention

[0004] The purpose of the present invention is to: through the movement of the adjusting mechanism, the moving part moves and at the same time drives the connecting block to move, so that the connecting block is separated from the limiting block, and the limiting block is moved to the supporting block by the elastic force of the installing spring, and the installing rod pushes the fixing plate and the fixing protrusion to move, and the connecting rod is moved in the connecting cylinder by the connecting spring until it is fixed to the ground, and then the fixing rod is hammered into the ground, and the limiting ring moves on the connecting plate with the fixing rod until the limiting ring is completely located on the top of the connecting plate, and at the same time, the sliding plate can be moved on the installing block by the movement of the limiting ring, and when the fixing rod is fixed to the appropriate position, the fixing cone at the bottom of the sliding plate is fixed to the ground, and then the engineering communication tower is installed on the docking plate, so as to fix the engineering communication tower Fixing can increase the installation stability of the engineering communication tower, and one of the synchronous wheels is driven to rotate by the installation motor, and the bidirectional worm can be rotated through the transmission of the synchronous belt, and the fixing nail can be rotated through the engagement of the bidirectional worm and the worm wheel, so as to adjust the angle between the two connecting plates, and one of the fixed gears is driven to rotate by the fixing motor, and the bidirectional threaded rod is rotated through the engagement between the two fixed gears, and the two moving parts are moved to the appropriate position through the limiting of the limiting rod. When the moving part pushes the fixing mechanism to move to the appropriate position, the engineering communication tower is installed on the docking plate through the cooperation of the adjusting mechanism and the fixing mechanism, and can be fixed according to engineering communication towers of different specifications, thereby increasing its practicality.

[0005] The technical solution adopted by the present invention is as follows: an engineering communication tower connection device and method, comprising:

[0006] A fixed box, the bottom of which is fixedly connected with four universal wheels;

[0007] An adjusting mechanism, wherein the adjusting mechanism comprises an adjusting component and a moving component, wherein the moving component is arranged on a fixed box, and the adjusting component is arranged on the moving component and the fixed box;

[0008] A fixing mechanism, the fixing mechanism comprising a power component, four groups of fixing components and four groups of reinforcement components, the power component is arranged on the adjustment mechanism, each group of the fixing components is arranged on the power component, and each group of the reinforcement components is arranged on the fixing component; and

[0009] The stabilizing mechanism comprises a plurality of connecting components, two installing components and two pushing components, each installing component group is arranged on a fixed box, each pushing component group is arranged on the installing components, and each connecting component group is arranged on the pushing components.

[0010] Among them, the moving component includes two moving parts, a two-way threaded rod and two limit rods. The two-way threaded rod rotates and passes through the outer surface of the fixed box body. Each of the limit rods is fixed and passes through the outer surface of the fixed box body. One side of each of the moving parts is threadedly sleeved on the outer surface of the two-way threaded rod, and one side of each of the moving parts is slidably sleeved on the outer surfaces of the two limit rods. Each of the moving parts is slidably embedded in both sides of the fixed box body.

[0011] Among them, the adjusting component includes a fixed motor and two fixed gears, the fixed motor is fixedly connected to the lower inner wall of the fixed box, one of the fixed gears is fixedly sleeved on the output end of the fixed motor, and the other fixed gear is fixedly sleeved on the outer surface of the bidirectional threaded rod, and the two fixed gears are meshed with each other.

[0012] Among them, the power component includes an installation box, an installation motor, two synchronous wheels, a bidirectional worm, two worm wheels and two fixing nails, the bottom of the installation box is fixedly connected to the top of the moving part, the bidirectional worm is rotatably connected between the inner walls of the two sides of the installation box, the installation motor is fixedly connected to the top of the moving part, one of the synchronous wheels is fixedly sleeved on the output end of the installation motor, and the other synchronous wheel is fixedly sleeved on the outer surface of the bidirectional worm, the two synchronous wheels are mutually transmitted through a synchronous belt, each of the fixing nails is rotatably connected between the moving part and the installation box, and one end of the fixing nail rotates through the top of the moving part, each of the worm wheels is fixedly sleeved on the outer surface of the fixing nail, and the two worm wheels are meshed with the bidirectional worm.

[0013] Among them, each group of the fixing components includes a connecting plate, a fixing rod, a limiting ring, a fixing spring and a docking plate. The connecting plate is fixedly sleeved on the outer surface of the fixing nail, the fixing rod slides through one end of the connecting plate, the docking plate and the limiting ring are both fixedly sleeved on the outer surface of the fixing rod, the docking plate is located directly above the limiting ring, the fixing spring is fixedly sleeved on the outer surface of the fixing rod, and the fixing spring is located at the bottom of the limiting ring.

[0014] Among them, each group of the reinforcement components includes three connecting parts, three sliding plates, three mounting blocks and three fixed cones, one end of each of the connecting parts is fixedly connected to the outer surface of the limiting ring, one end of each of the sliding plates is rotatably connected to the connecting part, the top of each of the fixed cones is fixedly connected to the bottom of the sliding plate, one side outer surface of each of the mounting blocks is fixedly connected to one side outer surface of the fixing rod, and one side outer surface of each of the sliding plates is slidably embedded in the outer surface of the mounting block.

[0015] Among them, two sliding grooves are opened at the bottom of the fixed box body, and each group of the installation components includes two connecting blocks and two supporting blocks. One end of each of the connecting blocks is fixedly connected to one side of the moving part, and the bottom end of each of the supporting blocks is fixedly connected to the bottom of the sliding groove.

[0016] Among them, each group of the pushing components includes a limit block, a mounting rod, a mounting spring, a fixing plate and a plurality of fixing protrusions, the mounting rod slides through the bottom of the sliding groove, the mounting spring is sleeved on the outer surface of the mounting rod, the bottom of the limit block is fixedly connected to the top of the mounting rod, the top of the fixing plate is fixedly connected to the bottom of the mounting rod, and the plurality of fixing protrusions are fixedly connected to the bottom of the fixing plate.

[0017] Among them, each group of connecting parts includes a connecting tube, a connecting rod and a connecting spring, the top end of the connecting tube is fixedly connected to the bottom of the fixed box, the bottom end of the connecting rod is fixedly connected to the top of the fixed plate, and the top end of the connecting rod is slidably embedded between the inner walls of the connecting tube, and the connecting spring is fixedly connected between the connecting tube and the connecting rod.

[0018] A method for connecting an engineering communication tower comprises the following steps:

[0019] Step 1, adjust the connection device: turn on the installation motor, the installation motor drives one of the synchronous wheels to rotate, the bidirectional worm can be rotated through the transmission of the synchronous belt, the fixing nail can be rotated through the meshing of the bidirectional worm and the worm wheel, so as to adjust the angle between the two connecting plates, and adjust the distance between the two connecting plates according to the actual situation of the communication tower; then turn on the fixing motor, the fixing motor drives one of the fixed gears to rotate, the bidirectional threaded rod is rotated through the meshing between the two fixed gears, and the two moving parts are moved to the appropriate position through the limiting of the limiting rod. When the moving part pushes the fixing mechanism to move to the appropriate position, the engineering communication tower is installed on the docking plate through the cooperation of the adjusting mechanism and the fixing mechanism;

[0020] Step 2, fix the connection device: the moving part moves while driving the connection block to move, so that the connection block is separated from the limit block, and the limit block is moved to the support block through the elastic force of the installation spring, and the installation rod pushes the fixing plate and the fixing protrusion to move, and the connecting spring is used to move the connecting rod in the connecting tube until it is fixed to the ground;

[0021] Step 3, reinforce the connection device: then hammer the fixing rod into the ground, and the limit ring moves on the connecting plate with the fixing rod until the limit ring is completely located on the top of the connecting plate. At the same time, the movement of the limit ring can make the sliding plate move on the mounting block. When the fixing rod is fixed to the appropriate position, the fixing cone at the bottom of the sliding plate is fixed to the ground, and then the engineering communication tower is installed on the docking plate to fix the engineering communication tower.

[0022] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0023] (1) In the present invention, by moving the adjusting mechanism, the moving part moves and drives the connecting block to move at the same time, so that the connecting block is separated from the limit block, and the limit block is moved to the support block by the elastic force of the installation spring, and the installation rod pushes the fixing plate and the fixing protrusion to move, and the connecting rod is moved in the connecting tube by the connecting spring until it is fixed to the ground, and then the fixing rod is hammered into the ground, and the limit ring moves on the connecting plate with the fixing rod until the limit ring is completely located on the top of the connecting plate. At the same time, the sliding plate can be moved on the installation block by the movement of the limit ring. When the fixing rod is fixed to a suitable position, the fixing cone at the bottom of the sliding plate is fixed to the ground, and then the engineering communication tower is installed on the docking plate, thereby fixing the engineering communication tower, which can increase the installation stability of the engineering communication tower.

[0024] (2) In the present invention, a motor is installed to drive one of the synchronous wheels to rotate, and the bidirectional worm can be rotated through the transmission of the synchronous belt. The fixing nail can be rotated through the meshing of the bidirectional worm and the worm wheel, so as to adjust the angle between the two connecting plates. One of the fixed gears is driven to rotate by a fixed motor, and the bidirectional threaded rod is rotated through the meshing of the two fixed gears. The two moving parts are moved to the appropriate position through the limiting of the limiting rod. When the moving part pushes the fixing mechanism to move to the appropriate position, the engineering communication tower is installed on the docking plate through the cooperation of the adjusting mechanism and the fixing mechanism. It can be fixed according to engineering communication towers of different specifications, thereby increasing its practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a front cross-sectional view of the present invention;

[0026] Figure 2 A top cross-sectional view of a sample placement block of the present invention;

[0027] Figure 3 It is a left side cross-sectional view of the circular hole part of the present invention;

[0028] Figure 4 It is an enlarged top view of the circular hole part of the present invention;

[0029] Figure 5 It is an enlarged top view of the circular hole part of the present invention;

[0030] Figure 6 It is an enlarged top view of the circular hole part of the present invention;

[0031] Figure 7 It is an enlarged top view of the circular hole part of the present invention;

[0032] Figure 8 It is an enlarged top view of the circular hole part of the present invention;

[0033] Fig. 9 It is a left side cross-sectional view of a sample placement block of the present invention.

[0034] Markings in the figure: 1, fixed box; 2, adjustment mechanism; 201, fixed motor; 202, fixed gear; 203, two-way threaded rod; 204, limit rod; 205, moving part; 3, fixing mechanism; 301, installation box; 302, installation motor; 303, synchronous wheel; 304, two-way worm; 305, worm wheel; 306, fixing nail; 307, connecting plate; 308, fixing rod; 309, docking plate; 310, limit Position ring; 311, connecting piece; 312, sliding plate; 313, mounting block; 314, fixing spring; 315, fixing cone; 4, stabilizing mechanism; 401, fixing plate; 402, fixing protrusion; 403, connecting block; 404, limiting block; 405, supporting block; 406, sliding groove; 407, mounting rod; 408, mounting spring; 409, connecting tube; 410, connecting rod; 411, connecting spring; 5, universal wheel. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0036] Embodiment 1

[0037] Reference Figure 1-Figure 9 : The present invention provides a technical solution: a connection device and method for an engineering communication tower, comprising: a fixed box 1, four universal wheels 5 are fixedly connected to the bottom of the fixed box 1; an adjusting mechanism 2, the adjusting mechanism 2 comprises an adjusting component and a moving component, the moving component is arranged on the fixed box 1, and the adjusting component is arranged on the moving component and the fixed box 1; a fixing mechanism 3, the fixing mechanism 3 comprises a power component, four groups of fixing components and four groups of reinforcement components, the power component is arranged on the adjusting mechanism 2, each group of fixing components is arranged on the power component, and each group of reinforcement components is arranged on the fixed component; and a stabilizing mechanism 4, the stabilizing mechanism 4 comprises multiple groups of connecting components, two groups of mounting components and two groups of pushing components, each group of mounting components is arranged on the fixed box 1, each group of pushing components is arranged on the mounting component, and each group of connecting components is arranged on the pushing component.

[0038] In this embodiment: the setting of the fixed box 1 is installed with an adjusting mechanism 2 and a fixing mechanism 3, and the cooperation of the adjusting mechanism 2 and the fixing mechanism 3 can realize the fixation of communication towers of different specifications, thereby increasing the practicability of the device; the setting of the universal wheel 5 can make the connecting device move; the adjusting mechanism 2 can be adjusted according to the specifications of the engineering communication tower; the setting of the adjusting component is used to adjust the position of the moving component; the setting of the moving component can make the fixing mechanism 3 move; the setting of the fixing mechanism 3 can be adjusted according to the specifications of the engineering communication tower and at the same time increase the installation stability of the engineering communication tower; the setting of the power component is used to provide rotational force; the setting of four groups of fixing components is used to fix the engineering communication tower; the setting of four groups of reinforcement components is used to reinforce the engineering communication tower; the setting of the stabilizing mechanism 4 can increase the installation stability of the fixed box 1; the setting of multiple groups of connecting components is used to connect the pushing components; the cooperation of two groups of installation components and two groups of pushing components is used to increase the stability of the engineering communication tower.

[0039] Specifically, the moving parts include two moving parts 205, a bidirectional threaded rod 203 and two limit rods 204. The bidirectional threaded rod 203 rotates and passes through the outer surface of the fixed box 1. Each limit rod 204 is fixed and passes through the outer surface of the fixed box 1. One side of each moving part 205 is threadedly sleeved on the outer surface of the bidirectional threaded rod 203, and one side of each moving part 205 is slidably sleeved on the outer surfaces of the two limit rods 204. Each moving part 205 is slidably embedded in both sides of the fixed box 1.

[0040] In this embodiment: the two moving members 205 are used to install the fixing mechanism 3, the bidirectional threaded rod 203 is used to adjust the positions of the two moving members 205, and the two limiting rods 204 are used for limiting.

[0041] Specifically, the adjusting component includes a fixed motor 201 and two fixed gears 202. The fixed motor 201 is fixedly connected to the lower inner wall of the fixed box 1. One of the fixed gears 202 is fixedly sleeved on the output end of the fixed motor 201, and the other fixed gear 202 is fixedly sleeved on the outer surface of the bidirectional threaded rod 203. The two fixed gears 202 are meshed with each other.

[0042] In this embodiment: the fixed motor 201 is used to provide rotational force, and the two fixed gears 202 are used for transmission. The structure and principle of the fixed motor 201 belong to the prior art and will not be introduced in detail here. The model can be selected according to actual usage.

[0043] Specifically, the power component includes an installation box 301, an installation motor 302, two synchronous wheels 303, a bidirectional worm 304, two worm wheels 305 and two fixing nails 306. The bottom of the installation box 301 is fixedly connected to the top of the moving part 205, and the bidirectional worm 304 is rotatably connected between the inner walls of the installation box 301 on both sides. The installation motor 302 is fixedly connected to the top of the moving part 205, one of the synchronous wheels 303 is fixedly sleeved on the output end of the installation motor 302, and the other synchronous wheel 303 is fixedly sleeved on the outer surface of the bidirectional worm 304. The two synchronous wheels 303 are mutually transmitted through a synchronous belt, each fixing nail 306 is rotatably connected between the moving part 205 and the installation box 301, and one end of the fixing nail 306 rotates and passes through the top of the moving part 205, each worm wheel 305 is fixedly sleeved on the outer surface of the fixing nail 306, and the two worm wheels 305 are meshed with the bidirectional worm 304.

[0044] In this embodiment: the setting of the installation motor 302 is used to provide rotational force, the setting of the two synchronous wheels 303 is used for transmission, the cooperation of the bidirectional worm 304 and the two worm wheels 305 is used to adjust the positions of the two fixing nails 306, and the setting of the two fixing nails 306 can install fixed components. The structure and principle of the installation motor 302 belong to the prior art and will not be introduced in detail here. Its model can be selected according to actual usage.

[0045] Specifically, each set of fixing components includes a connecting plate 307, a fixing rod 308, a limiting ring 310, a fixing spring 314 and a docking plate 309. The connecting plate 307 is fixedly mounted on the outer surface of the fixing pin 306. The fixing rod 308 slides through one end of the connecting plate 307. The docking plate 309 and the limiting ring 310 are both fixedly mounted on the outer surface of the fixing rod 308. The docking plate 309 is located directly above the limiting ring 310. The fixing spring 314 is fixedly mounted on the outer surface of the fixing rod 308, and the fixing spring 314 is located at the bottom of the limiting ring 310.

[0046] In this embodiment: the connection plate 307 is used to connect the fixing rod 308, the fixing rod 308 is used to fix the engineering communication tower, the limit ring 310 is used to limit and is also used to install the reinforcement component, the fixing spring 314 is used to support the fixing rod 308, and the docking plate 309 is used to install the engineering communication tower.

[0047] Specifically, each group of reinforcement components includes three connecting parts 311, three sliding plates 312, three mounting blocks 313 and three fixed cones 315. One end of each connecting part 311 is fixedly connected to the outer surface of the limiting ring 310, one end of each sliding plate 312 is rotatably connected to the connecting part 311, the top of each fixed cone 315 is fixedly connected to the bottom of the sliding plate 312, one side outer surface of each mounting block 313 is fixedly connected to one side outer surface of the fixing rod 308, and one side outer surface of each sliding plate 312 is slidably embedded in the outer surface of the mounting block 313.

[0048] In this embodiment: the three connecting members 311 are used to install three sliding plates 312 . The cooperation of the three sliding plates 312 and the three fixed cones 315 is used to increase the stability of the engineering communication tower. The three mounting blocks 313 can limit the three sliding plates 312 .

[0049] Specifically, two sliding grooves 406 are opened at the bottom of the fixed box 1, and each set of installation components includes two connecting blocks 403 and two supporting blocks 405. One end of each connecting block 403 is fixedly connected to one side of the moving part 205, and the bottom end of each supporting block 405 is fixedly connected to the bottom of the sliding groove 406.

[0050] In this embodiment: the sliding groove 406 is used to fix the installation component, and the two connecting blocks 403 and the two supporting blocks 405 are used to support the pushing component.

[0051] Specifically, each group of pushing components includes a limit block 404, a mounting rod 407, a mounting spring 408, a fixing plate 401 and a plurality of fixing protrusions 402. The mounting rod 407 slides through the bottom of the sliding groove 406. The mounting spring 408 is sleeved on the outer surface of the mounting rod 407. The bottom of the limit block 404 is fixedly connected to the top of the mounting rod 407. The top of the fixing plate 401 is fixedly connected to the bottom of the mounting rod 407. The plurality of fixing protrusions 402 are all fixedly connected to the bottom of the fixing plate 401.

[0052] In this embodiment: the limit block 404 is set to fix the installation rod 407, the installation rod 407 is set to connect the fixed plate 401, and the multiple fixing protrusions 402 are set to increase the installation stability. The installation spring 408, the limit block 404 and the installation rod 407 cooperate to adjust the position of the fixed plate 401.

[0053] Specifically, each set of connecting components includes a connecting tube 409, a connecting rod 410 and a connecting spring 411. The top end of the connecting tube 409 is fixedly connected to the bottom of the fixed box 1, the bottom end of the connecting rod 410 is fixedly connected to the top of the fixed plate 401, and the top end of the connecting rod 410 is slidably embedded between the inner walls of the connecting tube 409, and the connecting spring 411 is fixedly connected between the connecting tube 409 and the connecting rod 410.

[0054] In this embodiment, the connection tube 409 , the connection rod 410 and the connection spring 411 are configured to support the fixing plate 401 , and the connection rod 410 can slide in the connection tube 409 .

[0055] The following is a detailed description of the use of an engineering communication tower connection device and method provided by an embodiment of the present invention, and the use method includes the following steps: Step 1, adjusting the connection device: Turn on the installation motor 302, and the installation motor 302 drives one of the synchronous wheels 303 to rotate. The bidirectional worm 304 can be rotated through the transmission of the synchronous belt, and the fixing nail 306 can be rotated through the engagement of the bidirectional worm 304 and the worm wheel 305, so as to adjust the angle between the two connecting plates 307, and adjust the distance between the two connecting plates 307 according to the actual situation of the communication tower; then turn on the fixed motor 201, and the fixed motor 201 drives one of the fixed gears 202 to rotate, and the bidirectional threaded rod 203 is rotated through the engagement between the two fixed gears 202, and the two moving parts 205 are moved to the appropriate position through the limiting rod 204. When the moving part 205 pushes the fixing mechanism 3 to move to the appropriate position, the engineering communication tower is adjusted by the cooperation of the adjusting mechanism 2 and the fixing mechanism 3. Install it on the docking plate 309; Step 2, fix the connecting device: When the moving member 205 moves, it drives the connecting block 403 to move, so that the connecting block 403 is separated from the limit block 404, and the limit block 404 is moved to the support block 405 through the elastic force of the installation spring 408, and the installation rod 407 pushes the fixing plate 401 and the fixing protrusion 402 to move, and the connecting spring 411 makes the connecting rod 410 move in the connecting tube 409 until it is fixed to the ground; Step 3, reinforce the connecting device: Then The fixing rod 308 is hammered into the ground, and the limiting ring 310 moves on the connecting plate 307 along with the fixing rod 308 until the limiting ring 310 is completely located on the top of the connecting plate 307. At the same time, the movement of the limiting ring 310 can make the sliding plate 312 move on the mounting block 313. When the fixing rod 308 is fixed to a suitable position, the fixing cone 315 at the bottom of the sliding plate 312 is fixed to the ground, and then the engineering communication tower is installed on the docking plate 309, thereby fixing the engineering communication tower.

[0056] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An engineering communication tower connection device and method, characterized in that: include: A fixed box (1), wherein four universal wheels (5) are fixedly connected to the bottom of the fixed box (1); An adjusting mechanism (2), the adjusting mechanism (2) comprising an adjusting component and a moving component, the moving component being arranged on the fixed housing (1), and the adjusting component being arranged on the moving component and the fixed housing (1); A fixing mechanism (3), the fixing mechanism (3) comprising a power component, four groups of fixing components and four groups of reinforcement components, the power component being arranged on the adjustment mechanism (2), each group of the fixing components being arranged on the power component, and each group of the reinforcement components being arranged on the fixing component; and A stabilizing mechanism (4), the stabilizing mechanism (4) comprising a plurality of groups of connecting components, two groups of mounting components and two groups of pushing components, each group of the mounting components being arranged on a fixed box (1), each group of the pushing components being arranged on a mounting component, and each group of the connecting components being arranged on a pushing component.

2. An engineering communication tower connection device as claimed in claim 1, characterized in that: The movable component comprises two movable members (205), a bidirectional threaded rod (203) and two limiting rods (204); the bidirectional threaded rod (203) rotates and passes through the outer surface of the fixed box (1); each limiting rod (204) is fixed and passes through the outer surface of the fixed box (1); one side of each movable member (205) is threadedly sleeved on the outer surface of the bidirectional threaded rod (203); one side of each movable member (205) is slidably sleeved on the outer surfaces of the two limiting rods (204); and each movable member (205) is slidably embedded in both sides of the fixed box (1).

3. An engineering communication tower connection device as claimed in claim 2, characterized in that: The adjusting component comprises a fixed motor (201) and two fixed gears (202); the fixed motor (201) is fixedly connected to the lower inner wall of the fixed box (1); one of the fixed gears (202) is fixedly sleeved on the output end of the fixed motor (201); the other fixed gear (202) is fixedly sleeved on the outer surface of the bidirectional threaded rod (203); and the two fixed gears (202) are meshed with each other.

4. An engineering communication tower connection device as claimed in claim 3, characterized in that: The power component comprises an installation box (301), an installation motor (302), two synchronous wheels (303), a bidirectional worm (304), two worm wheels (305) and two fixing nails (306); the bottom of the installation box (301) is fixedly connected to the top of the moving part (205); the bidirectional worm (304) is rotatably connected between the inner walls of both sides of the installation box (301); the installation motor (302) is fixedly connected to the top of the moving part (205); one of the synchronous wheels (303) is fixedly sleeved on the installation motor (302) ), another synchronous wheel (303) is fixedly sleeved on the outer surface of the bidirectional worm (304), the two synchronous wheels (303) are mutually driven by a synchronous belt, each of the fixing nails (306) is rotatably connected between the moving part (205) and the installation box (301), and one end of the fixing nail (306) is rotatably passed through the top of the moving part (205), each of the worm wheels (305) is fixedly sleeved on the outer surface of the fixing nail (306), and the two worm wheels (305) are mutually meshed with the bidirectional worm (304).

5. An engineering communication tower connection device as claimed in claim 4, characterized in that: Each group of the fixing components comprises a connecting plate (307), a fixing rod (308), a limiting ring (310), a fixing spring (314) and a docking plate (309); the connecting plate (307) is fixedly sleeved on the outer surface of the fixing nail (306); the fixing rod (308) slides through one end of the connecting plate (307); the docking plate (309) and the limiting ring (310) are both fixedly sleeved on the outer surface of the fixing rod (308); the docking plate (309) is located directly above the limiting ring (310); the fixing spring (314) is fixedly sleeved on the outer surface of the fixing rod (308), and the fixing spring (314) is located at the bottom of the limiting ring (310).

6. An engineering communication tower connection device as claimed in claim 5, characterized in that: Each group of the reinforcing components comprises three connecting members (311), three sliding plates (312), three mounting blocks (313) and three fixed cones (315); one end of each of the connecting members (311) is fixedly connected to the outer surface of the limiting ring (310); one end of each of the sliding plates (312) is rotatably connected to the connecting member (311); the top of each of the fixed cones (315) is fixedly connected to the bottom of the sliding plate (312); one side outer surface of each of the mounting blocks (313) is fixedly connected to one side outer surface of the fixing rod (308); and one side outer surface of each of the sliding plates (312) is slidably embedded in the outer surface of the mounting block (313).

7. An engineering communication tower connection device as claimed in claim 6, characterized in that: Two sliding grooves (406) are provided at the bottom of the fixed box (1), and each group of the mounting components comprises two connecting blocks (403) and two supporting blocks (405), one end of each connecting block (403) is fixedly connected to one side of the moving part (205), and the bottom end of each supporting block (405) is fixedly connected to the bottom of the sliding groove (406).

8. An engineering communication tower connection device as claimed in claim 7, characterized in that: Each group of the pushing components comprises a limit block (404), a mounting rod (407), a mounting spring (408), a fixing plate (401) and a plurality of fixing protrusions (402); the fixing rod (407) slides through the bottom of the sliding groove (406); the fixing spring (408) is sleeved on the outer surface of the fixing rod (407); the bottom of the limit block (404) is fixedly connected to the top of the fixing rod (407); the top of the fixing plate (401) is fixedly connected to the bottom of the fixing rod (407); and the plurality of fixing protrusions (402) are fixedly connected to the bottom of the fixing plate (401).

9. An engineering communication tower connection device as claimed in claim 8, characterized in that: Each group of the connecting components comprises a connecting tube (409), a connecting rod (410) and a connecting spring (411); the top end of the connecting tube (409) is fixedly connected to the bottom of the fixed box (1); the bottom end of the connecting rod (410) is fixedly connected to the top of the fixed plate (401); and the top end of the connecting rod (410) is slidably embedded between the inner walls of the connecting tube (409); and the connecting spring (411) is fixedly connected between the connecting tube (409) and the connecting rod (410).

10. A method for connecting an engineering communication tower, characterized in that: The invention is applied to an engineering communication tower connection device as described in any one of claims 1 to 9, comprising the following steps: S1. Adjusting the connection device: Turning on the installation motor (302), the installation motor (302) drives one of the synchronous wheels (303) to rotate, the transmission of the synchronous belt can make the bidirectional worm (304) rotate, and the meshing of the bidirectional worm (304) and the worm wheel (305) can make the fixing nail (306) rotate, so as to adjust the angle between the two connecting plates (307), and adjust the distance between the two connecting plates (307) according to the actual situation of the communication tower; then turning on the fixing motor (201), the fixing motor (201) drives one of the fixed gears (202) to rotate, and the meshing between the two fixed gears (202) makes the bidirectional threaded rod (203) rotate, and the limiting of the limiting rod (204) makes the two moving parts (205) move to the appropriate position, and when the moving part (205) pushes the fixing mechanism (3) to move to the appropriate position, the engineering communication tower is installed on the docking plate (309) through the cooperation of the adjusting mechanism (2) and the fixing mechanism (3); S2, fixed connection device: the moving member (205) moves and drives the connection block (403) to move, so that the connection block (403) is separated from the limit block (404), and the limit block (404) is moved onto the support block (405) by the elastic force of the installation spring (408), and the installation rod (407) pushes the fixing plate (401) and the fixing protrusion (402) to move, and the connection spring (411) is used to move the connection rod (410) in the connection tube (409) until it is fixed to the ground; S3, strengthening the connection device: then hammer the fixing rod (308) into the ground, and the limiting ring (310) moves on the connecting plate (307) along with the fixing rod (308) until the limiting ring (310) is completely located on the top of the connecting plate (307). At the same time, the movement of the limiting ring (310) can make the sliding plate (312) move on the mounting block (313). When the fixing rod (308) is fixed to a suitable position, the fixing cone (315) at the bottom of the sliding plate (312) is fixed to the ground, and then the engineering communication tower is installed on the docking plate (309), thereby fixing the engineering communication tower.