Tool and method for treating sand-buried pipe column
By integrating injectors and fishing in the downhole salvage pipe column, using high-pressure fluid flushing and reverse operation, the problems of low construction efficiency and long construction cycle of the well-sleeved sand buried pipe column are solved, and efficient and fast salvage are achieved. The effect of reducing costs.
Patent Information
- Application Number
- CN202310511555.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-08
- Publication Date
- 2024-11-08
AI Technical Summary
The construction efficiency of the well-sleeved milling of the sand buried pipe column is low, the construction period is long, and the time and cost is high. The sleeve damage and the sleeve milling process are prone to problems such as the sleeve milling pipe column being stuck.
Provide a tool for treating sand buried pipe columns, including downhole salvage pipe columns, ejectors and fishing sludge. The coal sludge and sand in the well are flushed by high-pressure fluid, revealing the upper end of the sand buried pipe column, and then using fishing sludge and extracting Sand buried pipe column simplifies the salvage process.
It improves the salvage efficiency of sand buried pipe columns, shortens the construction cycle, reduces labor intensity and construction costs, and avoids the risk of casing damage and the sleeve milling barrel being stuck.
Smart Images

Figure CN118911624A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of fish salvage in oil and gas wells, and in particular relates to a tool and a method for processing a sand-buried pipe column. Background Art
[0002] In the oil and gas industry, well repair operations run through all aspects of drilling, development and exploitation. According to the various complex working conditions of oil wells, well repair operations are also diverse, and fish salvage is a common form of well repair operations. In the process of oil and gas reservoir development, fish may be stuck in the well due to various reasons. At this time, in order to maintain the normal development of oil and gas wells, the fish must be salvaged to avoid the scrapping of oil and gas wells and cause more serious economic losses. The conventional treatment method is to first mill the stuck point and then perform salvage operations. Generally, one pipe is milled and salvaged, and the stuck pipe column buried in the well is gradually salvaged. However, this treatment method has a long construction period and a high time cost.
[0003] Therefore, how to improve the efficiency of sand-buried tubular well casing milling and salvage construction and shorten the construction period is a technical problem that needs to be solved urgently by those skilled in the art. Summary of the invention
[0004] In view of the problems of low efficiency, long construction period and high time cost of casing milling and salvage construction in sand-buried tubular wells, as well as the problems of casing damage and casing milling tubular getting stuck during the casing milling process, the present invention provides a tool and method for processing sand-buried tubulars, aiming to solve at least one of the above problems.
[0005] To achieve the above purpose, the technical solution adopted by the present invention is as follows:
[0006] According to a first aspect of the present invention, there is provided a tool for processing a sand-buried tubular column, comprising: a downhole salvage tubular column which can be extended into a casing in which the sand-buried tubular column is located, the downhole salvage tubular column comprising an inverted drill pipe, an ejector, and a salvage spout which are sequentially connected from top to bottom, the salvage spout being adapted to the sand-buried tubular column, the salvage spout being connected at the bottom center of the ejector, and a plurality of nozzles being arranged at the bottom edge of the ejector; and a high-pressure fluid source which can be connected to the downhole salvage tubular column to supply high-pressure fluid thereto.
[0007] In some embodiments, the outer diameter of the injector is larger than the outer diameter of the sand buried tubing string.
[0008] In some embodiments, the nozzle may extend into the annular space between the sand buried tubing string and the casing.
[0009] In some embodiments, 4 to 6 nozzles may be provided.
[0010] In some embodiments, the scoop is a solid component and is not in fluid communication with the injector.
[0011] In some embodiments, the reverse drill pipe is a hollow component and is in fluid communication with the ejector.
[0012] In some embodiments, the tool for treating a sand-buried pipe string further comprises a blowdown line connected to the casing and a wastewater collection device capable of receiving fluid discharged through the blowdown line.
[0013] In some embodiments, the lower thread of the reverse-threaded drill pipe is connected to the injector, and the lower thread of the injector is connected to the scoop.
[0014] According to a second aspect of the present invention, there is provided a method for treating a sand-buried tubular column using the tool for treating a sand-buried tubular column according to the first aspect of the present invention, the method comprising the following steps: lowering a downhole salvage tubular column into a casing where the sand-buried tubular column is located until encountering resistance; connecting a high-pressure fluid source and the downhole salvage tubular column; opening the high-pressure fluid source, and spraying the high-pressure fluid through a nozzle of an ejector to flush the upper end of the sand-buried tubular column until the upper end of the sand-buried tubular column is exposed, and the flushing fluid is then returned through the annular space between the sand-buried tubular column and the casing; closing the high-pressure fluid source, and disconnecting the connection between the high-pressure fluid source and the downhole salvage tubular column; reversing the downhole salvage tubular column, turning the sand-buried tubular column upside down, and lifting the sand-buried tubular column out.
[0015] In some embodiments, the high-pressure fluid is a high-pressure well washing fluid.
[0016] By adopting the above technical solution, the present invention has the following beneficial effects:
[0017] The tool for processing sand-buried pipe strings provided by the present invention integrates an ejector and a salvage rod in the downhole salvage pipe string. After the downhole salvage pipe string is lowered into place in the casing, the coal slime and sand near the sand-buried pipe string can be washed away by a high-pressure jet to expose the upper end pipe string of the sand-buried pipe string. After that, the salvage rod can be reversed and the sand-buried pipe string can be lifted up and salvaged.
[0018] The method for processing a sand-buried pipe string provided by the present invention comprises the following steps: after the downhole salvage pipe string is lowered into place in the casing, a high-pressure jet is firstly used to wash away the coal mud and sand near the sand-buried pipe string by using an ejector integrated on the downhole salvage pipe string to expose the upper end pipe string of the sand-buried pipe string; then, the sand-buried pipe string is inverted by using a salvage rod integrated on the downhole salvage pipe string, and then the sand-buried pipe string can be lifted up and salvaged out.
[0019] The tool and method for handling sand-buried pipe strings provided by the present invention change the traditional milling and reverse salvaging of pipe strings that are completed in two trips to one trip, thereby improving work efficiency, being able to efficiently and quickly salvage sand-buried pipe strings, reducing labor intensity, shortening construction periods, and reducing construction costs. The tool and method for handling sand-buried pipe strings provided by the present invention use high-pressure jets to flush coal mud and sand near the sand-buried pipe strings to facilitate salvaging the pipe strings, without the need for milling tubes to mill the pipe strings, thereby avoiding the risk of casing damage and the risk of the milling tube being stuck. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0021] Figure 1 A schematic diagram of a tool for processing a sand-buried pipe string according to an embodiment of the present invention;
[0022] Figure 2 The present invention is a schematic flow chart of a method for treating a sand-buried pipe string according to an embodiment of the present invention.
[0023] Reference numerals list
[0024] 1 sand buried pipe string; 2 casing; 3 annular space; 4 blowdown pipe line; 5 sewage collection device; 6 wellhead connector; 7 production layer
[0025] 10 Downhole fishing string; 11 Inverted drill pipe; 12 Ejector; 13 Fishing grass; 14 Nozzle;
[0026] 20 high pressure hose; 30 elbow DETAILED DESCRIPTION
[0027] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the embodiments of the present invention are further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.
[0028] First of all, it should be noted that the specific structure, features and advantages of the present invention will be specifically described below by way of example, but all descriptions are only for illustration and should not be understood as limiting the present invention in any way. In addition, any single technical feature described or implied in the embodiments mentioned herein, or any single technical feature displayed or implied in the drawings, can still be combined or deleted between these technical features (or their equivalents) to obtain more other embodiments of the present invention that may not be directly mentioned in this document. In addition, in order to simplify the drawings, the same or similar technical features may be marked only in one place in the same drawing.
[0029] In the description of the present invention, it should be noted that the terms "center", "edge", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the invented product is usually placed when in use, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. It should be noted that the embodiments in this application and the features in the embodiments can be combined with each other without conflict.
[0030] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0031] A first aspect of the present invention provides a tool for processing sand-buried pipe strings. Figure 1 As shown, the tool for processing the sand-buried pipe string includes: a downhole salvage pipe string 10 that can be extended into the casing 2 where the sand-buried pipe string 1 is located, the downhole salvage pipe string 10 includes an inverted drill pipe 11, an ejector 12, and a salvage spout 13 that are connected in sequence from top to bottom, the salvage spout 13 is adapted to the sand-buried pipe string 1, the salvage spout 13 is connected to the bottom center position of the ejector 12, and a plurality of nozzles 14 are arranged at the bottom edge position of the ejector 12; and a high-pressure fluid source (not shown) that can be connected to the downhole salvage pipe string 10 to supply high-pressure fluid thereto.
[0032] In the scheme of the present invention, "the downhole salvage string 10 that can be extended into the casing 2 where the sand-buried pipe string 1 is located" means that the size of the downhole salvage string 10 allows it to be extended into the casing 2, that is, the maximum outer diameter of the downhole salvage string 10 must be smaller than the minimum inner diameter of the casing 2. In the scheme of the present invention, "the salvage hook 13 is adapted to the sand-buried pipe string 1" means that the salvage hook 13 is suitable for connecting the sand-buried pipe string 1 to facilitate its salvage, that is, the corresponding salvage hook can be selected according to the sand-buried pipe string to be salvaged. The "reverse drill pipe", "injector" and "salvage hook" mentioned in the present invention are all conventional components in the field, so their specific structural descriptions are omitted.
[0033] In the solution of the present invention, the bottom center position of the injector 12 is connected to the bailer 13, and a plurality of nozzles 14 are arranged at the bottom edge position of the injector 12, that is, the plurality of nozzles 14 are arranged around the bailer 13, which helps to spray high-pressure fluid toward the upper end of the sand-buried pipe column through the nozzles, so as to clean up the coal slime and sand near the upper end of the sand-buried pipe column and expose the upper end of the sand-buried pipe column.
[0034] In some embodiments, the outer diameter of the injector 12 is larger than the outer diameter of the sand-buried tubular string 1 so that high-pressure fluid can be injected into the annulus space 3 between the sand-buried tubular string 1 and the casing 2 through the nozzle 14, thereby facilitating flushing of the upper tubular string exposing the sand-buried tubular string 1.
[0035] In some embodiments, the nozzle 14 can extend into the annular space 3 between the sand-buried tubular string 1 and the casing 2, so as to facilitate the injection of high-pressure fluid into the annular space 3 between the sand-buried tubular string 1 and the casing 2 through the nozzle 14, thereby facilitating the flushing of the upper end tubular string exposed from the sand-buried tubular string 1.
[0036] In some embodiments, 4 to 6 nozzles 14 may be provided so that the spraying range effectively covers the entire annular space 3, thereby effectively cleaning the annular space 3. Preferably, the nozzles 14 may be evenly spaced around the bottom edge of the injector 12.
[0037] In some embodiments, the scoop 13 is a solid component and is not in fluid communication with the ejector 12. This facilitates adapting the existing scoop 13 according to actual needs without any modification of the scoop 13 structure, thereby simplifying production and assembly.
[0038] In some embodiments, the reverse drill pipe 11 is a hollow component and is in fluid communication with the ejector 12. High-pressure fluid from a high-pressure fluid source can flow into the ejector 12 via a fluid channel inside the reverse drill pipe 11.
[0039] In some embodiments, Figure 1 As shown, the tool for processing sand-buried tubulars also includes a high-pressure hose 20 arranged between the downhole salvage tubular 10 and a high-pressure fluid source. The high-pressure fluid from the high-pressure fluid source can flow into the downhole salvage tubular 10, especially the reverse drill pipe 11 and the injector 12, via the high-pressure hose 20.
[0040] In some embodiments, Figure 1 As shown, the tool for processing the sand-buried pipe string further comprises an elbow 30 arranged between the high-pressure hose 20 and the reverse-threaded drill pipe 11 .
[0041] In some embodiments, Figure 1 As shown, the tool for processing the sand-buried pipe string further includes a blowout line 4 connected to the casing 2 and a sewage collection device 5 that can receive the fluid discharged through the blowout line 4. Figure 1 As shown, the upper end of the casing 2 is connected to the blowout line 4 via the wellhead connector 6. For example, the upper end of the casing 2 is threadedly connected to the wellhead connector 6, and the downhole fishing string 10 is lowered into the center hole of the wellhead connector 6.
[0042] In some embodiments, the lower part of the reverse threaded drill pipe 11 is threadedly connected to the ejector 12, and the lower part of the ejector 12 is threadedly connected to the scoop 13. The threaded connection has the advantages of high connection strength, good sealing, and convenient operation.
[0043] From the above content, it can be seen that: according to the tool for processing sand-buried pipes described in the first aspect of the present invention, since the ejector and the salvage rod are integrated in the downhole salvage pipe, after the downhole salvage pipe is lowered into place in the casing, the coal slime and sand near the sand-buried pipe can be flushed with a high-pressure jet. After the flushing is completed and the upper end of the sand-buried pipe is exposed, the salvage rod can be reversed, and then the sand-buried pipe can be lifted up and fished out. The tool for processing sand-buried pipes provided by the present invention helps to efficiently and quickly salvage the sand-buried pipes, reduces labor intensity, shortens the construction period, and reduces construction costs. The tool for processing sand-buried pipes provided by the present invention uses a high-pressure jet to flush the coal slime and sand, and does not require a milling barrel to mill the pipe, which can avoid the risk of casing damage and the risk of the milling barrel getting stuck.
[0044] The second aspect of the present invention provides a method for treating a sand-buried pipe column using the tool for treating a sand-buried pipe column according to the first aspect of the present invention. Figure 2 As shown, the method for processing the sand-buried pipe string comprises the following steps: S1: lowering the downhole salvage pipe string into the casing where the sand-buried pipe string is located until encountering resistance, specifically, the downhole salvage pipe string can be lowered into the casing by connecting the reverse drill pipe of the downhole salvage pipe string via a running tool; S2: connecting the high-pressure fluid source and the downhole salvage pipe string, specifically, after removing the running tool, connecting one end of the high-pressure hose to the reverse drill pipe, and connecting the other end to the high-pressure fluid source; S3: turning on the high-pressure fluid source, and the high-pressure fluid is ejected through the nozzle of the ejector to flush the upper end of the sand-buried pipe string until the sand-buried pipe string is The upper end of the column is exposed, and the flushing fluid is then returned through the annular space between the sand-buried pipe string and the casing. Specifically, the high-pressure fluid flows through the high-pressure hose, the reverse drill pipe, and the ejector and flows out from the nozzle of the ejector to form a high-pressure jet, which is used to flush the coal slime and sand near the upper end of the sand-buried pipe string so as to expose the upper end of the sand-buried pipe string; S4: turn off the high-pressure fluid source and disconnect the connection between the high-pressure fluid source and the downhole salvage pipe string. Specifically, pull the high-pressure hose off the reverse drill pipe; S5: reverse the downhole salvage pipe string, reverse the upper end of the sand-buried pipe string, and lift it up to fish out the sand-buried pipe string.
[0045] In some embodiments, the high pressure fluid is a high pressure well washing fluid.
[0046] From the above content, it can be seen that: according to the method for treating sand-buried pipes described in the second aspect of the present invention, after the downhole salvage pipe is lowered into place in the casing, the ejector integrated on the downhole salvage pipe is used to spray a high-pressure jet to flush the coal slime and sand near the sand-buried pipe. After the flushing is completed and the upper end of the sand-buried pipe is exposed, the sand-buried pipe is inverted using a salvage hook integrated on the downhole salvage pipe, and then the sand-buried pipe can be lifted up and fished out. The method for treating sand-buried pipes provided by the present invention can efficiently and quickly salvage the sand-buried pipes, reduce labor intensity, shorten the construction period, and reduce construction costs. The method for treating sand-buried pipes provided by the present invention uses a high-pressure jet to flush the coal slime and sand, and does not require a milling tube to mill the pipe, which can avoid the risk of casing damage and the risk of the milling tube getting stuck.
[0047] The following reference Figure 1 A specific embodiment of the present invention is described:
[0048] Figure 1 The sand-buried pipe string 1 , the casing 2 in which the sand-buried pipe string 1 is located, the coal slime, sand and the production layer 7 in the annular space 3 between the sand-buried pipe string 1 and the casing 2 are shown.
[0049] The tools for handling the sand-buried pipe string include an ejector 12, a nozzle 14, and a salvage hook 13. The outer diameter of the ejector 12 should be larger than the outer diameter of the fish (i.e., the sand-buried pipe string 1). The nozzle 14 is located at the bottom edge of the ejector 12, and the nozzle 14 can extend into the annular space 3 between the fish and the casing 2. 4-6 nozzles 14 can be set. The salvage hook 13 is connected to the middle position at the bottom of the ejector 12 through a threaded connection, and different salvage hook tools can be selected for different fish. The salvage hook 13 is solid and is not connected to the ejector 12. The structure of the downhole salvage pipe string from top to bottom is: a high-pressure hose is connected to an elbow 30, the elbow 30 is threadedly connected to several reverse-threaded drill pipes 11, the lower part of the reverse-threaded drill pipe 11 is threadedly connected to the ejector 12, the lower part of the ejector 12 is threadedly connected to the salvage hook 13, and the wellhead casing gate is connected to the spray line 4 to the sewage collection device 5.
[0050] The method for processing the sand-buried pipe string comprises: firstly, threadingly connecting the wellhead connector 6 at the upper part of the casing 2, and lowering the downhole salvage pipe string through the center hole of the wellhead connector, and the downhole salvage pipe string is in the casing 2; in order of insertion, they are: a salvage rod 13, an ejector 12 (including 4-6 nozzles 14), and a reverse drill pipe 11; the upper end of the salvage rod 13 is threadedly connected to the lower part of the ejector 12, the upper part of the ejector 12 is threadedly connected to the reverse drill pipe 11, the reverse drill pipe 11 is connected to the wellhead, the upper end of the reverse drill pipe 11 is threadedly connected to an elbow 30, the upper end of the elbow 30 is connected to a high-pressure hose 20, the high-pressure hose 20 is connected to a cement pump truck, the threaded threaded rod of the casing gate on one side of the wellhead is connected to a spraying pipe line 4, and the spraying pipe line 4 is connected to a sewage collection device 5. The reverse drill pipe 11 at the bottom drives the bailer 13 downward, and the bailer 13 enters the sand-buried pipe column 1 until it encounters resistance. The elbow 30 is reconnected to the upper end of the reverse drill pipe 11, and the cement pump truck injects well washing fluid from the high-pressure hose 20. The well washing fluid passes through the high-pressure hose 20, the elbow 30, the wellhead connector 6, the reverse drill pipe 11, and the ejector 12, and is ejected from the nozzle 14 at high speed to form a high-pressure water flow to wash the coal slime and sand. The coal slime and sand are returned with the well washing fluid and pass through the casing 2 and the reverse drill pipe. The annulus between the reverse drill pipes 11 flows into the blowout pipe line 4 from the side gate of the wellhead, and finally flows into the sewage collection device 5. As the coal slime and sand are gradually cleaned, a single pipe at the upper end of the sand-buried pipe string leaks out. The elbow 30 is disassembled from the upper end of the reverse drill pipe 11, the reverse drill pipe 11 is reversed, and the salvage pipe 13 starts to work to reverse the upper end of the sand-buried pipe string 1, lift up the salvage pipe string, and salvage the upper end of the sand-buried pipe string 1; repeat the above process to salvage all the sand-buried pipe strings, and complete this construction.
[0051] All components of the tool for handling sand-buried pipes are made of common steel, and are commonly used products, components or parts in the petroleum field and are available on the market.
[0052] The above are exemplary embodiments disclosed in the present invention. The order disclosed in the above embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. However, it should be noted that the discussion of any of the above embodiments is only exemplary and is not intended to imply that the scope (including claims) disclosed in the embodiments of the present invention is limited to these examples. Various changes and modifications may be made without departing from the scope defined in the claims. The functions, steps and / or actions of the method claims according to the disclosed embodiments described herein do not need to be performed in any particular order. In addition, although the elements disclosed in the embodiments of the present invention may be described or required in individual form, they may also be understood as multiple unless explicitly limited to the singular.
[0053] A person skilled in the art should understand that the discussion of any of the above embodiments is only exemplary and is not intended to imply that the scope of the disclosure of the embodiments of the present invention (including the claims) is limited to these examples; under the concept of the embodiments of the present invention, the technical features in the above embodiments or different embodiments can also be combined, and there are many other changes in different aspects of the embodiments of the present invention as described above, which are not provided in detail for the sake of simplicity. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the embodiments of the present invention should be included in the protection scope of the embodiments of the present invention.
Claims
1. A tool for processing sand-buried pipe strings, characterized in that: include: A downhole salvage string that can be extended into the casing where the sand-buried pipe string is located, the downhole salvage string comprising an inverted drill pipe, an ejector, and a salvage hook connected in sequence from top to bottom, the salvage hook being adapted to the sand-buried pipe string, the salvage hook being connected to the bottom center of the ejector, and a plurality of nozzles being arranged at the bottom edge of the ejector; as well as A high pressure fluid source is connectable to the downhole fishing string to supply high pressure fluid thereto.
2. The tool for processing sand-buried pipe string according to claim 1, characterized in that: The outer diameter of the ejector is greater than the outer diameter of the sand buried pipe string.
3. The tool for processing sand-buried pipe string according to claim 1, characterized in that: The nozzle may extend into the annular space between the sand buried pipe string and the casing.
4. The tool for processing sand-buried pipe strings according to claim 1, characterized in that: The number of the nozzles may be 4 to 6.
5. The tool for processing sand-buried pipe string according to claim 1, characterized in that: The scoop is a solid component and is not in fluid communication with the ejector.
6. The tool for processing sand-buried pipe string according to claim 1, characterized in that: The reverse-thread drill pipe is a hollow component and is in fluid communication with the ejector.
7. The tool for processing sand-buried pipe string according to claim 1, characterized in that: The tool for processing a sand-buried pipe string further comprises a blowdown line connected to the casing and a wastewater collecting device capable of receiving fluid discharged through the blowdown line.
8. The tool for processing sand-buried pipe string according to claim 1, characterized in that: The lower thread of the reverse-threaded drill rod is connected to the ejector, and the lower thread of the ejector is connected to the scoop.
9. A method for treating a sand-buried pipe string using the tool for treating a sand-buried pipe string according to any one of claims 1 to 8, characterized in that: The following steps are involved: Lower the downhole fishing string into the casing where the sand-buried string is located until it encounters resistance; Connecting a high-pressure fluid source to the downhole fishing string; The high-pressure fluid source is turned on, and the high-pressure fluid is ejected through the nozzle of the ejector to flush the upper end of the sand-buried pipe string until the upper end of the sand-buried pipe string is exposed, and the flushing fluid is then returned through the annular space between the sand-buried pipe string and the casing; Turn off the high-pressure fluid source and disconnect the connection between the high-pressure fluid source and the downhole fishing string; The downhole fishing pipe string is reversed, the sand-buried pipe string is turned upside down by a fishing rod, and the sand-buried pipe string is lifted up to fish out.
10. The method for treating a sand-buried pipe column according to claim 9, characterized in that: The high-pressure fluid is a high-pressure well-washing fluid.
Citation Information
Patent Citations
Screen pipe washing fisher with leather cups
CN203769699U
Tool for fishing underground fallen fish
CN204098835U
Sleeve washing fishing spear
CN210829152U
Internal fishing and external fishing spear
CN211737093U
Cylinder type fish casing milling and fishing tool
CN214403504U