Roadway arrangement and support method for down mining of extremely close coal seam group
By excavating and supporting layer by layer in extremely close coal seam groups, using technologies such as anchor cables, grouting pipes and hydraulic support, the damage problem of upper coal seam mining on lower coal seam is solved, and the collection volume and the strength of the rock layer are improved. , simplified support installation and achieved more efficient coal seam mining.
Patent Information
- Application Number
- CN202411049153.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-08
AI Technical Summary
During the mining of extremely close coal seam groups, the mining of the upper coal seam will cause damage to its base plate, weaken the structure of the lower coal seam top plate, and the installation of the support structure is complex, affecting coal mining efficiency and safety.
A tunnel layout and support method is adopted, including excavating the return air tunnel and machine tunnel layer by layer in the upper and lower coal seams, using anchor cables and grouting pipes for support, and passing through single hydraulic support columns, roof plates, and metal mesh Frames and other structures are quickly installed and disassembled, and coal columns are retained to support the rock layer.
The collection volume of upper coal seam is increased, the impact of upper mining on lower coal seam is reduced, the strength of the rock layer is enhanced, the installation process of support structures is simplified, and the efficiency of workers is improved.
Smart Images

Figure CN118911703A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining, and in particular to a tunnel arrangement and support method for downward mining of a coal seam group at an extremely close distance. Background Art
[0002] Coal-bearing strata often contain a variety of different coal seams. Some coal seams are widely spaced and are not affected by each other during mining, while some coal seams are closely spaced and affect each other during mining, making mining more difficult. Therefore, in the past coal mining process, people would give priority to mining coal seams with good storage conditions. In recent years, with the increasing intensity of coal resource mining, many coal seams with good storage conditions are about to be exhausted in the short term, so difficult-to-mine coal seams with complex storage conditions have gradually received attention from professionals in related fields, especially the mining of coal seam groups at very close distances.
[0003] Very close distance coal seams refer to coal seams with small distances between layers and great influence on each other during mining. When mining close distance coal seams downward, mining of upper coal seams will damage its floor, weaken the structure of the lower coal seam roof, and change the stress distribution of the lower coal seam roof. These changes will cause large deformation of the surrounding rock of the lower coal seam mining tunnel and make tunnel maintenance difficult. In addition, during the support process, the installation of the support structure is relatively complicated. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] In view of the shortcomings of the prior art, the present invention provides a tunnel layout and support method for downward mining of a group of coal seams at extremely close distances, which solves the problem that during the mining of extremely close coal seams, mining of the upper coal seam will cause damage to its bottom plate, weaken the structure of the lower coal seam roof, and the problem of complex installation of the support structure.
[0006] (II) Technical solution
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: a tunnel layout method for downward mining of a very close coal seam group, wherein the very close coal seam group includes an upper coal seam, a rock layer and a lower coal seam, and comprises the following specific steps:
[0008] S1. First, excavate the upper first return air lane and the upper first machine lane inside the upper coal seam, then use anchor nets to support the tops of the upper first return air lane and the upper first machine lane, and then install the support structure inside the upper first return air lane and the upper first machine lane;
[0009] S2, mining the coal on the upper first working face, forming the upper first goaf after the mining is completed, then continuing to dig the upper second machine lane on the right side of the upper first machine lane, and using anchor nets to support the top of the upper second machine lane, installing the support structure inside the upper second machine lane, and finally mining the coal on the upper second working face, forming the upper second goaf after the mining is completed;
[0010] S3, installing grouting pipes at the bottom of the upper first return air lane, the upper first machine lane, the upper second machine lane, the upper first goaf and the upper second goaf, and injecting slurry into the rock layer to improve the strength of the rock layer;
[0011] S4, excavating the first return air lane and the first machine lane of the lower layer inside the lower coal seam, and using anchor nets to support the tops of the first return air lane and the first machine lane of the lower layer, then installing the support structure inside the first return air lane and the first machine lane of the lower layer, installing grouting pipes on the tops of the first return air lane and the first machine lane of the lower layer, and injecting slurry into the rock layer, and finally mining the coal at the first working face of the lower layer, which becomes the first goaf of the lower layer after mining is completed;
[0012] S5, using the method in S4 to excavate and support the lower second return air lane, the lower second machine lane, and mine coal at the lower second working face, and after the mining of the lower second working face is completed, it becomes the lower second goaf;
[0013] S6, using the method in S4 again to excavate and support the third return air lane and the third machine lane of the lower layer, and to mine coal on the third working face of the lower layer, and after the mining is completed, a third goaf of the lower layer is formed;
[0014] S7. The first coal pillar of the lower layer is retained between the first machine tunnel of the lower layer and the second return air tunnel of the lower layer, and the second coal pillar of the lower layer is retained between the second machine tunnel of the lower layer and the third return air tunnel of the lower layer.
[0015] Preferably, the upper first return air lane is located in the upper middle position of the lower first working surface, the lower first coal pillar is located in the lower middle position of the upper first working surface, the upper first machine lane is located in the upper middle position of the lower second working surface, the lower second coal pillar is located in the lower middle position of the upper second working surface, and the upper second machine lane is located in the upper middle position of the lower third working surface.
[0016] Preferably, the supporting structure includes a base plate, a single hydraulic support, a top plate and a metal mesh frame, the base plate is fixedly connected to the bottom of the single hydraulic support, the top plate is fixedly connected to the top of the single hydraulic support, a positioning rod is provided on the side wall of the base plate, a positioning hole is provided on the side wall of the metal mesh frame, and the metal mesh frame is clamped to the base plate through the positioning hole and the positioning rod, a connecting frame is fixedly connected to the bottom of the top plate, a connecting hole is provided at the bottom of the connecting frame, a latch is fixedly connected to the side wall of the metal mesh frame, and the latch is located above the positioning hole, and the metal mesh frame is clamped to the top plate through the latch, the connecting frame and the connecting hole.
[0017] A tunnel support method for downward mining of a coal seam group at an extremely close distance comprises the following specific steps: firstly, a single hydraulic support controls a roof plate to move upward to the top of a latch, then a positioning rod is inserted into a positioning hole, and finally, the single hydraulic support lifts the roof plate again and supports an anchor net cable at the top of the tunnel, while the latch is stuck in the interior of a connecting frame, thereby realizing the installation of a metal mesh frame, and the metal mesh frame on the side close to the working face is not installed.
[0018] Preferably, the row spacing of the single hydraulic props is 600 mm, and each metal mesh frame is arranged corresponding to three single hydraulic props.
[0019] (III) Beneficial effects
[0020] The present invention provides a tunnel arrangement and support method for downward mining of coal seams at extremely close distances. It has the following beneficial effects:
[0021] 1. The present invention adopts this arrangement method to increase the amount of coal collected from the upper coal seam. At the same time, a coal pillar is set below the goaf of the upper coal seam in the lower coal seam to provide support for the middle rock layer. At the same time, slurry is injected into the rock layer to increase the strength of the rock layer, thereby reducing the impact of upper coal mining on lower coal mining.
[0022] 2. The support structure of the present invention can realize the problem of rapid installation and disassembly of the metal mesh frame by arranging a bottom plate, a single hydraulic support, a top plate, a positioning rod, a metal mesh frame, a positioning hole, a connecting frame, a connecting hole and a latch, thereby greatly improving the installation efficiency of the workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is the distribution map of the tunnels in the upper and lower coal seams;
[0024] Figure 2 This is a schematic diagram showing the completion of mining of the upper coal seam and the lower coal seam;
[0025] Figure 3 This is the schematic diagram of the support of the first upper machine lane;
[0026] Figure 4 for Figure 3 Schematic diagram of the structure of A;
[0027] Figure 5 A top view of the connecting frame.
[0028] Among them, 1, upper coal seam; 2, rock layer; 3, lower coal seam; 4, first return air lane of upper layer; 5, first machine lane of upper layer; 6, second machine lane of upper layer; 7, first return air lane of lower layer; 8, first machine lane of lower layer; 9, second return air lane of lower layer; 10, second machine lane of lower layer; 11, third return air lane of lower layer; 12, third machine lane of lower layer; 13, first working face of upper layer; 14, second working face of upper layer; 15, first working face of lower layer; 16, second working face of lower layer face; 17, the third working face of the lower layer; 18, the first goaf of the upper layer; 19, the second goaf of the upper layer; 20, the first goaf of the lower layer; 21, the second goaf of the lower layer; 22, the third goaf of the lower layer; 23, the first coal pillar of the lower layer; 24, the second coal pillar of the lower layer; 25, the bottom plate; 26, the single hydraulic support; 27, the top plate; 28, the positioning rod; 29, the metal mesh frame; 30, the positioning hole; 31, the connecting frame; 32, the connecting hole; 33, the latch. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] Example:
[0031] like Figure 1-5 As shown, an embodiment of the present invention provides a tunnel arrangement method for downward mining of a coal seam group at a very close distance, wherein the coal seam group at a very close distance includes an upper coal seam 1, a rock layer 2, and a lower coal seam 3, wherein the thickness of the upper coal seam 1 is 3 m, the thickness of the rock layer 2 is 4 m, and the thickness of the lower coal seam 3 is 3.1 m;
[0032] The specific steps include:
[0033] S1. First, excavate the upper first return air lane 4 and the upper first machine lane 5 inside the upper coal seam 1, and then use anchor nets to support the tops of the upper first return air lane 4 and the upper first machine lane 5 to prevent the tops of the first return air lane 4 and the upper first machine lane 5 from collapsing. Then, install the support structure inside the upper first return air lane 4 and the upper first machine lane 5. The support structure mainly supports the anchor nets at the tops of the upper first return air lane 4 and the upper first machine lane 5, and can also protect the side walls. Similarly, the anchor nets mainly support the tops of the upper second machine lane 6, the lower first return air lane 7, the lower first machine lane 8, the lower second return air lane 9, the lower second machine lane 10, the lower third return air lane 11, and the lower third machine lane 12 to prevent collapse.
[0034] S2, mining the coal on the upper first working face 13, forming the upper first goaf 18 after the mining of the upper first working face 13 is completed, then continuing to dig the upper second machine tunnel 6 on the right side of the upper first machine tunnel 5, and using anchor nets to support the top of the upper second machine tunnel 6, installing the support structure inside the upper second machine tunnel 6, and finally mining the coal on the upper second working face 14, forming the upper second goaf 19 after the mining is completed;
[0035] S3, installing grouting pipes at the bottom of the upper first return air lane 4, the upper first machine lane 5, the upper second machine lane 6, the upper first goaf 18 and the upper second goaf 19, and injecting slurry into the rock layer 2 to improve the strength of the rock layer 2, injecting concrete slurry from the top of the rock layer 2 to fix the top of the rock layer, injecting concrete slurry into the rock layer 2 from the lower first return air lane 7, the lower first machine lane 8, the lower second return air lane 9, the lower second machine lane 10, the lower third return air lane 11 and the lower third machine lane 12 to fix the rock layer 2 from the bottom, thereby improving the strength of the rock layer 2;
[0036] S4, excavating the lower first return air lane 7 and the lower first machine lane 8 inside the lower coal seam 3, and using anchor nets to support the tops of the lower first return air lane 7 and the lower first machine lane 8, then installing the support structure inside the lower first return air lane 7 and the lower first machine lane 8, installing grouting pipes on the tops of the lower first return air lane 7 and the lower first machine lane 8, and injecting slurry into the rock layer 2, and finally mining the coal at the lower first working face 15, which becomes the lower first goaf 20 after mining is completed;
[0037] S5, using the method in S4 to carry out excavation and support of the lower second return air lane 9, the lower second machine lane 10 and coal mining of the lower second working face 16, and after the mining of the lower second working face 16 is completed, it becomes the lower second goaf 21;
[0038] S6, using the method in S4 again to excavate and support the lower third return air lane 11, the lower third machine lane 12, and to mine coal on the lower third working face 17, and after the mining is completed, a lower third goaf 22 is formed;
[0039] S7. The first coal pillar 23 of the lower layer is retained between the first machine tunnel 8 and the second return air tunnel 9 of the lower layer, and the second coal pillar 24 of the lower layer is retained between the second machine tunnel 10 and the third return air tunnel 11 of the lower layer. The first coal pillar 23 and the second coal pillar 24 are retained mainly to support the rock layer 2 to prevent the lower coal seam 3 from collapsing during the mining process, while no coal pillars are retained in the upper coal seam 1, which can increase the coal mining volume.
[0040] The upper first return air lane 4 is located at the middle position above the lower first working face 15, the lower first coal pillar 23 is located at the middle position below the upper first working face 13, the upper first machine lane 5 is located at the middle position above the lower second working face 16, the lower second coal pillar 24 is located at the middle position below the upper second working face 14, and the upper second machine lane 6 is located at the middle position above the lower third working face 17;
[0041] The supporting structure includes a bottom plate 25, a single hydraulic support 26, a top plate 27 and a metal mesh frame 29. The bottom plate 25 is fixedly connected to the bottom of the single hydraulic support 26, the top plate 27 is fixedly connected to the top of the single hydraulic support 26, a positioning rod 28 is provided on the side wall of the bottom plate 25, a positioning hole 30 is provided on the side wall of the metal mesh frame 29, and the metal mesh frame 29 is clamped to the bottom plate 25 through the positioning hole 30 and the positioning rod 28, a connecting frame 31 is fixedly connected to the bottom of the top plate 27, a connecting hole 32 is provided at the bottom of the connecting frame 31, a pin 33 is fixedly connected to the side wall of the metal mesh frame 29, and the pin 33 is located above the positioning hole 30, and the metal mesh frame 29 is clamped to the top plate 27 through the pin 33, the connecting frame 31 and the connecting hole 32.
[0042] A tunnel support method for downward mining of a coal seam group at a very close distance includes the following specific steps: first, a single hydraulic support 26 controls a roof plate 27 to move up to above a latch 33, and then a positioning rod 28 is inserted into a positioning hole 30; finally, the single hydraulic support 26 lifts up the roof plate 27 again and supports the anchor net cable at the top of the tunnel, while the latch 33 is stuck in the inside of a connecting frame 31, thereby realizing the installation of a metal mesh frame 29, and the metal mesh frame 29 on the side close to the working face is not installed.
[0043] The row spacing of the single hydraulic props 26 is 600 mm, and each metal mesh frame 29 is provided corresponding to three single hydraulic props 26 .
[0044] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for arranging tunnels for downward mining of a group of coal seams at very close distances, wherein the group of coal seams at very close distances comprises an upper coal seam (1), a rock layer (2) and a lower coal seam (3), characterized in that: The specific steps include: S1. First, excavate the upper first return air lane (4) and the upper first machine lane (5) inside the upper coal seam (1), then use anchor nets to support the tops of the upper first return air lane (4) and the upper first machine lane (5), and then install the support structure inside the upper first return air lane (4) and the upper first machine lane (5); S2, mining coal from the upper first working face (13), forming an upper first goaf (18) after mining the upper first working face (13), then continuing to excavate the upper second machine tunnel (6) on the right side of the upper first machine tunnel (5), and using anchor nets to support the top of the upper second machine tunnel (6), installing the support structure inside the upper second machine tunnel (6), and finally mining coal from the upper second working face (14), forming an upper second goaf (19) after mining; S3, installing grouting pipes at the bottom of the upper first return air lane (4), the upper first machine lane (5), the upper second machine lane (6), the upper first goaf (18) and the upper second goaf (19), and injecting slurry into the rock layer (2) to improve the strength of the rock layer (2); S4, excavating the first lower return air lane (7) and the first lower machine lane (8) inside the lower coal seam (3), and using anchor nets to support the tops of the first lower return air lane (7) and the first lower machine lane (8), then installing the support structure inside the first lower return air lane (7) and the first lower machine lane (8), installing grouting pipes on the tops of the first lower return air lane (7) and the first lower machine lane (8), and injecting slurry into the rock layer (2), and finally mining the coal at the first lower working face (15), which becomes the first lower goaf (20) after mining is completed; S5, using the method in S4 to excavate and support the lower second return air lane (9), the lower second machine lane (10), and mine coal at the lower second working face (16), and after the mining of the lower second working face (16) is completed, it becomes the lower second goaf (21); S6, again using the method in S4 to excavate and support the lower third return air lane (11), the lower third machine lane (12), and to mine coal on the lower third working face (17), and after the mining is completed, a lower third goaf (22) is formed; S7. The first coal pillar (23) of the lower layer is retained between the first machine tunnel (8) of the lower layer and the second return air tunnel (9) of the lower layer, and the second coal pillar (24) of the lower layer is retained between the second machine tunnel (10) of the lower layer and the third return air tunnel (11) of the lower layer.
2. The method for arranging tunnels for descending mining of extremely close-spaced coal seams according to claim 1 is characterized by: The upper first return air lane (4) is located at a middle position above the lower first working surface (15), the lower first coal pillar (23) is located at a middle position below the upper first working surface (13), the upper first machine lane (5) is located at a middle position above the lower second working surface (16), the lower second coal pillar (24) is located at a middle position below the upper second working surface (14), and the upper second machine lane (6) is located at a middle position above the lower third working surface (17).
3. The method for arranging tunnels for descending mining of extremely close-spaced coal seams according to claim 1 is characterized in that: The support structure comprises a bottom plate (25), a single hydraulic support (26), a top plate (27) and a metal mesh frame (29); the bottom plate (25) is fixedly connected to the bottom of the single hydraulic support (26); the top plate (27) is fixedly connected to the top of the single hydraulic support (26); a positioning rod (28) is arranged on the side wall of the bottom plate (25); a positioning hole (30) is arranged on the side wall of the metal mesh frame (29); and the metal mesh frame (29) is fixedly connected to the bottom of the single hydraulic support (26); and a positioning rod (28) is arranged on the side wall of the metal mesh frame (29); and the positioning hole (30) is provided on the side wall of the metal mesh frame (29). (30), the positioning rod (28) is clamped with the bottom plate (25), the bottom of the top plate (27) is fixedly connected with a connecting frame (31), the bottom of the connecting frame (31) is provided with a connecting hole (32), the side wall of the metal mesh frame (29) is fixedly connected with a latch (33), and the latch (33) is located above the positioning hole (30), and the metal mesh frame (29) is clamped with the top plate (27) through the latch (33), the connecting frame (31), and the connecting hole (32).
4. A tunnel support method for downward mining of a group of coal seams at very close distances, based on a tunnel arrangement method for downward mining of a group of coal seams at very close distances as claimed in any one of claims 1 to 3, characterized in that: The method comprises the following specific steps: firstly, a single hydraulic support (26) controls the top plate (27) to move upward to the top of the latch (33), then a positioning rod (28) is inserted into the inside of the positioning hole (30), and finally, the single hydraulic support (26) lifts up the top plate (27) again and supports the anchor net cable at the top of the tunnel, while the latch (33) is stuck in the inside of the connecting frame (31), thereby realizing the installation of the metal mesh frame (29), and the metal mesh frame (29) close to the working surface is not installed.
5. The tunnel support method for downward mining of extremely close-distance coal seam groups according to claim 4 is characterized by: The row spacing of the single hydraulic props (26) is 600 mm, and each metal mesh frame (29) is arranged corresponding to three single hydraulic props (26).
Citation Information
Cited By
Lower coal seam roadway surrounding rock pre-reinforcement method for ultra-close coal seam mining
CN121473831A
A method for pre-reinforcing surrounding rock of lower coal seam roadway in ultra-short distance coal seam mining
CN121473831B