Earth surface deformation monitoring method, device, system, equipment, medium and product

By automatically dividing the monitoring area and deploying total stations and spherical prisms through a central control server and remote deployment equipment, the high cost and accuracy dependence of manual operation in existing technologies have been solved, and efficient and accurate results have been achieved for monitoring surface deformation in uninhabited areas.

CN118913128APending Publication Date: 2024-11-08THREE GORGES GROUP IND DEVELOPMENT (BEIJING) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411117604.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Existing methods for monitoring surface deformation rely on manual operation, resulting in high labor costs and the accuracy of monitoring results depends on the experience of the surveyors, which is subject to human factors.

Method used

The system employs a central control server combined with remote delivery equipment, total station, and spherical prism. It automatically divides the monitoring area and remotely deploys instruments using multi-source remote sensing data. The total station's wireless communication capability is used to send monitoring data to the central control server to generate results.

Benefits of technology

It enables surface deformation monitoring in uninhabited areas, reduces labor costs, improves the accuracy and efficiency of monitoring results, and reduces the impact of human factors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118913128A_ABST
    Figure CN118913128A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides an earth surface deformation monitoring method, device, system and equipment, a medium and a product, relates to a computer technology, and aims to solve the problem that the prior art depends on manual measurement and is greatly influenced by human factors. According to the technical scheme, the method comprises the steps that a central control server divides a to-be-monitored area according to geographic information data and multi-source remote sensing data, and obtains a first to-be-monitored sub-area used for setting a datum point and a second to-be-monitored sub-area used for setting a monitoring point; the central control server controls the first remote delivery device to deliver the total station to a first to-be-monitored sub-area and controls the second remote delivery device to deliver the spherical prism to a second to-be-monitored sub-area, the total station and the spherical prism are matched for measurement, and the total station sends measurement data to the central control server after obtaining the measurement data; and the central control server generates an earth surface deformation monitoring result according to the measurement data. The method can be applied to earth surface deformation monitoring scenes of unmanned areas.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of communication technology, and in particular to a method, device, system, equipment, medium and product for monitoring surface deformation. Background Art

[0002] The surface deformation monitoring method provided by the prior art mainly includes: the surveying personnel conduct on-site observation of the inspection area, and determine the reference points of the monitoring points and the observation points based on the measurement experience; the prism is arranged at the monitoring point, and the total station is arranged at the reference point of the observation point; the surveying personnel manually operate the total station to obtain the monitoring data of each monitoring point; the surveying personnel copy the monitoring data from the total station, and analyze and process the monitoring data on the computer to obtain the deformation data of each monitoring point, and obtain the surface deformation monitoring results based on the deformation data of each monitoring point and the time axis information.

[0003] However, the methods provided by the prior art rely on manual labor to complete the entire surface deformation monitoring process, including: determining the benchmark points of the monitoring points and observation points, operating the total station, and analyzing and processing the monitoring data, etc., which has a high labor cost; and the accuracy of the surface deformation results depends on the measurement experience of the surveyors, such as: manually judging the positions of the benchmark points and observation points, etc. The human factor has a greater impact and may lead to inaccurate surface deformation monitoring results. Summary of the invention

[0004] The present invention provides a surface deformation monitoring method, device, system, equipment, medium and product to overcome the above problems or at least partially solve the above problems.

[0005] In a first aspect, the present invention provides a surface deformation monitoring system, comprising: a central control server, a first remote delivery device, a second remote delivery device, a total station and a spherical prism; wherein:

[0006] The central control server is used to obtain geographic information data of the area to be monitored, the geographic information data includes multi-source remote sensing data, and the area to be monitored is divided into a plurality of sub-areas to be monitored according to the geographic information data; the sub-areas to be monitored are divided into a first area set and a second area set according to the multi-source remote sensing data; at least one first sub-area to be monitored is selected from the first area set, and at least one second sub-area to be monitored corresponding to the first sub-area to be monitored is selected from the second area set; a first delivery instruction is sent to the first remote delivery device, the first delivery instruction carries the geographic information data of the first sub-area to be monitored, and a second delivery instruction is sent to the second remote delivery device, the second delivery instruction carries the geographic information data of the second sub-area to be monitored; the monitoring data sent by the total station is received, and a surface deformation monitoring result is generated according to the monitoring data;

[0007] The first remote delivery device is used to deliver the total station to a reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction;

[0008] The second remote placement device is used to place the spherical prism on the monitoring point indicated by the geographic information data of the second sub-area to be monitored according to the second placement instruction;

[0009] The total station is used to cooperate with the spherical prism to complete the surface deformation monitoring of the monitoring point, obtain the monitoring data, and send the monitoring data to the central control server through a pre-set wireless communication module.

[0010] Optionally, the central control server is further used to receive real-time dynamic measurement data of the reference point, and to correct the monitoring data according to the real-time dynamic measurement data.

[0011] Optionally, the total station is also used to send the real-time dynamic measurement data to the central control server.

[0012] Optionally, the surface deformation monitoring system further includes:

[0013] A real-time dynamic measurement device, used to send the real-time dynamic measurement data to the central control server;

[0014] The central control server is further configured to send a third delivery instruction to the first remote delivery device, wherein the third delivery instruction carries geographic information data of the first sub-area to be monitored;

[0015] The first remote delivery device is further used to deliver the real-time dynamic measurement device into the area indicated by the geographic information data of the first sub-area to be monitored according to the third delivery instruction.

[0016] Optionally, the central control server is further used to send control instructions to the total station;

[0017] The total station is further used to operate according to the control instructions;

[0018] The control instructions include but are not limited to: turning on / off the total station, turning on / off the wireless communication module and setting a monitoring data transmission strategy.

[0019] Optionally, the total station is further used to send an alarm signal to the central control server;

[0020] The central control server is further used to generate the control instruction according to the alarm signal;

[0021] The alarm signals include, but are not limited to, fault alarm, storage space overflow alarm, low power alarm, and calibration alarm.

[0022] In a second aspect, the present invention provides a method for monitoring ground deformation, which is applied to a central control server, and the method comprises:

[0023] Acquire geographic information data of the area to be monitored, and divide the area to be monitored into a plurality of sub-areas to be monitored according to the geographic information data, wherein the geographic information data includes multi-source remote sensing data;

[0024] Dividing the sub-area to be monitored into a first area set and a second area set according to the multi-source remote sensing data;

[0025] Selecting at least one first sub-area to be monitored from the first area set, and selecting at least one second sub-area to be monitored corresponding to the first sub-area to be monitored from the second area set;

[0026] Sending a first delivery instruction to a first remote delivery device, the first delivery instruction carrying geographic information data of the first sub-area to be monitored, and sending a second delivery instruction to a second remote delivery device, the second delivery instruction carrying geographic information data of the second sub-area to be monitored, so that the first remote delivery device delivers the total station to a reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device delivers the spherical prism to a monitoring point indicated by the geographic information data of the second sub-area to be monitored according to the second delivery instruction;

[0027] The monitoring data sent by the total station is received, and a surface deformation monitoring result is generated according to the monitoring data, wherein the monitoring data is obtained by measuring the total station in cooperation with the spherical prism.

[0028] Optionally, the surface deformation monitoring method further includes:

[0029] The real-time dynamic measurement data of the reference point sent by the total station is received, and the monitoring data is corrected according to the real-time dynamic measurement data.

[0030] Optionally, the surface deformation monitoring method further includes:

[0031] Sending a third delivery instruction to the first remote delivery device, wherein the third delivery instruction carries the geographic information data of the first sub-area to be monitored, so that the first remote delivery device delivers the real-time dynamic measurement device into the area indicated by the geographic information data of the first sub-area to be monitored according to the third delivery instruction;

[0032] The real-time dynamic measurement data of the reference point sent by the real-time dynamic measurement device is received, and the monitoring data is corrected according to the real-time dynamic measurement data.

[0033] Optionally, the surface deformation monitoring method further includes:

[0034] Sending control instructions to the total station so that the total station operates according to the control instructions, wherein the control instructions include but are not limited to: turning on / off the total station, turning on / off the wireless communication module, and setting a monitoring data transmission strategy.

[0035] Optionally, before sending the control instruction to the total station, the method further includes:

[0036] An alarm signal sent by the total station is received, and the control instruction is generated according to the alarm signal, wherein the alarm signal includes but is not limited to: a fault alarm, a storage space overflow alarm, a low power alarm, and a calibration alarm.

[0037] In a third aspect, the present invention provides a surface deformation monitoring device, which is applied to a central control server, and the device comprises:

[0038] The first module is used to obtain geographic information data of the area to be monitored, and divide the area to be monitored into multiple sub-areas to be monitored according to the geographic information data, wherein the geographic information data includes multi-source remote sensing data;

[0039] A second module is used to divide the sub-area to be monitored into a first area set and a second area set according to the multi-source remote sensing data;

[0040] A third module is used to select at least one first sub-area to be monitored from the first area set, and select at least one second sub-area to be monitored corresponding to the first sub-area to be monitored from the second area set;

[0041] A fourth module is used to send a first delivery instruction to a first remote delivery device, the first delivery instruction carries geographic information data of the first sub-area to be monitored, and send a second delivery instruction to a second remote delivery device, the second delivery instruction carries geographic information data of the second sub-area to be monitored, so that the first remote delivery device delivers the total station to a reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device delivers the spherical prism to a monitoring point indicated by the geographic information data of the second sub-area to be monitored according to the second delivery instruction;

[0042] The fifth module is used to receive the monitoring data sent by the total station and generate surface deformation monitoring results according to the monitoring data, wherein the monitoring data is obtained by measuring the total station in cooperation with the spherical prism.

[0043] Optionally, the fifth module is further used to receive real-time dynamic measurement data of the reference point sent by the total station, and to correct the monitoring data according to the real-time dynamic measurement data.

[0044] Optionally, the fourth module is further configured to send a third delivery instruction to the first remote delivery device, wherein the third delivery instruction carries geographic information data of the first sub-area to be monitored, so that the first remote delivery device delivers the real-time dynamic measurement device into the area indicated by the geographic information data of the first sub-area to be monitored according to the third delivery instruction;

[0045] The fifth module is further configured to receive the real-time dynamic measurement data of the reference point sent by the real-time dynamic measurement device, and to correct the monitoring data according to the real-time dynamic measurement data.

[0046] Optionally, the fourth module is also used to send control instructions to the total station so that the total station operates according to the control instructions, wherein the control instructions include but are not limited to: turning on / off the total station, turning on / off the wireless communication module and setting a monitoring data transmission strategy.

[0047] Optionally, the fourth module is also used to receive an alarm signal sent by the total station, and generate the control instruction according to the alarm signal, wherein the alarm signal includes but is not limited to: a fault alarm, a storage space overflow alarm, a low power alarm, and a calibration alarm.

[0048] In a fourth aspect, the present invention provides a communication device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, a surface deformation monitoring method as described above is implemented.

[0049] In a fifth aspect, the present invention further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the surface deformation monitoring method as described above is implemented.

[0050] In a sixth aspect, the present invention further provides a computer program product, comprising a computer program / instruction, which, when executed by a processor, implements any of the surface deformation monitoring methods described above.

[0051] In an embodiment of the present invention, the central control server can divide the area to be monitored into multiple sub-areas to be monitored according to the geographic information data; divide the sub-areas to be monitored into a first area set and a second area set according to the multi-source remote sensing data, select at least one first sub-area to be monitored from the first area set, select at least one second sub-area to be monitored corresponding to the first sub-area to be monitored from the second area set, send a first delivery instruction to the first remote delivery device, and send a second delivery instruction to the second remote delivery device, so that the first remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction. According to the second delivery instruction, the spherical prism can be delivered to the monitoring point indicated by the geographic information data of the second sub-area to be monitored, thereby achieving the purpose of automatically deploying the total station and the spherical prism, solving the problem that the prior art requires on-site manual deployment, resulting in high labor costs and large human factors. The technical solution provided by the embodiment of the invention selects monitoring points and reference points of the area based on geographic information data, does not rely on manual experience, and the selected monitoring points and reference points are more reliable. In addition, the total station and the spherical prism are deployed through the first remote delivery device and the second remote delivery device, so that the technical solution provided by the embodiment of the invention can be applied to the surface deformation monitoring scenario in the unmanned area. In addition, the total station has wireless communication capabilities. After acquiring the monitoring data, the monitoring data can be sent to the central control server, and the central control server generates the surface deformation monitoring results based on the monitoring data, without the need for manual data analysis, which further saves labor costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.

[0053] Figure 1 A schematic diagram of a system for monitoring ground deformation provided in an embodiment of the present invention;

[0054] Figure 2 A flow chart of the steps of a method for monitoring ground deformation provided in an embodiment of the present invention;

[0055] Figure 3 A device block diagram of a ground deformation monitoring device provided in an embodiment of the present invention;

[0056] Figure 4 A schematic diagram of the structure of a communication device provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0057] To make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. However, it will be appreciated by those skilled in the art that in the embodiments of the present invention, many technical details are proposed in order to enable the reader to better understand the present application. However, even without these technical details and various changes and modifications based on the following embodiments, the technical scheme claimed in the present application can be implemented. The division of the following embodiments is for the convenience of description, and should not constitute any limitation on the specific implementation of the present invention. The various embodiments can be combined and referenced with each other without contradiction.

[0058] Reference Figure 1 , shows a system schematic diagram of a surface deformation monitoring system provided by an embodiment of the present invention. The surface deformation monitoring system may include: a central control server 101, a first remote delivery device 102, a second remote delivery device 103, a total station 104 and a spherical prism 105.

[0059] The central control server 101 is used to obtain geographic information data of the area to be monitored, the geographic information data including multi-source remote sensing data, and divide the area to be monitored into multiple sub-areas to be monitored according to the geographic information data; divide the sub-areas to be monitored into a first area set and a second area set according to the multi-source remote sensing data; select at least one first sub-area to be monitored from the first area set, and select at least one second sub-area to be monitored corresponding to the first sub-area to be monitored from the second area set; send a first delivery instruction to the first remote delivery device 102, the first delivery instruction carries the geographic information data of the first sub-area to be monitored, and send a second delivery instruction to the second remote delivery device 103, the second delivery instruction carries the geographic information data of the second sub-area to be monitored; receive the monitoring data sent by the total station 104, and generate surface deformation monitoring results according to the monitoring data.

[0060] In this embodiment, the central control server 101 can establish communication with a Geographic Information System (GIS) to obtain geographic information data from the GIS.

[0061] In this embodiment, the regional division rules can be preset, for example, the regional division rules can be divided in units of X, where X is the area of ​​the unit sub-region, and the regional division rules can be grid division, the number of grids is 32, etc. Of course, the above is only a specific example, and in actual use, the regional division rules can be set according to needs. The central control server 101 can specifically divide the monitoring area according to the regional division rules based on the geographic information data.

[0062] In this embodiment, the multi-source remote sensing data includes but is not limited to: optical data, such as: high-resolution surface images taken by satellites or aerial platforms, etc.; thermal infrared data, such as: temperature change data of the surface, etc.; microwave data, such as: topographic mapping data obtained by synthetic aperture radar (SAR), etc. The sub-area to be monitored can be accurately divided into a first area set and a second area set through multi-source remote sensing data, wherein the first area set is used to set reference points, and the second area set is used to set monitoring points, the reference points are locations where surface deformation is not easy to occur, and the monitoring points are locations where surface deformation is easy to occur.

[0063] In this embodiment, the first sub-area to be monitored is the area corresponding to the reference point. This embodiment does not limit the number of first sub-areas to be monitored. According to actual monitoring needs, the first sub-areas to be monitored can be one or more. The second sub-area to be monitored is the area corresponding to the monitoring point. When there are multiple first sub-areas to be monitored, each first sub-area to be monitored can correspond to one or more second sub-areas to be monitored, and the second sub-areas to be monitored corresponding to any two first sub-areas to be monitored can overlap.

[0064] The first remote delivery device 102 is used to deliver the total station 104 to a reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction.

[0065] In this embodiment, the reference point may be any point in the first sub-area to be monitored.

[0066] The present embodiment does not specifically limit the first remote delivery device 102. The first remote delivery device 102 may be a drone or a remote-controlled car, etc. The first remote delivery device 102 may be set according to the actual geographical conditions of the first sub-area to be monitored.

[0067] The second remote placement device 103 is used to place the spherical prism 105 on the monitoring point indicated by the geographic information data of the second sub-area to be monitored according to the second placement instruction.

[0068] In this embodiment, the reference point may be any point in the second sub-area to be monitored.

[0069] The present embodiment does not specifically limit the second remote delivery device 103 . The second remote delivery device 103 may be a drone or a remote-controlled car, etc. The second remote delivery device 103 may be set according to the actual geographical conditions of the second sub-area to be monitored.

[0070] In this embodiment, the first remote delivery device 102 and the second remote delivery device 103 may also be the same device, for example, the same drone or the same remote-controlled car.

[0071] The total station 104 is used to cooperate with the spherical prism 105 to complete the surface deformation monitoring of the monitoring point, obtain the monitoring data, and send the monitoring data to the central control server 101 through a pre-set wireless communication module.

[0072] In this embodiment, the total station 104 is modified and a wireless communication module is added, so that the total station 104 can send the measurement data to the central control server 101 through a wireless network after obtaining the measurement data, so that the central control server 101 completes the relevant calculations and obtains the surface deformation monitoring results. The effects are: the central control server 101 has a strong computing power and can quickly calculate and obtain the surface deformation monitoring results, thereby improving the surface deformation monitoring efficiency; the total station 104 has a low modification cost and is easy to use in production.

[0073] In this embodiment, the central control server 101 can also be used to send control instructions to the total station 104; the total station 104 can also be used to operate according to the control instructions; wherein the control instructions include but are not limited to: turning on / off the total station, turning on / off the wireless communication module and setting a monitoring data transmission strategy.

[0074] It can be understood by those skilled in the art that in the prior art the total station 104 must be operated manually and cannot achieve the purpose of remote operation. Through the above technical solution, the central control server 101 can achieve the purpose of remotely controlling the total station 104, thereby extending the use time and service life of the total station 104.

[0075] In this embodiment, the total station 104 can also be used to send an alarm signal to the central control server 101; the central control server 101 can also be used to generate the control instruction based on the alarm signal; wherein the alarm signal includes but is not limited to: fault alarm, storage space overflow alarm, low power alarm and calibration alarm.

[0076] In this embodiment, in the event of a fault alarm, the central control server 101 can generate a recovery instruction and send the recovery instruction to the first remote delivery device 102 or the second remote delivery device 103, and the first remote delivery device 102 or the second remote delivery device 103 will retrieve the total station 104 from the reference point for repair, and the central control server 101 will send the recovery instruction to the total station 104. If the total station 104 can receive the recovery instruction, it will turn off the power and stop working.

[0077] In the event of a storage space overflow alarm, the central control server 101 may generate a storage space clearing instruction, and the total station 104 checks whether the monitoring data has been sent according to the instruction, and clears the local storage space after the monitoring data has been sent.

[0078] In the event of a low battery alarm, the central control server 101 may generate an indication to start the energy saving mode, and the total station 104 may perform relevant operations according to a preset energy saving strategy, wherein the skill strategy may include extending the measurement data reporting cycle, etc.

[0079] In the event of a calibration alarm, the central control server 101 may generate a calibration control instruction, and the total station 104 may perform a calibration operation according to the calibration control instruction.

[0080] In an embodiment of the present invention, the central control server can divide the area to be monitored into multiple sub-areas to be monitored according to the geographic information data; divide the sub-areas to be monitored into a first area set and a second area set according to the multi-source remote sensing data, select at least one first sub-area to be monitored from the first area set, select at least one second sub-area to be monitored corresponding to the first sub-area to be monitored from the second area set, send a first delivery instruction to the first remote delivery device, and send a second delivery instruction to the second remote delivery device, so that the first remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction. According to the second delivery instruction, the spherical prism can be delivered to the monitoring point indicated by the geographic information data of the second sub-area to be monitored, thereby achieving the purpose of automatically deploying the total station and the spherical prism, solving the problem that the prior art requires on-site manual deployment, resulting in high labor costs and large human factors. The technical solution provided by the embodiment of the invention selects monitoring points and reference points of the area based on geographic information data, does not rely on manual experience, and the selected monitoring points and reference points are more reliable. In addition, the total station and the spherical prism are deployed through the first remote delivery device and the second remote delivery device, so that the technical solution provided by the embodiment of the invention can be applied to the surface deformation monitoring scenario in the unmanned area. In addition, the total station has wireless communication capabilities. After acquiring the monitoring data, the monitoring data can be sent to the central control server, and the central control server generates the surface deformation monitoring results based on the monitoring data, without the need for manual data analysis, which further saves labor costs.

[0081] An embodiment of the present invention provides a surface deformation monitoring system, the system and Figure 1 The above are basically the same as shown, except that: the central control server 101 can also be used to receive real-time dynamic measurement data of the reference point, and correct the monitoring data according to the real-time dynamic measurement data.

[0082] In this embodiment, the real-time dynamic measurement data can be obtained by:

[0083] One is that the total station 104 reports. Specifically, the total station 104 is also used to send the real-time dynamic measurement data to the central control server 101.

[0084] The other is that the real-time dynamic measurement device reports. At this time, the surface deformation monitoring system provided by this embodiment may also include: a real-time dynamic measurement device, which is used to send the real-time dynamic measurement data to the central control server 101; the central control server 101 is also used to send a third delivery instruction to the first remote delivery device 102, and the third delivery instruction carries the geographic information data of the first sub-area to be monitored; the first remote delivery device 102 is also used to deliver the real-time dynamic measurement device to the area indicated by the geographic information data of the first sub-area to be monitored according to the third delivery instruction.

[0085] This embodiment achieves Figure 1 On the basis of the beneficial effects brought by the technical solution shown, the surface deformation of the benchmark point can be further monitored, and the real-time dynamic measurement data of the benchmark point can be used to correct the monitoring data, thereby achieving the purpose of improving the accuracy of the surface deformation monitoring results.

[0086] Reference Figure 2 , shows a flow chart of the steps of a surface deformation monitoring method provided by an embodiment of the present invention, the method may include the following steps:

[0087] Step 201, obtaining geographic information data of a to-be-monitored area, and dividing the to-be-monitored area into a plurality of to-be-monitored sub-areas according to the geographic information data, wherein the geographic information data includes multi-source remote sensing data;

[0088] Step 202: Divide the sub-area to be monitored into a first area set and a second area set according to the multi-source remote sensing data;

[0089] Step 203: Select at least one first sub-region to be monitored from the first region set, and select at least one second sub-region to be monitored corresponding to the first sub-region to be monitored from the second region set;

[0090] Step 204: Send a first delivery instruction to the first remote delivery device, the first delivery instruction carries the geographic information data of the first sub-area to be monitored, and send a second delivery instruction to the second remote delivery device, the second delivery instruction carries the geographic information data of the second sub-area to be monitored, so that the first remote delivery device delivers the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device delivers the spherical prism to the monitoring point indicated by the geographic information data of the second sub-area to be monitored according to the second delivery instruction;

[0091] Step 205: receiving the monitoring data sent by the total station, and generating a surface deformation monitoring result according to the monitoring data, wherein the monitoring data is obtained by measuring the total station in cooperation with the spherical prism.

[0092] Optionally, the surface deformation monitoring method may further include: receiving real-time dynamic measurement data of the reference point sent by the total station, and correcting the monitoring data according to the real-time dynamic measurement data.

[0093] Optionally, the surface deformation monitoring method may further include:

[0094] Sending a third delivery instruction to the first remote delivery device, wherein the third delivery instruction carries the geographic information data of the first sub-area to be monitored, so that the first remote delivery device delivers the real-time dynamic measurement device into the area indicated by the geographic information data of the first sub-area to be monitored according to the third delivery instruction;

[0095] The real-time dynamic measurement data of the reference point sent by the real-time dynamic measurement device is received, and the monitoring data is corrected according to the real-time dynamic measurement data.

[0096] Optionally, the surface deformation monitoring method may further include:

[0097] Sending control instructions to the total station so that the total station operates according to the control instructions, wherein the control instructions include but are not limited to: turning on / off the total station, turning on / off the wireless communication module, and setting a monitoring data transmission strategy.

[0098] Optionally, before sending the control instruction to the total station, the method further includes:

[0099] An alarm signal sent by the total station is received, and the control instruction is generated according to the alarm signal, wherein the alarm signal includes but is not limited to: a fault alarm, a storage space overflow alarm, a low power alarm, and a calibration alarm.

[0100] For a specific implementation of the surface deformation monitoring method provided by the embodiment of the present invention, please refer to Figure 1 The surface deformation monitoring system provided in the illustrated embodiment will not be described in detail here.

[0101] In an embodiment of the present invention, the central control server can divide the area to be monitored into multiple sub-areas to be monitored according to the geographic information data; divide the sub-areas to be monitored into a first area set and a second area set according to the multi-source remote sensing data, select at least one first sub-area to be monitored from the first area set, select at least one second sub-area to be monitored corresponding to the first sub-area to be monitored from the second area set, send a first delivery instruction to the first remote delivery device, and send a second delivery instruction to the second remote delivery device, so that the first remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction. According to the second delivery instruction, the spherical prism can be delivered to the monitoring point indicated by the geographic information data of the second sub-area to be monitored, thereby achieving the purpose of automatically deploying the total station and the spherical prism, solving the problem that the prior art requires on-site manual deployment, resulting in high labor costs and large human factors. The technical solution provided by the embodiment of the invention selects monitoring points and reference points of the area based on geographic information data, does not rely on manual experience, and the selected monitoring points and reference points are more reliable. In addition, the total station and the spherical prism are deployed through the first remote delivery device and the second remote delivery device, so that the technical solution provided by the embodiment of the invention can be applied to the surface deformation monitoring scenario in the unmanned area. In addition, the total station has wireless communication capabilities. After acquiring the monitoring data, the monitoring data can be sent to the central control server, and the central control server generates the surface deformation monitoring results based on the monitoring data, without the need for manual data analysis, which further saves labor costs.

[0102] Reference Figure 3 , Figure 3 A device block diagram of a ground surface deformation monitoring device is provided, wherein the ground surface deformation monitoring device 300 comprises:

[0103] The first module 301 is used to obtain geographic information data of a to-be-monitored area, and divide the to-be-monitored area into a plurality of to-be-monitored sub-areas according to the geographic information data, wherein the geographic information data includes multi-source remote sensing data;

[0104] The second module 302 is used to divide the sub-area to be monitored into a first area set and a second area set according to the multi-source remote sensing data;

[0105] The third module 303 is used to select at least one first sub-region to be monitored from the first region set, and select at least one second sub-region to be monitored corresponding to the first sub-region to be monitored from the second region set;

[0106] The fourth module 304 is used to send a first delivery instruction to the first remote delivery device, the first delivery instruction carries the geographic information data of the first sub-area to be monitored, and send a second delivery instruction to the second remote delivery device, the second delivery instruction carries the geographic information data of the second sub-area to be monitored, so that the first remote delivery device delivers the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device delivers the spherical prism to the monitoring point indicated by the geographic information data of the second sub-area to be monitored according to the second delivery instruction;

[0107] The fifth module 305 is used to receive the monitoring data sent by the total station, and generate surface deformation monitoring results according to the monitoring data, wherein the monitoring data is obtained by measuring the total station in cooperation with the spherical prism.

[0108] Optionally, the fifth module 305 is further configured to receive real-time dynamic measurement data of the reference point sent by the total station, and to correct the monitoring data according to the real-time dynamic measurement data.

[0109] Optionally, the fourth module 304 is further configured to send a third delivery instruction to the first remote delivery device, wherein the third delivery instruction carries the geographic information data of the first sub-area to be monitored, so that the first remote delivery device delivers the real-time dynamic measurement device into the area indicated by the geographic information data of the first sub-area to be monitored according to the third delivery instruction;

[0110] The fifth module 305 is further configured to receive the real-time dynamic measurement data of the reference point sent by the real-time dynamic measurement device, and to correct the monitoring data according to the real-time dynamic measurement data.

[0111] Optionally, the fourth module 304 is also used to send control instructions to the total station so that the total station operates according to the control instructions, wherein the control instructions include but are not limited to: turning on / off the total station, turning on / off the wireless communication module and setting a monitoring data transmission strategy.

[0112] Optionally, the fourth module 304 is further used to receive an alarm signal sent by the total station, and generate the control instruction according to the alarm signal, wherein the alarm signal includes but is not limited to: a fault alarm, a storage space overflow alarm, a low power alarm, and a calibration alarm.

[0113] For a specific implementation of the surface deformation monitoring device provided by the embodiment of the present invention, please refer to Figure 1 The surface deformation monitoring system provided in the illustrated embodiment will not be described in detail here.

[0114] In an embodiment of the present invention, the central control server can divide the area to be monitored into multiple sub-areas to be monitored according to the geographic information data; divide the sub-areas to be monitored into a first area set and a second area set according to the multi-source remote sensing data, select at least one first sub-area to be monitored from the first area set, select at least one second sub-area to be monitored corresponding to the first sub-area to be monitored from the second area set, send a first delivery instruction to the first remote delivery device, and send a second delivery instruction to the second remote delivery device, so that the first remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device can deliver the total station to the reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction. According to the second delivery instruction, the spherical prism can be delivered to the monitoring point indicated by the geographic information data of the second sub-area to be monitored, thereby achieving the purpose of automatically deploying the total station and the spherical prism, solving the problem that the prior art requires on-site manual deployment, resulting in high labor costs and large human factors. The technical solution provided by the embodiment of the invention selects monitoring points and reference points of the area based on geographic information data, does not rely on manual experience, and the selected monitoring points and reference points are more reliable. In addition, the total station and the spherical prism are deployed through the first remote delivery device and the second remote delivery device, so that the technical solution provided by the embodiment of the invention can be applied to the surface deformation monitoring scenario in the unmanned area. In addition, the total station has wireless communication capabilities. After acquiring the monitoring data, the monitoring data can be sent to the central control server, and the central control server generates the surface deformation monitoring results based on the monitoring data, without the need for manual data analysis, which further saves labor costs.

[0115] The embodiment of the present invention also provides a communication device, such as Figure 4 As shown, it includes a processor 401, a communication interface 402, a memory 403 and a communication bus 404, wherein the processor 401, the communication interface 402, and the memory 403 communicate with each other through the communication bus 404.

[0116] Memory 403, used for storing computer programs;

[0117] The processor 401, when used to execute the program stored in the memory 403, can implement the following steps:

[0118] Acquire geographic information data of the area to be monitored, and divide the area to be monitored into a plurality of sub-areas to be monitored according to the geographic information data, wherein the geographic information data includes multi-source remote sensing data;

[0119] Dividing the sub-area to be monitored into a first area set and a second area set according to the multi-source remote sensing data;

[0120] Selecting at least one first sub-area to be monitored from the first area set, and selecting at least one second sub-area to be monitored corresponding to the first sub-area to be monitored from the second area set;

[0121] Sending a first delivery instruction to a first remote delivery device, the first delivery instruction carrying geographic information data of the first sub-area to be monitored, and sending a second delivery instruction to a second remote delivery device, the second delivery instruction carrying geographic information data of the second sub-area to be monitored, so that the first remote delivery device delivers the total station to a reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device delivers the spherical prism to a monitoring point indicated by the geographic information data of the second sub-area to be monitored according to the second delivery instruction;

[0122] The monitoring data sent by the total station is received, and a surface deformation monitoring result is generated according to the monitoring data, wherein the monitoring data is obtained by measuring the total station in cooperation with the spherical prism.

[0123] Among them, the memory and the processor are connected in a bus manner, and the bus may include any number of interconnected buses and bridges, and the bus connects various circuits of one or more processors and memories together. The bus can also connect various other circuits such as peripheral devices, voltage regulators, and power management circuits together, which are all well known in the art, so this article will not further describe them. The bus interface provides an interface between the bus and the transceiver. The transceiver can be one element or multiple elements, such as multiple receivers and transmitters, providing a unit for communicating with various other devices on a transmission medium. The data processed by the processor can be transmitted on a wired medium or on a wireless medium through an antenna. Further, the antenna also receives data and transmits the data to the processor. The processor is responsible for managing the bus and general processing, and can also provide various functions, including timing, peripheral interfaces, voltage regulation, power management, and other control functions. The memory can be used to store data used by the processor when performing operations.

[0124] The communication bus mentioned in the above terminal can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus. The communication bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, only one thick line is used in the figure, but it does not mean that there is only one bus or one type of bus.

[0125] The communication interface is used for communication between the above terminal and other devices.

[0126] The memory may include a random access memory (RAM) or a non-volatile memory, such as at least one disk memory. Optionally, the memory may also be at least one storage device located away from the aforementioned processor.

[0127] The above-mentioned processor can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.

[0128] In another embodiment provided by the present invention, a computer-readable storage medium is also provided, in which instructions are stored. When the computer-readable storage medium is run on a computer, the computer executes the surface deformation monitoring method described in any of the above embodiments.

[0129] In another embodiment provided by the present invention, a computer program product including instructions is also provided, which, when executed on a computer, enables the computer to execute the surface deformation monitoring method described in any one of the above embodiments.

[0130] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented by software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from a website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrated. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state hard disk Solid State Disk (SSD)), etc.

[0131] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including one..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0132] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0133] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.

Claims

1. A surface deformation monitoring system, characterized in that: include: Central control server, first remote delivery device, second remote delivery device, total station and spherical prism; wherein, The central control server is used to obtain geographic information data of the area to be monitored, the geographic information data includes multi-source remote sensing data, and the area to be monitored is divided into a plurality of sub-areas to be monitored according to the geographic information data; the sub-areas to be monitored are divided into a first area set and a second area set according to the multi-source remote sensing data; at least one first sub-area to be monitored is selected from the first area set, and at least one second sub-area to be monitored corresponding to the first sub-area to be monitored is selected from the second area set; a first delivery instruction is sent to the first remote delivery device, the first delivery instruction carries the geographic information data of the first sub-area to be monitored, and a second delivery instruction is sent to the second remote delivery device, the second delivery instruction carries the geographic information data of the second sub-area to be monitored; the monitoring data sent by the total station is received, and a surface deformation monitoring result is generated according to the monitoring data; The first remote delivery device is used to deliver the total station to a reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction; The second remote placement device is used to place the spherical prism on the monitoring point indicated by the geographic information data of the second sub-area to be monitored according to the second placement instruction; The total station is used to cooperate with the spherical prism to complete the surface deformation monitoring of the monitoring point, obtain the monitoring data, and send the monitoring data to the central control server through a pre-set wireless communication module.

2. The system according to claim 1, characterized in that The central control server is also used to receive real-time dynamic measurement data of the reference point, and to correct the monitoring data according to the real-time dynamic measurement data.

3. The system according to claim 2, characterized in that The total station is also used to send the real-time dynamic measurement data to the central control server.

4. The system according to claim 2, characterized in that Also includes: A real-time dynamic measurement device, used to send the real-time dynamic measurement data to the central control server; The central control server is further configured to send a third delivery instruction to the first remote delivery device, wherein the third delivery instruction carries geographic information data of the first sub-area to be monitored; The first remote delivery device is further used to deliver the real-time dynamic measurement device into the area indicated by the geographic information data of the first sub-area to be monitored according to the third delivery instruction.

5. The system according to claim 1, characterized in that The central control server is also used to send control instructions to the total station; The total station is further used to operate according to the control instructions; The control instructions include but are not limited to: turning on / off the total station, turning on / off the wireless communication module and setting a monitoring data transmission strategy.

6. The system according to claim 5, characterized in that The total station is also used to send an alarm signal to the central control server; The central control server is further used to generate the control instruction according to the alarm signal; The alarm signals include, but are not limited to, fault alarm, storage space overflow alarm, low power alarm, and calibration alarm.

7. A method for monitoring ground deformation, characterized in that: Applied to the central control server, the method includes: Acquire geographic information data of the area to be monitored, and divide the area to be monitored into a plurality of sub-areas to be monitored according to the geographic information data, wherein the geographic information data includes multi-source remote sensing data; Dividing the sub-area to be monitored into a first area set and a second area set according to the multi-source remote sensing data; Selecting at least one first sub-area to be monitored from the first area set, and selecting at least one second sub-area to be monitored corresponding to the first sub-area to be monitored from the second area set; Sending a first delivery instruction to a first remote delivery device, the first delivery instruction carrying geographic information data of the first sub-area to be monitored, and sending a second delivery instruction to a second remote delivery device, the second delivery instruction carrying geographic information data of the second sub-area to be monitored, so that the first remote delivery device delivers the total station to a reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device delivers the spherical prism to a monitoring point indicated by the geographic information data of the second sub-area to be monitored according to the second delivery instruction; The monitoring data sent by the total station is received, and a surface deformation monitoring result is generated according to the monitoring data, wherein the monitoring data is obtained by measuring the total station in cooperation with the spherical prism.

8. The method according to claim 7, characterized in that The method further comprises: The real-time dynamic measurement data of the reference point sent by the total station is received, and the monitoring data is corrected according to the real-time dynamic measurement data.

9. The method according to claim 7, characterized in that: The method further comprises: Sending a third delivery instruction to the first remote delivery device, wherein the third delivery instruction carries the geographic information data of the first sub-area to be monitored, so that the first remote delivery device delivers the real-time dynamic measurement device into the area indicated by the geographic information data of the first sub-area to be monitored according to the third delivery instruction; The real-time dynamic measurement data of the reference point sent by the real-time dynamic measurement device is received, and the monitoring data is corrected according to the real-time dynamic measurement data.

10. The method according to claim 7, characterized in that The method further comprises: Sending control instructions to the total station so that the total station operates according to the control instructions, wherein the control instructions include but are not limited to: turning on / off the total station, turning on / off the wireless communication module, and setting a monitoring data transmission strategy.

11. The method according to claim 10, characterized in that Before sending the control instruction to the total station, the method further comprises: An alarm signal sent by the total station is received, and the control instruction is generated according to the alarm signal, wherein the alarm signal includes but is not limited to: a fault alarm, a storage space overflow alarm, a low power alarm, and a calibration alarm.

12. A surface deformation monitoring device, characterized in that: Applied to a central control server, the device comprises: The first module is used to obtain geographic information data of the area to be monitored, and divide the area to be monitored into multiple sub-areas to be monitored according to the geographic information data, wherein the geographic information data includes multi-source remote sensing data; A second module is used to divide the sub-area to be monitored into a first area set and a second area set according to the multi-source remote sensing data; A third module is used to select at least one first sub-area to be monitored from the first area set, and select at least one second sub-area to be monitored corresponding to the first sub-area to be monitored from the second area set; A fourth module is used to send a first delivery instruction to a first remote delivery device, the first delivery instruction carries geographic information data of the first sub-area to be monitored, and send a second delivery instruction to a second remote delivery device, the second delivery instruction carries geographic information data of the second sub-area to be monitored, so that the first remote delivery device delivers the total station to a reference point indicated by the geographic information data of the first sub-area to be monitored according to the first delivery instruction, and the second remote delivery device delivers the spherical prism to a monitoring point indicated by the geographic information data of the second sub-area to be monitored according to the second delivery instruction; The fifth module is used to receive the monitoring data sent by the total station and generate surface deformation monitoring results according to the monitoring data, wherein the monitoring data is obtained by measuring the total station in cooperation with the spherical prism.

13. A communication device, characterized in that: include: A transceiver, a memory, a processor, and a program stored on the memory and executable on the processor; The processor is used to read the program in the memory to implement the surface deformation monitoring method as described in any one of claims 7-11.

14. A computer-readable storage medium for storing a program, characterized in that: When the program is executed by a processor, the surface deformation monitoring method as described in any one of claims 7 to 11 is implemented.

15. A computer program product comprising a computer program / instructions, characterized in that When the computer program / instructions are executed by a processor, a method for monitoring surface deformation as described in any one of claims 7 to 11 is implemented.