Optimal train connection decoupling curve planning method and system for virtual coupling train
Through the optimal decoupling curve planning method for virtual coupled trains, the problem of rapid decoupling of virtual coupled trains entering the station and multi-channel line intersection scenarios is solved, and the long coupling process of trains before entering the station is realized, which improves line capacity and decoupling efficiency.
Patent Information
- Application Number
- CN202410924915.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-08
AI Technical Summary
The prior art has failed to effectively solve the problem of rapid decoupling of virtual coupled trains entering the station and train decoupling in the scenarios of multi-channel line intersection, and does not consider mutual coordination between behaviors.
A virtual coupled train optimal decoupling curve planning method is proposed. By obtaining train, line and throat area data, it is necessary to determine whether front and rear vehicles can be safely decoupled. If possible, the operating curve is optimized. If not, the rear vehicles are required to park and Optimize the running curve of the front and rear vehicle behind the throat area, combine the objective function, state iteration equation and constraints, and optimize the speed and strength to achieve safety and energy saving decoupling.
This realizes the coupling process that maintains the longest possible time before entering the station, improves the line capacity, and guides the train group to complete the decoupling process of entry efficiently and safely.
Smart Images

Figure CN118917049A_ABST
