Optimal train connection decoupling curve planning method and system for virtual coupling train

Through the optimal decoupling curve planning method for virtual coupled trains, the problem of rapid decoupling of virtual coupled trains entering the station and multi-channel line intersection scenarios is solved, and the long coupling process of trains before entering the station is realized, which improves line capacity and decoupling efficiency.

CN118917049APending Publication Date: 2024-11-08SOUTHWEST JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410924915.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The prior art has failed to effectively solve the problem of rapid decoupling of virtual coupled trains entering the station and train decoupling in the scenarios of multi-channel line intersection, and does not consider mutual coordination between behaviors.

Method used

A virtual coupled train optimal decoupling curve planning method is proposed. By obtaining train, line and throat area data, it is necessary to determine whether front and rear vehicles can be safely decoupled. If possible, the operating curve is optimized. If not, the rear vehicles are required to park and Optimize the running curve of the front and rear vehicle behind the throat area, combine the objective function, state iteration equation and constraints, and optimize the speed and strength to achieve safety and energy saving decoupling.

Benefits of technology

This realizes the coupling process that maintains the longest possible time before entering the station, improves the line capacity, and guides the train group to complete the decoupling process of entry efficiently and safely.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917049A_ABST
    Figure CN118917049A_ABST
Patent Text Reader

Abstract

The invention discloses an optimal train receiving decoupling curve planning method and system for a virtual coupling train, relates to the technical field of rail transit, and solves the technical problem that rapid decoupling of the virtual coupling train entering a station is not considered in the prior art. The method comprises the steps that S1, train data, line data and throat area data at the current moment are acquired, and initial optimization conditions are set; s2, judging whether the front vehicle and the rear vehicle can be safely decoupled or not, and if the front vehicle and the rear vehicle can be safely decoupled, directly optimizing the running curves of the front vehicle and the rear vehicle and outputting an optimization result; if safe decoupling cannot be carried out, the rear vehicle is required to be stopped, the running curve of the rear vehicle is optimized after the front vehicle and the throat area are opened, and an optimization result is output; according to the method, rapid and energy-saving are taken as optimization objectives, factors such as characteristics of the trains, line characteristics, turnout opening processes and safety are comprehensively considered, arriving of the trains at respective target stations is taken as terminal constraints, collaborative optimization is carried out on speed curves of the front train and the rear train, and a train group is guided to efficiently and safely complete a decoupling pull-in process.
Need to check novelty before this filing date? Find Prior Art