Data center machine room refrigeration equipment operation optimization method and related device

Through numerical simulation and CFD technology, the air conditioning system of the data center computer room is optimized, and the problems of low power use efficiency and heat dissipation in the data center computer room are solved, achieving more efficient energy consumption management and greening goals.

CN118917249AInactive Publication Date: 2024-11-08STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO

Patent Information

Application Number
CN202411130049.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The prior art lacks methods to effectively reduce the PUE value of data center computer rooms, resulting in low power usage efficiency, increased carbon emissions, and heat dissipation in the computer rooms affects server performance.

Method used

Using numerical simulation method to create a data center computer room model, divide grids, set boundary conditions and calculation parameters, analyze the temperature, humidity, cleanliness and air flow rate of different working conditions through CFD technology, determine the optimal air conditioning configuration and redundancy scheme, and optimize the air conditioning The system is running.

Benefits of technology

实现了对机房空调系统的最优配置,降低了能耗和热量散发,提高了服务器性能,并有效降低了PUE值,促进了绿色数据中心的建设。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917249A_ABST
    Figure CN118917249A_ABST
Patent Text Reader

Abstract

The invention belongs to an operation optimization method, and provides a data center machine room refrigeration equipment operation optimization method and a related device for solving the problem of lack of a method for effectively reducing a PUE value at present. A model of specific conditions in a machine room is constructed through software, and then calculation results of different working conditions are solved by dividing grids, setting inter-edge conditions and setting a solver to be substituted into related software. The CFD technology is applied to research of machine room refrigeration equipment, data such as machine room temperature and humidity, cleanliness, air velocity and cabinet heating density are subjected to modeling experiments, and optimal configuration of a machine room air conditioning system is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to an operation optimization method, and specifically to an operation optimization method and related devices for refrigeration equipment in a data center computer room. Background Art

[0002] With the development of electronic equipment, the number of high-heat-density servers in computer rooms has gradually increased, and the heat dissipation has also increased at an alarming rate. Servers and other equipment in computer rooms of various data centers contain a large number of microprocessors, which have high power consumption and heat release. This not only puts a burden on the air-conditioning equipment infrastructure, but also the heat dissipation in the rack has a great impact on server performance. According to research, carbon emissions related to IT / telecommunications have become one of the largest sources of greenhouse gas emissions, and the emission momentum in this field is still rising rapidly with the growth of global demand for computing, data storage and communication technology. Therefore, more and more people are beginning to pay attention to the construction of green computer rooms.

[0003] At present, the PUE (Power Usage Effectiveness) value has become a relatively common indicator for measuring the power efficiency of data centers. The closer the PUE value is to 1, the higher the degree of greenness, but there is currently a lack of effective means to reduce the PUE value. Summary of the invention

[0004] In view of the current lack of effective methods for reducing PUE values, the present application provides a method and related devices for optimizing the operation of refrigeration equipment in a data center computer room.

[0005] In order to achieve the above objectives, this application adopts the following technical solutions:

[0006] In a first aspect, the present application provides a method for optimizing the operation of refrigeration equipment in a data center computer room, comprising:

[0007] Create a data center computer room model based on the computer room data of the data center computer room;

[0008] Dividing the data center computer room model into grids, setting boundary conditions and calculation parameters, and performing simulation calculations;

[0009] Based on the simulation results, the number of air conditioners that need to be run is determined according to the total power consumption of the data center room and the cooling capacity of a single air conditioner, and multiple redundancy schemes are set;

[0010] Analyze the temperature parameters of each redundant scheme and determine the redundant scheme that will be finally adopted.

[0011] Furthermore, the computer room data of the present application includes: the number of cabinets, the layout of the cabinets, the height of the data center computer room, the height of the raised floor, the height of the suspended ceiling from the ceiling, and the air supply and return method of the computer room.

[0012] Furthermore, the present application sets boundary conditions and calculation parameters, including:

[0013] The air supply outlet of the data center room is set as the velocity boundary condition, the return air outlet is set as the free pressure outlet, the cabinet heat flux density is determined according to the mechanism power, and the ambient temperature and heat transfer coefficient are set according to the environmental conditions of the data center room.

[0014] Furthermore, the present application analyzes the temperature parameters of each redundancy scheme and determines the final redundancy scheme to be adopted, including:

[0015] Analyze the cabinet temperature of each redundancy solution, and determine the first optimal redundancy solution based on the cooling effect of the four walls and whether there is a local high-temperature area;

[0016] The air volume of each row of cabinets, the temperature cloud map and the velocity cloud map of the cross sections at different distances above the floor in the first optimal redundancy scheme are analyzed respectively, the first optimal redundancy scheme is confirmed, and the final redundant scheme is obtained.

[0017] Furthermore, after the final redundant solution is determined in the present application, it also includes: analyzing the cold air distribution in the computer room, determining the overall placement position of the cabinet and the optimal design of the perforated floor near the side of the air-conditioning room.

[0018] Furthermore, the optimal design scheme of the perforated floor near the air-conditioning room side of the present application includes: adding an intake fan to the perforated floor near the air-conditioning room side to close the cold channel.

[0019] Furthermore, the redundancy solution finally adopted by the present application also includes: adding an intake fan at the floor ventilation area close to the air-conditioning side; and shortening the air flow distance under the floor and laying a cold air channel.

[0020] In a second aspect, the present application provides a data center computer room refrigeration equipment operation optimization system, comprising:

[0021] A creation module is used to create a data center computer room model according to the computer room data of the data center computer room;

[0022] A calculation module, used to divide the data center computer room model into grids, set boundary conditions and calculation parameters, and then perform simulation calculations;

[0023] The redundancy scheme module is used to determine the number of air conditioners that need to be operated and set multiple redundancy schemes based on the simulation calculation results, the total power consumption of the data center room and the cooling capacity of a single air conditioner;

[0024] The optimization module is used to analyze the temperature parameters of each redundant solution and determine the redundant solution to be finally adopted.

[0025] In a third aspect, the present application provides an electronic device, including:

[0026] Memory for storing computer programs;

[0027] The processor is used to implement the steps of the above-mentioned data center computer room refrigeration equipment operation optimization method when executing the computer program.

[0028] In a fourth aspect, the present application provides a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned method for optimizing the operation of refrigeration equipment in a computer room of a data center are implemented.

[0029] Compared with the prior art, this application has the following beneficial effects:

[0030] This application proposes a method for optimizing the operation of refrigeration equipment in a data center computer room. The method uses numerical simulation to simulate the power consumption and energy consumption of different working conditions. According to the actual measurement on site, the model size data is collected, and the specific conditions in the computer room are modeled through software. Then, the grid is divided, the edge conditions are set, and the solver is set to substitute into the relevant software to solve the calculation results of different working conditions. By applying CFD technology to the research of computer room refrigeration equipment, the data such as computer room temperature and humidity, cleanliness, air flow rate and cabinet heat density are modeled and experimented to achieve the optimal configuration of the computer room air conditioning system.

[0031] The present application also proposes a data center computer room refrigeration equipment operation optimization system, electronic equipment and computer storage medium, which have all the advantages of the above-mentioned data center computer room refrigeration equipment operation optimization method. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0033] Figure 1 This is a flow chart of an embodiment of a method for optimizing the operation of refrigeration equipment in a computer room of a data center according to the present application.

[0034] Figure 2 This is a flow chart of another embodiment of the method for optimizing the operation of refrigeration equipment in a computer room of a data center of the present application.

[0035] Figure 3 This is a side view of the data center computer room for this application.

[0036] Figure 4Schematic diagram of the model created in the modeling software for this application.

[0037] Figure 5 Schematic diagram of the grid generated for this application.

[0038] Figure 6 This is a schematic diagram of the cabinet temperature comparison under the 4+5 redundancy solution working conditions of this application.

[0039] Figure 7 This is the temperature cloud diagram at the half-height 1m position of the cabinet when the single machine power is 4kW.

[0040] Figure 8 This is the temperature cloud diagram of the section 0.2m above the floor of this application.

[0041] Fig. 9 This is the temperature cloud diagram of the section 1.8m above the floor of this application.

[0042] Fig.10 This is a velocity vector diagram for this application.

[0043] Fig.11 This is the velocity contour diagram of the section 0.2m above the floor of this application.

[0044] Fig.12 This is the velocity contour diagram of the section 1m above the floor of this application.

[0045] Fig.13 This is the velocity contour diagram of the section 1.8m above the floor of this application.

[0046] Fig.14 This is the schematic diagram of the data center computer room refrigeration equipment operation optimization system for this application. DETAILED DESCRIPTION

[0047] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0048] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0049] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0050] In the description of the embodiments of the present application, it should be noted that if the terms "upper", "lower", "horizontal", "inner", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the invented product is usually placed when used. It is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0051] In addition, if the term "horizontal" appears, it does not mean that the component must be absolutely horizontal, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", which does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0052] In the description of the embodiments of the present application, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0053] Data center refers to the equipment that can realize the centralized processing, storage, transmission, exchange and management of information, and server equipment, computer equipment, storage equipment, network equipment, etc. are generally considered to be the key equipment of the data room. With the rapid development of information technology, the business demand for information processing and exchange is increasing day by day, and the scale and thermal capacity of data center construction are constantly increasing. Due to the accelerated promotion of information construction in the power industry and the development and application of new technologies and new businesses such as the Internet, cloud computing, and mobile Internet, the continuous high-density integration of IT equipment, the power consumption of data centers will continue to increase significantly, and energy conservation and emission reduction and the construction of green data centers have become issues of widespread concern.

[0054] Relevant research shows that communications has become one of the largest energy-consuming industries in the world, and power consumption is still rising rapidly with the continuous growth of computing, data storage and communication needs. Therefore, building green data centers based on the concepts of "green, environmentally friendly, energy-saving and efficient" has become a broad consensus in the industry.

[0055] The PUE value refers to the ratio of all energy consumed by a data center to the energy consumed by IT loads. The closer the PUE value is to 1, the higher the degree of greenness of a data center. Currently, the PUE value of a data center room is usually between 2 and 3. How to effectively reduce the PUE value has become an important issue for large data centers.

[0056] This application applies CFD (Computational Fluid Dynamics) technology to the research of computer room refrigeration equipment, and conducts modeling experiments on data such as computer room temperature and humidity, cleanliness, air flow rate, and cabinet heat density to achieve the optimal configuration of the computer room air conditioning system.

[0057] like Figure 1 As shown, it is a first flow chart of the method for optimizing the operation of refrigeration equipment in a computer room of a data center of the present application, which may include:

[0058] S101, creating a data center computer room model according to computer room data of the data center computer room.

[0059] S102, dividing the data center computer room model into grids, setting boundary conditions and calculation parameters, and then performing simulation calculations.

[0060] S103, based on the simulation calculation results, according to the total power consumption of the data center computer room and the cooling capacity of a single air conditioner, determine the number of air conditioners that need to be operated and set multiple redundancy schemes.

[0061] S104, analyzing the temperature parameters of each redundant solution to determine the redundant solution to be finally adopted.

[0062] As an example, in order to ensure reliable and stable operation of the equipment, the design of the computer room air conditioning must meet the following requirements: (1) The preset temperature and humidity design standards for the computer room. (2) The accumulation of pollutants such as dust and corrosive gases in the air will affect the life of the machine and the accuracy and stability of the computer. For this reason, the computer room must have a certain degree of cleanliness. The air supply speed of the dedicated unit under the cabinet raised floor must be greater than 1.5-2.0m / s.

[0063] In order to ensure the quality of the air in the computer room, the following requirements must be met: (1) The fresh air volume in the air-conditioning room must reach 30 to 50 m 3 / h. The ratio of fresh air volume to total air volume is about 13%-18%. Maintain a positive pressure value of about 10-15Pa in the computer room. Prevent outdoor and adjacent room air from infiltrating into the computer room. In order to ensure the cleanliness of the computer room, the fresh air must be coarsely filtered. The total supply air must be filtered with medium efficiency; (2) A negative ion generator should be installed in the computer room to increase the number of negative ions in the computer room, and ultraviolet sterilization lamps should be installed near the air outlet of the air-conditioning system or in appropriate places. Turn on the lights regularly to kill bacteria and viruses. (3) The net height of the computer room should be 3m. In order to ensure the stability of the indoor temperature and reduce load interference, thermal insulation measures should be taken. The heat transfer coefficient of the general enclosure structure should not be greater than 0.9w / m 2 k.

[0064] The 4kw power of a single cabinet is divided into 8 working conditions. The calculation results are compared with the experimental results, showing that turning off air conditioners No. 3, 4, 7, 8, and 9 can not only meet the cabinet cold air demand, but also achieve the purpose of energy saving. The calculation results of the 6kw single cabinet power are compared with the experimental results, showing that turning off air conditioners No. 1, 5, and 9 can meet the requirements. The simulation results of the 8kw single cabinet power are compared with the experimental results, showing that the cooling effect of turning off air conditioner No. 1 temporarily meets the requirements when considering the energy-saving effect, but there are overheated cabinets and heat reflux. If the single cabinet 8kw power solution is not adopted, the current computer room cannot effectively meet the load.

[0065] After analysis, it was found that the overall temperature at the front of the computer room was high. The main reason was that the cold air flow under the floor was offset when it was transported above the floor, and air vortices were found under the floor, which had a certain impact on energy consumption and cooling. Therefore, considering the current situation of the computer room, some improvement measures were proposed: the cabinet was placed at the back, an air intake fan was added near the perforated floor on the side of the air-conditioning room, the cold channel was closed, a flow channel was laid under the floor, and the air flow on the wall generated a mixed turbulent vortex at the back of the computer room. In the next work plan, the effect of the improvement measures will be simulated and tested.

[0066] Correspondingly, for the above example, an embodiment of the present application is used as an example for description. Figure 2 As shown, it is a second flow chart of the method for optimizing the operation of refrigeration equipment in a computer room of a data center of the present application, which may include:

[0067] S101, obtaining relevant computer room data of a data center computer room.

[0068] A single computer room in a data center has 62 cabinets, which are arranged in 6 rows. The computer room adopts the air supply and return mode of bottom supply and top return. The precision air conditioner has a dedicated air conditioning room. There is a partition wall between the IT computer room and the precision air conditioner room. The upper and lower ends of the partition wall are hollowed out, which are hot and cold channels respectively. The computer room is 5m high, the floor is 0.9m high, and the ceiling is 1.2m from the ceiling. The air conditioner room is equipped with underfloor air supply and ceiling return air. Figure 3 , which is a side view of the data center room in this embodiment.

[0069] S102, creating a model in a modeling software according to relevant computer room data of the data center computer room.

[0070] like Figure 4 As shown, it is a schematic diagram of the model created in the modeling software in this embodiment. For the convenience of analysis, the computer room simulation object can be simplified, and the cabinets are arranged horizontally, with a total of 62 cabinets, two rows in a group, and each group of cabinets is placed face to face. There are two types of cabinets, one is 0.8m long, 0.8m wide, and 2m high, and the other is 0.6m long, 1.1m wide, and 2m high. Each row of cabinets is equipped with a power supply head cabinet. The computer room ceiling is 1.2m, the raised floor is 0.9m, the total height is 5m, and the ceiling return air duct dimensions are 0.8m×14m, 2.1m×14m, and 1.3m×14m. The room floors are all anti-static floors, with a size of 0.6m×0.6m, so the size of the raised floor air inlet is an integer multiple of the size of the anti-static floor. The precision air-conditioning room is separated from the computer room by an insulation board, and the return air duct is reserved. Nine air conditioners share one air outlet, which is about 20m×0.8m in size. The precision air conditioner is 1.6m long, 0.8m wide and 2m high. They are evenly arranged in groups of three, with air outlet at the bottom and air return at the top. The parameters of a single air conditioner are cooling capacity of 66.9kW, air volume of 16020CMH and cooling capacity of 67kW, air volume of 17600CMH. According to the air supply volume, the air supply speed of a single air conditioner can be calculated as 3.48m / s and 3.82m / s. Then generate a grid, such as Figure 5 The following is a schematic diagram of the generated grid.

[0071] Figure 5 The grid in the middle is a non-structured grid. After the grid is generated, it can be imported into Fluent to enter the calculation phase. In Fluent, the air supply outlet is set as the velocity boundary condition, and the return air outlet is a free pressure outlet. The cabinet heat flux density is calculated according to different cabinet powers to obtain three densities, which are 521w / m 2 、782w / m 2 、1043w / m 2 Since the cabinet is located in an area with high summer temperatures, the ambient temperature is set to 323K and the heat transfer coefficient is 7w / m 2k. Then set the solver to calculate. The number of grids in this embodiment is about 300,000. The calculation time varies according to different working conditions, and the number of convergence steps is also different.

[0072] S203, determining an optimization solution through CFD simulation and experimental comparison.

[0073] In order to explain this application in detail, the following specific scenarios are taken as examples for detailed explanation:

[0074] Scenario 1: Single cabinet power consumption 4KW, air conditioning control air supply temperature 14℃, air volume 16020CMH

[0075] The total power consumption of the computer room is 256kW, and the cooling capacity of a single air conditioner is 66.9kW. At least four air conditioners are needed to meet the cooling demand, and a 4+5 and 5+4 redundancy solution is adopted.

[0076] Among them, the 4+5 redundancy solution:

[0077] Working condition 1: Turn off air conditioners 1, 4, 6, 7, and 9;

[0078] Working condition 2: Turn off air conditioners 1, 3, 5, 7, and 9;

[0079] Working condition three: turn off air conditioners 1, 2, 3, 8, and 9;

[0080] Working condition 4: Turn off air conditioners 3, 4, 7, 8 and 9.

[0081] like Figure 6 The following is a schematic diagram of the cabinet temperature comparison under the 4+5 redundancy scheme. (a) corresponds to condition 1, (b) corresponds to condition 2, (c) corresponds to condition 3, and (d) corresponds to condition 4.

[0082] from Figure 6 It can be observed that there are more high-temperature areas on the wall in working conditions 2 and 3, and there are local hot spots and extremely high-temperature areas. In comparison, the wall cooling effect of working condition 4 is better, and there are no local high-temperature areas.

[0083] like Figure 7 The following is the temperature cloud diagram at the half-height 1m position of the cabinet when the single machine power is 4kW. Among them, (a) corresponds to working condition 1, (b) corresponds to working condition 2, (c) corresponds to working condition 3, and (d) corresponds to working condition 4. Figure 7 It can be seen that the air volume of the two rows of cabinets on the left and the two rows of cabinets in the middle of working condition 4 is the largest, and the heat exchange effect is also the best. In working condition 4, air conditioners 7, 8, and 9 are turned off, mainly because there are fewer cabinets on the right, so the required cooling air volume is also less. Air conditioners 1, 2, 5, and 6 are turned on to fully cool the cabinets on the left and the middle. In working condition 4, air conditioners 4, 5, 6, and 7 are turned on, and the air conditioners facing the two rows of cabinets on the left are turned off. Figure 7 It can also be seen that the cold air volume of the two rows of cabinets on the left is the least, which also leads to Figure 6 The air outlet temperature of the two rows of cabinets on the left side of the middle working condition 4 is extremely high. This shows that when the power of a single machine is low, fewer air conditioners need to be turned on. Although a static pressure box is set at the air outlet of the air conditioner to mix the air from each air conditioner, the mixing is not uniform due to the low wind speed and low turbulence. Figure 7 It can also be seen that in the four working conditions, the temperature of the upper half of the cabinet is generally higher than that of the lower half, and there is a difference in the surface temperature of the two rows of cabinets arranged relatively, which is mainly related to the air flow.

[0084] like Figure 8 As shown in the figure, it is the temperature cloud diagram of the section 0.2m above the floor. Fig. 9 The temperature cloud diagram of the section 1.8m above the floor is shown in the figure. Fig.10 is a velocity vector diagram, Fig.11 This is the velocity cloud diagram of the section 0.2m above the floor. Fig.12 It is the velocity cloud diagram of the section 1m above the floor. Fig.13 The velocity contour diagram of the section 1.8 m above the floor. (a) to (d) correspond to working conditions 1 to 4, respectively.

[0085] Among them, the 5+4 redundancy solution:

[0086] Working condition 5: Turn off air conditioners 1, 3, 6, and 9;

[0087] Working condition six: turn off air conditioners 1, 4, 7, and 9;

[0088] Working condition seven: turn off air conditioners 1, 2, 3, and 4;

[0089] Working condition eight: Turn off air conditioners 1, 2, 8 and 9.

[0090] Using the same analysis method as the 4+5 redundancy solution (no further description), among the four solutions, working conditions 5 and 6 have better cooling effects, working conditions 6, 7 and 8 have roughly the same cooling effects, and working condition 5 has the best effect. Comparing the 4+5 and 5+4 redundancy solutions, working conditions 1 and 5 have the best cabinet cooling effects, but considering multiple factors such as air conditioning energy consumption, working condition 1 has the best comprehensive performance, greatly improving the energy-saving effect while cooling.

[0091] Table 1 is a data comparison table for the 4+5 redundancy solution, and Table 2 is a data comparison table for the 5+4 redundancy solution:

[0092] Table 1: Data comparison table of 4+5 redundancy scheme (unit: °C)

[0093]

[0094] Table 2: Data comparison table of 5+4 redundancy scheme (unit: °C)

[0095]

[0096] The above test data were tested with a Fluke 975v temperature tester, and all are instantaneous values. The CFD data are all average values ​​calculated under steady-state conditions, and the initial values ​​of the air supply outlets of the air conditioners are all unified at 14°C. By comparing the CFD data, it can be found that the average air supply and return air temperature difference of the 4+5 air conditioners is 9.75 degrees Celsius, while the average air supply and return air temperature difference of the 5+4 air conditioners is 7.3 degrees Celsius. The same test data are 11.9°C and 9.6°C respectively. Taking into account the energy consumption of air conditioners and the room cooling effect, the 4+5 redundancy solution is better when the power of a single cabinet is 4kw, and solution 4 has the best effect.

[0097] Therefore, the application scope of this application is wide, and the optimal solution can be determined according to actual needs.

[0098] Scenario 2: The power consumption of a single cabinet is 6KW, the power consumption of a single cabinet is 6kW, the total cabinet power consumption is 372kW, the air supply temperature of the air conditioner is controlled at 14℃, the air volume is 16020CMH, the total power consumption of the computer room is 372kW, and the cooling capacity of a single air conditioner is 66.9kW. At least six air conditioners are required to meet the cooling requirements, so a 6+3 and 7+2 redundancy solution is adopted.

[0099] The following table 3 is a data comparison table under 6KW working conditions:

[0100] Table 3: Data comparison table under 6KW working condition (unit: ℃)

[0101]

[0102] 6+3 layout:

[0103] Solution 1: Turn off air conditioners 1, 5, and 9 Solution 2: Turn off air conditioners 1, 8, and 9

[0104] Solution 3: Turn off air conditioners 4, 5, and 9; Solution 4: Turn off air conditioners 7, 8, and 9

[0105] 7+2 layout:

[0106] Solution 1: Turn off air conditioners 1 and 9; Solution 2: Turn off air conditioners 3 and 9

[0107] Solution 3: Turn off air conditioners 1 and 2;

[0108] A similar scheme to the above is used for analysis. According to the CFD simulation results, the 6+3 redundancy scheme is not much different from the 7+2 redundancy scheme, but the energy consumption of a single air conditioner is very large, so the 6+3 scheme can reduce energy consumption and achieve the room cooling target. Through the analysis of the simulation results, it can be seen that the cooling effect of working condition 1 is better than that of working conditions 2, 3, and 4. However, there are overheated cabinets in working conditions 5, 6, and 7. The main reason is that the heat reflux leads to local high temperature areas, the cabinet layout is unreasonable, and there are dead corners.

[0109] Scenario 3: The power of a single cabinet is 8 kW, and the total power consumption of the cabinet is 496 kW; the air supply temperature of the air conditioner is 14°C.

[0110] The total power consumption of the computer room is 504kW, while the cooling capacity of a single air conditioner is 66.9kW, so at least eight air conditioners are needed to meet the cooling needs. Since the power consumption of a single cabinet is relatively large, the solution of fully turning on the air conditioner is first adopted to compare different air conditioner parameters to see if they can meet the cabinet's heat dissipation needs, and then consider adopting a redundant solution.

[0111] Air conditioning full-on solution: Working condition 1: air conditioning cooling capacity 66.9KW, air volume 16020CMH. Table 4 below is the CFD and test results table of scenario 3 working condition 1.

[0112] Table 4: CFD and test results for scenario 3, condition 1 (unit: °C)

[0113]

[0114] In the fully-on air conditioning solution, although the total power consumption of the cabinet is met, there are overheated cabinets. The main reason for this phenomenon is the heat reflux phenomenon. In addition, there are dead corners in the cabinet layout, and the cold air cannot reach the cabinet wall smoothly, making the local cooling efficiency extremely slow, which has a great impact on the working efficiency of the cabinet server.

[0115] 8+1 redundancy solution: Condition 3: turn off air conditioner 1; Condition 4: turn off air conditioner 6; Condition 5: turn off air conditioner 9. Table 5 below is a comparison table of the 8+1 solution for scenario 3.

[0116] Table 5: Comparison of 8+1 solutions for scenario 3 (unit: °C)

[0117]

[0118] In the 8+1 solution, one air conditioner was selected from each of the three groups and turned off. In the simulation results, there were overheated cabinets in working conditions 4 and 5. When the cabinets were running at full load, heat reflux was very likely to occur. The closer to the air conditioner, the more overheated cabinets there were. In addition, high-temperature areas were generated at the connection points of different cabinets, which had a great impact on the operation of the server and could not remove the heat in time. Considering the energy-saving and high-efficiency conditions, it was more reasonable to adopt working condition 3.

[0119] S204, analyzing the cold air distribution in the computer room.

[0120] The first working condition under 6kW was selected as the analysis object. It was found that the high wind speed area between 0.2m and 0.5m above the floor of the computer room was concentrated between the cabinets, and the closer to the cabinet wall, the higher the wind speed. The vertical section velocity cloud map of the cabinets in the back row of the computer room was displayed, and it can be clearly seen that the direction of the airflow sent from the floor was offset. The airflow between the two groups of cabinets on the left turned to the cabinet on the far left, and the airflow between the cabinets on the far right turned to the cabinet on the right. It can also be seen that the airflow in the room is offset to the rear end of the computer room as a whole. Analysis of the section velocity cloud map found that this phenomenon was caused by the occurrence of airflow vortex at the rear end of the static pressure box, resulting in local high flow rate, resulting in the formation of vortex airflow in different directions at the opening of the floor at the bottom of the computer room and output above the floor. In this way, the cold air flow will be biased to one side of the cabinet, resulting in less cold air flow in the opposite cabinet, resulting in different cooling effects for the two rows of cabinets arranged on the same opposite side. The direction of cold air flow above the opening floor is offset, not vertical to the floor, but generally toward the end of the computer room away from the air conditioning room. The reason for this phenomenon is that the radial velocity of the cold air blown out by the air conditioner is the largest. When the pressure of the static pressure box under the floor reaches a certain level, the cold air begins to be transported above the floor. Since the radial velocity is dominant, the cold air area in the room is mainly concentrated in the middle and rear end of the computer room.

[0121] Through experimental testing and CFD simulation comparison, this application found that under the condition of 4KW power of a single cabinet, the cabinet wall cooling effect of working condition one is better and the energy consumption is lower; under the condition of 6KW power of a single cabinet, the working condition one solution is more reasonable. Although there is an overheated cabinet, this problem can be reasonably solved by changing the cabinet access position; under the condition of 8KW power of a single cabinet, working condition three is more prominent in reducing energy consumption, and working condition three solution is adopted after comprehensive consideration.

[0122] As the power consumption of the cabinet increases, the air supply temperature of the air conditioner must be continuously reduced to ensure the temperature of the equipment. However, if the air supply temperature is too low, there will be a risk of condensation in the computer room. Optimizing the cabinet layout plan and the location of the floor air supply outlet will effectively reduce the cabinet wall temperature, thereby reducing energy consumption and improving cooling efficiency. The local heat island phenomenon is mainly caused by the short circuit of air flow that is prone to occur on the side close to the air-conditioning room. Therefore, the cabinets should be arranged as far away from the air-conditioning side as possible, and the same cabinets should be arranged together to avoid mixed cabinet layout. The height of the ceiling can be appropriately lowered to accelerate the return of hot air. Temperature and humidity can be measured using professional instruments based on the specific number of cabinets, size of the computer room, and materials of the computer room. According to the standard, due to the large amount of waste heat in the computer room, in order to prevent condensation on the surface of the computer, the relative humidity of the air supply under the raised floor to the cabinet must be <80%. The air supply speed of the dedicated unit under the raised floor of the cabinet must be greater than 1.5-2.0m / s. Air particle concentration 17,600,000 particles / M 2 ④ The cleanliness level of the computer room must reach at least level 8.5.

[0123] In actual applications, computer equipment, especially switches and other equipment, have high requirements for the temperature of the computer room. If the temperature is too high, it is easy to cause poor heat dissipation of the machine, causing the working parameters of the transistor to drift, affecting the stability and reliability of the circuit, and in severe cases, it can also cause breakdown and damage of components. During the long-term operation of communication equipment, it is more appropriate to control the machine temperature between 18℃ and 25℃. For the selection of air-conditioning equipment, if conditions permit, try to choose air-conditioning dedicated to the computer room.

[0124] Humidity also has a great impact on communication equipment. Wet air can easily cause the metal parts and connector parts of the equipment to rust, and cause the insulation of circuit boards, connectors and wiring to decrease. In severe cases, it can also cause circuit short circuits. Too dry air can easily cause static electricity effects, threatening the safety of communication equipment. In order to keep the relative humidity of the communication room in compliance with the standard, a humidifier or dehumidifier can be installed according to the specific situation of the room.

[0125] In summary, in this embodiment, the following measures can be adopted for improvement:

[0126] (1) Close the cold air channel to form a cold pool;

[0127] (2) Install an air intake fan near the floor ventilation area on the air-conditioning side;

[0128] (3) Shorten the air flow distance under the floor and lay a cold air duct.

[0129] like Fig.14 As shown, the embodiment of the present application discloses a data center computer room refrigeration equipment operation optimization system, including:

[0130] A creation module is used to create a data center computer room model according to the computer room data of the data center computer room;

[0131] A calculation module, used to divide the data center computer room model into grids, set boundary conditions and calculation parameters, and then perform simulation calculations;

[0132] The redundancy scheme module is used to determine the number of air conditioners that need to be operated and set multiple redundancy schemes based on the simulation calculation results, the total power consumption of the data center room and the cooling capacity of a single air conditioner;

[0133] The optimization module is used to analyze the temperature parameters of each redundant solution and determine the redundant solution to be finally adopted.

[0134] It should be noted that in several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are merely schematic. For example, the division of each module is only a logical function division. There may be other division methods in actual implementation. For example, multiple modules can be combined or integrated into another device, or some features can be ignored or not executed. The module described as a separate component may or may not be physically separated. The component displayed as a module may be a physical unit or multiple physical units, that is, it may be located in one place, or it may be distributed in multiple different places. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment.

[0135] In addition, each module in each embodiment of the present invention may be integrated into a processing unit, each module may exist physically separately, or two or more modules may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of a software functional unit.

[0136] An electronic device provided in an embodiment of the present application includes a memory and a processor. The memory stores a computer program. When the processor executes the computer program, the steps of the method for optimizing the operation of a data center computer room refrigeration equipment as described in any of the above embodiments are implemented.

[0137] Another electronic device provided in the embodiment of the present application may also include: an input port connected to the processor, used to transmit multimodal data collected by an external acquisition device to the processor; and a display unit connected to the processor, used to display the processing results of the processor to the outside world; a communication module connected to the processor, used to realize communication between the electronic device and the outside world. The display unit can be a display panel, a laser scanning display, etc.; the communication mode adopted by the communication module includes but is not limited to mobile high-definition link technology (HML), universal serial bus (USB), high-definition multimedia interface (HDMI), wireless connection: wireless fidelity technology (WiFi), Bluetooth communication technology, low-power Bluetooth communication technology, and communication technology based on IEEE802.11s.

[0138] An embodiment of the present application provides a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, the steps of the method for optimizing the operation of refrigeration equipment in a data center computer room as described in any of the above embodiments are implemented.

[0139] The computer-readable storage medium involved in the present application includes random access memory (RAM), internal memory, read-only memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disks, removable disks, CD-ROMs, or any other form of storage medium known in the technical field.

[0140] For the description of the relevant parts of the data center computer room refrigeration equipment operation optimization system, electronic device and computer-readable storage medium provided in the embodiments of the present application, please refer to the detailed description of the corresponding parts in the data center computer room refrigeration equipment operation optimization method provided in the embodiments of the present application, which will not be repeated here. In addition, the parts of the above technical solutions provided in the embodiments of the present application that are consistent with the implementation principles of the corresponding technical solutions in the prior art are not described in detail to avoid excessive elaboration.

[0141] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A method for optimizing the operation of refrigeration equipment in a data center computer room, characterized in that: include: Create a data center computer room model based on the computer room data of the data center computer room; Dividing the data center computer room model into grids, setting boundary conditions and calculation parameters, and performing simulation calculations; Based on the simulation results, the number of air conditioners that need to be run is determined according to the total power consumption of the data center room and the cooling capacity of a single air conditioner, and multiple redundancy schemes are set; Analyze the temperature parameters of each redundant scheme and determine the redundant scheme that will be finally adopted.

2. According to claim 1, a method for optimizing the operation of refrigeration equipment in a data center computer room is characterized in that: The computer room data includes: the number of cabinets, the layout of the cabinets, the height of the data center computer room, the height of the raised floor, the height of the suspended ceiling from the ceiling, and the air supply and return method of the computer room.

3. According to claim 2, a method for optimizing the operation of refrigeration equipment in a data center computer room is characterized in that: The setting of boundary conditions and calculation parameters includes: The air supply outlet of the data center room is set as the velocity boundary condition, the return air outlet is set as the free pressure outlet, the cabinet heat flux density is determined according to the mechanism power, and the ambient temperature and heat transfer coefficient are set according to the environmental conditions of the data center room.

4. According to claim 3, a method for optimizing the operation of refrigeration equipment in a data center computer room is characterized in that: The step of analyzing the temperature parameters of each redundant solution to determine the redundant solution to be finally adopted includes: Analyze the cabinet temperature of each redundancy solution, and determine the first optimal redundancy solution based on the cooling effect of the four walls and whether there is a local high-temperature area; The air volume of each row of cabinets, the temperature cloud map and the velocity cloud map of the cross sections at different distances above the floor in the first optimal redundancy scheme are analyzed respectively, the first optimal redundancy scheme is confirmed, and the final redundant scheme is obtained.

5. According to claim 4, a method for optimizing the operation of refrigeration equipment in a data center computer room is characterized in that: After the final redundant solution is determined, the method further includes: analyzing the cold air distribution in the computer room to determine the overall placement position of the cabinet and the optimal design solution for the perforated floor near the air-conditioning room.

6. A method for optimizing the operation of refrigeration equipment in a data center computer room according to claim 5, characterized in that: The optimal design scheme for the perforated floor near the air-conditioning room side includes: adding an air intake fan to the perforated floor near the air-conditioning room side to close the cold channel.

7. A method for optimizing the operation of refrigeration equipment in a data center computer room according to claim 6, characterized in that: The redundant solution finally adopted also includes: adding an air intake fan at the floor ventilation area close to the air-conditioning side; and shortening the air flow distance under the floor and laying a cold air channel.

8. A data center computer room refrigeration equipment operation optimization system, characterized in that: include: A creation module is used to create a data center computer room model according to the computer room data of the data center computer room; A calculation module, used to divide the data center computer room model into grids, set boundary conditions and calculation parameters, and then perform simulation calculations; The redundancy scheme module is used to determine the number of air conditioners that need to be operated and set multiple redundancy schemes based on the simulation calculation results, the total power consumption of the data center room and the cooling capacity of a single air conditioner; The optimization module is used to analyze the temperature parameters of each redundant solution and determine the redundant solution to be finally adopted.

9. An electronic device, characterized in that: include: Memory for storing computer programs; A processor is used to implement the steps of the data center computer room refrigeration equipment operation optimization method as described in any one of claims 1 to 7 when executing the computer program.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method for optimizing the operation of refrigeration equipment in a computer room of a data center as claimed in any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Data center machine room equipment layout method based on fluid mechanics simulation

    CN113779689A

  • Machine room energy saving method and device, computing equipment and computer storage medium

    CN116963456A

  • CFD-based data center machine room thermal environment modeling grid optimization method

    CN118133727A

  • Dynamic prediction control method, apparatus and system for precision air conditioner

    EP4375585A1

Cited By

  • Energy consumption prediction and energy-saving control method adopting deep neural network

    CN120406136A

  • Automatic energy-saving control method and device for refrigerating system

    CN120540102A

  • An automatic energy-saving control method and device for a refrigeration system

    CN120540102B