Pull-type production scheduling system and production scheduling method for improving production efficiency
By adopting pull-type production scheduling system and intelligent control in circuit board production, combining order demand and workshop site situation, optimizing production plan, the problems of high inventory and slow response in the traditional push production model are solved, and efficient and automated Production process reduces costs and improves efficiency.
Patent Information
- Application Number
- CN202410962701.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-08
AI Technical Summary
The traditional push-type production model leads to high inventory costs, slow response to market changes, low production efficiency and long production cycles in circuit board production, making it difficult to cope with the diversification and personalization of customer needs, resulting in complex scheduling and optimization of the work workshop.
The pull-type production scheduling system is adopted to complete the operation scheduling based on customer order needs and workshop on-site conditions. The pull-type production simulation model and consumption, production and inventory simulation table are established through the intelligent control end, and the production plan is optimized in real time to realize virtual production and automated control. Reduce inventory and improve response speed.
Effectively reduce inventory, improve production efficiency and response speed, optimize production processes, reduce production costs, improve product yields, and achieve automation and efficient utilization of resources through equipment interconnection and process optimization.
Smart Images

Figure CN118917595A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of circuit board production, and in particular relates to a pull-type production scheduling system and a production scheduling method for improving production efficiency. Background Art
[0002] In the process of circuit board production, the traditional "push" production plan and process are set according to the predicted market demand. Due to factors such as high inventory cost, slow response to market changes, low production efficiency, overproduction, and long production cycle, the specific job scheduling and optimization of the manufacturing workshop is an indispensable link in the optimization and control of the production system. It is related to the continuity and timeliness of the enterprise's production and directly affects the work efficiency and benefits of the production system. With the diversification and personalization of customer needs, multi-variety small batch production has become a trend, making the job shop scheduling and optimization problem more and more complicated;
[0003] To this end, we propose a pull-type scheduling system and scheduling method for improving production efficiency. The pull-type control mode combines customer order requirements and workshop site conditions to complete job scheduling, which can effectively make up for the shortcomings of the push-type production mode, facilitate rapid response to the market, reduce work-in-process inventory, and reduce production costs. Summary of the invention
[0004] The purpose of the present invention is to provide a pull-type production scheduling system and a production scheduling method for improving production efficiency. The pull-type control mode combines customer order requirements and workshop site conditions to complete job scheduling, which can effectively make up for the shortcomings of the push-type production mode, facilitate rapid response to the market, reduce work-in-progress inventory, and reduce production costs.
[0005] The technical solution adopted by the present invention is as follows:
[0006] A pull-type production scheduling system for improving production efficiency includes a pull-type production scheduling system for controlling a circuit board production device; the pull-type production scheduling system includes: a raw material end, a production end, a warehousing end, an order end and an intelligent control end. The order end first generates circuit board product order information and sends the circuit board product order information to the intelligent control end. A pull-type production simulation model and a consumption, production and inventory simulation table are established inside the intelligent control end. The pull-type production simulation model first obtains product order information, outputs an optimal production plan through virtual production of the pull-type production simulation model, and sends the production plan to the production end. The production end completes circuit board product production according to the production plan, and then temporarily stores the produced products at the warehousing end, which distributes them according to the order information and continuously updates the consumption, production and inventory simulation table.
[0007] Preferably, the circuit board production device includes a cutting mechanism, a pressing mechanism, an automatic welding mechanism, a detection mechanism and a controller. A transmission mechanism is provided between the cutting mechanism, the pressing mechanism, the automatic welding mechanism and the detection mechanism. The controller controls the cutting mechanism, the pressing mechanism, the automatic welding mechanism and the detection mechanism through the pull-type production scheduling system to complete the circuit board production.
[0008] Preferably, a revision module is also provided inside the intelligent control end. When the production end completes the production of circuit board products according to the production plan, the revision module timely revises the optimal output of the pull production simulation model by collecting the production end data fed back by the production end.
[0009] Preferably, the production end completes the circuit board production through the circuit board production device, and the cutting mechanism uses a cutting machine to cut the plate; common cutting machines include CNC cutting machines, laser cutting machines, etc.;
[0010] The laminating mechanism uses a laminating machine to press the circuit boards at various levels together to form a complete circuit board; generally, high temperature and high pressure are required for laminating to ensure the firmness and stability of the circuit board;
[0011] The automatic welding mechanism uses automated welding equipment to weld electronic components to the circuit board to form a complete circuit system; generally, automated welding equipment can complete the welding of components more quickly and accurately;
[0012] The detection mechanism uses detection equipment to detect whether the components on the circuit board are correctly installed according to the design requirements and whether the circuit board can work normally; commonly used detection equipment includes X-ray detection machines and AOI detection machines.
[0013] Preferably, the controller is used to receive the production plan sent by the intelligent control end, and control the cutting mechanism, the pressing mechanism, the automatic welding mechanism and the detection mechanism in real time to produce circuit boards according to the production plan; the controller is also used to collect real-time production data of the cutting mechanism, the pressing mechanism, the automatic welding mechanism and the detection mechanism, and feed back the production data to the production end.
[0014] Preferably, the pull-type production scheduling system also includes an early warning module, which automatically calculates the remaining time of each order from the delivery date; for production processes that meet the quantity and delivery date at the same time, delay warnings are issued for those with negative remaining time, and planners can focus on orders that have already received delay warnings.
[0015] Preferably, the pull-type production simulation model includes a virtual factory business collaboration sub-architecture based on deep learning, a data perception and efficient transmission sub-architecture, and a virtual-to-real mapping sub-architecture driven by fusion time; the data perception and efficient transmission sub-architecture mainly completes the perception and efficient transmission of basic data of the industrial digital twin to improve the scene, realizes the modeling of the physical and logical components of the physical entity smart factory as data objects, and uses a distributed Internet of Things node cluster to realize efficient transmission of data objects; the virtual-to-real mapping sub-architecture driven by fusion events mainly establishes the mapping rules between the physical entity smart factory data model and the twin model under highly dynamic scenarios, maps the dynamic changes of the data model in the real space into the time and space changes of the twin model in the virtual space, and realizes the synchronous changes of the data model in the real space and the twin model in the virtual space; the virtual factory business collaboration sub-architecture based on deep learning mainly realizes the business process reengineering and optimal control strategy generation of the virtual factory under highly dynamic attributes, and provides a multi-objective optimization scheduling strategy for the virtual factory driven by the industrial digital twin and feeds it back to the production end;
[0016] Preferably, the consumption, production and inventory simulation table is used to record the remaining amount of raw materials at the raw material end, the amount of products produced at the production end, the amount of products not produced at the production end, the amount of orders produced at the order end, the amount of orders not produced at the order end and the inventory at the warehousing end.
[0017] A pull-type production scheduling method for improving production efficiency comprises the following steps:
[0018] S1: The order end first generates circuit board product order information;
[0019] S2: Sending the circuit board product order information to the intelligent control terminal;
[0020] S3: The intelligent control terminal internally establishes a pull-type production simulation model and a consumption, production and inventory simulation table;
[0021] S4: The pull-type production simulation model first obtains product order information, and then performs virtual production of the pull-type production simulation model; outputs the optimal production plan, and sends the production plan to the production end.
[0022] S5: The production end completes the production of the circuit board product according to the production plan;
[0023] S6: The revision module timely revises the optimal output of the pull-type production simulation model by collecting the production data fed back by the production end, and the production end completes the production of the circuit board product according to the continuously updated optimal output;
[0024] S7: The produced circuit board products are temporarily stored in the warehouse, and the warehouse delivers them according to the order information;
[0025] S8: Update the consumption, production and inventory simulation tables in real time.
[0026] The technical effects achieved by the present invention are:
[0027] In the present invention, the order end first generates circuit board product order information, and sends the circuit board product order information to the intelligent control end, and a pull-type production simulation model and a consumption, production and inventory simulation table are established inside the intelligent control end. The pull-type production simulation model first obtains the product order information, and outputs the optimal production plan through virtual production of the pull-type production simulation model, and sends the production plan to the production end. The production end completes the production of circuit board products according to the production plan, and then temporarily stores the produced products at the warehousing end, which is distributed according to the order information and continuously updates the consumption, production and inventory simulation tables at the same time. The new mode pull system triggers production activities based on actual demand, and pays more attention to reducing inventory, improving production efficiency and response speed, thereby solving many limitations of traditional push-type production scheduling methods, optimizing the production process through downstream demand, reducing inventory and improving production efficiency.
[0028] In the present invention, the intelligent control end of the present invention uses an efficient production scheduling algorithm to complete more effective planning and scheduling of production processes, including priority sorting of production orders and optimal allocation of resources, thereby greatly improving production efficiency; the intelligent control end provides an intuitive operation and management interface, making operation simpler and more convenient; the pull-type production simulation model processes data and performs real-time analysis; at the same time, data from the production end is collected to ensure the accuracy and processing efficiency of data collection, thereby achieving real-time monitoring of production indicators, trend prediction and fault diagnosis; equipment interconnection and process optimization; involving interconnecting and cooperating the system with on-site production equipment to achieve automation and optimization of the entire production process. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a system block diagram of a pull-type production scheduling system for improving production efficiency in the first embodiment of the present invention;
[0030] Figure 2 It is a system block diagram of a circuit board production device according to an embodiment of the present invention;
[0031] Figure 3 is a system block diagram of a pull-type production simulation model in the first embodiment of the present invention;
[0032] Figure 4 It is a flow chart of a pull-type production scheduling method for improving production efficiency in Embodiment 2 of the present invention.
[0033] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0034] 1. Cutting mechanism; 2. Pressing mechanism; 3. Automatic welding mechanism; 4. Detection mechanism; 5. Controller; 6. Transmission mechanism. DETAILED DESCRIPTION
[0035] In order to make the purpose and advantages of the present invention more clearly understood, the present invention is specifically described below in conjunction with embodiments. It should be understood that the following text is only used to describe one or several specific embodiments of the present invention, and does not strictly limit the scope of protection of the specific claims of the present invention.
[0036] Embodiment 1
[0037] like Figure 1 As shown, a pull-type production scheduling system for improving production efficiency includes a pull-type production scheduling system for controlling a circuit board production device; the pull-type production scheduling system includes: a raw material end, a production end, a warehousing end, an order end and an intelligent control end. The order end first generates circuit board product order information, and sends the circuit board product order information to the intelligent control end. A pull-type production simulation model and a consumption, production and inventory simulation table are established inside the intelligent control end. The pull-type production simulation model first obtains product order information, and outputs an optimal production plan through virtual production of the pull-type production simulation model, and sends the production plan to the production end. The production end completes circuit board product production according to the production plan, and then temporarily stores the produced products at the warehousing end, which distributes them according to the order information, and continuously updates the consumption, production and inventory simulation tables.
[0038] It is worth mentioning that in the present invention, the new mode pull system triggers production activities based on actual demand, focusing more on reducing inventory, improving production efficiency and response speed, thereby solving many limitations of traditional push scheduling methods, optimizing the production process through downstream demand, reducing inventory and improving production efficiency;
[0039] like Figure 1 As shown in the figure, by establishing a pull production simulation model, the pull production simulation model is used for pull scheduling. The principle of pull scheduling is that the manufacturing process starts from the final product and traces back, that is, from the last production stage, and then tracks forward to the first production stage; only when the next step requires a certain unit of product, this unit will produce the product; this method effectively reduces the problems of invalid inventory and low production efficiency, and at the same time reduces the negative impact of forecasting errors on the production process;
[0040] The main features include: period production: products are produced only when there is actual demand; inventory reduction: products are not produced when they are not needed, reducing overproduction and inventory backlogs; zero waste production: because production is strictly based on demand, there is no excess product leading to waste.
[0041] For example; a customer's urgent order on the PCB production line; in this case, the intelligent control end will automatically retrieve the necessary raw materials from the raw material end and send a signal to create a task in the production end, which will be queued before other currently executing tasks; this allows the production end to start processing this urgent order immediately without affecting other queued orders.
[0042] like Figure 2 As shown, the circuit board production device includes a cutting mechanism 1, a pressing mechanism 2, an automatic welding mechanism 3, a detection mechanism 4 and a controller 5. A transmission mechanism 6 is provided between the cutting mechanism 1, the pressing mechanism 2, the automatic welding mechanism 3 and the detection mechanism 4. The controller 5 controls the cutting mechanism 1, the pressing mechanism 2, the automatic welding mechanism 3 and the detection mechanism 4 through a pull-type production scheduling system to complete the circuit board production.
[0043] like Figure 1 As shown, a revision module is also provided inside the intelligent control end. When the production end completes the production of circuit board products according to the production plan, the revision module timely revises the optimal output of the pull production simulation model by collecting the production end data fed back by the production end.
[0044] It must be said that by collecting production data fed back by the production end to revise the production plan of the pull production simulation model, the final production plan is more suitable for the production of the production end, which greatly improves the production efficiency and yield.
[0045] like Figure 2 As shown, the production end completes the circuit board production through the circuit board production device, and the cutting mechanism 1 uses a cutting machine to cut the plate; common cutting machines include CNC cutting machines, laser cutting machines, etc.; the pressing mechanism 2 uses a pressing machine to press the circuit boards at various levels together to form a complete circuit board; generally, high temperature and high pressure are required for pressing to ensure the firmness and stability of the circuit board; the automatic welding mechanism 3 uses automated welding equipment to weld electronic components to the circuit board to form a complete circuit system; generally, automated welding equipment can complete the welding of components more quickly and accurately; the detection mechanism 4 uses detection equipment to detect whether the components on the circuit board are correctly installed according to the design requirements, and whether the circuit board can work normally; commonly used detection equipment includes X-ray detection machines and AOI detection machines.
[0046] like Figure 2 As shown, the controller 5 is used to receive the production plan sent by the intelligent control end, and to control the cutting mechanism 1, the pressing mechanism 2, the automatic welding mechanism 3 and the detection mechanism 4 in real time to produce circuit boards according to the production plan; the controller 5 is also used to collect the real-time production data of the cutting mechanism 1, the pressing mechanism 2, the automatic welding mechanism 3 and the detection mechanism 4, and to feed back the production data to the production end.
[0047] like Figure 1 As shown, it must be said that the intelligent control end in the present invention uses an efficient production scheduling algorithm to more effectively plan and schedule the production process, including priority sorting of production orders and optimal allocation of resources, thereby greatly improving production efficiency.
[0048] It should be added that the raw material side determines whether the raw materials are sufficient based on the production plan. If the raw materials are insufficient, a prompt will be issued to remind the staff to replenish the raw materials in time.
[0049] The intelligent control terminal of the present invention provides an intuitive operation and management interface, making the operation simpler and more convenient.
[0050] The pull-type production simulation model in the present invention collects data from the production end through data processing and real-time analysis, thereby ensuring the accuracy of data collection and processing efficiency, and realizing real-time monitoring, trend prediction and fault diagnosis of production indicators.
[0051] The equipment interconnection and process optimization in the present invention involve interconnecting and coordinating the system with on-site production equipment to achieve automation and optimization of the entire production process.
[0052] The present invention ensures the security of production data and prevents unauthorized access, while also protecting the privacy information of enterprises and customers.
[0053] The pull scheduling system also includes an early warning module, which automatically calculates the remaining time of each order from the delivery date. For production processes that meet both the quantity and delivery date, delay warnings will be issued for those with negative remaining time. Planners can focus on orders that have already received delay warnings.
[0054] like Figure 3As shown in the figure, the pull-type production simulation model includes a virtual factory business collaboration sub-architecture based on deep learning, a data perception and efficient transmission sub-architecture, and a virtual-to-real mapping sub-architecture driven by fusion time; the data perception and efficient transmission sub-architecture mainly completes the perception and efficient transmission of the basic data of the industrial digital twin to improve the scene, realizes the modeling of the physical and logical components of the physical entity smart factory as data objects, and uses the distributed Internet of Things node cluster to realize the efficient transmission of data objects; the virtual-to-real mapping sub-architecture driven by fusion event mainly establishes the mapping rules between the data model and the twin model of the physical entity smart factory under highly dynamic scenarios, maps the dynamic changes of the data model in the real space into the time and space changes of the twin model in the virtual space, and realizes the synchronous changes of the data model in the real space and the twin model in the virtual space; the virtual factory business collaboration sub-architecture based on deep learning mainly realizes the business process reengineering and optimal control strategy generation of the virtual factory under highly dynamic attributes, and provides a multi-objective optimization scheduling strategy for the virtual factory driven by the industrial digital twin and feeds it back to the production end; forming a benign closed-loop feedback mechanism to fundamentally improve the reasoning and decision-making level of the physical entity smart factory.
[0055] like Figure 3 As shown in the figure, the key to the virtual factory business collaboration model system architecture is to generate virtual entities with high-fidelity properties based on virtual space to simulate the controlled behavior of physical entities in real space, and to feed back corresponding control strategy information to physical entities to predict and optimize the behavior trends of physical entities in real space. The complete life cycle operation and maintenance logic of the physical entity smart factory is decomposed into tasks under the goal orientation, focusing on the three coupled sub-architectures of data perception and efficient transmission, fusion event-driven virtual-real mapping, and virtual factory business collaboration based on deep learning, and constructing the virtual factory business collaboration model system architecture under the background of industrial digital twin simulation modeling. Figure 1 Shown
[0056] The consumption, production and inventory simulation table is used to record the remaining amount of raw materials on the raw material side, the amount of products produced on the production side, the amount of products not produced on the production side, the amount of orders produced on the order side, the amount of orders not produced on the order side, and the inventory on the warehousing side.
[0057] Embodiment 2
[0058] like Figure 4 As shown, a pull-type production scheduling method for improving production efficiency comprises the following steps:
[0059] S1: The order side first generates the circuit board product order information;
[0060] S2: Send the circuit board product order information to the intelligent control terminal;
[0061] S3: The intelligent control terminal establishes a pull-type production simulation model and consumption, production and inventory simulation tables;
[0062] S4: The pull production simulation model first obtains product order information, and then performs virtual production in the pull production simulation model; outputs the optimal production plan, and sends the production plan to the production end.
[0063] S5: The production side completes the production of circuit board products according to the production plan;
[0064] S6: The revision module timely revises the optimal output of the pull-type production simulation model by collecting the production data fed back by the production end, and the production end completes the production of the circuit board product according to the continuously updated optimal output;
[0065] S7: The produced circuit board products are temporarily stored in the warehouse, and the warehouse delivers them according to the order information;
[0066] S8: Update consumption, production and inventory simulation tables in real time.
[0067] It has to be said that, for example, in actual use, production is first carried out for two days according to the production plan in step S4, and the revision module collects the production end data within the first two days of feedback from the production end; the production plan is revised, and then production is carried out for another two days, and the above iterations are repeated until the circuit board product of the order information is completed, thereby finally achieving further improvement in production efficiency and product yield.
[0068] The above is only a preferred embodiment of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principles of the present invention, and these improvements and modifications should also be considered as the protection scope of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to the conventional means in the art unless otherwise specified and limited.
Claims
1. A pull-type production scheduling system for improving production efficiency, used for controlling a circuit board production device, characterized in that: The pull-type production scheduling system includes: a raw material end, a production end, a warehousing end, an order end and an intelligent control end. The order end first generates circuit board product order information and sends the circuit board product order information to the intelligent control end. A pull-type production simulation model and consumption, production and inventory simulation tables are established inside the intelligent control end. The pull-type production simulation model first obtains product order information, outputs the optimal production plan through virtual production of the pull-type production simulation model, and sends the production plan to the production end. The production end completes the production of circuit board products according to the production plan, and then temporarily stores the produced products at the warehousing end, which distributes them according to the order information and continuously updates the consumption, production and inventory simulation tables.
2. A pull-type production scheduling system for improving production efficiency according to claim 1, characterized in that: The circuit board production device comprises a cutting mechanism (1), a pressing mechanism (2), an automatic welding mechanism (3), a detection mechanism (4) and a controller (5); a transmission mechanism (6) is provided between the cutting mechanism (1), the pressing mechanism (2), the automatic welding mechanism (3) and the detection mechanism (4); the controller (5) controls the cutting mechanism (1), the pressing mechanism (2), the automatic welding mechanism (3) and the detection mechanism (4) through the pull-type production scheduling system to complete the circuit board production.
3. A pull-type production scheduling system for improving production efficiency according to claim 1, characterized in that: The intelligent control end is also internally provided with a revision module. When the production end completes the production of circuit board products according to the production plan, the revision module timely revises the optimal output of the pull-type production simulation model by collecting the production end data fed back by the production end.
4. A pull-type production scheduling system for improving production efficiency according to claim 1, characterized in that: The production end completes the production of the circuit board through the circuit board production device, and the cutting mechanism (1) uses a cutting machine to cut the board; The pressing mechanism (2) uses a pressing machine to press the circuit boards at various levels together to form a complete circuit board; The automatic welding mechanism (3) uses an automated welding device to weld electronic components to a circuit board to form a complete circuit system. The detection mechanism (4) uses detection equipment to detect whether the components on the circuit board are correctly installed according to the design requirements and whether the circuit board can work normally.
5. A pull-type production scheduling system for improving production efficiency according to claim 1, characterized in that: The controller (5) is used to receive the production plan sent by the intelligent control end, and to control the cutting mechanism (1), the pressing mechanism (2), the automatic welding mechanism (3) and the detection mechanism (4) in real time according to the production plan to produce circuit boards; the controller (5) is also used to collect real-time production data of the cutting mechanism (1), the pressing mechanism (2), the automatic welding mechanism (3) and the detection mechanism (4), and to feed back the production data to the production end.
6. A pull-type production scheduling system for improving production efficiency according to claim 1, characterized in that: The pull-type production scheduling system also includes an early warning module, which automatically calculates the remaining time from the delivery date of each order; for production processes that meet both the quantity and the delivery date, a delay warning is issued for those with a negative remaining time.
7. A pull-type production scheduling system for improving production efficiency according to claim 1, characterized in that: The pull-type production simulation model includes a virtual factory business collaboration sub-architecture based on deep learning, a data perception and efficient transmission sub-architecture, and a virtual-to-real mapping sub-architecture that integrates time-driven. The data perception and efficient transmission sub-architecture mainly completes the perception and efficient transmission of basic data of the industrial digital twin improvement scene, realizes the modeling of the physical and logical components of the physical entity smart factory as data objects, and uses distributed Internet of Things node clusters to achieve efficient transmission of data objects. The virtual-to-real mapping sub-architecture that integrates event-driven mainly establishes the mapping rules between the physical entity smart factory data model and the twin model under highly dynamic scenarios, maps the dynamic changes of the data model in the real space into the time and space changes of the twin model in the virtual space, and realizes the synchronous changes of the data model in the real space and the twin model in the virtual space. The virtual factory business collaboration sub-architecture based on deep learning mainly realizes the business process reengineering and optimal control strategy generation of the virtual factory under highly dynamic attributes, and provides a multi-objective optimization scheduling strategy for the virtual factory driven by the industrial digital twin and feeds it back to the production end.
8. The pull-type production scheduling system for improving production efficiency according to claim 1, characterized in that: The consumption, production and inventory simulation table is used to record the remaining raw materials at the raw material end, the amount of products produced at the production end, the amount of products not produced at the production end, the amount of orders produced at the order end, the amount of orders not produced at the order end and the inventory at the warehousing end.
9. A pull-type production scheduling method for improving production efficiency, characterized in that: The following steps are involved: S1: The order end first generates circuit board product order information; S2: Sending the circuit board product order information to the intelligent control terminal; S3: The intelligent control terminal internally establishes a pull-type production simulation model and a consumption, production and inventory simulation table; S4: The pull-type production simulation model first obtains product order information, and then performs virtual production of the pull-type production simulation model; outputs the optimal production plan, and sends the production plan to the production end; S5: The production end completes the production of the circuit board product according to the production plan; S6: The revision module timely revises the optimal output of the pull-type production simulation model by collecting the production data fed back by the production end, and the production end completes the production of the circuit board product according to the continuously updated optimal output; S7: The produced circuit board products are temporarily stored in the warehouse, and the warehouse delivers them according to the order information; S8: Update the consumption, production and inventory simulation tables in real time.