Automatic gear shifting method, system and device for ships passing through same-section different-grade ship locks
Through automated ship gearing methods and systems, the ship gearing solution in different levels of locks is optimized, the problem of low efficiency of ship locks is solved, the utilization rate of locks and gate passes are improved, and manual interference and costs are reduced.
Patent Information
- Application Number
- CN202410971121.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-08
AI Technical Summary
It is difficult for the prior art to effectively dispatch ship locks of different levels to improve ship locks through the locks, resulting in congestion in ship locks through the locks.
Through an automatic gearing method and system, based on the dimension data of the ship and lock, the maximum capacity of the lock is determined by iteratively, the ship gearing scheme is optimized, the maximum utilization rate of the lock is ensured, and the ship's mooring is shortened by the principle of back-in-first-out time.
It significantly improves the effective utilization rate of the lock and the overall efficiency of the lock, reduces manual interference, avoids the situation where the ship cannot pass the lock due to errors in size selection, and alleviates the congestion of the ship's lock through.
Smart Images

Figure CN118917599A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of gear shifting for ships passing through a lock, and in particular to an automatic gear shifting method, system and device for ships passing through locks of different grades with the same cross section. Background Art
[0002] With the development of the shipping industry, the number of inland navigable ships is increasing, and the ships are becoming larger and larger, with larger tonnage. Many inland hubs have built ship locks, but due to the low tonnage level of the original lock design, they can no longer meet the navigation needs of ships, resulting in congestion of ships passing through the locks. Therefore, many inland hubs will build one or more lines of larger and higher-level locks after the existing locks are built to meet the needs of shipping development, which leads to a situation where different levels of locks exist in the same section of the inland river. There are differences between the old and new locks, and the ships that can be served by each other must have different service ranges. How to dispatch between locks of different levels to improve the efficiency of ship passing through the locks has become a challenging and urgent task for lock dispatchers and managers.
[0003] Patent application number 202011603741.0 discloses a method for automatic scheduling of multi-line locks. This method mainly involves grading ships that have completed lock registration into designated locks according to their sizes when scheduling multi-line locks. This method simply classifies ships by size and then arranges them into locks of corresponding sizes based on the classification structure, without considering the maximum utilization rate of a single lock area or the maximum utilization rate of the overall lock area.
[0004] The patent application number 201310576938.3 also discloses a simulation and analysis method for the joint scheduling of multi-line parallel locks. This method regards the scheduling of ship passing through the lock as an operation problem of two objects, the lock and the ship, and uses this to construct a mathematical model of the lock operation status and a mathematical model of the fleet movement. The two models use scheduling conditions to constrain each other. When used for the analysis of the operation status of multi-line parallel locks and the traffic conditions in the navigation conflict zone, the mutual influence between locks, locks and ships, and ships and ships in the joint scheduling of multi-line parallel locks can be calculated and analyzed. This method mainly studies and analyzes the navigation conditions of ships before and after entering and exiting the locks of ships passing through multi-line parallel locks, mainly to provide a reference for traffic organization in the joint scheduling of multi-line parallel locks. Summary of the invention
[0005] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a method, system and device for automatically shifting gears for ships passing through locks of different grades with the same cross-section.
[0006] The purpose of the present invention can be achieved by the following technical solutions:
[0007] As a first aspect of the present invention, a method for automatically shifting gears for ships passing through locks of different grades with the same cross-section is provided, wherein the method is used for scheduling and shifting gears when there are multiple locks of different grades in the cross-section, and the steps include:
[0008] According to the order of application, the ships applying for passage are arranged into the lock chambers of each lock in turn until the lock can no longer accommodate more ships and the original gear shifting plan is obtained;
[0009] According to the order of ship reporting and passing through the lock, add the reporting ships to the original gear plan;
[0010] Each time a ship is added to the lock, for each lock, the ships in each row of the lock are blocked in turn based on the width of the lock and the ship, until the remaining length of the lock cannot accommodate the current largest ship; the last row of the lock is blocked according to the remaining length of the lock and the length of the ship, and a pre-lock plan is formed;
[0011] Repeat the above process of adding ships reporting for locks and arranging ships to form a lock-passing plan until each lock can no longer fully accommodate all the ships in the lock-passing plan; the lock-passing plan that can accommodate the largest number of ships is used as the final lock-passing scheduling plan.
[0012] As a preferred technical solution, the ship blocks are sequentially arranged in each row of the locks based on the width of the locks and the ships, as follows:
[0013] For each row of locks, select the ship with the largest current size for placement;
[0014] According to the width of the lock chamber, and based on whether the remaining width of the lock chamber after placing the largest ship can accommodate the two smallest ships side by side, ships of appropriate width shall be placed within the remaining width of the lock.
[0015] As a preferred technical solution, if the remaining width of the lock chamber after placing the largest ship is greater than the sum of the widths of the two smallest ships placed side by side, the smallest ship will be placed first, and then the remaining width of the lock chamber after placing the largest and smallest ships will be calculated;
[0016] According to the remaining width of the lock chamber after placing the largest ship and the smallest ship, select a ship from the remaining ships to place so that the remaining width of the lock chamber is the smallest after placing it.
[0017] As a preferred technical solution, if the remaining width of the lock chamber after placing the largest ship is less than the sum of the widths of the two smallest ships placed side by side, then according to the remaining width of the lock chamber after placing the largest ship, one ship is selected from the remaining ships and placed separately, so that the remaining width of the lock chamber after placing it is minimized.
[0018] As a preferred technical solution, the last row of the lock is shifted according to the remaining length of the lock and the length of the ship, as follows:
[0019] Calculate whether the smallest ship can fit into the remaining space in the lock;
[0020] If the remaining length of the lock is greater than the length of the smallest ship, the smallest ship will be put into the gear sequence;
[0021] If the remaining length of the lock is less than the length of the smallest ship, the ship cannot be included in the gear sequence to complete the gear shifting of the corresponding lock.
[0022] As a preferred technical solution, the method arranges the ships in the same row from large to small in sequence, and makes the larger ships in the latter row dock behind the smaller ships in the former row.
[0023] As an optimal technical solution, the method adopts the last-in-first-out principle for ships entering the final gear scheme to dock at the pier, that is, instructing the ship to dock at the pier. For the same row of ships, the ship that first enters the lock chamber will enter the pier later and dock on the outside.
[0024] As a second aspect of the present invention, there is provided a system for automatically shifting gears for ships passing through locks of different levels with the same cross-section, the system executing the method for automatically shifting gears for ships passing through locks of different levels with the same cross-section as described above, comprising:
[0025] Data collection module, used to collect basic data such as the size of ships passing through the lock, and basic information of the lock;
[0026] The model building module is used to determine the ship automatic gear shifting rules based on the available space in the lock chamber, obtain the ship passing through the lock reporting information, and build the automatic gear shifting models of locks of different levels with the same section according to the basic data of the passing ship and the ship gear shifting rules;
[0027] The ship gear module is used to optimize and solve the automatic gear models of locks of different levels with the same cross-section in sequence by using a screening strategy, obtain the best automatic gear scheme for locks of different levels with the same cross-section, form a gear diagram for passing the lock, guide the sequence of each ship passing the lock in the anchorage based on the automatic gear scheme for locks of different levels with the same cross-section and the gear diagram, and instruct the ships passing the lock to dock at the berthing pier and the designated position in the lock chamber according to the automatic gear scheme, so as to realize the automatic gear method for ships in locks of different levels with the same cross-section.
[0028] As a third aspect of the present invention, there is provided an automatic gear shifting device for ships passing through locks of different levels with the same cross-section, comprising a memory, a processor, and a program stored in the memory, wherein when the processor executes the program, the automatic gear shifting method for ships passing through locks of different levels with the same cross-section as described above is implemented.
[0029] As a fourth aspect of the present invention, there is provided a storage medium having a program stored thereon, wherein when the program is executed, the method for automatically shifting gears for ships passing through locks of different levels with the same cross-section as described above is implemented.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] 1) The present invention aims at the gear shifting of different-level ship lock groups with the same section. Under the basic principle of "first come, first served", an iterative method is adopted to calculate the maximum number of ships that the ship lock group can accommodate, and the optimal solution is selected as the final gear shifting scheme, which can significantly improve the effective utilization rate of the ship locks.
[0032] 2) The present invention arranges gears according to the size of the ship, collects the length and width data of the ships passing through the lock, and arranges gears according to the principle of maximizing the lock chamber utilization rate of the lock that is arranged first, thereby ensuring that some locks have a higher lock chamber utilization rate and improving the overall lock chamber utilization rate.
[0033] 3) The present invention arranges the ships in the same row from large to small in sequence, and allows the larger ships in the latter row to dock behind the smaller ships in the former row, thereby improving the utilization efficiency of the length of the lock.
[0034] 4) For ships entering the final gearing plan, the last-in-first-out principle is adopted to dock at the berthing pier, that is, the ship is instructed to dock at the berthing pier, and the ship in the same row that enters the lock chamber first will dock at the berthing pier later. This can shorten the berthing time when the ship enters the lock chamber and improve the efficiency of passing the lock.
[0035] 5) The present invention also provides an automatic gear shifting system for ships in locks of different levels with the same cross-section, which is more objective and accurate, avoiding the situation in which the lock cannot accommodate the ship to be arranged to pass through the lock due to incorrect selection of ship size during manual gear shifting, reducing human interference factors and improving lock passing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 The present invention is a flow chart of an implementation method of automatic gear shifting for ships passing through locks of different grades with the same cross-section.
[0037] Figure 2 It is a schematic diagram of the upward gear of the ship lock in one embodiment of the present invention. DETAILED DESCRIPTION
[0038] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.
[0039] Example 1
[0040] As one of the embodiments of the present invention, a method for automatically shifting ships in locks of different levels with the same cross-section is provided, which can enable the lock dispatcher to automatically shift the ships through the lock after the ship passes the lock, and inform the ships passing the lock of the shifting plan through wireless broadcasting. Under the premise that the ships waiting for the lock meet the priority of reporting and passing the lock, the number of ships passing the lock is maximized, the utilization rate of the lock chamber is improved, the efficiency of ship passing the lock is improved, and the congestion of ships passing the lock is alleviated.
[0041] The present invention is applicable to the dispatching and shifting work of the ship locks with more than two different grades in the cross section. In this embodiment, the ship locks with four different grades in the same cross section are taken as an example. Figure 1 As shown, the specific execution steps of the method of the present invention are as follows:
[0042] Step 1. Collect the lock parameter data and calculate the lengths of locks 1 to 4, respectively. 1 , L 2 , L 3 , L 4 ; The widths of locks 1 to 4 are W 1 , W 2 , W 3 , W 4 , and W 1 <W 2 <W 3 <W 4 .
[0043] Step 2. According to the order of lock application, the ships are arranged to pass through the lock once, that is, according to the order of lock application, the ships applying for lock application are arranged into lock chambers 1 to 4 in sequence until the lock can no longer accommodate more ships. This gearing scheme is counted as the original gearing scheme;
[0044] Step 3. Based on the principle of "first come, first served", add one ship that has reported to the lock to the original gear plan according to the order of ship reporting and passing the lock, forming the lock pre-plan 0;
[0045] Step 4. According to the information of ship declaration, collect the parameter data of ships passing through the lock, and sort the n ships passing through the lock plan 0 from large to small. If the size of two ships is the same, sort them from large to small according to the actual tonnage, and record their length and width dimensions as
[0046] Step 5. Maximize the ship Place it in the first row at the front of Gate 4;
[0047] Step 6. Calculate the remaining width based on the lock chamber width to see if the two smallest ships can be placed side by side. like If the width is sufficient, place the smallest ship first. Then calculate the remaining width According to W k , select a ship with the most suitable width from the remaining ships Maximize the utilization of the lock chamber width, that is, There is a minimum value (W>0), and the gears are shifted in order from large to small according to the same row of ships; if Then calculate the remaining width According to W k , placing a ship with the most suitable width alone can maximize the width utilization of the lock chamber. There is a minimum value (W>0);
[0048] Step 7. Rearrange the remaining ships after step 6 according to their sizes from large to small, and record their length and width dimensions respectively.
[0049] Step 8. Maximize the Ship Placed in the second row of Lock No. 4, according to the width of the lock chamber, calculate whether the remaining width can accommodate the smallest two ships side by side like If the width is sufficient, place the smallest ship first. Then calculate the remaining width According to W k , select a ship with the most suitable width from the remaining ships Maximize the utilization of the lock chamber width, that is, has a minimum value (W>0); and the ships in the same row are arranged in order from large to small, and the larger ships are docked behind the smaller ships; if Then calculate the remaining width According to W k , placing a ship with the most suitable width alone can maximize the utilization of the lock chamber width. There is a minimum value (W>0);
[0050] Step 9. Complete the ship blocking work of the 3rd, 4th, 5th to Nth rows of Lock 4 according to the above rules, until the length of Lock 4 cannot accommodate the largest ship in the N+1th row. Right now Then calculate the smallest ship Can the length of the The ship Into the gear sequence, No. 4 lock gears N+1 rows of ships; if This means that the length of the space is insufficient and the ship cannot be Enter the gear sequence, i.e., Lock 4 will gear N rows of ships, and Lock 4 will complete the gear shifting;
[0051] Step 10. Use the same rules to complete the gear shifting work for Gate 3, Gate 2, and Gate 1;
[0052] Step 11. If locks 1 to 4 can fully accommodate n ships in lock pre-plan 0, then add one ship to lock pre-plan 0 according to the order of ship registration and lock passing, forming lock pre-plan 1;
[0053] Step 12. Identify the ship sizes, sort the n+1 ships by size, and record their length and width dimensions respectively. Follow the same rules as above to complete the shifting of gates 4, 3, 2, and 1;
[0054] Step 13. If locks 1 to 4 can fully accommodate n+1 ships in lock pre-plan 1, then add another ship to lock pre-plan 1 to form lock pre-plan 2;
[0055] By analogy, when the lock pre-plan m is reached, when locks 1 to 4 cannot fully accommodate the n+m ships of lock pre-plan m, it means that locks 1 to 4 cannot accommodate more ships, and the operation ends. Then lock pre-plan n+m-1 is counted as the final plan for this round of lock scheduling, and a lock gear diagram is formed;
[0056] Step 14. Inform the ships that enter the final plan of the lock passage scheduling to dock at the berthing pier using the last-in-first-out principle, that is, instruct the ships to dock at the berthing pier. For the same row of ships, the ship that enters the lock chamber first will enter the berthing pier later and dock at the outside.
[0057] Compared with the prior art, the above technical scheme proposes for the first time a gearing solution for the scheduling of different-level ship lock groups with the same cross section; for the gearing of different-level ship lock groups with the same cross section, under the basic principle of "first report, first pass", an iterative method is used to calculate the maximum number of ships that the ship lock group can accommodate, and the optimal solution is selected as the final gearing scheme, which can significantly improve the effective utilization rate of the ship lock. Gearing is performed according to the size of the ship, and the length and width dimension data of the ships passing through the lock are collected. Gearing is performed according to the principle of making the first geared ship lock have the maximum lock chamber utilization rate, which can ensure that some locks have a higher lock chamber utilization rate and improve the overall lock chamber utilization rate. The same row of ships is geared from large to small, and the larger ships in the latter row are docked behind the smaller ships in the former row, which can improve the length and size utilization efficiency of the lock. For the ships entering the final gearing scheme, the last-in-first-out principle is adopted to dock at the pier, that is, the ship is instructed to dock at the pier. For the same row of ships, the ship that first enters the lock chamber, the ship that enters the pier later, and is moored on the outside. It can shorten the berthing time of ships entering the lock chamber and improve the efficiency of passing the lock.
[0058] Example 2
[0059] In this embodiment, a water conservancy project is taken as an example. There are four locks on it, which are arranged in parallel on the right bank of the river section. Among them, lock No. 1 is 2000 tons, and the lock chamber size is 200mx34mx4.5m (length x width x depth, the same below), and lock No. 2 is 1000 tons, and the lock chamber size is 185mx23mx3.5m. Lock No. 3 and lock No. 4 are 3000 tons, and the lock chamber size is 330mx34mx5.8m. The total annual one-way capacity of the four locks exceeds 100 million tons. It can be seen from the lock parameters that the water conservancy project is a typical case of different levels of locks on the same section. The following takes the example of ships passing through the lock group as an example to illustrate the specific implementation of the present invention.
[0060] Step 1. If a ship plans to go upstream through the four-line ship lock, it must first report to the ship lock operation and management unit and inform the basic parameters of the ship and cargo information. The ship will be moored at the anchorage of the lock and wait for passage. The ship lock operation and management unit will review the information provided by the ship. If the ship is a ship that should be given priority to pass the lock as stipulated by the traffic management department, it will be given priority to pass the lock according to policy requirements; if it is not a ship that is given priority to pass the lock, the ship will be given a corresponding queue number to queue for the lock. And collect the lock parameter data, the lengths of locks 1 to 4 are L respectively. 1 , L 2 , L 3 , L 4 ; The widths of locks 1 to 4 are W 1 , W 2 , W 3 , W 4 , and W 1 <W 2 <W 3 <W 4 .
[0061] Table 1 Dimensional parameters of Changzhou Locks No. 1 to 4
[0062]
[0063] According to the method for shifting gears for ships passing through locks of different levels with the same cross section as described in the above embodiment, the No. 1 to No. 4 locks are shifted, and the upward gear of the lock is as follows: Figure 2 As shown, the method for shifting ships in locks of different levels with the same cross section of the present invention can enable the lock dispatcher to automatically shift the ships through the lock after the ship has reported the lock, and then inform the ships passing through the lock of the shifting plan through wireless broadcasting. Under the premise that the ships waiting for the lock meet the priority of reporting and passing through the lock, the number of ships passing through the lock is maximized, the utilization rate of the lock chamber is improved, the efficiency of ship passing through the lock is improved, and the congestion of ships passing through the lock is alleviated.
[0064] Example 3
[0065] As another embodiment of the present invention, this embodiment provides an automatic gear shifting system for ships in locks of different levels with the same cross-section, and the system includes:
[0066] Data collection module, used to collect basic data such as the size of ships passing through the lock, and basic information of the lock;
[0067] The model building module is used to determine the ship automatic gear shifting rules based on the available space in the lock chamber, obtain the ship passing through the lock reporting information, and build the automatic gear shifting models of locks of different levels with the same section according to the basic data of the passing ship and the ship gear shifting rules;
[0068] The ship gear module is used to optimize and solve the automatic gear models of locks of different levels with the same cross-section in sequence by using a screening strategy, obtain the best automatic gear scheme for locks of different levels with the same cross-section, form a gear diagram for passing the lock, guide the sequence of each ship passing the lock in the anchorage based on the automatic gear scheme for locks of different levels with the same cross-section and the gear diagram, and instruct the ships passing the lock to dock at the berthing pier and the designated position in the lock chamber according to the automatic gear scheme, so as to realize the automatic gear method for ships in locks of different levels with the same cross-section.
[0069] This embodiment uses an automatic gear shifting system for ships in locks of different levels with the same cross-section to automatically calculate the gear shifting plan for ships passing through the locks. Compared with manual gear shifting, it is faster and can improve work efficiency. An automatic gear shifting system for ships in locks of different levels with the same cross-section automatically shifts gears, which is more objective and accurate. It avoids the situation that the lock cannot accommodate the ship to be scheduled to pass through the lock due to the error in the selection of ship size during manual gear shifting, reduces human interference factors, and improves the efficiency of passing through the lock. Automated gear shifting reduces labor costs and the overall operating costs of the locks; gear scheduling abides by the basic principle of first-come-first-served, and abides by the relevant provisions of the operation and management methods of navigation buildings.
[0070] The present invention takes ships passing through the lock as the research object, and each ship passing through the lock as an independent individual. Aiming at the gear shifting problem of ships passing through locks of different grades with the same cross-section, the present invention uses an automated program to automatically analyze and calculate the gear shifting schemes with relatively high lock passing efficiency obtained by ships passing through the lock under different gear shifting rules, and selects the gear shifting scheme with the highest efficiency as the final gear shifting scheme for ships passing through the lock. After determining the final gear shifting scheme, the gear shifting of the ships passing through the lock is scheduled according to the principle of "last in, first out". Under the lock operation trend of "high efficiency and few people", the present invention provides a solution and reference basis for the automatic scheduling and management of locks of different grades with the same cross-section.
[0071] Example 4
[0072] As a third aspect of the present invention, the present application also provides an electronic device, comprising: one or more processors; a memory for storing one or more programs; when the one or more programs are executed by the one or more processors, the one or more processors implement the above-mentioned method for shifting ships in locks of different levels with the same section. In addition to the above-mentioned processor, memory and interface, any device with data processing capability in which the device in the embodiment is located may also include other hardware according to the actual function of the device with data processing capability, which will not be described in detail.
[0073] Example 5
[0074] As a fourth aspect of the present invention, the present application also provides a computer-readable storage medium having computer instructions stored thereon, which, when executed by a processor, implement the above-mentioned method for shifting ships in locks of different levels with the same section. The computer-readable storage medium may be an internal storage unit of any device with data processing capabilities as described in any of the aforementioned embodiments, such as a hard disk or a memory. The computer-readable storage medium may also be an external storage device, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), an SD card, a flash card (Flash Card), etc. equipped on the device. Furthermore, the computer-readable storage medium may also include both an internal storage unit and an external storage device of any device with data processing capabilities. The computer-readable storage medium is used to store the computer program and other programs and data required by any device with data processing capabilities, and may also be used to temporarily store data that has been output or is to be output.
[0075] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A method for automatically shifting gears for ships passing through locks of different levels with the same cross section, characterized in that: The method is used to perform the scheduling and shifting work of a section with multiple ship locks of different grades, and the steps include: According to the order of application, the ships applying for passage are arranged into the lock chambers of each lock in turn until the lock can no longer accommodate more ships and the original gear shifting plan is obtained; According to the order of ship reporting and passing through the lock, add the reporting ships to the original gear plan; Each time a ship is added to the lock, for each lock, the ships in each row of the lock are blocked in turn based on the width of the lock and the ship, until the remaining length of the lock cannot accommodate the current largest ship; the last row of the lock is blocked according to the remaining length of the lock and the length of the ship, and a pre-lock plan is formed; Repeat the above process of adding ships reporting for locks and arranging ships to form a lock-passing plan until each lock can no longer accommodate all the ships in the lock-passing plan. The lock-passing plan that can accommodate the largest number of ships is used as the final lock-passing scheduling plan.
2. The method for automatically shifting gears for ships passing through locks of different levels with the same cross-section according to claim 1 is characterized in that: The ship blocking is performed in each row of the lock in turn based on the width of the lock and the ship, specifically as follows: For each row of locks, select the ship with the largest current size for placement; According to the width of the lock chamber, and based on whether the remaining width of the lock chamber after placing the largest ship can accommodate the two smallest ships side by side, ships of appropriate width shall be placed within the remaining width of the lock.
3. The method for automatically shifting gears for ships passing through locks of different levels with the same cross-section according to claim 2, characterized in that: If the remaining width of the lock chamber after placing the largest ship is greater than the sum of the widths of the two smallest ships placed side by side, the smallest ship shall be placed first, and then the remaining width of the lock chamber after placing the largest and smallest ships shall be calculated; According to the remaining width of the lock chamber after placing the largest ship and the smallest ship, select a ship from the remaining ships to place so that the remaining width of the lock chamber is the smallest after placing it.
4. The method for automatically shifting gears for ships passing through locks of different levels with the same cross section according to claim 2, characterized in that: If the remaining width of the lock chamber after placing the largest ship is less than the sum of the widths of the two smallest ships placed side by side, then according to the remaining width of the lock chamber after placing the largest ship, one ship shall be selected from the remaining ships and placed separately so that the remaining width of the lock chamber after placing it is the smallest.
5. The method for automatically shifting gears for ships passing through locks of different levels with the same cross-section according to claim 1, characterized in that: The last row of the lock is shifted according to the remaining length of the lock and the length of the ship, as follows: Calculate whether the smallest ship can fit into the remaining space in the lock; If the remaining length of the lock is greater than the length of the smallest ship, the smallest ship will be included in the gear sequence; If the remaining length of the lock is less than the length of the smallest ship, the ship cannot be included in the gear sequence to complete the gear shifting of the corresponding lock.
6. The method for automatically shifting gears for ships passing through locks of different levels with the same cross-section according to claim 1, characterized in that: The method sequentially arranges the ships in the same row from large to small, and makes the larger ships in the latter row dock behind the smaller ships in the former row.
7. The method for automatically shifting gears for ships passing through locks of different levels with the same cross-section according to claim 1, characterized in that: The method adopts the last-in-first-out principle to dock the ships entering the final gear plan at the berthing pier, that is, instructs the ships to dock at the berthing pier, and the ships in the same row that sail to the lock chamber first enter the berthing pier later and dock at the outside.
8. An automatic gear shifting system for ships with locks of different levels in the same section, characterized in that: The system implements the method for automatically shifting gears for ships passing through locks of different levels with the same cross-section as described in any one of claims 1 to 7, comprising: Data collection module, used to collect basic data such as the size of ships passing through the lock, and basic information of the lock; The model building module is used to determine the ship automatic gear shifting rules based on the available space in the lock chamber, obtain the ship passing through the lock reporting information, and build the automatic gear shifting models of locks of different levels with the same section according to the basic data of the passing ship and the ship gear shifting rules; The ship gear module is used to optimize and solve the automatic gear models of locks of different levels with the same cross-section in sequence by using a screening strategy, obtain the best automatic gear scheme for locks of different levels with the same cross-section, form a gear diagram for passing the lock, guide the sequence of each ship passing the lock in the anchorage based on the automatic gear scheme for locks of different levels with the same cross-section and the gear diagram, and instruct the ships passing the lock to dock at the berthing pier and the designated position in the lock chamber according to the automatic gear scheme, so as to realize the automatic gear method for ships in locks of different levels with the same cross-section.
9. An automatic gear shifting device for ships in locks of different levels with the same cross section, comprising a memory, a processor, and a program stored in the memory, characterized in that: When the processor executes the program, the method for automatically shifting gears for ships passing through locks of different levels with the same cross-section as described in any one of claims 1-7 is implemented.
10. A storage medium having a program stored thereon, characterized in that: When the program is executed, the method for automatically shifting gears for ships passing through locks of different levels with the same cross-section as described in any one of claims 1-7 is implemented.