Project cost consultation management method and system
Through multi-angle regulation and evaluation of engineering cost consulting management, a low cost risk and feasibility plan was selected, and the problem of construction plans in the existing technology did not meet the needs and budget exceeded, achieving higher completion and Party A Satisfaction.
Patent Information
- Application Number
- CN202410920648.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-08
AI Technical Summary
The existing engineering cost consulting management methods are relatively simple, and the considerations are not comprehensive enough, especially the considerations of cost control and construction feasibility and risk, which makes it difficult for the plan to meet the actual construction needs, and it is easy to have insufficient completion or excessive budget. Condition.
By obtaining project plans, design plans and construction plans, we form a preliminary cost structure, conduct budget control, feasibility assessment, cost risk assessment and plan adjustment, select candidates with low cost risk and feasibility, and conduct full monitoring during the construction process. and real-time modifications to store related data using distributed storage technology.
Ensure that the plan can meet the needs of Party A and actual construction, improve the completion degree, reduce the possibility of exceeding the budget, and fully consider Party A's opinions to enhance Party A's experience.
Smart Images

Figure HDA0004936608000000011 
Figure HDA0004936608000000021 
Figure HDA0004936608000000022
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering cost consulting management, and in particular to a method and system for engineering cost consulting management. Background Art
[0002] Engineering cost consulting management refers to the process of comprehensive evaluation and management of project costs through professional consulting agencies or consultants in construction projects. Engineering cost consulting management aims to ensure that the project cost is reasonable, economical and efficient, and provide decision-making basis and support.
[0003] The existing engineering cost consulting management is relatively simple and does not take into account all aspects, especially the feasibility and risk of cost control and construction. As a result, in actual construction, the solutions generated by the engineering cost consulting management are difficult to meet the needs of Party A and the actual construction needs, and are prone to insufficient solution completion or large budget overruns. Summary of the invention
[0004] In order to solve the above technical problems, a method and system for engineering cost consulting management are provided. This technical solution solves the problem that the existing engineering cost consulting management proposed in the above background technology is relatively single and does not take into account all situations, especially the feasibility and risk of cost control and construction. As a result, in actual construction, the solutions generated by the engineering cost consulting management are difficult to meet the needs of Party A and the actual construction, and are prone to problems such as insufficient completion of the solutions or large budget overruns.
[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:
[0006] A method for engineering cost consulting management, comprising:
[0007] Obtaining a project plan, a design plan and a construction plan, obtaining a construction cost budget, and forming a preliminary cost framework based on the project plan, the design plan and the construction plan, wherein the preliminary cost framework is composed of at least one project process;
[0008] Send the preliminary cost structure to Party A to obtain budget details, and form a budget control plan based on the budget details;
[0009] Evaluate and analyze the preliminary cost framework and form consulting opinions;
[0010] Based on the consulting opinions and the budget control plan, form at least one pre-selected plan, conduct a feasibility assessment on the pre-selected plan, and select the pre-selected plan that meets the feasibility assessment as the alternative plan;
[0011] Conduct cost risk assessment on alternative plans to obtain cost risk values, and select alternative plans with cost risk values less than the preset value as candidate plans;
[0012] Sending at least one candidate solution to Party A, obtaining Party A's adjustment requirements, and adjusting at least one candidate solution based on Party A's adjustment requirements to obtain at least one optimized solution;
[0013] Send at least one optimization plan to Party A, obtain Party A's voting results, and select the optimization plan with the highest number of votes as the final budget plan;
[0014] Monitor the cost during the project implementation process. When the project is changed due to force majeure, modify the final budget plan in real time based on the changes in the project, and send the modified results of the final budget plan to Party A. Force majeure factors include construction errors and weather factors.
[0015] Distributed storage technology is used to store the preliminary cost framework, budget control plan, consulting opinions, pre-selected plans, alternative plans, candidate plans, optimized plans, final budget plan and the modification results of the final budget plan.
[0016] Preferably, forming a preliminary cost framework according to the project plan, design plan and construction plan includes the following steps:
[0017] According to the project plan, at least one construction process is obtained during construction;
[0018] Based on the design plan, decompose and obtain at least one construction target object;
[0019] Allocating at least one construction target object to at least one construction process, and aggregating the construction target objects corresponding to the same construction process to obtain a set of construction target objects;
[0020] Based on the construction plan, at least one construction labor cost is decomposed;
[0021] Allocating at least one construction labor cost to at least one construction process, and aggregating the construction labor costs corresponding to the same construction process to obtain a construction labor cost set;
[0022] Summarize the construction process, the set of construction objects, the set of construction labor costs and their corresponding relationships to form a preliminary cost framework.
[0023] Preferably, forming a budget control scheme based on the budget details comprises the following steps:
[0024] Decomposing the budget details into at least one budget limit, and pairing at least one budget limit with at least one construction process, wherein the total cost of the construction process is less than the corresponding budget limit;
[0025] Summarize the budget limits, construction processes and their matching relationships to form a budget control plan.
[0026] Preferably, the step of evaluating and analyzing the preliminary cost framework and forming an advisory opinion comprises the following steps:
[0027] Based on the big data, at least one construction benchmark target object and at least one construction benchmark cost required to complete the construction process are obtained;
[0028] The construction process and its corresponding at least one construction benchmark target and at least one construction benchmark cost are summarized to form an advisory opinion.
[0029] Preferably, the forming of at least one pre-selected plan based on the consultation opinion and the budget control plan comprises the following steps:
[0030] A random combination of at least one construction benchmark object forms a first combination, and the first combination is paired with a construction process corresponding to the construction benchmark object;
[0031] At least one random combination of construction benchmark costs is formed into a second combination, and the second combination is paired with a construction process corresponding to the construction benchmark cost;
[0032] Use the first combination corresponding to the construction process to supplement the set of construction target objects corresponding to the construction process;
[0033] The second combination corresponding to the construction process is used to supplement the construction labor cost set corresponding to the construction process;
[0034] Obtain a supplemented preliminary cost structure as a pre-selected option;
[0035] When the first combination traverses all random combinations of at least one construction benchmark object and the second combination traverses all random combinations of at least one construction benchmark cost, the supplemented preliminary cost structure forms at least one pre-selected solution;
[0036] Based on historical data, in the pre-selected plan, the minimum cost of the construction process to complete its corresponding construction target set and construction labor cost set is obtained. When the minimum cost of the construction process is higher than the corresponding budget limit, the pre-selected plan is deleted.
[0037] Preferably, the feasibility assessment of the pre-selected schemes and the selection of the pre-selected schemes that pass the feasibility assessment comprises the following steps:
[0038] Allocate the budget limit corresponding to the construction process in proportion to the set of construction target objects and the set of construction labor costs corresponding to the construction process, and obtain the budget pre-selection allocation relationship;
[0039] According to the budget pre-selection allocation relationship and based on historical data, the completion degree of the construction process is estimated to obtain the feasibility value of the construction process;
[0040] When the feasibility value of at least one construction process in the pre-selected scheme is greater than a preset value, the pre-selected scheme is used as an alternative scheme.
[0041] Preferably, the step of performing cost risk assessment on the alternative solutions to obtain a cost risk value comprises the following steps:
[0042] Conduct cost analysis on the set of construction objects and the set of construction labor costs corresponding to the construction process in the alternative solutions;
[0043] Based on historical data, the possibility that the total cost of the construction process exceeds the corresponding budget limit is obtained as the cost risk value.
[0044] Preferably, adjusting at least one candidate solution based on the adjustment requirements of Party A includes the following steps:
[0045] Based on the adjustment requirements of Party A, the set of construction target objects and the set of construction labor costs corresponding to the construction process in the candidate solution are adjusted;
[0046] The adjusted candidate plan will be used as the optimized plan.
[0047] Preferably, the real-time modification of the final budget plan based on the changes in the project includes the following steps:
[0048] Based on the changes in the project, at least one element that needs to be reworked in the set of construction objects corresponding to the construction process in the final budget plan is obtained and copied and added to the set of construction objects corresponding to the construction process;
[0049] The labor cost of at least one element that needs to be reworked corresponding to the construction process is calculated and added to the construction labor cost set.
[0050] A system for engineering cost consulting management, used to implement the above-mentioned method for engineering cost consulting management, comprising:
[0051] A framework building module, wherein the framework building module obtains a project plan, a design plan and a construction plan, obtains a construction cost budget, and forms a preliminary cost framework according to the project plan, the design plan and the construction plan, wherein the preliminary cost framework is composed of at least one project process;
[0052] A budget control module, wherein the budget control module sends a preliminary cost structure to Party A, obtains budget details, and forms a budget control plan based on the budget details;
[0053] An architecture assessment module, which assesses and analyzes the preliminary cost architecture and forms an advisory opinion;
[0054] A feasibility assessment module, which forms at least one pre-selected plan based on the consulting opinion and the budget control plan, performs feasibility assessment on the pre-selected plan, and selects the pre-selected plan that meets the feasibility assessment as an alternative plan;
[0055] A risk assessment module, wherein the risk assessment module performs a cost risk assessment on the alternative solutions to obtain a cost risk value, and selects an alternative solution with a cost risk value less than a preset value as a candidate solution;
[0056] A solution adjustment module, wherein the solution adjustment module sends at least one candidate solution to Party A, obtains Party A's adjustment requirements, and adjusts at least one candidate solution based on Party A's adjustment requirements to obtain at least one optimized solution;
[0057] A scheme determination module, wherein the scheme determination module sends at least one optimization scheme to Party A, obtains Party A's voting results, and selects the optimization scheme with the highest number of votes as the final budget scheme;
[0058] A monitoring and modification module, which monitors the costs during the project implementation process. When the project is changed due to force majeure, the final budget plan is modified in real time based on the changes in the project, and the modification results of the final budget plan are sent to Party A;
[0059] A distributed storage module uses distributed storage technology to store the preliminary cost structure, budget control plan, consulting opinions, pre-selected plans, alternative plans, candidate plans, optimized plans, final budget plan and the modification results of the final budget plan.
[0060] Compared with the prior art, the present invention has the following beneficial effects:
[0061] By setting up the architecture building module, budget control module, architecture evaluation module, feasibility evaluation module, risk assessment module and scheme adjustment module, the budget scheme can be adjusted from multiple angles to ensure that the scheme can meet the needs of Party A and actual construction. At the same time, the feasibility of construction is evaluated, and the cost risk is evaluated, so as to select a scheme with high feasibility and low cost risk. In this way, the completion of the scheme can be guaranteed, and the possibility of the scheme exceeding the budget is low. At the same time, the opinions of Party A are fully taken into consideration, and the real-time situation of the budget exceeding is generated and pushed to Party A in a timely manner, thereby improving Party A's experience. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] Figure 1 A schematic diagram of the method flow of engineering cost consulting management of the present invention;
[0063] Figure 2 A schematic diagram of a preliminary cost structure process flow chart is formed according to the project plan, design plan and construction plan of the present invention;
[0064] Figure 3 A schematic diagram of a flow chart of forming a budget control scheme based on budget details of the present invention;
[0065] Figure 4 For the present invention, the preliminary cost framework is evaluated and analyzed to form a consultation opinion flow chart;
[0066] Figure 5 Form at least one pre-selected solution flow diagram for the present invention based on consulting opinions and budget control solutions;
[0067] Figure 6 A schematic flow chart of the present invention for conducting feasibility assessment on pre-selected schemes and selecting pre-selected schemes that meet the feasibility assessment;
[0068] Figure 7 The cost risk assessment of the alternative solutions is performed for the present invention to obtain a cost risk value flow chart;
[0069] Figure 8 A schematic diagram of a flow chart of adjusting at least one candidate solution based on the adjustment requirements of Party A of the present invention;
[0070] Fig. 9 The present invention is a flowchart of modifying the final budget plan in real time based on the changes in the project. DETAILED DESCRIPTION
[0071] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.
[0072] Reference Figure 1 As shown, a method for engineering cost consulting management includes:
[0073] Obtaining a project plan, a design plan and a construction plan, obtaining a construction cost budget, and forming a preliminary cost framework based on the project plan, the design plan and the construction plan, wherein the preliminary cost framework is composed of at least one project process;
[0074] Send the preliminary cost structure to Party A to obtain budget details, and form a budget control plan based on the budget details;
[0075] Evaluate and analyze the preliminary cost framework and form consulting opinions;
[0076] Based on the consulting opinions and the budget control plan, form at least one pre-selected plan, conduct a feasibility assessment on the pre-selected plan, and select the pre-selected plan that meets the feasibility assessment as the alternative plan;
[0077] Conduct cost risk assessment on alternative plans to obtain cost risk values, and select alternative plans with cost risk values less than the preset value as candidate plans;
[0078] Sending at least one candidate solution to Party A, obtaining Party A's adjustment requirements, and adjusting at least one candidate solution based on Party A's adjustment requirements to obtain at least one optimized solution;
[0079] Send at least one optimization plan to Party A, obtain Party A's voting results, and select the optimization plan with the highest number of votes as the final budget plan;
[0080] Monitor the cost during the project implementation process. When the project is changed due to force majeure, modify the final budget plan in real time based on the changes in the project, and send the modified results of the final budget plan to Party A. Force majeure factors include construction errors and weather factors.
[0081] Distributed storage technology is used to store the preliminary cost framework, budget control plan, consulting opinions, pre-selected plans, alternative plans, candidate plans, optimized plans, final budget plan and the modification results of the final budget plan.
[0082] Reference Figure 2 As shown, according to the project plan, design plan and construction plan, the formation of the preliminary cost framework includes the following steps:
[0083] According to the project plan, at least one construction process is obtained during construction;
[0084] Based on the design plan, decompose and obtain at least one construction target object;
[0085] Allocating at least one construction target object to at least one construction process, and aggregating the construction target objects corresponding to the same construction process to obtain a set of construction target objects;
[0086] Based on the construction plan, at least one construction labor cost is decomposed;
[0087] Allocating at least one construction labor cost to at least one construction process, and aggregating the construction labor costs corresponding to the same construction process to obtain a construction labor cost set;
[0088] Summarize the construction process, the set of construction objects, the set of construction labor costs and their corresponding relationships to form a preliminary cost framework.
[0089] The preliminary cost structure includes the construction process and the set of construction target objects and the set of construction labor costs corresponding to the construction process. The cost of the construction process can be estimated based on the set of construction target objects and the set of construction labor costs corresponding to the construction process. The material costs of the elements in the set of construction target objects need to be included in the cost, and the elements in the construction labor cost set are the labor costs of the construction, which also need to be included in the cost. Therefore, the cost of each construction process can be calculated based on the preliminary cost structure, and targeted changes can be made when changes are made, making the entire management process more organized.
[0090] Reference Figure 3 As shown, based on the budget details, forming a budget control plan includes the following steps:
[0091] Decomposing the budget details into at least one budget limit, and pairing at least one budget limit with at least one construction process, wherein the total cost of the construction process is less than the corresponding budget limit;
[0092] Summarize the budget limits, construction processes and their matching relationships to form a budget control plan.
[0093] The budget control plan is given by Party A in order to limit the cost of each construction process and thus limit the overall cost, thereby ensuring that the overall funds will not be excessively exceeded, ensuring that the project funds are sufficient and can be completed smoothly.
[0094] Reference Figure 4 As shown, the evaluation and analysis of the preliminary cost framework and the formation of consulting opinions include the following steps:
[0095] Based on the big data, at least one construction benchmark target object and at least one construction benchmark cost required to complete the construction process are obtained;
[0096] The construction process and its corresponding at least one construction benchmark target and at least one construction benchmark cost are summarized to form an advisory opinion.
[0097] The construction benchmark targets and construction benchmark costs are obtained for the construction process based on big data, and their standards are higher than those of the existing construction process. Therefore, consulting opinions can improve the existing construction process and improve the quality of the construction process without exceeding the budget.
[0098] Reference Figure 5 As shown, based on the consulting opinions and the budget control plan, forming at least one pre-selected plan includes the following steps:
[0099] A random combination of at least one construction benchmark object forms a first combination, and the first combination is paired with a construction process corresponding to the construction benchmark object;
[0100] At least one random combination of construction benchmark costs is formed into a second combination, and the second combination is paired with a construction process corresponding to the construction benchmark cost;
[0101] Use the first combination corresponding to the construction process to supplement the set of construction target objects corresponding to the construction process;
[0102] The second combination corresponding to the construction process is used to supplement the construction labor cost set corresponding to the construction process;
[0103] Obtain a supplemented preliminary cost structure as a pre-selected option;
[0104] When the first combination traverses all random combinations of at least one construction benchmark object and the second combination traverses all random combinations of at least one construction benchmark cost, the supplemented preliminary cost structure forms at least one pre-selected solution;
[0105] Based on historical data, in the pre-selected plan, the minimum cost of the construction process to complete its corresponding construction target set and construction labor cost set is obtained. When the minimum cost of the construction process is higher than the corresponding budget limit, the pre-selected plan is deleted.
[0106] The pre-selected plan satisfies the requirement of minimum cost within the budget. Therefore, the pre-selected plan can be implemented, but the effect of its construction needs to be further evaluated.
[0107] Reference Figure 6 As shown, conducting a feasibility assessment on the pre-selected options and selecting the pre-selected options that meet the feasibility assessment requirements include the following steps:
[0108] Allocate the budget limit corresponding to the construction process in proportion to the set of construction target objects and the set of construction labor costs corresponding to the construction process, and obtain the budget pre-selection allocation relationship;
[0109] According to the budget pre-selection allocation relationship and based on historical data, the completion degree of the construction process is estimated to obtain the feasibility value of the construction process;
[0110] When the feasibility value of at least one construction process in the pre-selected scheme is greater than a preset value, the pre-selected scheme is used as an alternative scheme.
[0111] Due to budget constraints, the completion of each construction step in the construction process of the preliminary plan may not meet the requirements. Therefore, it is necessary to evaluate the feasibility of the construction process and then select an alternative plan with high feasibility. In this way, when implementing the alternative plan, it can avoid construction that does not meet quality requirements.
[0112] Reference Figure 7 As shown in the figure, the cost risk assessment of the alternatives to obtain the cost risk value includes the following steps:
[0113] Conduct cost analysis on the set of construction objects and the set of construction labor costs corresponding to the construction process in the alternative solutions;
[0114] Based on historical data, the possibility that the total cost of the construction process exceeds the corresponding budget limit is obtained as the cost risk value.
[0115] There are various uncertainties in construction, which may lead to budget overruns. Therefore, based on historical data, cost risk assessments of alternative plans can be conducted, and plans with a low possibility of cost overruns can be selected for implementation. Therefore, in actual situations, even if budget overruns occur, they are likely to be within an acceptable range and will not affect the overall progress of the project.
[0116] Reference Figure 8 As shown, based on the adjustment requirements of Party A, adjusting at least one candidate solution includes the following steps:
[0117] Based on the adjustment requirements of Party A, the set of construction target objects and the set of construction labor costs corresponding to the construction process in the candidate solution are adjusted;
[0118] The adjusted candidate plan will be used as the optimized plan.
[0119] The decision-making power of the plan lies with Party A. Therefore, it is necessary to fully consider Party A’s opinions and make targeted adjustments so that the plan meets Party A’s needs.
[0120] Reference Fig. 9 As shown in the figure, based on the changes in the project, the real-time modification of the final budget plan includes the following steps:
[0121] Based on the changes in the project, at least one element that needs to be reworked in the set of construction objects corresponding to the construction process in the final budget plan is obtained and copied and added to the set of construction objects corresponding to the construction process;
[0122] The labor cost of at least one element that needs to be reworked corresponding to the construction process is calculated and added to the construction labor cost set.
[0123] Project changes are mainly caused by weather conditions that may cause construction products to be damaged by rain or hail, resulting in the need for rework. They may also be caused by construction errors that lead to dimensional errors, which both require rework and increase costs, and require timely feedback to Party A.
[0124] A system for engineering cost consulting management, used to implement the above-mentioned method for engineering cost consulting management, comprising:
[0125] A framework building module, wherein the framework building module obtains a project plan, a design plan and a construction plan, obtains a construction cost budget, and forms a preliminary cost framework according to the project plan, the design plan and the construction plan, wherein the preliminary cost framework is composed of at least one project process;
[0126] A budget control module, wherein the budget control module sends a preliminary cost structure to Party A, obtains budget details, and forms a budget control plan based on the budget details;
[0127] An architecture assessment module, which assesses and analyzes the preliminary cost architecture and forms an advisory opinion;
[0128] A feasibility assessment module, which forms at least one pre-selected plan based on the consulting opinion and the budget control plan, performs feasibility assessment on the pre-selected plan, and selects the pre-selected plan that meets the feasibility assessment as an alternative plan;
[0129] A risk assessment module, wherein the risk assessment module performs a cost risk assessment on the alternative solutions to obtain a cost risk value, and selects an alternative solution with a cost risk value less than a preset value as a candidate solution;
[0130] A solution adjustment module, wherein the solution adjustment module sends at least one candidate solution to Party A, obtains Party A's adjustment requirements, and adjusts at least one candidate solution based on Party A's adjustment requirements to obtain at least one optimized solution;
[0131] A scheme determination module, wherein the scheme determination module sends at least one optimization scheme to Party A, obtains Party A's voting results, and selects the optimization scheme with the highest number of votes as the final budget scheme;
[0132] A monitoring and modification module, which monitors the costs during the project implementation process. When the project is changed due to force majeure, the final budget plan is modified in real time based on the changes in the project, and the modification results of the final budget plan are sent to Party A;
[0133] A distributed storage module uses distributed storage technology to store the preliminary cost structure, budget control plan, consulting opinions, pre-selected plans, alternative plans, candidate plans, optimized plans, final budget plan and the modification results of the final budget plan.
[0134] Furthermore, the present solution also proposes a storage medium on which a computer-readable program is stored, and when the computer-readable program is called, the above-mentioned method of engineering cost consulting management is executed.
[0135] It is understandable that the storage medium may be a magnetic medium, such as a floppy disk, a hard disk, or a magnetic tape; an optical medium, such as a DVD; or a semiconductor medium, such as a solid state drive (SSD).
[0136] To sum up, the advantages of the present invention are: by setting up an architecture building module, a budget control module, an architecture evaluation module, a feasibility evaluation module, a risk evaluation module and a scheme adjustment module, the budget scheme can be regulated from multiple angles to ensure that the scheme can meet the needs of Party A and actual construction. At the same time, the feasibility of the construction is evaluated, and the cost risk is evaluated, so as to select a scheme with high feasibility and low cost risk. Thus, the completion of the scheme can be guaranteed, and the possibility of the scheme exceeding the budget is low. At the same time, the opinions of Party A are fully taken into consideration, and the real-time situation of the budget exceeding is generated and pushed to Party A in a timely manner, thereby improving Party A's experience.
[0137] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A method for engineering cost consulting management, characterized in that: include: Obtaining a project plan, a design plan and a construction plan, obtaining a construction cost budget, and forming a preliminary cost framework based on the project plan, the design plan and the construction plan, wherein the preliminary cost framework is composed of at least one project process; Send the preliminary cost structure to Party A to obtain budget details, and form a budget control plan based on the budget details; Evaluate and analyze the preliminary cost framework and form consulting opinions; Based on the consulting opinions and the budget control plan, form at least one pre-selected plan, conduct a feasibility assessment on the pre-selected plan, and select the pre-selected plan that meets the feasibility assessment as the alternative plan; Conduct cost risk assessment on alternative plans to obtain cost risk values, and select alternative plans with cost risk values less than the preset value as candidate plans; Sending at least one candidate solution to Party A, obtaining Party A's adjustment requirements, and adjusting at least one candidate solution based on Party A's adjustment requirements to obtain at least one optimized solution; Send at least one optimization plan to Party A, obtain Party A's voting results, and select the optimization plan with the highest number of votes as the final budget plan; Monitor the cost during the project implementation process. When the project is changed due to force majeure, modify the final budget plan in real time based on the changes in the project, and send the modified results of the final budget plan to Party A. Force majeure factors include construction errors and weather factors. Distributed storage technology is used to store the preliminary cost framework, budget control plan, consulting opinions, pre-selected plans, alternative plans, candidate plans, optimized plans, final budget plan and the modification results of the final budget plan.
2. A method for engineering cost consulting management according to claim 1, characterized in that: The formation of a preliminary cost framework based on the project plan, design plan and construction plan includes the following steps: According to the project plan, at least one construction process is obtained during construction; Based on the design plan, decompose and obtain at least one construction target object; Allocating at least one construction target object to at least one construction process, and aggregating the construction target objects corresponding to the same construction process to obtain a set of construction target objects; Based on the construction plan, at least one construction labor cost is decomposed; Allocating at least one construction labor cost to at least one construction process, and aggregating the construction labor costs corresponding to the same construction process to obtain a construction labor cost set; Summarize the construction process, the set of construction objects, the set of construction labor costs and their corresponding relationships to form a preliminary cost framework.
3. A method for engineering cost consulting management according to claim 2, characterized in that: The forming of a budget control scheme based on the budget details comprises the following steps: Decomposing the budget details into at least one budget limit, and pairing at least one budget limit with at least one construction process, wherein the total cost of the construction process is less than the corresponding budget limit; Summarize the budget limits, construction processes and their matching relationships to form a budget control plan.
4. A method for engineering cost consulting management according to claim 3, characterized in that: The evaluation and analysis of the preliminary cost framework and the formation of consulting opinions include the following steps: Based on the big data, at least one construction benchmark target object and at least one construction benchmark cost required to complete the construction process are obtained; The construction process and its corresponding at least one construction benchmark target and at least one construction benchmark cost are summarized to form an advisory opinion.
5. A method for engineering cost consulting management according to claim 4, characterized in that: The forming of at least one pre-selected plan based on the consulting opinions and the budget control plan comprises the following steps: A random combination of at least one construction benchmark object forms a first combination, and the first combination is paired with a construction process corresponding to the construction benchmark object; At least one random combination of construction benchmark costs is formed into a second combination, and the second combination is paired with a construction process corresponding to the construction benchmark cost; Use the first combination corresponding to the construction process to supplement the set of construction target objects corresponding to the construction process; The second combination corresponding to the construction process is used to supplement the construction labor cost set corresponding to the construction process; Obtain a supplemented preliminary cost structure as a pre-selected option; When the first combination traverses all random combinations of at least one construction benchmark object and the second combination traverses all random combinations of at least one construction benchmark cost, the supplemented preliminary cost structure forms at least one pre-selected solution; Based on historical data, in the pre-selected plan, the minimum cost of the construction process to complete its corresponding construction target set and construction labor cost set is obtained. When the minimum cost of the construction process is higher than the corresponding budget limit, the pre-selected plan is deleted.
6. A method for engineering cost consulting management according to claim 5, characterized in that: The feasibility assessment of the pre-selected schemes and the selection of the pre-selected schemes that meet the feasibility assessment requirements include the following steps: Allocate the budget limit corresponding to the construction process in proportion to the set of construction target objects and the set of construction labor costs corresponding to the construction process, and obtain the budget pre-selection allocation relationship; According to the budget pre-selection allocation relationship and based on historical data, the completion degree of the construction process is estimated to obtain the feasibility value of the construction process; When the feasibility value of at least one construction process in the pre-selected scheme is greater than a preset value, the pre-selected scheme is used as an alternative scheme.
7. A method for engineering cost consulting management according to claim 6, characterized in that: The cost risk assessment of the alternative solutions to obtain the cost risk value comprises the following steps: Conduct cost analysis on the set of construction objects and the set of construction labor costs corresponding to the construction process in the alternative solutions; Based on historical data, the possibility that the total cost of the construction process exceeds the corresponding budget limit is obtained as the cost risk value.
8. A method for engineering cost consulting management according to claim 7, characterized in that: The adjusting of at least one candidate solution based on the adjustment requirements of Party A comprises the following steps: Based on the adjustment requirements of Party A, the set of construction target objects and the set of construction labor costs corresponding to the construction process in the candidate solution are adjusted; The adjusted candidate plan will be used as the optimized plan.
9. A method for engineering cost consulting management according to claim 8, characterized in that: The real-time modification of the final budget plan based on the changes in the project includes the following steps: Based on the changes in the project, at least one element that needs to be reworked in the set of construction objects corresponding to the construction process in the final budget plan is obtained and copied and added to the set of construction objects corresponding to the construction process; The labor cost of at least one element that needs to be reworked corresponding to the construction process is calculated and added to the construction labor cost set.
10. A system for engineering cost consulting management, used to implement the method for engineering cost consulting management as claimed in any one of claims 1 to 9, characterized in that: include: A framework building module, wherein the framework building module obtains a project plan, a design plan and a construction plan, obtains a construction cost budget, and forms a preliminary cost framework according to the project plan, the design plan and the construction plan, wherein the preliminary cost framework is composed of at least one project process; A budget control module, wherein the budget control module sends a preliminary cost structure to Party A, obtains budget details, and forms a budget control plan based on the budget details; An architecture assessment module, which assesses and analyzes the preliminary cost architecture and forms an advisory opinion; A feasibility assessment module, which forms at least one pre-selected plan based on the consulting opinion and the budget control plan, performs feasibility assessment on the pre-selected plan, and selects the pre-selected plan that meets the feasibility assessment as an alternative plan; A risk assessment module, wherein the risk assessment module performs a cost risk assessment on the alternative solutions to obtain a cost risk value, and selects an alternative solution with a cost risk value less than a preset value as a candidate solution; A solution adjustment module, wherein the solution adjustment module sends at least one candidate solution to Party A, obtains Party A's adjustment requirements, and adjusts at least one candidate solution based on Party A's adjustment requirements to obtain at least one optimized solution; A scheme determination module, wherein the scheme determination module sends at least one optimization scheme to Party A, obtains Party A's voting results, and selects the optimization scheme with the highest number of votes as the final budget scheme; A monitoring and modification module, which monitors the costs during the project implementation process. When the project is changed due to force majeure, the final budget plan is modified in real time based on the changes in the project, and the modification results of the final budget plan are sent to Party A; A distributed storage module uses distributed storage technology to store the preliminary cost structure, budget control plan, consulting opinions, pre-selected plans, alternative plans, candidate plans, optimized plans, final budget plan and the modification results of the final budget plan.