Batch classification prediction method and device for final cumulative gas production rate of gas well
By classifying the cumulative production time and gas production of gas wells, drawing production characteristic curves, and dynamically classifying and calculating gas well EUR, the problem of inability to batch process gas well EUR in the existing technology is solved, and rapid and accurate prediction of gas fields or well areas is achieved. Improve the scientific nature of development decisions.
Patent Information
- Application Number
- CN202310504050.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-06
- Publication Date
- 2024-11-08
AI Technical Summary
The existing methods for forecasting the final cumulative gas production of gas wells mainly aim at single wells, and batch processing of gas wells in gas fields, well areas or development units cannot be achieved, and there are restrictions on long production time or multiple formation pressure tests.
A batch classification prediction method for the final cumulative gas production of gas wells is proposed. By calculating the cumulative production time and gas production of each well, the well type classification, the production characteristic curve is drawn, and the function of the cumulative gas production to EUR ratio and production time is calculated. Relationship, preliminary calculation and complex EUR until a consistent prediction result is achieved.
It has achieved rapid and accurate prediction of gas well EUR in a certain gas field, a well area or development unit, improved prediction accuracy, provided a basis for the evaluation and adjustment of gas field development effects, and guided gas field stable production and development adjustment.
Smart Images

Figure CN118917703A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of natural gas development, and in particular relates to a method and device for batch classification prediction of final cumulative gas production of a gas well. Background Art
[0002] The estimated ultimate recovery (EUR) of a gas well is a key indicator for measuring the development effect of a gas well in production, and is also an important indicator for formulating development and adjustment plans for gas fields. Rapid and accurate prediction of the EUR of a gas well is crucial for understanding the development potential of a block and formulating a reasonable production scale. At present, the prediction methods for the EUR of a gas well mainly include modern production decline analysis (RTA), Arps production decline method, pressure drop method, etc.
[0003] The modern production decline analysis method is based on the unstable seepage theory, and based on typical charts such as Fetkovich and Blasin game, it uses single well production, pressure and other production data to quantitatively analyze the seepage characteristics of gas wells, determine reservoir parameters, calculate well-controlled reserves, and then predict the EUR of gas wells. This method requires the gas well to produce for a certain period of time, and the pressure drop is transmitted to the boundary of the gas reservoir to achieve quasi-steady-state flow, and the evaluation results are relatively accurate.
[0004] The Arps production decline method is based on the historical production data of a single well, fits the production decline trend, determines the decline type, obtains the functional relationship between the gas well production and production time, and then predicts the gas well EUR. This method requires that the gas well production must enter the decline production stage.
[0005] The pressure drop method is based on the material balance principle. It estimates the reserves of the reservoir space according to the relationship between the cumulative gas production of a single well and the drop in formation pressure, and then predicts the EUR of the gas well. This method requires that the gas well production rate reaches more than 10%, and there are two or more measured or calculated formation pressures during the production stage. The more pressure data, the more it can truly reflect the production process of the gas well, and the more accurate the analysis results.
[0006] Based on the above analysis, it can be seen that the above analysis methods are all for EUR prediction of single wells, and cannot be used for batch processing of gas wells in a certain gas field, a certain well area or a development unit. In addition, there are limitations such as requiring a long production time or requiring multiple formation pressure tests. Summary of the invention
[0007] In view of the above problems, the present invention proposes a batch classification prediction method for the final cumulative gas production of gas wells, which comprises the following steps:
[0008] Calculate the cumulative production time and cumulative gas production of each well based on the production data of the wells to be evaluated;
[0009] According to the well type classification, all gas wells of the same well type are aligned according to the production time, and a production characteristic curve with the production time and average daily gas production as coordinates is drawn;
[0010] According to the average daily gas production and the production time, a functional relationship between the proportion of the cumulative gas production to the EUR and the production time is calculated, and the EUR is preliminarily calculated according to the functional relationship;
[0011] According to the initially calculated EUR, all gas wells of the same well type are dynamically classified, and production characteristic curves are drawn for each type of gas well according to the dynamic classification results to obtain the recalculated EUR of each gas well and the classification results of this gas well;
[0012] Determine whether the gas well classification result and recalculated EUR are the same as the dynamic classification result and initial EUR. If they are the same, the gas well classification result and recalculated EUR are the final prediction results.
[0013] Furthermore, if the current gas well classification result and recalculated EUR are different from the dynamic classification result and initial EUR result, the current gas well classification result is recalculated again until the current recalculation result is the same as the initial calculation result or the previous recalculation result.
[0014] Furthermore, the method further includes, before calculating the cumulative production time and cumulative gas production of each well to date based on the production data of the well to be evaluated: screening the wells to be evaluated in the target area and determining the well type classification;
[0015] The screening criteria are: producing gas wells with a production time of more than 1 year and less than the designed production life;
[0016] The well type classification includes: straight directional well, horizontal well, high-angle well, side-drilling horizontal well, etc.
[0017] Furthermore, the production data includes the production date and historical daily gas production of the well to be evaluated.
[0018] Furthermore, the method for dynamically classifying all gas wells of the same well type includes: field experience method, cumulative frequency method and economic evaluation method;
[0019] The dynamic classification includes Class I wells, Class II wells and Class III wells.
[0020] Further, the functional relationship between the proportion of cumulative gas production to EUR and the production time is calculated according to the average daily gas production and the production time, including the following steps:
[0021] Fitting the functional relationship between average daily gas production and commissioning time
[0022] according to Calculate the cumulative gas production from the start of production to the designed production life, which is the average EUR of the selected gas wells;
[0023] The functional relationship ω(t) between the proportion of cumulative gas production to EUR and the production time is calculated based on the average EUR of the selected gas well set;
[0024] The EUR of each gas well is preliminarily calculated based on ω(t) and the actual cumulative gas production of each gas well to obtain the initial EUR.
[0025] Furthermore, the functional relationship between the average daily gas production and the production time is for:
[0026]
[0027] The functional relationship between the cumulative gas production ratio to EUR and the production time ω(t) is:
[0028]
[0029] The calculation formula for the initial EUR is:
[0030]
[0031] In the formula, t represents the time of commissioning; is the average daily gas production of the selected gas well on the tth day of production; q i (t) is the daily gas production of the i-th gas well on the t-th day of production; n(t) is the total number of gas wells with production time ≥ t; ω(t) is the proportion of the cumulative gas production on the t-th day to the EUR; R is the average EUR of the selected gas wells; r i Initial calculation of EUR for the i-th gas well; Q i is the cumulative gas production of the i-th gas well, t i is the cumulative production time of the i-th gas well; ω(t i ) is the tth i The value of the function ω(t) of the day.
[0032] In a second aspect, the present invention proposes a batch classification prediction device for the final cumulative gas production of a gas well, the device comprising:
[0033] The first calculation unit is used to calculate the cumulative production time and cumulative gas production of each well according to the production data of the well to be evaluated;
[0034] The production characteristic curve drawing unit is used to align all gas wells of the same well type according to the production time according to the well type classification, and draw a production characteristic curve with the production time and the average daily gas production as coordinates;
[0035] A EUR preliminary calculation unit, used to calculate the functional relationship between the proportion of the cumulative gas production to the EUR and the production time according to the average daily gas production and the production time, and preliminarily calculate the EUR according to the functional relationship;
[0036] The EUR recalculation unit is used to dynamically classify all gas wells of the same well type according to the initially calculated EUR, and to draw production characteristic curves for each type of gas well according to the dynamic classification results, so as to obtain the recalculated EUR of each gas well and the classification results of this gas well;
[0037] The result judgment unit is used to judge whether the gas well classification result and recalculated EUR are the same as the dynamic classification result and the initial EUR result. If they are the same, the gas well classification result and recalculated EUR are the final prediction results.
[0038] Furthermore, the device also includes a screening unit for screening wells to be evaluated in the target area and determining the well type classification.
[0039] In a third aspect, the present invention also proposes an electronic device for batch classification prediction of final cumulative gas production of gas wells, comprising a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus;
[0040] Memory, used to store computer programs;
[0041] The processor is used to implement the batch classification prediction method of the final cumulative gas production of the gas wells when executing the program stored in the memory.
[0042] In a fourth aspect, the present invention further proposes a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the batch classification prediction method for the final cumulative gas production of the gas wells.
[0043] Beneficial effects of the present invention:
[0044] The present invention dynamically classifies the gas wells to be developed of the same well type, and obtains the functional relationship between the proportion of the cumulative gas production of gas wells with the same production characteristics to the EUR and the time of commissioning, so as to batch and quickly predict the EUR of a large number of gas wells in a gas field, a well area or a development unit, thereby improving the prediction accuracy. After predicting the EUR of the gas well using the method of the present invention, the development effect of the gas field or block can be evaluated, and a basis can be provided for the stable production and development adjustment of the gas field. Based on the EUR of the gas well, the gas well leakage radius can be further evaluated, and the control degree of the development well network on the reserves and the distribution of the remaining reserves can be analyzed; it can also guide the deployment of gas field capacity construction, determine the drilling workload of the gas field development plan and adjustment plan, and provide scientific support for the long-term large-scale stable production and high-quality development of the gas reservoir.
[0045] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0047] Figure 1 A flow chart showing a method for batch classification prediction of final cumulative gas production of gas wells according to an embodiment of the present invention is shown;
[0048] Figure 2 It shows the EUR frequency accumulation curve of the vertical wells in Block A of Sulige Gas Field in the embodiment of the present invention;
[0049] Figure 3 The EUR distribution diagram of a vertical well of a tight sandstone gas reservoir under different gas prices in an embodiment of the present invention is shown;
[0050] Figure 4 It shows the production characteristic curve fitting diagram of the B block of the Sulige gas field in the embodiment of the present invention;
[0051] Figure 5 The first-year daily production and EUR distribution diagram of the vertical wells put into production in Block C of the Sulige Gas Field in the embodiment of the present invention are shown. DETAILED DESCRIPTION
[0052] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0053] Based on the limitations of the existing methods for predicting EUR of gas wells such as RTA, Arps production decline method, and pressure drop method, and the problem that batch prediction cannot be achieved, the present invention proposes a batch classification prediction method for the final cumulative gas production of gas wells, including but not limited to Figure 1 Steps shown:
[0054] S1: Screen the wells to be evaluated in the target area and determine the well type classification.
[0055] In the process of screening target areas, in order to avoid errors caused by factors such as production fluctuations and production system adjustments in the early stage of gas well production, the screening criteria for wells to be evaluated are: producing gas wells with a production time of more than 1 year and less than the designed production life.
[0056] Well types include, but are not limited to, straight directional wells, horizontal wells, side-drilling horizontal wells and high-angle wells, etc., with no less than 10 wells of each type.
[0057] S2: Obtain production data of the well to be evaluated, including the date of commissioning and historical daily gas production q i (t), calculate the cumulative production time t of each well up to now i And the cumulative gas production Q i .
[0058]
[0059] Where, t is the time of commissioning, in days (d); t i is the cumulative production time of the i-th gas well, in d; q i (t) is the daily gas production of the ith gas well on the tth day of production, in 10 4 m 3 ;Q i is the cumulative gas production of the i-th gas well; the unit is 10 4 m 3 ;
[0060] S3: According to the well type classification, all gas wells of the same well type are aligned according to the production time, and a production characteristic curve is drawn with the production time as the horizontal axis and the average daily gas production as the vertical axis; it should be noted that because the production dates of each gas well are different, the average daily gas production of the selected wells is calculated according to the production time (the first day of production, the second day) (rather than averaging by date, such as the average daily gas production of each well on January 1, 2023), and then a production characteristic curve is drawn with the production time as the horizontal axis and the average daily gas production as the vertical axis.
[0061] S4: Based on average daily gas production The functional relationship between the cumulative gas production ratio to EUR (ω) and the production time ω(t) is calculated by the production time t;
[0062] The specific process is as follows:
[0063] S41: According to the Arps production decline principle, the average daily gas production is fitted Functional relationship between the time of commissioning t
[0064]
[0065] In the formula, is the average daily gas production of the selected gas well on the tth day of production, in units of 10 4 m 3 ;q i (t) is the daily gas production of the ith gas well on the tth day of production, in 10 4 m 3 ; n(t) is the total number of gas wells with production time ≥ t, in units of wells;
[0066] Among them, the Arps reduction equation is shown in Table 1:
[0067] Table 1 Arps reduction equation
[0068]
[0069] The q in the equation in Table 1 is obtained by curve fitting i , b, n three constants (the third column in the table), and then get the average daily gas production The functional relationship between the production time t and the production time t. Based on this function, the average daily gas production at any production time can be obtained
[0070] S42: According to The function calculates the cumulative gas production from the start of production to the designed production life, which is the average EUR of the selected gas wells, and then obtains the functional relationship between the cumulative gas production ratio to EUR (ω) and the production time ω(t);
[0071]
[0072] Where, ω(t) is the proportion of cumulative gas production on day t to EUR, %; is the average daily gas production of the selected gas well on the tth day of production; t represents the production time; R is the average EUR of the selected gas well, in units of 10 4 m 3 ;
[0073] S43: Based on ω(t) and the actual cumulative gas production of each gas well, the EUR of each gas well is preliminarily calculated to obtain the initial EUR. The calculation formula is as follows:
[0074]
[0075] In the formula, r i The initial calculation of EUR for the i-th gas well, in units of 10 4 m 3 ;Q i is the cumulative gas production of the i-th gas well, t i is the cumulative production time of the i-th gas well; ω(t i ) is the tth iThe value of the function ω(t) at the day (i.e., t = t i ).
[0076] S5: Based on the initially calculated EUR obtained in step S4, all gas wells of the same well type are dynamically classified, and the gas wells are divided into three categories: I, II, and III. The gas well classification methods include but are not limited to: on-site experience method, cumulative frequency method, and economic evaluation method.
[0077] On-site experience method: It is divided according to the past gas well classification experience. Taking a well area in the Sulige Gas Field as an example:
[0078] Vertical well: For type I wells, EUR ≥ 3000; for type II wells, 1500 < EUR < 3000; for type III wells, EUR ≤ 1500×10 4 m 3 ;
[0079] Horizontal well: For type I wells, EUR ≥ 10000; for type II wells, 5000 < EUR < 10000; for type III wells, EUR ≤ 5000×10 4 m 3 .
[0080] Cumulative frequency method: Taking the gas well EUR as the core index, by plotting the cumulative frequency curve of the gas well EUR, observing the curve characteristics, and establishing the classification criteria. In an embodiment of the present invention, taking the vertical wells in Well Area A of the Sulige Gas Field as an example, according to the initially calculated EUR results, the cumulative frequency curve of the gas well EUR is plotted as Figure 2 shown. It can be seen from the figure that the EUR cumulative frequency curves are all in a three-segment distribution, and the EUR at the intersection points are 1250 and 2650×10 4 m 3 respectively. Accordingly, the vertical wells are divided into three categories: for type I wells, EUR ≥ 2650; for type II wells, 1250 < EUR < 2650; for type III wells, EUR ≤ 1250×10 4 m 3 .
[0081] Economic evaluation method: Taking the internal rate of return (IRR) as the core parameter, comprehensively considering factors such as the product rate, gas price, comprehensive cost of gas wells, production and operation costs, sales taxes and surcharges, and income tax, establishing an economic evaluation model, obtaining the relationship between the internal rate of return and the gas well EUR, and classifying the gas wells. Taking the vertical wells in a tight sandstone gas reservoir as an example, the relationship between the internal return and the gas well EUR at the current gas price is as Figure 3 shown. The abscissa is the gas price, and the ordinate is the gas well EUR. For type I wells, IRR ≥ 30%, EUR ≥ 3099; for type II wells, 8% < IRR < 30%, 1490 < EUR < 3099; for type III wells, IRR ≤ 8%, EUR ≤ 1490×10 4 m 3 .
[0082] S6: According to the dynamic classification results, align each type of gas wells by time, draw a production characteristic curve, repeat steps S4 and S5, and obtain the recalculated EUR and gas well classification results of each gas well;
[0083] S7: Obtain the final result of EUR and gas well classification for each gas well;
[0084] If the gas well classification result of this time is the same as the initial calculation (or the last recalculation) result, the recalculated EUR and gas well classification will be the final prediction result;
[0085] If the current gas well classification result is different from the initial calculation result (or the last recalculation result), step S6 is repeated according to the current recalculation gas well classification result to perform the next recalculation.
[0086] Based on the same concept of the present invention, the present invention proposes a batch classification prediction device for the final cumulative gas production of a gas well, the device comprising:
[0087] Screening unit, used to screen wells to be evaluated in the target area and determine the well type classification;
[0088] The first calculation unit is used to calculate the cumulative production time and cumulative gas production of each well according to the production data of the well to be evaluated;
[0089] The production characteristic curve drawing unit is used to align all gas wells of the same well type according to the production time according to the well type classification, and draw a production characteristic curve with the production time and the average daily gas production as coordinates;
[0090] A EUR preliminary calculation unit, used to calculate the functional relationship between the proportion of the cumulative gas production to the EUR and the production time according to the average daily gas production and the production time, and preliminarily calculate the EU R according to the functional relationship;
[0091] The EUR recalculation unit is used to dynamically classify all gas wells of the same well type according to the initially calculated EUR, and to draw production characteristic curves for each type of gas well according to the dynamic classification results, so as to obtain the recalculated EUR of each gas well and the classification results of this gas well;
[0092] The result judgment unit is used to judge whether the gas well classification result and recalculated EUR are the same as the dynamic classification result and the initial EUR result. If they are the same, the gas well classification result and recalculated EUR are the final prediction results.
[0093] Based on the same concept of the present invention, the present invention also proposes an electronic device and a computer-readable storage medium for batch classification prediction of the final cumulative gas production of gas wells;
[0094] The electronic device comprises a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus;
[0095] Memory, used to store computer programs;
[0096] The processor is used to implement the batch classification prediction method of the final cumulative gas production of the gas wells when executing the program stored in the memory.
[0097] When the computer program is executed by a processor, the batch classification prediction method for the final cumulative gas production of the gas wells is implemented.
[0098] This embodiment takes Block B of the Sulige Gas Field as an example to explain in detail the batch classification prediction method for the final cumulative gas production of the above-mentioned gas wells. Block B of the Sulige Gas Field is a typical tight sandstone gas field. After nearly 20 years of development, as of the end of 2022, the block has put into production a total of 1,230 vertical wells and 339 horizontal wells. The large number of gas wells makes management difficult. It is urgent to evaluate the gas well development indicators and block development effects to provide a basis for the formulation of stable production and development adjustment policies for the block.
[0099] S1: Screen 930 producing vertical wells in the block with a production time of more than 1 year and less than the design life of 15 years;
[0100] S2: Obtain the production data of the wells to be evaluated, including the date of commissioning and historical daily gas production, calculate the cumulative commissioning time and cumulative gas production of each well to date, and extract some well data as shown in Table 2.
[0101] Table 2 Partial production data of Block B of Sulige Gas Field
[0102]
[0103]
[0104] S3: Align all gas wells in time and draw production characteristic curves, such as Figure 4 As shown, the horizontal axis is the commissioning time, and the vertical axis is the average daily gas production of a single well. The time unit in the figure can be converted into days.
[0105] S4: According to the Arps production decline principle, fit the average daily gas production The functional relationship between the time of commissioning t and
[0106]
[0107] according to The function calculation shows that the average EUR of the cumulative gas production from the start of production to the designed production life is 32.27 million cubic meters, and the functional relationship between the proportion of cumulative gas production to EUR and the production time ω(t) is obtained;
[0108]
[0109] According to ω(t), the EUR of each gas well is preliminarily calculated. The obtained EUR of the gas well is called the initial EUR. The field experience method is used to dynamically classify the gas wells. Some results are shown in Table 3:
[0110] Table 3 Preliminary calculation of EUR and classification of some vertical wells in Block B of Sulige Gas Field
[0111]
[0112]
[0113] S5: According to the dynamic classification results, each type of gas well is aligned by time, and the production characteristic curve is drawn. The above steps are repeated. After two recalculations, the EUR of each gas well and the final results of gas well classification are obtained, as shown in Table 4:
[0114] Table 4 EUR and classification of some vertical wells in Block B of Sulige Gas Field
[0115]
[0116]
[0117]
[0118] The prediction method also includes drawing a distribution diagram of the daily production and EUR of the vertical wells put into production in previous years; in another embodiment of the present invention, taking Block C of Sulige Gas Field as an example, the EUR of 298 vertical wells put into production in the block between 2012 and 2022 is predicted by the present invention, and the results are shown in Table 5. Figure 5 The following is a chart showing the distribution of daily production and EUR in the first year of production of vertical wells put into production over the years.
[0119] Table 5 Statistics of production indicators of vertical wells put into production in Block C of Sulige Gas Field over the years
[0120]
[0121]
[0122] It can be seen that with the passage of time from production to production, the EUR of vertical wells has an overall downward trend, reflecting the development deployment idea of "fat first and thin later" for the gas field; the development effect of the wells put into production from 2012 to 2016 was good, with an average EUR of 25.02 million cubic meters per well, and the effect was poor from 2017 to 2020, with an average EUR of 15.60 million cubic meters per well, which was 16.92 million cubic meters lower than the design value of the scheme; the development effect of the wells put into production in the past two years has been significantly improved, with an average EUR of 20.04 million cubic meters per well, which is better than the design value of the scheme.
[0123] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein; and these modifications or substitutions do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A batch classification prediction method for the final cumulative gas production of a gas well, characterized in that: The method comprises the following steps: Calculate the cumulative production time and cumulative gas production of each well based on the production data of the well to be evaluated; According to the well type classification, all gas wells of the same well type are aligned according to the production time, and a production characteristic curve with the production time and average daily gas production as coordinates is drawn; According to the average daily gas production and the production time, a functional relationship between the proportion of the cumulative gas production to the EUR and the production time is calculated, and the EUR is preliminarily calculated according to the functional relationship; According to the initially calculated EUR, all gas wells of the same well type are dynamically classified, and production characteristic curves are drawn for each type of gas well according to the dynamic classification results to obtain the recalculated EUR of each gas well and the classification results of this gas well; Determine whether the current gas well classification result and recalculated EUR are the same as the dynamic classification result and initial EUR result. If they are the same, the current gas well classification result and recalculated EUR are the final prediction results.
2. The batch classification prediction method for the final cumulative gas production of gas wells according to claim 1 is characterized in that: If the current gas well classification result and recalculated EUR are different from the dynamic classification result and initial EUR result, the current gas well classification result will be recalculated again until the current recalculation result is the same as the initial calculation result or the previous recalculation result.
3. The batch classification prediction method for the final cumulative gas production of gas wells according to claim 1 is characterized in that: The method further includes, before calculating the cumulative production time and cumulative gas production of each well to date based on the production data of the well to be evaluated: screening the wells to be evaluated in the target area and determining the well type classification; The screening criteria are: producing gas wells with a production time of more than 1 year and less than the designed production life; The well type classification includes: straight directional well, horizontal well, high-angle well and side-drilling horizontal well.
4. The batch classification prediction method for the final cumulative gas production of a gas well according to any one of claims 1 to 3, characterized in that: The production data includes the commissioning date and historical daily gas production of the well to be evaluated.
5. The batch classification prediction method for the final cumulative gas production of gas wells according to claim 1 is characterized in that: The method for dynamically classifying all gas wells of the same well type includes: field experience method, cumulative frequency method and economic evaluation method; The dynamic classification includes Class I wells, Class II wells and Class III wells.
6. The batch classification prediction method for the final cumulative gas production of gas wells according to claim 1 is characterized in that: The functional relationship between the proportion of cumulative gas production to EUR and the production time is calculated based on the average daily gas production and the production time, and the following steps are included: Fitting the functional relationship between average daily gas production and commissioning time according to Calculate the cumulative gas production from the start of production to the designed production life, where the cumulative gas production is the average EUR of the selected gas well set; The functional relationship ω(t) between the proportion of cumulative gas production to EUR and the production time is calculated based on the average EUR of the selected gas well set; According to ω(t) and the actual cumulative gas production of each gas well, the EUR of each gas well is preliminarily calculated to obtain the initial EUR.
7. The batch classification prediction method for the final cumulative gas production of gas wells according to claim 1 is characterized in that: The functional relationship between the average daily gas production and the commissioning time for: The functional relationship between the cumulative gas production ratio to EUR and the production time ω(t) is: The calculation formula for the initial EUR is: In the formula, t represents the time of commissioning; is the average daily gas production of the selected gas well on the tth day of production; q i (t) is the daily gas production of the i-th gas well on the t-th day of production; n(t) is the total number of gas wells with production time ≥ t; ω(t) is the proportion of the cumulative gas production on the t-th day to the EUR; R is the average EUR of the selected gas wells; r i Initial calculation of EUR for the i-th gas well; Q i is the cumulative gas production of the i-th gas well, t i is the cumulative production time of the i-th gas well; ω(t i ) is the tth i The value of the function ω(t) of the day.
8. A batch classification prediction device for the final cumulative gas production of a gas well, characterized in that: The device comprises: The first calculation unit is used to calculate the cumulative production time and cumulative gas production of each well according to the production data of the well to be evaluated; The production characteristic curve drawing unit is used to align all gas wells of the same well type according to the production time according to the well type classification, and draw a production characteristic curve with the production time and the average daily gas production as coordinates; A EUR preliminary calculation unit, used to calculate the functional relationship between the proportion of the cumulative gas production to the EUR and the production time according to the average daily gas production and the production time, and preliminarily calculate the EUR according to the functional relationship; The EUR recalculation unit is used to dynamically classify all gas wells of the same well type according to the initially calculated EUR, and to draw production characteristic curves for each type of gas well according to the dynamic classification results, so as to obtain the recalculated EUR of each gas well and the classification results of this gas well; The result judgment unit is used to judge whether the gas well classification result and recalculated EUR are the same as the dynamic classification result and the initial EUR result. If they are the same, the gas well classification result and recalculated EUR are the final prediction results.
9. The batch classification prediction device for the final cumulative gas production of gas wells according to claim 8, characterized in that: The device also includes a screening unit for screening wells to be evaluated in the target area and determining the well type classification.
10. An electronic device for batch classification prediction of final cumulative gas production of gas wells, characterized in that: It includes a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus; Memory, used to store computer programs; The processor is used to implement the batch classification prediction method for the final cumulative gas production of the gas wells described in any one of claims 1-7 when executing the program stored in the memory.
11. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the batch classification prediction method for the final cumulative gas production of a gas well according to any one of claims 1 to 7 is implemented.