Nuclear fuel assembly verification device
By dividing the simulated fuel rod into shorter segments and using the connecting rod and grid structure, the design of the nuclear fuel assembly verification device is simplified, and the problems of high production costs and cumbersome replacement operations in the prior art are solved, and the cost is achieved Reduce and improve efficiency.
Patent Information
- Application Number
- CN202410956096.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-11-08
AI Technical Summary
In the prior art, the production cost of the simulated nuclear fuel assembly verification device is high and the replacement operation is cumbersome, mainly due to the large number of simulated fuel rods and the complex design.
Design a nuclear fuel assembly verification device, which simplifies the simulated nuclear fuel assembly by dividing the simulated fuel rod into two shorter simulated fuel sections, and uses the connecting rod, simulated upper pipe seat, simulated lower pipe seat and grid structures. The structure reduces the number and production cost of simulated fuel rods.
It reduces the production cost of the nuclear fuel assembly verification device, simplifies replacement operations, reduces the waste of simulated fuel rods, and improves the verification efficiency and equipment reliability.
Smart Images

Figure CN118919105A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of nuclear fuel assembly safety detection, and in particular to a simulation nuclear fuel assembly calibration device. Background Art
[0002] The nuclear fuel assembly in a nuclear power plant is one of the important components. The nuclear fuel assembly will deform during long-term operation in the underwater environment of the fuel pool. When the deformation exceeds a certain degree, the nuclear fuel assembly will be stuck when loading and unloading, affecting the subsequent work progress and even affecting the stable operation of the unit. Therefore, it is necessary to measure the underwater nuclear fuel assembly with detection equipment, such as the external dimensions, the diameter of the nuclear fuel rod, the gap between the nuclear fuel rods, the torsional deformation of the assembly, and other detection indicators. However, when the detection equipment detects the nuclear fuel assembly in the underwater environment, the underwater environment will affect the detection accuracy of the detection equipment. Therefore, it is necessary to design a simulated nuclear fuel assembly calibration device to simulate the detection indicators required for the nuclear fuel assembly; first, the detection equipment is used to measure the above-mentioned detection indicators for the nuclear fuel assembly calibration device, and then the detection equipment is used to measure the above-mentioned detection indicators for the underwater nuclear fuel assembly, and finally the detection equipment is used to measure the above-mentioned detection indicators for the nuclear fuel assembly calibration device. By comparing the detection indicators of the simulated nuclear fuel assembly calibration device measured for the first time and the simulated nuclear fuel assembly calibration device measured for the second time, it is verified whether the measurement data of the underwater nuclear fuel assembly measured by the detection equipment is reliable.
[0003] In the prior art, a simulated nuclear fuel assembly is usually manufactured with the same dimensions and structure as the real nuclear fuel assembly to provide detection index calibration for the detection equipment, wherein the simulated fuel rods used have the same dimensions, length, and diameter as the real fuel rods, and the number of simulated fuel rods is also the same as the real fuel rods. However, since the calibration device only needs to provide the detection equipment with relevant detection indicators when calibrating the detection equipment, the above design will increase the manufacturing cost of the nuclear fuel assembly calibration device because the simulated fuel rods used and their number are consistent with the real fuel rods, and the replacement operation is cumbersome due to the large number of fuel rods. Summary of the invention
[0004] The purpose of the present invention is to provide a nuclear fuel assembly verification device, simplify the structure of the simulated nuclear fuel assembly, and reduce the manufacturing cost of the nuclear fuel assembly verification device.
[0005] To achieve this object, the present invention adopts the following technical solutions:
[0006] The present invention provides a nuclear fuel assembly calibration device, comprising:
[0007] Connecting rod;
[0008] A simulated upper tube seat connected to one end of the connecting rod;
[0009] A simulated lower tube seat connected to the other end of the connecting rod;
[0010] Two first simulated grids are spaced apart from each other along the axial direction of the connecting rod, wherein the two first simulated grids are both located between the simulated upper tube seat and the simulated lower tube seat and are both connected to the connecting rod;
[0011] A plurality of simulated fuel rods are arranged at intervals, wherein the simulated fuel rods include two coaxial simulated fuel nodes arranged at intervals, the two simulated fuel nodes are respectively connected to the two first simulated grids, and the simulated fuel nodes are arranged at intervals from the simulated upper pipe seat or the simulated lower pipe seat.
[0012] Furthermore, the first simulated grid includes a first connecting portion and a second connecting portion connected at an angle, the connecting rod includes a first side wall and a second side wall connected at an angle, the first connecting portion is fitted and connected to the first side wall, the second connecting portion is fitted to the second side wall and is provided with a mounting hole, and a plurality of the simulated fuel nodes are respectively passed through the plurality of the mounting holes.
[0013] Furthermore, the first simulation grid also includes a third connecting portion, which is parallel to and spaced apart from the first connecting portion, and the second connecting portion is connected between the first connecting portion and the third connecting portion. The connecting rod also includes a third side wall, which is parallel to and spaced apart from the first side wall, and the third side wall is connected to the second side wall, and the third connecting portion is in contact with the third side wall.
[0014] Furthermore, the mounting hole is a first threaded hole, and one end of the simulated fuel node is provided with an external thread and is threadedly connected to the first threaded hole.
[0015] Furthermore, the first simulation grid is provided with a first through hole, the connecting rod is provided with a second threaded hole, and the nuclear fuel assembly verification device also includes a first bolt, which passes through the first through hole and is threadedly connected to the second threaded hole to fix the relative position of the first simulation grid and the connecting rod.
[0016] Furthermore, the nuclear fuel assembly verification device also includes a second simulation grid, which is spaced between two of the first simulation grids and connected to the connecting rod.
[0017] Furthermore, a plurality of the second simulation grids are provided, and the plurality of the second simulation grids are all located between two of the first simulation grids and are spaced apart along the axial direction of the connecting rod.
[0018] Furthermore, the second simulation grid is provided with a second through hole, the connecting rod is provided with a third threaded hole, and the nuclear fuel assembly verification device also includes a second bolt, which passes through the second through hole and is threadedly connected to the third threaded hole to fix the relative position of the second simulation grid and the connecting rod.
[0019] Furthermore, the nuclear fuel assembly verification device also includes a lifting ring, and the lifting ring is installed on the simulated upper pipe seat or the simulated lower pipe seat.
[0020] Furthermore, the connecting rod is made of square steel and has an inner cavity, and a drainage hole connecting the outside and the inner cavity is opened on the connecting rod.
[0021] The nuclear fuel assembly calibration device of the present invention has at least the following beneficial effects:
[0022] The nuclear fuel assembly verification device of the present invention comprises a connecting rod, a simulated upper tube seat, a simulated lower tube seat, two first simulated grids, and a plurality of simulated fuel rods arranged at intervals. The simulated upper tube seat is connected to one end of the connecting rod; the simulated lower tube seat is connected to the other end of the connecting rod; two first simulated grids are arranged at intervals along the axial direction of the connecting rod, and the two first simulated grids are both located between the simulated upper tube seat and the simulated lower tube seat and are both connected to the connecting rod; the simulated fuel rod comprises two coaxial and spaced simulated fuel nodes, the two simulated fuel nodes are respectively connected to the two first simulated grids, and the simulated fuel nodes are spaced from the simulated upper tube seat or the simulated lower tube seat. By making the original whole simulated fuel rod into two shorter simulated fuel nodes, the structure of the simulated nuclear fuel assembly is simplified, and the manufacturing cost of the nuclear fuel assembly verification device is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 is a schematic structural diagram of a nuclear fuel assembly calibration device according to an embodiment of the present invention;
[0024] Figure 2 is a schematic structural diagram of a nuclear fuel assembly calibration device without a simulated nuclear fuel rod in an embodiment of the present invention;
[0025] Figure 3 is a structural fracture view of a nuclear fuel assembly calibration device according to an embodiment of the present invention;
[0026] Figure 4 It is a schematic diagram of the partial structure of the nuclear fuel assembly calibration device without the simulated fuel rods in the embodiment of the present invention;
[0027] Figure 5 It is a partial enlarged view of point A in the embodiment of the present invention.
[0028] In the figure:
[0029] 1. Connecting rod; 11. First side wall; 12. Second side wall; 13. Third side wall; 14. Second threaded hole; 15. Third threaded hole; 16. Drain hole; 2. Simulated upper tube seat; 3. Simulated lower tube seat; 4. First simulated grid; 41. First connecting part; 42. Second connecting part; 421. Mounting hole; 4211. First threaded hole; 43. Third connecting part; 44. First through hole; 5. Simulated fuel rod; 51. Simulated fuel node; 6. Second simulated grid; 61. Second through hole; 7. First bolt; 8. Second bolt; 9. Lifting ring. DETAILED DESCRIPTION
[0030] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0031] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0033] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0034] This embodiment provides a nuclear fuel assembly calibration device, which simulates various parts of a real underwater nuclear fuel assembly, including but not limited to the upper tube seat, the lower tube seat, the fuel rod, the grid, etc. The real underwater nuclear fuel assembly includes but is not limited to the third-generation pressurized water reactor fuel assembly, etc. The calibration device can simultaneously provide calibration of measurement technical indicators such as but not limited to the length of the fuel rod, the height of the fuel assembly, the gap between multiple fuel rods, the gap between the fuel rod and the upper and lower tube seats, and the degree of bending and twisting of the grid for the detection equipment, avoiding the problems of complex operation and long time consumption of using special calibration parts for single detection items, and reducing the calibration time. A verification function is also provided. The verification device is placed next to the underwater nuclear fuel assembly. Before performing various numerical tests on the underwater nuclear fuel assembly, the corresponding numerical measurements are first performed on the verification device. Then, various numerical measurements of the underwater nuclear fuel assembly are measured. Then, the same numerical measurements are performed on the verification device. By comparing the difference between the results of the first numerical measurement and the third numerical measurement, the authenticity of the second numerical measurement result is judged. If there is no difference between the results of the first numerical measurement and the third numerical measurement or the difference is within an acceptable range, the second numerical measurement result is judged to be authentic and reliable. Otherwise, it is unreliable and needs to be measured again.
[0035] Please refer to Figures 1 to 5 As shown, the nuclear fuel assembly verification device in this embodiment includes a connecting rod 1, a simulated upper tube seat 2, a simulated lower tube seat 3, two first simulated grids 4, and a plurality of simulated fuel rods 5 arranged at intervals. The simulated upper tube seat 2 is connected to one end of the connecting rod 1; the simulated lower tube seat 3 is connected to the other end of the connecting rod 1; the two first simulated grids 4 are arranged at intervals along the axial direction of the connecting rod 1, and the two first simulated grids 4 are both located between the simulated upper tube seat 2 and the simulated lower tube seat 3 and are both connected to the connecting rod 1; the simulated fuel rod 5 includes two coaxial and spaced simulated fuel nodes 51, the two simulated fuel nodes 51 are respectively connected to the two first simulated grids 4, and the simulated fuel nodes 51 are spaced from the simulated upper tube seat 2 or the simulated lower tube seat 3.
[0036] Specifically, in this embodiment, the overall height value of the underwater nuclear fuel assembly is simulated by the connecting rod 1, the simulated upper tube seat 2, and the simulated lower tube seat 3. The simulated fuel rod 5 includes two simulated fuel nodes 51. Since a plurality of simulated fuel rods 5 are arranged at intervals on the first simulated grid 4, each simulated fuel node 51 is also arranged at intervals on the first simulated grid 4; the diameter of the simulated fuel node 51 is the same as the diameter of the fuel rod in the underwater nuclear fuel assembly; the two simulated fuel nodes 51 are respectively coaxially installed on the two first simulated grids 4, and the length of the two simulated fuel nodes 51 plus the length of the interval between the two equals the length of the fuel rod in the underwater nuclear fuel assembly; in this way, the length and diameter values of the simulated rods in the underwater nuclear fuel assembly can be simulated. On the first simulated grid 4 close to the simulated upper tube seat 2 and away from the simulated lower tube seat 3, the simulated fuel node 51 is located between the simulated upper tube seat 2 and the first simulated grid 4, and the spacing value of the top of the simulated fuel node 51 from the simulated upper tube seat 2 is consistent with the spacing value of the top of the fuel rod in the underwater nuclear fuel assembly from the upper tube seat; on the first simulated grid 4 close to the simulated lower tube seat 3 and away from the simulated upper tube seat 2, the simulated fuel node 51 is located between the simulated lower tube seat 3 and the first simulated grid 4, and the spacing value of the top of the simulated fuel node 51 from the simulated lower tube seat 3 is consistent with the spacing value of the top of the fuel rod in the underwater nuclear fuel assembly from the lower tube seat; in this way, the spacing value between the fuel rod in the underwater nuclear fuel assembly to the upper tube seat and the lower tube seat can be simulated. And the spacing value between several simulated fuel nodes 51 is also consistent with the spacing value between each fuel rod in the underwater nuclear fuel assembly, so that the spacing value of each fuel rod in the underwater nuclear fuel assembly can be simulated. While ensuring the calibration and verification functions of the verification device, one simulated fuel rod 5 is designed to be two simulated fuel nodes 51, which reduces the production cost of the simulated fuel rod 5 and also reduces the waste of the simulated fuel rod 5 when replacing the simulated fuel node 51, thereby reducing the overall production and use cost of the device.
[0037] Alternatively, if Figure 4 and Figure 5As shown, the first simulated grid 4 includes a first connection portion 41 and a second connection portion 42 connected at an angle, and the connecting rod 1 includes a first side wall 11 and a second side wall 12 connected at an angle, the first connection portion 41 is attached to and connected with the first side wall 11, the second connection portion 42 is attached to the second side wall 12 and has a mounting hole 421, and a plurality of simulated fuel nodes 51 are correspondingly penetrated through the plurality of mounting holes 421. Specifically, in this embodiment, the first simulated grid 4 is configured as a first connection portion 41 and a second connection portion 42 connected at an angle, which can reduce the manufacturing cost of the first simulated grid 4. The connection angle of the first connection portion 41 and the second connection portion 42 corresponds to the connection angle of the first side wall 11 and the second side wall 12 on the connecting rod 1, and the first connection portion 41 can be attached to and connected with the first side wall 11, thereby connecting the first simulated grid 4 to the connecting rod 1. By opening a plurality of mounting holes 421 on the second connecting portion 42 of the first simulated grid 4 for correspondingly mounting a plurality of simulated fuel nodes 51, the spacing positions of the plurality of mounting holes 421 correspond to the spacing positions of a plurality of fuel rods in the underwater nuclear fuel assembly, thereby reducing the number of simulated fuel nodes 51 used, reducing the manufacturing cost and subsequent replacement cost of the device, and the reduction in the number of simulated fuel nodes 51 can also reduce the workload of workers in installing and replacing the simulated fuel nodes 51.
[0038] Furthermore, if Figure 4 and Figure 5 As shown, the first simulated grid 4 also includes a third connecting portion 43, the third connecting portion 43 is parallel to and spaced from the first connecting portion 41, the second connecting portion 42 is connected between the first connecting portion 41 and the third connecting portion 43, the connecting rod 1 also includes a third side wall 13, the third side wall 13 is parallel to and spaced from the first side wall 11, the third side wall 13 is connected to the second side wall 12, and the third connecting portion 43 is in contact with the third side wall 13. In this embodiment, the first simulated grid 4 also includes a third connecting portion 43 that fits the third side wall 13, the third connecting portion 43 is connected to the other end connected to the second connecting portion 42, the first connecting portion 41 and the third connecting portion 43 are parallel and respectively connected to the two ends of the second connecting portion 42, and the first simulated grid 4 is designed into a U-shaped structure through the first connecting portion 41, the second connecting portion 42 and the third connecting portion 43. In this way, the first simulated grid 4 can be quickly plugged into the connecting rod 1 through the opening of the U-shaped structure, so that the first simulated grid 4 can be closely attached to the connecting rod 1 and is not easy to fall off; and the first simulated grid 4 is closer to the grid of the underwater nuclear fuel assembly. In other embodiments, the third connecting portion 43 can also be connected to the third side wall 13, so that the connection between the first simulated frame and the connecting rod 1 is more reliable.
[0039] Furthermore, if Figure 5As shown, the mounting hole 421 is a first threaded hole 4211, and one end of the simulated fuel node 51 is provided with an external thread and is threadedly connected to the first threaded hole 4211. Such a configuration facilitates the installation and removal of the simulated fuel node 51, facilitates the replacement of the simulated fuel node 51, replaces the simulated fuel node 51 with different size parameters, and simulates underwater nuclear fuel assemblies with different size parameters.
[0040] Alternatively, if Figure 3 and Figure 4 As shown, the first simulated grid 4 is provided with a first through hole 44, the connecting rod 1 is provided with a second threaded hole 14, and the nuclear fuel assembly verification device further includes a first bolt 7, which passes through the first through hole 44 and is threadedly connected to the second threaded hole 14 to fix the relative position of the first simulated grid 4 and the connecting rod 1. Specifically, in this embodiment, the first simulated grid 4 is detachably connected to the connecting rod 1 by the first bolt 7, which is convenient for the installation and replacement of the first simulated grid 4, and the first simulated grid 4 with different size parameters can be replaced to simulate underwater nuclear fuel assemblies with different size parameters. It should be noted that the number of the first bolts 7 used is determined according to the specific situation, and the number can be one, two, or three, without specific limitation, and is determined according to the number of the second threaded hole 14 on the connecting rod 1 and the first through hole 44 on the first simulated grid 4.
[0041] To replace the fuel rods on a general simulated fuel assembly, it is necessary to first remove the simulated upper tube seat 2 or the simulated lower tube seat 3, and then pull out the entire length of the fuel rod from the simulated grid, and the replacement operation is complicated; while for the verification device, it is only necessary to remove the first simulated grid 4 from the connecting rod 1, and then remove the simulated fuel node 51 from the first simulated grid 4, and the replacement operation is relatively simple.
[0042] Alternatively, if Figures 1 to 3 As shown, the nuclear fuel assembly verification device further includes a second simulated grid 6, which is arranged between two first simulated grids 4 and connected to the connecting rod 1. The second simulated grid 6 is provided to perform numerical calibration and verification of bending and torsion of the grid in the underwater nuclear fuel assembly.
[0043] Furthermore, if Figures 1 to 3As shown, there are a plurality of second simulated grids 6, and the plurality of second simulated grids 6 are all located between the two first simulated grids 4 and are arranged at intervals along the axial direction of the connecting rod 1. The plurality of second simulated grids 6 are connected to the connecting rod 1 in order to better simulate the underwater nuclear fuel assembly, and are arranged according to the main grid positions of the underwater nuclear fuel assembly, so that the simulation of the device is more realistic and effective. In this embodiment, the shape of the second simulated grid 6 is consistent with the shape of the first simulated grid 4, but since the simulated fuel rod 5 does not need to be penetrated by the second simulated grid 6, the second simulated grid 6 does not need to be provided with the mounting hole 421, and the manufacturing process of the second simulated grid 6 is reduced accordingly, thereby reducing the manufacturing cost of the second simulated grid 6, thereby reducing the overall manufacturing cost of the device.
[0044] Furthermore, if Figure 2 and Figure 3 As shown, the second simulated grid 6 is provided with a second through hole 61, the connecting rod 1 is provided with a third threaded hole 15, and the nuclear fuel assembly verification device further includes a second bolt 8, which passes through the second through hole 61 and is threadedly connected to the third threaded hole 15 to fix the relative position of the second simulated grid 6 and the connecting rod 1. Such a configuration is also convenient for the installation and replacement of the second simulated grid 6, and the second simulated grid 6 with different size parameters can be replaced to simulate underwater nuclear fuel assemblies with different size parameters. It should be noted that the number of the second bolts 8 used is determined according to the specific situation, and the number can be one, two, or three, without specific limitation, and is determined by the number of the third threaded hole 15 on the connecting rod 1 and the second through hole 61 on the second simulated grid 6.
[0045] Alternatively, if Figure 4 As shown, the nuclear fuel assembly verification device also includes a lifting ring 9, which is installed on the simulated upper pipe seat 2 or the simulated lower pipe seat 3. The arrangement of the lifting ring 9 facilitates the use of a lifting tool to send the device to the side of the underwater nuclear fuel assembly, and also facilitates the lifting tool to lift the device up.
[0046] Alternatively, if Figures 1 to 5 As shown, the connecting rod 1 is made of square steel and has an inner cavity, and a drainage hole 16 connecting the outside and the inner cavity is opened on the connecting rod 1. The connecting rod 1 made of square steel with a cavity can not only ensure the strength of the connecting rod 1 but also reduce the weight of the entire device. When the device comes up from the underwater environment, the excess water can be drained out of the connecting rod 1 through the drainage hole 16. The number of drainage holes 16 and the size of the opening of the hole are determined according to the length and width of the connecting rod 1, and it is sufficient to quickly drain the water from the connecting rod 1. In this embodiment, the calibration device is made of corrosion-resistant stainless steel, which can ensure long-term and stable calibration work underwater.
[0047] In this embodiment, the simulated fuel rod 5 of the nuclear fuel assembly verification device is made into only two simulated fuel nodes 51, and a plurality of simulated fuel rods 5 are installed on only one side of the first simulated grid 4, which not only reduces the production cost of a single simulated fuel rod 5, but also reduces the number of simulated fuel rods 5 used, as well as the production costs of the first simulated grid 4 and the second simulated grid 6, thereby reducing the production cost of the verification device without affecting the verification work of the detection equipment.
[0048] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A nuclear fuel assembly calibration device, characterized in that: include: Connecting rod (1); A simulated upper tube seat (2), wherein the simulated upper tube seat (2) is connected to one end of the connecting rod (1); A simulated lower tube seat (3), wherein the simulated lower tube seat (3) is connected to the other end of the connecting rod (1); Two first simulated grids (4) spaced apart from each other along the axial direction of the connecting rod (1), the two first simulated grids (4) being located between the simulated upper tube seat (2) and the simulated lower tube seat (3) and being connected to the connecting rod (1); A plurality of simulated fuel rods (5) are arranged at intervals, wherein the simulated fuel rods (5) include two coaxial simulated fuel nodes (51) arranged at intervals, the two simulated fuel nodes (51) are respectively connected to the two first simulated grids (4), and the simulated fuel nodes (51) are arranged at intervals from the simulated upper tube seat (2) or the simulated lower tube seat (3).
2. A nuclear fuel assembly calibration device according to claim 1, characterized in that: The first simulated grid (4) comprises a first connecting portion (41) and a second connecting portion (42) connected at an angle, the connecting rod (1) comprises a first side wall (11) and a second side wall (12) connected at an angle, the first connecting portion (41) is fitted and connected to the first side wall (11), the second connecting portion (42) is fitted to the second side wall (12) and is provided with a mounting hole (421), and a plurality of the simulated fuel nodes (51) are respectively passed through the plurality of the mounting holes (421).
3. A nuclear fuel assembly calibration device according to claim 2, characterized in that: The first simulation grid (4) also includes a third connecting portion (43), the third connecting portion (43) is parallel to and spaced from the first connecting portion (41), the second connecting portion (42) is connected between the first connecting portion (41) and the third connecting portion (43), the connecting rod (1) also includes a third side wall (13), the third side wall (13) is parallel to and spaced from the first side wall (11), the third side wall (13) is connected to the second side wall (12), and the third connecting portion (43) is in contact with the third side wall (13).
4. A nuclear fuel assembly calibration device according to claim 2, characterized in that: The mounting hole (421) is a first threaded hole (4211), and one end of the simulated fuel node (51) is provided with an external thread and is threadedly connected to the first threaded hole (4211).
5. A nuclear fuel assembly calibration device according to claim 1, characterized in that: The first simulation grid (4) is provided with a first through hole (44), the connecting rod (1) is provided with a second threaded hole (14), and the nuclear fuel assembly verification device further comprises a first bolt (7), the first bolt (7) passes through the first through hole (44) and is threadedly connected to the second threaded hole (14) to fix the relative position of the first simulation grid (4) and the connecting rod (1).
6. A nuclear fuel assembly calibration device according to claim 1, characterized in that: The nuclear fuel assembly calibration device further comprises a second simulation grid (6), wherein the second simulation grid (6) is arranged between two of the first simulation grids (4) and is connected to the connecting rod (1).
7. A nuclear fuel assembly calibration device according to claim 6, characterized in that: A plurality of the second simulated grids (6) are provided, and the plurality of the second simulated grids (6) are all located between two of the first simulated grids (4) and are arranged at intervals along the axial direction of the connecting rod (1).
8. A nuclear fuel assembly calibration device according to claim 6, characterized in that: The second simulation grid (6) is provided with a second through hole (61), the connecting rod (1) is provided with a third threaded hole (15), and the nuclear fuel assembly verification device further comprises a second bolt (8), the second bolt (8) passes through the second through hole (61) and is threadedly connected to the third threaded hole (15) to fix the relative position of the second simulation grid (6) and the connecting rod (1).
9. A nuclear fuel assembly calibration device according to any one of claims 1 to 8, characterized in that: The nuclear fuel assembly verification device also includes a lifting ring (9), and the lifting ring (9) is installed on the simulated upper pipe seat (2) or the simulated lower pipe seat (3).
10. A nuclear fuel assembly calibration device according to any one of claims 1 to 8, characterized in that: The connecting rod (1) is made of square steel and has an inner cavity. A drainage hole (16) connecting the outside and the inner cavity is provided on the connecting rod (1).