Method and system for monitoring adsorption tower of COAP system

By collecting and comparing the temperature data of the adsorption tower in the COAP system, issuing an alarm and performing defect removal actions, the problem of adsorption tower failure is solved, ensuring the stable operation of the system and the effect of pollutant removal.

CN118925440AActive Publication Date: 2024-11-12HUANENG LINYI POWER GENERATION CO LTD +2

Patent Information

Application Number
CN202411327513.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-12
Estimated Expiration
2044-09-23

AI Technical Summary

Technical Problem

There are insufficient monitoring and fault treatment of adsorption towers in COAP system, resulting in the failure to meet the standards for pollutants removal and affecting the stable operation of the system.

Method used

Adoptment tower monitoring method of COAP system, by collecting inlet flue gas temperature, filler temperature and outlet flue gas temperature, comparing the temperature range and issuing alarm information, and performing corresponding defect removal actions, such as inert gas injection, flow regulation and filler Unblock to ensure the normal operation of the adsorption tower.

Benefits of technology

The continuous and stable operation of the adsorption tower is achieved, the failure to remove pollutants is avoided, and the operating efficiency and stability of the system are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118925440A_ABST
    Figure CN118925440A_ABST
Patent Text Reader

Abstract

The invention provides an adsorption tower monitoring method and system of a COAP system, and the adsorption tower monitoring method of the COAP system comprises the steps: collecting the inlet flue gas temperature of an adsorption tower; collecting the filler temperature and the outlet flue gas temperature of each adsorption module; comparing the inlet flue gas temperature with the first temperature range, the filler temperature with the second temperature range, and the outlet flue gas temperature with the third temperature range; and sending out corresponding alarm information according to a comparison result, and executing a corresponding defect elimination action. According to the adsorption tower monitoring method and system of the COAP system disclosed by the invention, the fault problem of the adsorption tower can be solved in time, the continuous operation of the adsorption tower is ensured, and the problem that pollutant removal cannot reach the standard is avoided, so that the operation efficiency of the adsorption tower is improved, and the stable operation of the COAP system is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of COAP systems, and in particular to an adsorption tower monitoring method and system for a COAP system. Background Art

[0002] COAP (Cold Oxidation Absorption Process) is a flue gas pollutant treatment technology that uses the principle of low-temperature oxidation adsorption to achieve integrated removal of multiple pollutants in flue gas by fillers. Among them, the adsorption tower is one of the most core equipment of the COAP system. Monitoring and eliminating defects in the adsorption tower to ensure its continuous operation is the prerequisite for the stable operation of the entire COAP system. Summary of the invention

[0003] The present disclosure aims to solve one of the technical problems in the related art at least to some extent.

[0004] To this end, an object of the present disclosure is to provide an adsorption tower monitoring method and system for a COAP system.

[0005] To achieve the above-mentioned purpose, the first aspect of the present disclosure provides an adsorption tower monitoring method of a COAP system, the COAP system comprising: the adsorption tower and a plurality of adsorption modules stacked in the adsorption tower, the adsorption modules being provided with fillers, the adsorption tower monitoring method comprising: collecting the inlet flue gas temperature of the adsorption tower; collecting the filler temperature and the outlet flue gas temperature of each of the adsorption modules; comparing the inlet flue gas temperature with a first temperature range, the filler temperature with a second temperature range, and the outlet flue gas temperature with a third temperature range; issuing corresponding alarm information according to the comparison result, and executing corresponding fault elimination actions.

[0006] Optionally, a corresponding alarm message is issued based on the result of the comparison, and a corresponding fault elimination action is performed, including: when the inlet flue gas temperature is within the first temperature range, and the packing temperature of the adsorption module is higher than the second temperature range, and the outlet flue gas temperature of the adsorption module is higher than the third temperature range, a first alarm message is issued, and inert gas is introduced into the adsorption module to eliminate overheating of the packing in the adsorption module.

[0007] Optionally, it also includes: collecting the moisture content of the inlet flue gas of the adsorption tower; comparing the moisture content of the inlet flue gas with a first moisture content range, and comparing the moisture content of the inlet flue gas with a second moisture content range, wherein the first moisture content range is lower than the second moisture content range; when the moisture content of the inlet flue gas is within the first moisture content range, issuing a second alarm message of a first degree; when the moisture content of the inlet flue gas is within the second moisture content range, issuing the second alarm message of a second degree.

[0008] Optionally, it also includes: when the moisture content of the inlet flue gas is higher than the first moisture content range, reducing the inlet flue gas flow rate of the adsorption tower to a first flow rate, a second flow rate and a third flow rate in sequence until the inlet flue gas flow rate of the adsorption tower is zero, wherein the first flow rate is greater than the second flow rate, the second flow rate is greater than the third flow rate, and the third flow rate is greater than zero.

[0009] Optionally, a corresponding alarm message is issued based on the result of the comparison, and a corresponding fault elimination action is performed, including: when the inlet flue gas temperature is higher than the first temperature range, a third alarm message is issued, and the inlet flue gas flow of the adsorption tower is reduced to a fourth flow, a fifth flow, and a sixth flow in sequence until the inlet flue gas flow of the adsorption tower is zero, wherein the fourth flow is greater than the fifth flow, the fifth flow is greater than the sixth flow, and the sixth flow is greater than zero.

[0010] Optionally, it also includes: collecting the outlet flue gas pollutant concentration of the adsorption tower; comparing the outlet flue gas pollutant concentration and the concentration range; when the inlet flue gas temperature is within the first temperature range, and the packing temperature of the adsorption module is lower than the second temperature range, the outlet flue gas temperature of the adsorption module is lower than the third temperature range, and the outlet flue gas pollutant concentration is higher than the concentration range, issuing a fourth alarm message and performing a packing unblocking action of the adsorption module to eliminate packing blockage of the adsorption module.

[0011] Optionally, it also includes: collecting the first inlet flue gas pressure and outlet flue gas pressure of each of the adsorption modules; comparing the first inlet flue gas pressure and pressure range and the outlet flue gas pressure and pressure range; wherein, when the first inlet flue gas pressure is higher than the pressure range and the outlet flue gas pressure is lower than the pressure range, a fifth alarm message is issued, and a packing clearing action of the adsorption module is performed to eliminate packing blockage of the adsorption module.

[0012] Optionally, it also includes: collecting the second inlet flue gas pressure of the adsorption tower; comparing the second inlet flue gas pressure with the pressure range; wherein, when the first inlet flue gas pressure is higher than the pressure range, and the second inlet flue gas pressure is higher than the pressure range, and the outlet flue gas pressure is lower than the pressure range, the fifth alarm message is issued, and the packing dredging action of the adsorption module is performed.

[0013] A second aspect of the present disclosure provides an adsorption tower monitoring system for a COAP system, the COAP system comprising: the adsorption tower and a plurality of adsorption modules stacked in the adsorption tower, wherein fillers are arranged in the adsorption modules, and the adsorption tower monitoring system comprises: a collection module, the collection module is used to collect the inlet flue gas temperature of the adsorption tower and the filler temperature and the outlet flue gas temperature of each of the adsorption modules; a comparison module, the comparison module is used to compare the inlet flue gas temperature with a first temperature range, the filler temperature and a second temperature range, and the outlet flue gas temperature with a third temperature range; an execution module, the execution module is used to issue corresponding alarm information according to the comparison result, and execute corresponding fault elimination actions.

[0014] Optionally, the adsorption module includes: a tower, a distributor, a drop feeder and a discharge hopper, the distributor and the drop feeder are arranged in the tower from top to bottom in sequence, an adsorption zone is formed between the distributor and the drop feeder, the discharge hopper is arranged below the drop feeder, the top of the distributor is used to receive the filler, the distributor is used to evenly arrange the filler in the adsorption zone, and the drop feeder is used to evenly discharge the filler at the bottom of the adsorption zone into the discharge hopper; wherein the collection module is used to collect the filler temperature in the adsorption zone and the outlet flue gas temperature of the adsorption zone.

[0015] Optionally, the distributor includes: a plurality of distribution cone buckets arranged in parallel, a distribution pipe is provided at the lower end of the distribution cone bucket, adjacent distribution cone buckets are sealed and connected, and the smoke outlet of the adsorption zone is arranged relative to the lower end of the distribution cone bucket and / or the distribution pipe in the horizontal direction; the drop feeder includes: a plurality of drop feed cone buckets arranged in parallel and at intervals, a drop feed pipe is provided at the lower end of the drop feed cone bucket, and the smoke inlet of the adsorption zone is arranged relative to the drop feed cone bucket and / or the drop feed pipe in the horizontal direction.

[0016] Optionally, the dropper further comprises: a plurality of discharge hoppers arranged in parallel, adjacent discharge hoppers being sealedly connected, the discharge hoppers being located above the drop cone hopper, and the lower end of at least one of the discharge hoppers being arranged opposite to the upper end of the drop cone hopper.

[0017] Optionally, the adsorption module also includes: a unloading device, which includes: a material tray, a material dropping rake and a driving assembly, the material tray is arranged below the dropper and spaced between the dropper port, the material tray is used to receive the dropped material from the dropper, the material dropping rake is arranged between the material tray and the dropper and is slidably arranged on the material tray along a preset direction, the driving assembly is arranged on the tower, and the driving assembly is transmission-connected to the material dropping rake, the driving assembly is used to drive the material dropping rake to reciprocate along the preset direction, and adjust the moving frequency of the material dropping rake to rake the filler on the material tray into the unloading hopper at a preset rate.

[0018] The third aspect of the present disclosure provides an electronic device, comprising: a processor; and a memory for storing instructions executable by the processor; wherein the processor is configured to execute the instructions to implement the adsorption tower monitoring method of the COAP system provided in the first aspect of the present disclosure.

[0019] The technical solution provided by the present disclosure may have the following beneficial effects:

[0020] By collecting the inlet flue gas temperature of the adsorption tower and comparing the inlet flue gas temperature with the first temperature range, the inlet flue gas temperature of the adsorption tower can be monitored. By collecting the packing temperature of each adsorption module and comparing the packing temperature with the second temperature range, the packing temperature of the adsorption module in the adsorption tower can be monitored. By collecting the outlet flue gas temperature of each adsorption module and comparing the outlet flue gas temperature with the third temperature range, the outlet flue gas temperature of the adsorption module in the adsorption tower can be monitored. At the same time, according to the comparison results of the inlet flue gas temperature with the first temperature range, the packing temperature and the second temperature range, and the outlet flue gas temperature with the third temperature range, corresponding alarm information is issued, and corresponding fault elimination actions are performed, so as to timely solve the fault problem of the adsorption tower, ensure the continuous operation of the adsorption tower, avoid the problem of pollutant removal failing to meet the standards, thereby improving the operation efficiency of the adsorption tower and ensuring the stable operation of the COAP system.

[0021] Additional aspects and advantages of the present disclosure will be given in part in the following description and in part will be obvious from the following description or learned through practice of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The above and / or additional aspects and advantages of the present disclosure will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0023] Figure 1 It is a schematic flow chart of an adsorption tower monitoring method of a COAP system proposed in one embodiment of the present disclosure;

[0024] Figure 2is a schematic structural diagram of an adsorption tower proposed in one embodiment of the present disclosure;

[0025] Figure 3 It is a structural schematic diagram of an adsorption tower monitoring system of a COAP system proposed in one embodiment of the present disclosure;

[0026] Figure 4 is a schematic structural diagram of an adsorption tower proposed in one embodiment of the present disclosure;

[0027] Figure 5 is a schematic structural diagram of an adsorption module in an adsorption tower proposed in one embodiment of the present disclosure;

[0028] Figure 6 It is a structural schematic diagram of a discharging device in an adsorption tower proposed in an embodiment of the present disclosure;

[0029] As shown in the figure: 1. Adsorption tower;

[0030] 11. Adsorption module;

[0031] 111. Tower;

[0032] 112, material distributor, 1121, material distributor cone, 1122, material distributor pipe;

[0033] 113, a material dropper, 1131, a material drop cone, 1132, a material drop pipe, 1133, a material discharge hopper;

[0034] 114. Discharge hopper;

[0035] 115. unloading device, 1151. material tray, 1152. material dropping rake, 1153. driving assembly;

[0036] 2. Acquisition module, 3. Comparison module, 4. Execution module. DETAILED DESCRIPTION

[0037] Embodiments of the present disclosure are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present disclosure, and are not to be construed as limitations of the present disclosure. On the contrary, the embodiments of the present disclosure include all changes, modifications, and equivalents that fall within the spirit and connotation of the appended claims.

[0038] like Figure 1 and Figure 2 As shown, the embodiment of the present disclosure provides an adsorption tower monitoring method of a COAP (Cold Oxidation Absorption Process) system, comprising:

[0039] S1: Collect the inlet flue gas temperature of adsorption tower 1;

[0040] S2: collecting the filler temperature and outlet flue gas temperature of each adsorption module 11;

[0041] S3: comparing the inlet flue gas temperature with the first temperature range, the filler temperature with the second temperature range, and the outlet flue gas temperature with the third temperature range;

[0042] S4: Issue corresponding alarm information according to the comparison result and execute corresponding fault elimination action.

[0043] It can be understood that by collecting the inlet flue gas temperature of the adsorption tower 1 and comparing the inlet flue gas temperature with the first temperature range, the inlet flue gas temperature of the adsorption tower 1 can be monitored, by collecting the packing temperature of each adsorption module 11 and comparing the packing temperature with the second temperature range, the packing temperature of the adsorption module 11 in the adsorption tower 1 can be monitored, and by collecting the outlet flue gas temperature of each adsorption module 11 and comparing the outlet flue gas temperature with the third temperature range, the outlet flue gas temperature of the adsorption module 11 in the adsorption tower 1 can be monitored. At the same time, according to the comparison results of the inlet flue gas temperature with the first temperature range, the packing temperature and the second temperature range, and the outlet flue gas temperature with the third temperature range, corresponding alarm information is issued, and corresponding fault elimination actions are performed, so as to timely solve the fault problem of the adsorption tower 1, ensure the continuous operation of the adsorption tower 1, avoid the problem of pollutant removal failing to meet the standards, thereby improving the operation efficiency of the adsorption tower 1 and ensuring the stable operation of the COAP system.

[0044] It should be noted that the COAP system is a system that uses COAP technology to remove various pollutants such as sulfur dioxide, nitrogen oxides, sulfur trioxide, mercury, hydrogen chloride, volatile organic compounds, etc. from flue gas. Figure 2 and Figure 4 As shown, the COAP system includes a spray tower (not shown in the figure), an adsorption tower 1, a plurality of adsorption modules 11 stacked in the adsorption tower 1, etc., wherein fillers are arranged in the adsorption module 11, and the low-temperature flue gas enters from the inlet of the adsorption tower 1 and passes through a plurality of adsorption modules 11 respectively before being discharged from the outlet of the adsorption tower 1, and when the low-temperature flue gas passes through the adsorption module 11, the fillers in the adsorption module 11 adsorb the pollutants in the low-temperature flue gas, thereby achieving the removal of pollutants in the flue gas.

[0045] If the flue gas temperature in the adsorption tower 1 is too high, it cannot meet the low temperature requirement of the COAP technology, resulting in failure of the adsorption tower 1 and inability to remove pollutants. At the same time, the excessively high flue gas temperature in the adsorption tower 1 is also likely to cause spontaneous combustion of the filler, resulting in failure of the adsorption module 11. Therefore, by monitoring the inlet flue gas temperature of the adsorption tower 1, the filler temperature of each adsorption module 11 and the outlet flue gas temperature, and issuing corresponding alarm information and performing fault elimination actions, abnormal flue gas temperature in the adsorption tower 1 can be avoided, thereby ensuring stable and continuous operation of the adsorption tower 1.

[0046] At the same time, the oxygen, water and sulfur dioxide in the flue gas easily react to form sulfuric acid and release a large amount of heat, which can also easily cause spontaneous combustion of activated carbon.

[0047] The type of filler in the adsorption module 11 can be set according to actual needs, and there is no limitation to this. For example, the filler can be activated carbon.

[0048] The method for collecting the inlet flue gas temperature of the adsorption tower 1 can be set according to actual needs and is not limited to this. For example, at least one first temperature sensor is set at the inlet of the adsorption tower 1 to collect the inlet flue gas temperature of the adsorption tower 1 using the first temperature sensor.

[0049] The method for collecting the filler temperature of the adsorption module 11 can be set according to actual needs and is not limited to this. For example, at least one second temperature sensor is set in the adsorption module 11 to collect the filler temperature of the adsorption module 11 using the second temperature sensor.

[0050] The method for collecting the outlet flue gas temperature of the adsorption module 11 can be set according to actual needs and is not limited to this. For example, at least one third temperature sensor is set at the outlet of the adsorption module 11 to collect the outlet flue gas temperature of the adsorption module 11 using the third temperature sensor.

[0051] Each adsorption module 11 is provided with at least one second temperature sensor and at least one third temperature sensor. For example, when there are sixteen adsorption modules 11, at least sixteen second temperature sensors and at least sixteen third temperature sensors are provided.

[0052] The inlet flue gas temperature of the adsorption tower 1 needs to be within a first temperature range. The specific value of the first temperature range can be set according to actual needs and is not limited to this. For example, the first temperature range can be -15 degrees to -10 degrees.

[0053] The filler temperature of the adsorption module 11 needs to be within the second temperature range. The specific value of the second temperature range can be set according to actual needs and is not limited to this. For example, the second temperature range can be -10 degrees to -5 degrees.

[0054] The outlet flue gas temperature of the adsorption module 11 needs to be within a third temperature range. The specific value of the third temperature range can be set according to actual needs and is not limited to this. For example, the third temperature range can be -5 degrees to 0 degrees.

[0055] In some embodiments, a corresponding alarm message is issued according to the comparison result, and a corresponding fault elimination action is performed, including:

[0056] When the inlet flue gas temperature is within the first temperature range, the packing temperature of the adsorption module 11 is higher than the second temperature range, and the outlet flue gas temperature of the adsorption module 11 is higher than the third temperature range, a first alarm message is issued, and inert gas is introduced into the adsorption module 11 to eliminate overheating of the packing in the adsorption module 11.

[0057] It can be understood that when the inlet flue gas temperature is within the first temperature range, it indicates that the inlet flue gas temperature of the adsorption tower 1 is in a normal state. When the packing temperature of the adsorption module 11 is higher than the second temperature range, and the outlet flue gas temperature of the adsorption module 11 is higher than the third temperature range, it indicates that the packing temperature and the outlet flue gas temperature of the adsorption module 11 are in an abnormally elevated state. At this time, it can be determined that the internal temperature of the adsorption module 11 is too high, and the packing may have a spontaneous combustion problem. Therefore, by issuing the first alarm information, the operating personnel can be promptly prompted to carry out corresponding cooperation and processing. At the same time, by introducing inert gas into the adsorption module 11, the oxygen, moisture, etc. in the adsorption module 11 can be replaced to cool the inside of the adsorption module 11 and extinguish the packing that may burn. In this way, the problem of overheating of the packing in the adsorption module 11 is promptly eliminated, and the stable and continuous operation of the adsorption tower 1 is ensured.

[0058] It should be noted that the first alarm information is used to remind the operating personnel. The method of issuing the first alarm information can be set according to actual needs and is not limited to this. For example, the first alarm information can be sound information, light information, sound and light information, etc. The first alarm information can be issued through a sound alarm, a light alarm, a sound and light alarm, etc.

[0059] The method of introducing the inert gas into the adsorption module 11 can be set according to actual needs, and there is no limitation on this. For example, the adsorption tower 1 includes a gas storage tank, in which compressed inert gas is stored, and the gas outlet end of the gas storage tank is respectively connected to the gas inlet end of multiple adsorption modules 11, and the gas inlet end of each adsorption module 11 is provided with a switch valve. Among them, when the inlet flue gas temperature is within the first temperature range, and the filler temperature of the adsorption module 11 is higher than the second temperature range, and the outlet flue gas temperature of the adsorption module 11 is higher than the third temperature range, the switch valve is opened, and the inert gas in the gas storage tank enters the adsorption module 11 to cool the adsorption module 11 and extinguish the filler that may burn in the adsorption module 11.

[0060] The specific type of the inert gas can be set according to actual needs and is not limited thereto. For example, the inert gas can be nitrogen.

[0061] In some embodiments, the adsorption tower monitoring method further comprises:

[0062] Collect the moisture of the inlet flue gas of the adsorption tower 1;

[0063] The inlet flue gas moisture is compared with a first moisture content range, and the inlet flue gas moisture is compared with a second moisture content range, wherein the first moisture content range is lower than the second moisture content range.

[0064] When the moisture content of the inlet flue gas is within the first moisture content range, a second alarm message of the first degree is issued;

[0065] When the moisture content of the inlet flue gas is within a second moisture content range, a second alarm message of a second degree is issued.

[0066] It can be understood that by collecting the moisture content of the inlet flue gas of the adsorption tower 1 and comparing the moisture content of the inlet flue gas with the first moisture content range and the moisture content of the inlet flue gas with the second moisture content range, the moisture content of the inlet flue gas of the adsorption tower 1 can be monitored, and then combined with the monitoring of the inlet flue gas temperature of the adsorption tower 1 and the packing temperature and outlet flue gas temperature of the adsorption module 11, the cause of the fault in the adsorption module 11 can be accurately determined, ensuring that the operating personnel can monitor the adsorption tower 1 more accurately and systematically.

[0067] At the same time, when the moisture content of the inlet flue gas is within the first moisture content range, it indicates that the moisture content of the inlet flue gas of the adsorption tower 1 is in a normal state. Therefore, when the inlet flue gas temperature is within the first temperature range, and the filler temperature of the adsorption module 11 is higher than the second temperature range, and the outlet flue gas temperature of the adsorption module 11 is higher than the third temperature range, it can be judged that the internal temperature of the adsorption module 11 is too high and the filler has a spontaneous combustion problem. Therefore, by issuing a second alarm message of the first degree, the operating personnel can be promptly prompted to perform precise coordinated processing actions to ensure that the overheating problem of the filler in the adsorption module 11 is eliminated in time, thereby ensuring the stable and continuous operation of the adsorption tower 1.

[0068] When the moisture content of the inlet flue gas is within the second moisture content range, it indicates that the moisture content of the inlet flue gas of the adsorption tower 1 is in an abnormally elevated state. Therefore, when the inlet flue gas temperature is within the first temperature range, and the filler temperature of the adsorption module 11 is higher than the second temperature range, and the outlet flue gas temperature of the adsorption module 11 is higher than the third temperature range, it can be determined that sulfuric acid is generated and heat is released inside the adsorption module 11, and the higher heat may cause the filler to spontaneously combust. Therefore, by issuing a second alarm message of the second degree, the operating personnel can be promptly prompted to perform precise coordinated processing actions to ensure that the filler overheating problem in the adsorption module 11 is eliminated in a timely manner, thereby ensuring the stable and continuous operation of the adsorption tower 1.

[0069] It should be noted that when the inlet flue gas temperature is within the first temperature range and the inlet flue gas moisture is within the first moisture range, the filler temperature of the adsorption module 11 is higher than the second temperature range, and the outlet flue gas temperature of the adsorption module 11 is higher than the third temperature range, an inert gas is introduced into the adsorption module 11. The inert gas can be used to replace the oxygen in the adsorption module 11, thereby extinguishing the burning filler in the adsorption module 11.

[0070] When the inlet flue gas temperature is within the first temperature range and the inlet flue gas moisture is within the second moisture range, the filler temperature of the adsorption module 11 is higher than the second temperature range, and the outlet flue gas temperature of the adsorption module 11 is higher than the third temperature range, an inert gas is introduced into the adsorption module 11. The inert gas can be used to replace the oxygen and moisture in the adsorption module 11, thereby gradually cooling the adsorption module 11 and extinguishing the filler that may burn in the adsorption module 11.

[0071] The moisture content of the inlet flue gas of the adsorption tower 1 needs to be within the first moisture content range. The specific value of the first moisture content range can be set according to actual needs and is not limited to this. For example, the first moisture content range can be less than 70 mg / Nm 3 .

[0072] The method for collecting the moisture content of the flue gas at the inlet of the adsorption tower 1 can be set according to actual needs and is not limited to this. For example, at least one flue gas moisture meter is set at the inlet of the adsorption tower 1 to collect the moisture content of the flue gas at the inlet of the adsorption tower 1 using the flue gas moisture meter.

[0073] The specific value of the second water content range can be set according to actual needs, and there is no limitation on this. For example, the second water content range can be 70 mg / Nm 3 Up to 200mg / Nm 3 .

[0074] The second alarm information is used to remind the operator. The sending method of the second alarm information can be set according to actual needs, and there is no limitation on this. For example, the second alarm information can be sound information, light information, sound and light information, etc., and the second alarm information can be sent through a sound alarm, a light alarm, a sound and light alarm, etc. Among them, the second alarm information of the first degree is different from the second alarm information of the second degree. Different degrees of alarm information can be sounds of different sizes, lights of different brightness or different frequencies, etc., and there is no limitation on this.

[0075] In some embodiments, the adsorption tower monitoring method further comprises:

[0076] When the moisture content of the inlet flue gas is higher than the first moisture content range, the inlet flue gas flow rate of the adsorption tower 1 is reduced to the first flow rate, the second flow rate and the third flow rate in sequence until the inlet flue gas flow rate of the adsorption tower 1 is zero, wherein the first flow rate is greater than the second flow rate, the second flow rate is greater than the third flow rate, and the third flow rate is greater than zero.

[0077] It can be understood that when the moisture content of the inlet flue gas is higher than the first moisture content range, it means that the moisture content of the inlet flue gas is too high. Excessive inlet flue gas moisture will affect the removal of pollutants by the adsorption tower 1, resulting in reduced operating efficiency and reduced operating quality of the adsorption tower 1. Therefore, the inlet flue gas flow rate of the adsorption tower 1 is gradually reduced and finally reduced to zero to stop the operation of the adsorption tower 1, thereby avoiding the excessive pollutants in the flue gas at the outlet of the adsorption tower 1 and facilitating the operating personnel to solve the fault problem in time.

[0078] It should be noted that when the moisture content of the inlet flue gas is higher than the first moisture content range and within the second moisture content range, a second alarm message of the second degree is issued and inert gas is introduced into the adsorption module 11, and at the same time, the inlet flue gas flow rate of the adsorption tower 1 is gradually reduced until the adsorption tower 1 stops operating.

[0079] The low-temperature flue gas at the inlet of the adsorption tower 1 comes from the cooling of the spray tower. The rear section of the spray tower uses 20% calcium chloride solution to cool the flue gas, so that the inlet flue gas of the adsorption tower 1 contains a large amount of calcium chloride. Calcium chloride is easily attached to the surface of the filler, resulting in a decrease in the adsorption capacity of the filler, and the calcium chloride adsorbed on the surface of the filler cannot be removed by the rear-end regeneration tower, which has a permanent negative impact on the filler. Therefore, when the moisture content of the inlet flue gas is higher than the first moisture content range, the inlet flue gas flow rate of the adsorption tower 1 is gradually reduced until the adsorption tower 1 stops running, and the fault is eliminated in time, which can ensure a high adsorption capacity of the filler, thereby ensuring the stable and continuous operation of the adsorption tower 1.

[0080] Among them, if the moisture content of the inlet flue gas is too high, it means that the demisting effect in the spray tower at the front end of the adsorption tower 1 is poor. Therefore, after the adsorption tower 1 stops running, the operator can carry out maintenance such as unblocking the defogger in the spray tower.

[0081] By reducing the inlet flue gas flow rate of the adsorption tower 1 to zero before passing through the first flow rate, the second flow rate and the third flow rate in sequence, the moisture content of the inlet flue gas of the adsorption tower 1 at different flow levels can be monitored as a whole, thereby effectively reducing the misjudgment of the moisture content of the inlet flue gas of the adsorption tower 1 and realizing accurate monitoring of the moisture content of the inlet flue gas of the adsorption tower 1. At the same time, through the setting of the first flow rate, the second flow rate and the third flow rate, the shutdown buffer of the adsorption tower 1 is realized, thereby reducing the failure rate at the adsorption tower 1 and ensuring the stable operation of the adsorption tower 1 after the fault is eliminated.

[0082] The specific values ​​of the first flow rate, the second flow rate and the third flow rate can be set according to actual needs and are not limited thereto.

[0083] The method for collecting the inlet flue gas flow rate of the adsorption tower 1 can be set according to actual needs and is not limited to this. For example, at least one flow sensor is set at the inlet of the adsorption tower 1 to collect the inlet flue gas flow rate of the adsorption tower 1 using the flow sensor.

[0084] In some embodiments, a corresponding alarm message is issued according to the comparison result, and a corresponding fault elimination action is performed, including:

[0085] When the inlet flue gas temperature is higher than the first temperature range, a third alarm message is issued, and the inlet flue gas flow rate of the adsorption tower 1 is reduced to the fourth flow rate, the fifth flow rate and the sixth flow rate in sequence until the inlet flue gas flow rate of the adsorption tower 1 is zero, wherein the fourth flow rate is greater than the fifth flow rate, the fifth flow rate is greater than the sixth flow rate, and the sixth flow rate is greater than zero.

[0086] It can be understood that when the inlet flue gas temperature is higher than the first temperature range, it means that the inlet flue gas temperature of the adsorption tower 1 is too high. Therefore, the inlet flue gas flow rate of the adsorption tower 1 is gradually reduced and finally reduced to zero to realize the stopping of the operation of the adsorption tower 1, thereby avoiding the excessive pollutants in the flue gas at the outlet of the adsorption tower 1. At the same time, through the issuance of the third alarm information, the operating personnel can be prompted in time to perform precise coordinated processing actions to ensure the timely elimination of fault problems, thereby ensuring the stable and continuous operation of the adsorption tower 1.

[0087] It should be noted that the low-temperature flue gas at the inlet of the adsorption tower 1 comes from the cooling of the spray tower. When the inlet flue gas temperature is too high, it means that the cooling efficiency of the spray tower is reduced. Therefore, after the adsorption tower 1 stops running, the operator can inspect and repair the spray system in the spray tower.

[0088] The third alarm information is used to remind the operating personnel. The method of issuing the third alarm information can be set according to actual needs and is not limited to this. For example, the third alarm information can be sound information, light information, sound and light information, etc. The third alarm information can be issued through a sound alarm, a light alarm, a sound and light alarm, etc.

[0089] By reducing the inlet flue gas flow rate of the adsorption tower 1 to zero before passing through the fourth flow rate, the fifth flow rate and the sixth flow rate in sequence, the inlet flue gas temperature of the adsorption tower 1 at different flow levels can be monitored as a whole, thereby effectively reducing the misjudgment of the inlet flue gas temperature of the adsorption tower 1 and realizing accurate monitoring of the inlet flue gas temperature of the adsorption tower 1. At the same time, through the setting of the fourth flow rate, the fifth flow rate and the sixth flow rate, the shutdown buffer of the adsorption tower 1 is realized, thereby reducing the failure rate at the adsorption tower 1 and ensuring the stable operation of the adsorption tower 1 after the fault is eliminated.

[0090] Among them, the specific values ​​of the fourth flow rate, the fifth flow rate and the sixth flow rate can be set according to actual needs and are not limited to this.

[0091] In some embodiments, the adsorption tower monitoring method further comprises:

[0092] Collect the flue gas pollutant concentration at the outlet of adsorption tower 1;

[0093] Compare outlet flue gas pollutant concentrations and concentration ranges.

[0094] When the inlet flue gas temperature is within the first temperature range, the packing temperature of the adsorption module 11 is lower than the second temperature range, the outlet flue gas temperature of the adsorption module 11 is lower than the third temperature range, and the outlet flue gas pollutant concentration is higher than the concentration range, a fourth alarm message is issued, and the packing clearing action of the adsorption module 11 is performed to eliminate the packing blockage of the adsorption module 11.

[0095] It is understandable that by collecting the outlet flue gas pollutant concentration of the adsorption tower 1 and comparing the outlet flue gas pollutant concentration and concentration range, the outlet flue gas pollutant concentration of the adsorption tower 1 can be monitored to avoid exceeding the pollutant standard in the outlet flue gas of the adsorption tower 1.

[0096] When the inlet flue gas temperature is within the first temperature range, it indicates that the inlet flue gas temperature of the adsorption tower 1 is in a normal state. When the packing temperature of the adsorption module 11 is lower than the second temperature range, and the outlet flue gas temperature of the adsorption module 11 is lower than the third temperature range, it indicates that the packing temperature and the outlet flue gas temperature of the adsorption module 11 are in an abnormally reduced state. When the outlet flue gas pollutant concentration is higher than the concentration range, it indicates that the outlet flue gas pollutant concentration of the adsorption tower 1 is in an abnormally increased state. Therefore, by combining the inlet flue gas temperature of the adsorption tower 1, the packing temperature and the outlet flue gas temperature of the adsorption module 11, and the outlet flue gas pollutant concentration of the adsorption tower 1, it can be determined that the packing in the adsorption module 11 is blocked, resulting in poor flue gas circulation. Therefore, by issuing the fourth alarm information, the operator can be prompted to perform precise coordinated processing actions in a timely manner. At the same time, by executing the packing dredging action of the adsorption module 11, the packing blockage problem in the adsorption module 11 can be eliminated in time, thereby ensuring the smooth circulation of the flue gas. Thus, the timely resolution of the adsorption module 11 fault is ensured, thereby ensuring the stable and continuous operation of the adsorption tower 1.

[0097] It should be noted that the method for collecting the flue gas pollutant concentration at the outlet of the adsorption tower 1 can be set according to actual needs and is not limited to this. For example, multiple pollutant concentration sensors are set at the outlet of the adsorption tower 1, and the multiple pollutant concentration sensors can respectively detect the nitrogen oxide concentration, sulfur dioxide concentration, smoke concentration, etc.

[0098] The concentration of flue gas pollutants at the outlet of adsorption tower 1 needs to be within the concentration range. The specific value of the concentration range can be set according to actual needs and is not limited to this. For example, when the monitored pollutants are nitrogen oxides, the concentration range of nitrogen oxides is not more than 50mg / Nm 3 When the monitored pollutant is sulfur dioxide, the concentration range of sulfur dioxide shall not exceed 35 mg / Nm 3 When the pollutant being monitored is smoke, the concentration range of smoke shall not exceed 5 mg / Nm 3 .

[0099] Among them, when the concentration of all flue gas pollutants at the outlet of adsorption tower 1 exceeds 1mg / Nm 3 When the concentration of flue gas pollutants at the outlet of the adsorption tower 1 exceeds the corresponding concentration range, the fourth alarm information of the second degree can be issued.

[0100] The fourth alarm information is used to remind the operating personnel. The method of issuing the fourth alarm information can be set according to actual needs and is not limited to this. For example, the fourth alarm information can be sound information, light information, sound and light information, etc. The fourth alarm information can be issued through a sound alarm, a light alarm, a sound and light alarm, etc.

[0101] The specific type of the filler dredging action of the adsorption module 11 can be set according to actual needs, and there is no limitation to this. For example, the filler dredging of the adsorption module 11 can be completed by using an air cannon set on the adsorption module 11.

[0102] When the adsorption module 11 filler dredging action still fails to dredge the filler, the operator can directly dredge it manually.

[0103] In some embodiments, the adsorption tower monitoring method further comprises:

[0104] Collecting the first inlet flue gas pressure and the outlet flue gas pressure of each adsorption module 11;

[0105] comparing the first inlet flue gas pressure and pressure range with the outlet flue gas pressure and pressure range;

[0106] Among them, when the first inlet flue gas pressure is higher than the pressure range and the outlet flue gas pressure is lower than the pressure range, the fifth alarm information is issued, and the filler dredging action of the adsorption module 11 is performed to eliminate the filler blockage of the adsorption module 11.

[0107] It can be understood that by collecting the first inlet flue gas pressure and outlet flue gas pressure of each adsorption module 11, and comparing the first inlet flue gas pressure and pressure range, and comparing the outlet flue gas pressure and pressure range, the inlet flue gas pressure and outlet flue gas pressure of the adsorption module 11 in the adsorption tower 1 can be monitored.

[0108] When the first inlet flue gas pressure is higher than the pressure range, it indicates that the inlet flue gas pressure of the adsorption module 11 is in an abnormally increased state. When the outlet flue gas pressure is lower than the pressure range, it indicates that the outlet flue gas pressure of the adsorption module 11 is in an abnormally decreased state. Therefore, by combining the first inlet flue gas pressure and the outlet flue gas pressure of the adsorption module 11, it can be determined that there is a problem of packing blockage in the adsorption module 11, resulting in poor flue gas circulation. Therefore, by issuing the fifth alarm information, the operator can be prompted to perform precise coordinated processing actions in a timely manner. At the same time, by executing the packing dredging action of the adsorption module 11, the packing blockage problem in the adsorption module 11 can be eliminated in time, thereby ensuring smooth flow of flue gas. Therefore, the timely resolution of the adsorption module 11 fault is guaranteed, thereby ensuring the stable and continuous operation of the adsorption tower 1.

[0109] It should be noted that the method for collecting the first inlet flue gas pressure and the outlet flue gas pressure of the adsorption module 11 can be set according to actual needs, and there is no limitation to this. For example, at least one first pressure sensor is set at the inlet of the adsorption module 11 to collect the first inlet flue gas pressure of the adsorption module 11 using the first pressure sensor, and at least one second pressure sensor is set at the outlet of the adsorption module 11 to collect the outlet flue gas pressure of the adsorption module 11 using the second pressure sensor.

[0110] The first inlet flue gas pressure and the outlet flue gas pressure of the adsorption module 11 need to be within a pressure range. The specific value of the pressure range can be set according to actual needs and is not limited to this. For example, the pressure range can be 1.1-1.2 times the standard atmospheric pressure.

[0111] The fifth alarm information is used to remind the operating personnel. The method of issuing the fifth alarm information can be set according to actual needs and is not limited to this. For example, the fifth alarm information can be sound information, light information, sound and light information, etc. The fifth alarm information can be issued through a sound alarm, a light alarm, a sound and light alarm, etc.

[0112] Among them, the packing unblocking action of the adsorption module 11 can be executed according to the judgment of the inlet flue gas temperature and the outlet flue gas pollutant concentration of the adsorption tower 1 and the packing temperature and the outlet flue gas temperature of the adsorption module 11. The packing unblocking action of the adsorption module 11 can also be executed according to the judgment of the first inlet flue gas pressure and the outlet flue gas pressure of the adsorption module 11. At the same time, the execution of the packing unblocking action can also be judged based on the combination of the two, and there is no limitation to this.

[0113] In some embodiments, the adsorption tower monitoring method further comprises:

[0114] Collect the flue gas pressure at the second inlet of the adsorption tower 1;

[0115] Compare the second inlet flue gas pressure with the pressure range;

[0116] Among them, when the first inlet flue gas pressure is higher than the pressure range, the second inlet flue gas pressure is higher than the pressure range, and the outlet flue gas pressure is lower than the pressure range, a fifth alarm message is issued, and the filler dredging action of the adsorption module 11 is executed.

[0117] It can be understood that by collecting the second inlet flue gas pressure of the adsorption tower 1 and comparing the second inlet flue gas pressure and the pressure range, the inlet flue gas pressure of the adsorption tower 1 can be monitored. At the same time, the packing unblocking action of the adsorption module 11 is performed according to the combination of the first inlet flue gas pressure, the second inlet flue gas pressure and the outlet flue gas pressure, so that the overall fault resolution of the adsorption module 11 is more accurate and efficient.

[0118] It should be noted that the method for collecting the second inlet flue gas pressure of the adsorption tower 1 can be set according to actual needs and is not limited to this. For example, at least one third pressure sensor is set at the inlet of the adsorption tower 1 to collect the second inlet flue gas pressure of the adsorption tower 1 using the third pressure sensor.

[0119] like Figure 3 As shown, the embodiment of the present disclosure also proposes an adsorption tower monitoring system of a COAP system, including a collection module 2, a comparison module 3 and an execution module 4, the collection module 2 is used to collect the inlet flue gas temperature of the adsorption tower 1 and the filler temperature and the outlet flue gas temperature of each adsorption module 11, the comparison module 3 is used to compare the inlet flue gas temperature with the first temperature range, the filler temperature with the second temperature range and the outlet flue gas temperature with the third temperature range, and the execution module 4 is used to issue corresponding alarm information according to the comparison result and execute corresponding fault elimination actions.

[0120] It can be understood that by collecting the inlet flue gas temperature of the adsorption tower 1 and comparing the inlet flue gas temperature with the first temperature range, the inlet flue gas temperature of the adsorption tower 1 can be monitored, by collecting the packing temperature of each adsorption module 11 and comparing the packing temperature with the second temperature range, the packing temperature of the adsorption module 11 in the adsorption tower 1 can be monitored, and by collecting the outlet flue gas temperature of each adsorption module 11 and comparing the outlet flue gas temperature with the third temperature range, the outlet flue gas temperature of the adsorption module 11 in the adsorption tower 1 can be monitored. At the same time, according to the comparison results of the inlet flue gas temperature with the first temperature range, the packing temperature and the second temperature range, and the outlet flue gas temperature with the third temperature range, corresponding alarm information is issued, and corresponding fault elimination actions are performed, so as to timely solve the fault problem of the adsorption tower 1, ensure the continuous operation of the adsorption tower 1, avoid the problem of pollutant removal failing to meet the standards, thereby improving the operation efficiency of the adsorption tower 1 and ensuring the stable operation of the COAP system.

[0121] It should be noted that the above explanation of the embodiment of the adsorption tower monitoring method of the COAP system is also applicable to each module in the adsorption tower monitoring system of the COAP system of this embodiment, which will not be described in detail.

[0122] like Figure 5As shown, in some embodiments, the adsorption module 11 includes a tower 111, a distributor 112, a dropper 113 and a discharge hopper 114, the distributor 112 and the dropper 113 are arranged in the tower 111 from top to bottom, an adsorption zone is formed between the distributor 112 and the dropper 113, the discharge hopper 114 is arranged below the dropper 113, the top of the distributor 112 is used to receive fillers, the distributor 112 is used to evenly arrange the fillers in the adsorption zone, and the dropper 113 is used to evenly discharge the fillers at the bottom of the adsorption zone into the discharge hopper 114; wherein, the collection module is used to collect the filler temperature in the adsorption zone and the outlet flue gas temperature of the adsorption zone.

[0123] It can be understood that the distributor 112 receives the filler above and forms a transition layer. The distributor 112 evenly distributes the filler in the transition layer to the adsorption zone and stacks them in sequence to form an adsorption layer. The low-temperature flue gas enters from the tower 111 and contacts the adsorption layer in the adsorption zone, thereby being adsorbed and purified into clean flue gas by the filler. The clean flue gas is discharged from the tower 111, thereby completing the adsorption of the flue gas.

[0124] The filler saturated with adsorption by the adsorption layer falls into the corresponding discharge hopper 114 through the dropper 113, and the filler discharged from the discharge hopper 114 can be sent to the subsequent regeneration equipment for regeneration, thereby realizing recycling.

[0125] Thus, the filler saturated with adsorption at the bottom of the adsorption layer is discharged, and new filler is distributed on the top of the adsorption layer through the distributor 112, so that the adsorption layer maintains a certain adsorption capacity, avoiding that the filler in the adsorption layer gradually loses its adsorption and purification ability as the adsorption time increases.

[0126] It should be noted that the adsorption tower 1 provided in this embodiment has multiple stacked adsorption modules 11, and an adsorption layer can be arranged in each adsorption module 11. Therefore, each adsorption module 11 can perform an independent flue gas treatment process, thereby greatly improving the flue gas treatment capacity of the adsorption tower 1 per unit time.

[0127] The stacking method of the multiple adsorption modules 11 can be set according to actual needs, and there is no limitation on this. For example, the multiple adsorption modules 11 are stacked in alignment with each other in the vertical direction. Specifically, the top and bottom ends of the towers 111 of the multiple adsorption modules 11 are abutted and connected in sequence to form a tower body that can be regarded as an integrated structure in appearance, so that the structure of the adsorption tower 1 is stable. The outer wall of the adsorption tower 1 can be provided with multiple inlets and multiple outlets corresponding to the multiple adsorption modules 11.

[0128] The tower 111 of the adsorption module 11 may be divided into a plurality of tower 111 sections, and the tower 111 sections are spliced ​​together to form the tower 111, thereby reducing the requirements for hoisting and transportation.

[0129] like Figure 5 As shown, in some embodiments, the distributor 112 includes a plurality of distribution cone buckets 1121 arranged in parallel, and a distribution pipe 1122 is provided at the lower end of the distribution cone bucket 1121. Adjacent distribution cone buckets 1121 are sealed and connected to prevent smoke from passing upward through the distributor 112 and entering the transition layer. The smoke outlet of the adsorption zone is arranged horizontally relative to the lower end of the distribution cone bucket 1121 and / or the distribution pipe 1122, so that the clean smoke discharged from the top of the adsorption layer can be discharged from the smoke outlet of the adsorption zone.

[0130] Among them, the upper end size of the distribution cone bucket 1121 is larger than the lower end size, and its cross-sectional area gradually decreases downward in the vertical direction. After the adjacent distribution cone buckets 1121 are sealed and connected, there is a certain interval between the lower ends of the adjacent distribution cone buckets 1121. At the same time, the distribution pipe 1122 is connected to the lower end outlet size of the distribution cone bucket 1121 in a coordinated manner, and there is also a certain interval between the adjacent distribution pipes 1122. The filler in the transition layer passes downward through the distribution cone bucket 1121 and the distribution pipe 1122 at the lower end of the distribution cone bucket 1121 in turn to enter the adsorption zone to form an adsorption layer. The top surface of the adsorption layer is flush with the bottom end of the distribution pipe 1122. Therefore, the interval space between the lower ends of adjacent distribution cone buckets 1121 and the interval space between adjacent distribution pipes 1122 are located above the adsorption layer. The space is opposite to and connected to the smoke outlet of the adsorption zone in the horizontal direction. After the clean smoke is discharged from the top of the adsorption layer, it enters the space above the adsorption layer and is then discharged from the smoke outlet of the adsorption zone.

[0131] It should be noted that the width of the smoke outlet of the adsorption zone may be consistent with the width of the distributor 112, so that the clean smoke can be discharged from the tower 111 more smoothly, reducing the resistance at the smoke outlet of the adsorption zone.

[0132] like Figure 5 As shown, in some embodiments, the dropper 113 includes a plurality of dropper cones 1131 arranged in parallel and at intervals, a dropper pipe 1132 is arranged at the lower end of the dropper cone 1131, the smoke inlet of the adsorption zone is arranged horizontally opposite to the dropper cone 1131 and / or the dropper pipe 1132, and the dropper cones 1131 are arranged at intervals to allow low-temperature smoke to pass upward through the dropper 113 and enter the adsorption layer. In other words, the dropper cone 1131 and the dropper pipe 1132 connected to the lower end are arranged at intervals, and the low-temperature smoke enters from the smoke inlet of the adsorption zone and passes through the gaps between the dropper cones 1131 in a dispersed manner upward to enter the adsorption layer.

[0133] The width of the flue gas inlet in the adsorption zone can be consistent with the width of the dropper 113, thereby reducing the air intake resistance of the low-temperature flue gas and promoting the low-temperature flue gas to enter the tower 111 in a dispersed manner and to contact the fillers between the adsorption layers evenly.

[0134] The filler at the bottom of the adsorption layer is dropped directly through the dropping cone bucket 1131 and the dropping tube 1132 below the dropping cone bucket 1131. It should be noted that in order to prevent the filler in the adsorption layer from falling from the gap between the dropping cone buckets 1131, the gap size between the dropping cone buckets 1131 should be smaller than the size of the filler particles.

[0135] like Figure 5 As shown, in some embodiments, the dropper 113 further includes a plurality of discharge hoppers 1133 arranged in parallel, and adjacent discharge hoppers 1133 are sealed and connected to each other, and the discharge hoppers 1133 are located above the drop cone hopper 1131, and the lower end of at least one discharge hopper 1133 is arranged opposite to the upper end of the drop cone hopper 1131. The filler at the bottom of the adsorption layer first passes through the discharge hopper 1133, and then falls into the corresponding drop cone hopper 1131 from the discharge hopper 1133. After the low-temperature flue gas passes through the gap between the drop cone hoppers 1131, it passes through the discharge hopper 1133 from bottom to top and enters the adsorption layer.

[0136] Among them, the upper end of a material dropping cone hopper 1131 can be opposite to the lower ends of four material discharging hoppers 1133, and the lower end of the material discharging hopper 1133 is substantially flush with the upper end of the material dropping cone hopper 1131 in the horizontal direction.

[0137] like Figure 5 and Figure 6 As shown, in some embodiments, the adsorption module also includes a discharge device 115, the discharge device 115 includes a material tray 1151, a material rake 1152 and a driving assembly 1153, the material tray 1151 is arranged below the dropper 113 and spaced between the dropper port, the material tray 1151 is used to receive the dropped material from the dropper 113, the material rake 1152 is arranged between the material tray 1151 and the dropper 113 and is slidably arranged on the material tray 1151 along a preset direction, the driving assembly 1153 is arranged on the tower 111, and the driving assembly 1153 is transmission-connected to the material rake 1152, the driving assembly 1153 is used to drive the material rake 1152 to reciprocate along a preset direction, and adjust the moving frequency of the material rake 1152 to rake the filler on the material tray 1151 into the discharge hopper 114 at a preset rate.

[0138] The driving assembly 1153 drives the rake 1152 to move back and forth in a preset direction, and adjusts the moving frequency of the rake 1152 so that the rake 1152 can move the filler on the tray 1151, thereby adjusting the rate at which the filler falls from the tray 1151 to the discharge hopper 114.

[0139] The specific type of the driving component 1153 can be set according to actual needs and is not limited to this. For example, the driving component 1153 can be a hydraulic cylinder.

[0140] It should be noted that, in order to implement the above-mentioned embodiments, the embodiments of the present disclosure also propose an electronic device, including a processor and a memory for storing instructions executable by the processor, wherein the processor is configured to execute instructions to implement the adsorption tower monitoring method of the COAP system as in the embodiments of the present disclosure.

[0141] It should be noted that, in the description of the present disclosure, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. In addition, in the description of the present disclosure, unless otherwise specified, the meaning of "plurality" is two or more.

[0142] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present disclosure includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present disclosure belong.

[0143] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0144] Although the embodiments of the present disclosure have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present disclosure. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present disclosure.

Claims

1. A method for monitoring an adsorption tower of a COAP system of a low temperature oxidation adsorption process, characterized in that: The COAP system comprises: the adsorption tower and a plurality of adsorption modules stacked in the adsorption tower, wherein fillers are arranged in the adsorption modules, and the adsorption tower monitoring method comprises: collecting the inlet flue gas temperature of the adsorption tower; Collecting the filler temperature and outlet flue gas temperature of each adsorption module; comparing the inlet flue gas temperature with a first temperature range, the filler temperature with a second temperature range, and the outlet flue gas temperature with a third temperature range; According to the comparison result, a corresponding alarm message is issued and a corresponding fault elimination action is performed.

2. The adsorption tower monitoring method of the COAP system according to claim 1, characterized in that: The step of issuing corresponding alarm information according to the comparison result and executing corresponding fault elimination actions includes: When the inlet flue gas temperature is within the first temperature range, the packing temperature of the adsorption module is higher than the second temperature range, and the outlet flue gas temperature of the adsorption module is higher than the third temperature range, a first alarm message is issued, and inert gas is introduced into the adsorption module to eliminate overheating of the packing in the adsorption module.

3. The adsorption tower monitoring method of the COAP system according to claim 2, characterized in that: Also includes: collecting the moisture content of the inlet flue gas of the adsorption tower; Comparing the inlet flue gas moisture content with a first moisture content range, and comparing the inlet flue gas moisture content with a second moisture content range, wherein the first moisture content range is lower than the second moisture content range; When the moisture content of the inlet flue gas is within the first moisture content range, a second alarm message of a first degree is issued; When the moisture content of the inlet flue gas is within the second moisture content range, the second alarm information of the second degree is issued.

4. The adsorption tower monitoring method of the COAP system according to claim 3, characterized in that: Also includes: When the moisture content of the inlet flue gas is higher than the first moisture content range, the inlet flue gas flow rate of the adsorption tower is reduced to a first flow rate, a second flow rate and a third flow rate in sequence until the inlet flue gas flow rate of the adsorption tower is zero, wherein the first flow rate is greater than the second flow rate, the second flow rate is greater than the third flow rate, and the third flow rate is greater than zero.

5. The adsorption tower monitoring method of the COAP system according to claim 1, characterized in that: The step of issuing corresponding alarm information according to the comparison result and executing corresponding fault elimination actions includes: When the inlet flue gas temperature is higher than the first temperature range, a third alarm message is issued, and the inlet flue gas flow rate of the adsorption tower is reduced to a fourth flow rate, a fifth flow rate and a sixth flow rate in sequence until the inlet flue gas flow rate of the adsorption tower is zero, wherein the fourth flow rate is greater than the fifth flow rate, the fifth flow rate is greater than the sixth flow rate, and the sixth flow rate is greater than zero.

6. The adsorption tower monitoring method of the COAP system according to claim 1, characterized in that: Also includes: Collecting the flue gas pollutant concentration at the outlet of the adsorption tower; comparing the outlet flue gas pollutant concentrations and concentration ranges; When the inlet flue gas temperature is within the first temperature range, the packing temperature of the adsorption module is lower than the second temperature range, the outlet flue gas temperature of the adsorption module is lower than the third temperature range, and the outlet flue gas pollutant concentration is higher than the concentration range, a fourth alarm message is issued, and a packing clearing action of the adsorption module is performed to eliminate packing blockage of the adsorption module.

7. The adsorption tower monitoring method of the COAP system according to claim 1, characterized in that: Also includes: Collecting the first inlet flue gas pressure and the outlet flue gas pressure of each adsorption module; comparing the first inlet flue gas pressure and pressure range with the outlet flue gas pressure and pressure range; Among them, when the first inlet flue gas pressure is higher than the pressure range and the outlet flue gas pressure is lower than the pressure range, the fifth alarm information is issued, and the filler unblocking action of the adsorption module is performed to eliminate the filler blockage of the adsorption module.

8. The adsorption tower monitoring method of the COAP system according to claim 7, characterized in that: Also includes: collecting the flue gas pressure at the second inlet of the adsorption tower; comparing the second inlet flue gas pressure with the pressure range; Among them, when the first inlet flue gas pressure is higher than the pressure range, and the second inlet flue gas pressure is higher than the pressure range, and the outlet flue gas pressure is lower than the pressure range, the fifth alarm information is issued and the filler dredging action of the adsorption module is performed.

9. An adsorption tower monitoring system for a COAP system, characterized in that: The COAP system comprises: the adsorption tower and a plurality of adsorption modules stacked in the adsorption tower, wherein fillers are arranged in the adsorption modules, and the adsorption tower monitoring system comprises: A collection module, the collection module is used to collect the inlet flue gas temperature of the adsorption tower and the filler temperature and outlet flue gas temperature of each adsorption module; A comparison module, the comparison module is used to compare the inlet flue gas temperature with a first temperature range, the filler temperature with a second temperature range, and the outlet flue gas temperature with a third temperature range; An execution module is used to issue corresponding alarm information according to the comparison result and execute corresponding fault elimination actions.

10. The adsorption tower monitoring system of the COAP system according to claim 9, characterized in that: The adsorption module comprises: A tower, a distributor, a dropper and a discharge hopper, wherein the distributor and the dropper are sequentially arranged in the tower from top to bottom, an adsorption zone is formed between the distributor and the dropper, the discharge hopper is arranged below the dropper, the top of the distributor is used to receive the filler, the distributor is used to evenly arrange the filler in the adsorption zone, and the dropper is used to evenly discharge the filler at the bottom of the adsorption zone into the discharge hopper; The acquisition module is used to acquire the filler temperature in the adsorption zone and the outlet flue gas temperature of the adsorption zone.

11. The adsorption tower monitoring system of the COAP system according to claim 10, characterized in that: The distributor comprises: a plurality of distribution cone buckets arranged in parallel, a distribution pipe is arranged at the lower end of each distribution cone bucket, adjacent distribution cone buckets are sealed and connected, and the smoke outlet of the adsorption zone is arranged horizontally relative to the lower end of each distribution cone bucket and / or the distribution pipe; The dropper comprises: a plurality of drop cone buckets arranged in parallel and at intervals, a drop pipe is arranged at the lower end of the drop cone bucket, and the smoke inlet of the adsorption zone is arranged opposite to the drop cone bucket and / or the drop pipe in the horizontal direction.

12. The adsorption tower monitoring system of the COAP system according to claim 11, characterized in that: The dropper also includes: A plurality of discharge hoppers are arranged in parallel, and adjacent discharge hoppers are sealed and connected to each other. The discharge hoppers are located above the drop cone hopper, and the lower end of at least one of the discharge hoppers is arranged opposite to the upper end of the drop cone hopper.

13. The adsorption tower monitoring system of the COAP system according to claim 10, characterized in that: The adsorption module also includes: A discharge device, the discharge device comprising: a material tray, a material dropping rake and a driving assembly, the material tray being arranged below the material dropper and spaced apart from the material dropper port, the material tray being used to receive the material dropped from the material dropper, the material dropping rake being arranged between the material tray and the material dropper and slidingly arranged on the material tray along a preset direction, the driving assembly being arranged on the tower, and the driving assembly being transmission-connected to the material dropping rake, the driving assembly being used to drive the material dropping rake to reciprocate along the preset direction, and to adjust the moving frequency of the material dropping rake so as to rake the filler on the material tray into the discharge hopper at a preset rate.

14. An electronic device, characterized in that: include: processor; a memory for storing instructions executable by the processor; The processor is configured to execute the instructions to implement the adsorption tower monitoring method of the COAP system as described in any one of claims 1-8.

Citation Information

Patent Citations

  • Flue gas purifying system

    CN103446830A

  • Inert gas protection system and method of active carbon adsorption towers

    CN107998818A

  • Method for controlling overtemperature of coke oven flue gas active coke desulfurization and denitrification system

    CN114307522A

  • Dry desulfurization device for flue gas active coke

    CN116966720A

  • Continuous operation's active carbon adsorption device

    CN206064096U

Cited By

  • Waste water graded discharge control system and method

    CN119637985A

  • Control method based on atmospheric parameters and relative humidity in waste incineration deacidification process

    CN120447337A