Desulfurization feeding system for preventing digestion tank from boiling

By adding an ash discharge valve to the desulfurization feeding system and linking it with the feeder, the problem of boiling in the digester was solved, the amount of lime and water was matched, boiling accidents in the digester were avoided, and the safety and environmental protection indicators of the equipment were ensured to meet the standards.

CN118925488APending Publication Date: 2024-11-12CHONGQING IRON & STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411087127.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In existing desulfurization feeding systems, the digester is prone to safety accidents due to the boiling of lime slurry. This is mainly due to the delayed closing of the electric gate valve and excessive instantaneous lime feeding caused by lime caking, which prevents the water supply from keeping up in time.

Method used

An ash discharge valve is installed between the lime hopper and the feeder, and the ash discharge valve is linked to the feeder for control. An instantaneous feeding target value is set. When the target value is exceeded, the feeder stops running immediately, and the ash discharge valve and the electric slide valve are interlocked and closed to ensure that the lime and water are matched.

Benefits of technology

It effectively prevents the digester from boiling, avoids safety accidents, reduces maintenance and repair costs, ensures the safe and stable operation of the equipment, and avoids exceeding environmental protection standards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118925488A_ABST
    Figure CN118925488A_ABST
Patent Text Reader

Abstract

The invention provides a desulfurization feeding system and method for preventing boiling of a digestion tank. The system comprises a lime tank, a feeder and the digestion tank, and the feeder is communicated with the lime tank through a first pipeline; the slaking tank is communicated with the feeder through a second pipeline, and the feeder feeds lime in the lime tank into the slaking tank; wherein the first pipeline is provided with a manual gate valve and a cindervalve, the second pipeline is provided with an electric gate valve, and when the feeder operates normally, the manual gate valve, the cindervalve and the electric gate valve are in an open state, and the cindervalve and the feeder are in interlocking control. Compared with the prior art, according to the scheme, the feeding system is optimally designed, so that the conditions that the proportion of lime and water in the digestion tank is unbalanced and the lime is heated and boiled under the conditions that the amount of the lime entering the digestion tank is increased suddenly, and the amount of the lime is large and the amount of the water is small are completely eradicated, and safety accidents caused by splashing of the lime slurry all around are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of desulfurization feeding systems, in particular to a desulfurization feeding system for preventing a digestion tank from boiling. Background Art

[0002] After the coal gas enters the boiler and burns, the flue gas will produce sulfur dioxide (SO2), which is a substance that damages the environment. At present, our power generation system adopts SDA semi-dry desulfurization technology for desulfurization, so that sulfur dioxide (SO2) can meet the national emission standard or ultra-low emission standard. SDA semi-dry desulfurization technology is a technology that uses quicklime and water in a certain ratio to produce calcium hydroxide (Ca(OH)2) through an exothermic reaction for desulfurization.

[0003] In the original desulfurization feeding system, the following are designed in sequence: lime tank - manual gate valve (normally open) - two-stage screw feeder - electric gate valve (interlock control) - digestion tank. When the instantaneous feeding amount exceeds the set value, the feeder will stop running and the electric gate valve will be interlocked and closed. Since there is a delay in the closing feedback of the electric gate valve, it takes more than 10 seconds to close. At the same time, due to the lime hardening phenomenon in this desulfurization method itself, the electric gate valve cannot be completely closed during the use of the system. Lime has good flow performance. When the gate valve is closed, lime will also flow from the gap of the gate valve to the lime digestion tank. The delayed closing and inability to close the gate valve will cause a sharp increase in the instantaneous feeding of lime into the digestion tank. At this time, the water supply cannot be tracked in time. Soon, the viscous lime slurry will heat up to more than 90 degrees, and the digestion tank will boil. A large amount of boiling lime slurry will splash everywhere, causing safety accidents. Summary of the invention

[0004] In view of the above-mentioned shortcomings of the prior art, an object of the present invention is to provide a desulfurization feeding system that prevents the digester from boiling, so as to solve the problems of safety accidents caused by boiling of lime slurry in the digester during the feeding process in the prior art.

[0005] To achieve the above-mentioned and other related purposes, the present invention provides a desulfurization feeding system for preventing a digester from boiling, comprising:

[0006] A lime tank, wherein the lime tank is used to hold lime powder;

[0007] A feeder, wherein the feeder is connected to the lime tank via a first pipeline;

[0008] A digestion tank, wherein the digestion tank is connected to the feeder via a second pipeline, and the feeder feeds the lime in the lime tank into the digestion tank, and the lime in the digestion tank reacts with water in an exothermic manner to generate Ca(OH)2 for desulfurization;

[0009] Among them, a manual gate valve and an ash discharge valve are provided on the first pipeline, and an electric gate valve is provided on the second pipeline. When the feeder operates normally, the manual gate valve, the ash discharge valve and the electric gate valve are in an open state, and the ash discharge valve is interlocked with the feeder for control.

[0010] Optionally, the electric gate valve is interlocked with the feeder for control.

[0011] Optionally, the ash unloading valve is an electric ash unloading valve.

[0012] Optionally, a sealing strip is used to seal the rotating blades on the ash discharge valve.

[0013] Optionally, the feeder is a two-stage screw feeder.

[0014] Accordingly, the present invention also provides a desulfurization feeding method for preventing a digester from boiling, which uses any of the above-mentioned desulfurization feeding systems for preventing a digester from boiling to perform feeding, and the feeding method comprises the following steps:

[0015] When the feeding system operates normally, the manual gate valve, the ash discharge valve, and the electric gate valve are in an open state, and the feeder runs continuously at a uniform speed to feed the lime in the lime tank into the digestion tank through the first pipeline and the second pipeline;

[0016] An instantaneous given target value of lime is set. During the normal operation of the feeding system, when the instantaneous feeding amount of lime exceeds the instantaneous given target value, the feeder stops running, and the ash discharge valve is closed along with the interlocking control of the feeder, so that a large amount of lime will not enter the digester instantaneously.

[0017] Optionally, the feeder stops running and the electric gate valve is closed along with the interlocking control of the feeder.

[0018] As described above, the desulfurization feeding system and method for preventing the digester from boiling of the present invention controls the feeding amount of lime by installing an ash discharge valve between the lime tank and the feeder, and controls the ash discharge valve and the feeder in linkage. When the instantaneous feeding amount exceeds the set instantaneous feeding target value, the feeder immediately stops running, and at the same time, the ash discharge valve and the feeder are interlocked and immediately closed, and the electric gate valve is closed in about ten seconds, which ensures that a large amount of lime will not enter the digester instantaneously, thereby ensuring that the water supply and the ash supply are always in a matching state, so as to prevent the digester from boiling due to the sudden increase in the instantaneous lime flow and the inability of the water supply flow to keep up in time. Compared with the prior art, the present scheme optimizes the design of the feeding system, prevents the sudden increase in the instantaneous lime amount entering the digester, causing the imbalance of the ratio of lime and water in the digester, and the situation that the lime heats and boils when the amount of lime is large and the amount of water is small, thereby avoiding the safety accidents caused by the splashing of lime slurry. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 Shown is a schematic structural diagram of a desulfurization feeding system for preventing a digester tank from boiling, as an exemplary embodiment.

[0020] The description of the reference numerals in the embodiments includes:

[0021] Lime tank 10, first pipeline 11, manual gate valve 12, ash discharge valve 13, feeder 14, second pipeline 15, electric gate valve 16, digestion tank 17. DETAILED DESCRIPTION

[0022] The following describes the embodiments of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0023] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.

[0024] like Figure 1 As shown, in an exemplary embodiment, a desulfurization feeding system for preventing a digester from boiling includes:

[0025] A lime tank 10, wherein the lime tank 10 is used to hold lime powder;

[0026] A feeder 14, wherein the feeder 14 is connected to the lime tank 10 via a first pipeline 11;

[0027] A digestion tank 17, wherein the digestion tank 17 is connected to the feeder 14 via a second pipe 15, and the feeder 14 feeds the lime in the lime tank 10 into the digestion tank 17, and the lime in the digestion tank 17 reacts with water in an exothermic manner to generate Ca(OH)2 for desulfurization;

[0028] Among them, a manual gate valve 12 and an ash discharge valve 13 are provided on the first pipeline 11, and an electric gate valve 16 is provided on the second pipeline 15. When the feeder 14 operates normally, the manual gate valve 12, the ash discharge valve 13, and the electric gate valve 16 are in an open state, and the ash discharge valve 13 is interlocked with the feeder 14 for control.

[0029] A desulfurization feeding system for preventing the digester from boiling in the present scheme is the part of the lime slurry system that feeds lime, and the rest is the ash slurry system, which is not shown in the present scheme; in the specific system structure, for example, the digester 17 should be connected to the water supply pipe and the lime slurry pipe, etc., which are not described.

[0030] In the specific implementation process, the lime feeding amount is controlled by adding an ash discharge valve 13 between the lime tank 10 and the feeder 14, and the ash discharge valve 13 is linked with the feeder 14 for control. When the instantaneous feeding amount exceeds the set instantaneous feeding target value, the feeder 14 immediately stops running. At the same time, the ash discharge valve 13 is interlocked with the feeder 14 and immediately closed, and the electric gate valve 16 is closed in about ten seconds. It is ensured that a large amount of lime will not enter the digester 17 instantaneously, thereby ensuring that the water supply and the ash supply are always matched, so as to prevent the digester 17 from boiling due to the sudden increase in the instantaneous lime flow and the inability of the water supply flow to keep up in time.

[0031] In some embodiments, the electric gate valve 16 is interlocked with the feeder 14. For example, Figure 1 As shown, the electric gate valve 16 is interlocked with the feeder 14 . When the feeder 14 stops running, the electric gate valve 16 is also closed, which can further prevent lime from entering the digestion tank 17 .

[0032] In some embodiments, the ash discharge valve 13 is an electric ash discharge valve 13. For example, Figure 1 As shown, it is more convenient to set the electric ash discharge valve 13 for linkage control.

[0033] In some embodiments, the rotary blades on the ash discharge valve 13 are sealed with sealing strips. When the ash discharge valve 13 is closed, lime cannot flow into the feeder 14 from the gap between the rotary blades on the ash discharge valve 13. The double protection prevents the amount of lime exceeding a given value from entering the lime digestion tank 17, thereby avoiding the frequent boiling accidents of the lime digestion tank 17 and ensuring the safety of the operation and maintenance personnel.

[0034] In some embodiments, the feeder 14 is a two-stage screw feeder 14. For example, Figure 1 As shown, timely feeding can be ensured and the feeding amount can be controlled.

[0035] In some embodiments, the scheme further provides a desulfurization feeding method for preventing a digester from boiling, wherein the feeding method uses any one of the above-mentioned desulfurization feeding systems for preventing a digester from boiling to feed the feed, and the feeding method comprises the following steps:

[0036] When the feeding system operates normally, the manual gate valve 12, the ash discharge valve 13, and the electric gate valve 16 are in an open state, and the feeder 14 runs continuously at a uniform speed to feed the lime in the lime tank 10 into the digestion tank 17 through the first pipeline 11 and the second pipeline 15;

[0037] An instantaneous given target value of lime is set. During the normal operation of the feeding system, when the instantaneous feeding amount of lime exceeds the instantaneous given target value, the feeder 14 stops running, and the ash discharge valve 13 is closed by interlocking control with the feeder 14, so that a large amount of lime will not enter the digestion tank 17 instantaneously.

[0038] In some embodiments, the feeder 14 stops running, and the electric gate valve 16 is closed in conjunction with the feeder 14 .

[0039] Specifically, the present method is a feeding method formulated according to the feeding system in the present scheme to prevent the digester 17 from boiling. The feeding process of lime is controlled according to this feeding method, and it can ensure that after the feeder 14 stops feeding, the lime can be prevented from entering the digester 17 in time, thereby avoiding the boiling accident of the lime digester 17, ensuring the safety of the operating and maintenance personnel, ensuring the safety of the desulfurization equipment, avoiding the environmental risk of being forced to withdraw the desulfurization equipment for maintenance, and greatly reducing the maintenance cost of the desulfurization equipment.

[0040] In actual application, the optimization and rectification carried out by this plan has low investment cost, mainly spare parts and labor cost, totaling 12,300 yuan; after optimization and rectification, the frequent boiling accidents of lime digester 17 can be prevented, and the actual benefits generated come from three aspects: 1. The maintenance and clearing labor cost after the boiling accident of digester 17 saves 156,000 yuan per year; 2. Safety benefit, preventing personal scalding accidents caused by boiling of digester 17; 3. Preventing accidents of exceeding environmental protection indicators caused by boiling of digester 17 and the shutdown of environmental protection equipment.

[0041] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A desulfurization feeding system to prevent boiling of digester tanks, It is characterized in that include: A lime tank, wherein the lime tank is used to hold lime powder; A feeder, wherein the feeder is connected to the lime tank via a first pipeline; The digestion tank is connected to the feeder through a second pipeline. The feeder feeds the lime in the lime tank into the digestion tank. The lime in the digestion tank reacts with water to produce Ca(OH) 2 Desulfurization; Among them, a manual gate valve and an ash discharge valve are provided on the first pipeline, and an electric gate valve is provided on the second pipeline. When the feeder operates normally, the manual gate valve, the ash discharge valve and the electric gate valve are in an open state, and the ash discharge valve is interlocked with the feeder for control.

2. The desulfurization feeding system for preventing the digester from boiling according to claim 1, Features: The electric gate valve is interlocked with the feeder for control.

3. The desulfurization feeding system for preventing the digester from boiling according to claim 1, Features: The ash discharge valve is an electric ash discharge valve.

4. The desulfurization feeding system for preventing the digester from boiling according to claim 3, Features: The rotating blades on the ash discharge valve are sealed with sealing strips.

5. The desulfurization feeding system for preventing the digester from boiling according to claim 4, Features: The feeder is a two-stage screw feeder.

6. A desulfurization feeding method to prevent boiling of digester tanks, It is characterized in that The feeding method adopts the desulfurization feeding system for preventing the digester from boiling as claimed in any one of claims 1 to 5, and the feeding method comprises the following steps: When the feeding system operates normally, the manual gate valve, the ash discharge valve, and the electric gate valve are in an open state, and the feeder runs continuously at a uniform speed to feed the lime in the lime tank into the digestion tank through the first pipeline and the second pipeline; An instantaneous given target value of lime is set. During the normal operation of the feeding system, when the instantaneous feeding amount of lime exceeds the instantaneous given target value, the feeder stops running, and the ash discharge valve is closed along with the interlocking control of the feeder, so that a large amount of lime will not enter the digester instantaneously.

7. The desulfurization feeding method for preventing the digester from boiling according to claim 6, Features: When the feeder stops running, the electric gate valve is closed along with the interlocking control of the feeder.