Split type box mining crusher, crushing shaft structure and assembling method
By using a split-type box structure and an integrated crushing trough design, the deformation problem of underground coal mine crushers during adjustment is solved, the assembly accuracy and structural strength are improved, and the service life of key components is extended.
Patent Information
- Application Number
- CN202411092759.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The thin-plate welded structure of existing underground coal mine crushers causes frequent disassembly and assembly of the input and output troughs when adjusting the crushing particle size, which can easily lead to deformation and affect the service life of bearings and seals.
The design adopts a split box structure, with the crushing inlet and outlet channels being an integral structure. Combined with a portal frame and a square connecting seat, the crushing shaft assembly is positioned by adjusting the plate, avoiding the need to disassemble the U-shaped channel, thus enhancing structural strength and controlling assembly accuracy.
It improves the assembly accuracy and structural strength of the crusher, reduces deformation, extends the service life of key components, and simplifies the crushing particle size adjustment process.
Smart Images

Figure CN118925865A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of mining crushers, and in particular to a split-box mining crusher, a crushing shaft structure and an assembly method. Background Art
[0002] The main load-bearing parts of the crusher used in the coal mine underground chute, such as the crushing chute, input chute and output chute, adopt a thin plate welding structure. The input chute and output chute are affected by the structure of the crusher itself and can only be designed as a U-shaped structure. The crusher drive unit and crushing shaft are installed on the outlet chute. Each time the crushing particle size is adjusted by adding or removing the pad, the fasteners of the inlet chute, outlet chute and crushing chute must be loosened. Frequent disassembly and assembly during the process of adjusting the crushing force can easily cause deformation, affecting the service life of key components such as bearings and seals on the crushing shaft of the crusher. Summary of the invention
[0003] In order to solve the technical problems existing in the above-mentioned technology, it is necessary to provide a split-box mining crusher crushing shaft structure.
[0004] A split-box mining crusher crushing shaft structure, comprising a crushing shaft group, a gate-type structure crushing trough, a U-shaped outlet trough, and an adjustment plate; The gate-type structure crushing slot includes a crushing inlet slot and a crushing slot; the crushing inlet slot is arranged at the inlet end of the crushing slot, and the U-shaped outlet slot is arranged at the outlet end of the crushing slot; The adjustment plate is arranged on the crushing groove and is located between the U-shaped outlet groove and the crushing inlet groove; The crushing shaft group includes a square connecting seat, a sealing cover, a bearing cover, a tapered hole double-row self-aligning bearing, a bearing mounting tapered sleeve, a bearing seat, and a hammer crushing main shaft; the square connecting seat is arranged on the adjustment plate and is respectively connected to the U-shaped outlet groove and the crushing inlet groove, the bearing seat is arranged in the square connecting seat, the tapered hole double-row self-aligning bearing is installed in the bearing seat, and is sleeved on the two ends of the hammer crushing main shaft, the bearing mounting tapered sleeve is sleeved between the hammer crushing main shaft and the tapered hole double-row self-aligning bearing, the bearing cover is sleeved on both ends of the hammer crushing main shaft and is located on the outside of the tapered hole double-row self-aligning bearing, and the sealing cover is sleeved on the two ends of the hammer crushing main shaft and is located on the outside of the bearing cover.
[0005] Preferably, one end of the hammer crusher main shaft is also connected to a coupling.
[0006] Preferably, the input end of the coupling is connected to a driving part.
[0007] Preferably, the bearing mounting cone sleeve is fixed with an axial displacement by a nut sleeved on the hammer crusher main shaft.
[0008] It is also necessary to provide a method for assembling the crushing shaft structure of a split-box mining crusher.
[0009] A method for assembling a crushing shaft structure of a split-box mining crusher is applicable to the above-mentioned split-box mining crusher crushing shaft structure, comprising the following steps: S1: pre-assembled crushing shaft assembly; S2: Install the adjustment plate into the door-type structure crushing slot. The door-type structure crushing slot is composed of a crushing inlet slot and a crushing slot to form an integral structure, which serves as the installation and positioning body of the crushing shaft group and the driving part; install the assembled crushing shaft group on the adjustment plate, and ensure that the crushing shaft group is adapted and connected to the crushing inlet slot; S3: Rotate the crushing shaft assembly to make it rotate flexibly by fine-tuning the displacement of the square connecting seat in the axial direction of the hammer crushing main shaft, and check the parallelism between the shaft end of the hammer crushing main shaft and the outer end surface of the square connecting seat; S4: Install the U-shaped outlet groove, coupling and drive unit in sequence, fasten them with fasteners, and complete the assembly.
[0010] Preferably, in step S1, the crushing shaft assembly is assembled in the following manner: S11: Install the bearing seat into the square connecting seat, install the tapered hole double row self-aligning bearing, and use the bearing cover and fasteners to position and fasten the bearing seat and the tapered hole double row self-aligning bearing to the square connecting seat; S12: Place the hammer crusher main shaft on the support, and hoist the square connecting seat with the tapered hole double row self-aligning bearing installed to one end of the hammer crusher main shaft for alignment; S13: Use the cone sleeve pressing tool to assemble the bearing installation cone sleeves at the two ends of the hammer crusher main shaft, so that the bearing installation cone sleeves are pressed into the cone hole of the cone hole double row self-aligning bearing, and are respectively close to the cone hole of the cone hole double row self-aligning bearing and the outer circle of the hammer crusher main shaft, and the locking nuts are installed and tightened; S14: Assemble the sealing cover on the bearing cover; S15: Use the same method to assemble the sealing cover, bearing cover, tapered hole double row self-aligning bearing, bearing mounting cone sleeve, bearing seat and locking nut on the other end of the upper hammer crusher main shaft; S16: Check that the square connecting seat can rotate flexibly and be aligned. Check and measure the parallelism between the main shaft end of the hammer crusher and the outer end face of the square connecting seat. If it meets the requirements, record them separately.
[0011] Preferably, in step S3, the following method is used to check the parallelism between the end of the hammer crushing main shaft and the outer end surface of the square connecting seat: When assembling the crushing shaft group, the parallelism between the hammer crushing main shaft end and the outer end surface of the square connecting seat measured is recorded as L1 and L2 respectively; After the crushing shaft assembly is installed on the adjustment plate, the measured parallelism between the hammer crushing main shaft end and the outer end surface of the square connecting seat is recorded as L11 and L21 respectively; Compare L1 and L11, as well as L2 and L21. If the differences are less than 0.15mm, tighten the fasteners on each positioning surface. If they do not meet the requirements, they need to be adjusted again and re-measured and calibrated until they meet the requirements.
[0012] Preferably, the cone sleeve pressing tool includes a pressing sleeve, a stud, a high-pressure hollow oil cylinder, and a locking knob; the stud is installed in the threaded center hole at the end of the hammer crusher main shaft, the pressing sleeve supports the end face of the bearing installation cone sleeve, the high-pressure hollow oil cylinder is sleeved on the stud, and the high-pressure hollow oil cylinder piston rod axially presses the pressing sleeve, and the locking knob is screwed on the stud to press the high-pressure hollow oil cylinder.
[0013] It is also necessary to provide a split-type box mining crusher.
[0014] A split-box mining crusher comprises the above-mentioned split-box mining crusher crushing shaft structure.
[0015] Compared with the prior art, the split-box mining crusher, crushing shaft structure and assembly method provided by the present invention, the crushing entrance slot, the crushing slot composed of the gate-type structure is designed as an integral structure, which solves the problem of deformation of the traditional split structure during disassembly and assembly. The gate-type frame structure has higher strength and less deformation, and serves as the installation and positioning body of the crushing shaft and the driving part of the square installation structure; when adjusting the crushing particle size of the crusher, the crushing particle size adjustment plate does not need to disassemble the U-shaped outlet slot, and the main frame of the crusher does not need to be disassembled; the problem that the fasteners of the inlet slot and the outlet slot and the crushing slot need to be loosened each time the crushing particle size adjustment pad is adjusted, and the input slot and output slot of the U-shaped structure are easily deformed is solved; the assembly and detection method for controlling the assembly accuracy solves the problem of difficult control of the crushing shaft assembly accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0017] Figure 1 It is a structural schematic diagram of the present invention.
[0018] Figure 2 For the present invention Figure 1 Schematic diagram of the top view structure.
[0019] Figure 3 It is a schematic structural diagram of the crushing shaft group of the present invention.
[0020] Figure 4It is a schematic diagram of the structure of the hammer crushing main shaft of the present invention.
[0021] Figure 5 It is a structural schematic diagram of the taper sleeve pressing tooling of the present invention when installing the taper sleeve of the bearing.
[0022] Figure 6 It is a schematic diagram of the structure of the crushing shaft assembly after assembly of the present invention.
[0023] Figure 7 It is a schematic diagram of the structure of the present invention after being assembled with a gate-type structure crushing chute and a U-shaped outlet chute.
[0024] Figure 8 For the present invention Figure 7 Schematic diagram of the front view structure.
[0025] In the figure: crushing shaft group 1, square connecting seat 11, sealing cover 12, bearing cover 13, tapered hole double row self-aligning bearing 14, bearing mounting tapered sleeve 15, bearing seat 16, hammer crushing main shaft 17, locking nut 18, gate structure crushing groove 2, crushing inlet groove 21, crushing groove 22, U-shaped outlet groove 3, coupling 4, driving part 5, adjustment plate 6, tapered sleeve clamping tool 7, pressing sleeve 71, stud 72, high-pressure hollow cylinder 73, locking knob 74, support 8. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] In the description of the present invention, it should be understood that the terms "upper", "middle", "outer", "inner", "lower" and the like indicating directions or positional relationships are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the components or elements referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as limiting the present invention.
[0028] Please see Figures 1 to 3In one embodiment, the present invention provides a split-box mining crusher crushing shaft structure, including a crushing shaft group 1, a gate-type structure crushing slot 2, a U-shaped outlet slot 3, and an adjustment plate 6; the gate-type structure crushing slot 2 includes a crushing inlet slot 21 and a crushing slot 22; the crushing inlet slot is arranged at the inlet end of the crushing slot 22, and the U-shaped outlet slot 3 is arranged at the outlet end of the crushing slot 22. The adjustment plate 6 is arranged on the crushing slot 22 and is located between the U-shaped outlet slot 3 and the crushing inlet slot 21. The crushing shaft group 1 includes a square connecting seat 11, a sealing cover 12, a bearing cover 13, a tapered hole double-row self-aligning bearing 14, a bearing mounting tapered sleeve 15, a bearing seat 16, and a hammer crushing main shaft 17; the square connecting seat 11 is arranged on the adjustment plate 6 and is respectively connected to the U-shaped outlet groove 3 and the crushing inlet groove 21, the bearing seat 16 is arranged in the square connecting seat 11, the tapered hole double-row self-aligning bearing 14 is installed in the bearing seat 16, and is sleeved on the two ends of the hammer crushing main shaft 17, the bearing mounting tapered sleeve 15 is sleeved between the hammer crushing main shaft 17 and the tapered hole double-row self-aligning bearing 14, the bearing cover 13 is sleeved on both ends of the hammer crushing main shaft 17 and is located on the outside of the tapered hole double-row self-aligning bearing 14, and the sealing cover is sleeved on the two ends of the hammer crushing main shaft 17 and is located on the outside of the bearing cover 13.
[0029] Among them, one end of the hammer crushing main shaft 17 is also connected to a coupling 4. The input end of the coupling 4 is connected to a driving part 5.
[0030] The bearing mounting cone sleeve 15 is fixed in axial displacement by a nut sleeved on the hammer crushing main shaft 17 .
[0031] In one embodiment, the present invention provides a split-box mining crusher, including a split-box mining crusher crushing shaft structure.
[0032] The crushing shaft structure of the box-type mining crusher includes a crushing shaft group 1, a gate-type structure crushing slot 2, a U-shaped outlet slot 3, and an adjustment plate 6; the gate-type structure crushing slot 2 includes a crushing inlet slot 21 and a crushing slot 22; the crushing inlet slot is arranged at the inlet end of the crushing slot 22, and the U-shaped outlet slot 3 is arranged at the outlet end of the crushing slot 22. The adjustment plate 6 is arranged on the crushing slot 22 and is located between the U-shaped outlet slot 3 and the crushing inlet slot 21. The crushing shaft group 1 includes a square connecting seat 11, a sealing cover 12, a bearing cover 13, a tapered hole double-row self-aligning bearing 14, a bearing mounting tapered sleeve 15, a bearing seat 16, and a hammer crushing main shaft 17; the square connecting seat 11 is arranged on the adjustment plate 6 and is respectively connected to the U-shaped outlet groove 3 and the crushing inlet groove 21, the bearing seat 16 is arranged in the square connecting seat 11, the tapered hole double-row self-aligning bearing 14 is installed in the bearing seat 16, and is sleeved on the two ends of the hammer crushing main shaft 17, the bearing mounting tapered sleeve 15 is sleeved between the hammer crushing main shaft 17 and the tapered hole double-row self-aligning bearing 14, the bearing cover 13 is sleeved on both ends of the hammer crushing main shaft 17 and is located on the outside of the tapered hole double-row self-aligning bearing 14, and the sealing cover is sleeved on the two ends of the hammer crushing main shaft 17 and is located on the outside of the bearing cover 13.
[0033] Among them, one end of the hammer crushing main shaft 17 is also connected to a coupling 4. The input end of the coupling 4 is connected to a driving part 5.
[0034] The bearing mounting cone sleeve 15 is fixed in axial displacement by a nut sleeved on the hammer crushing main shaft 17 .
[0035] Please see Figures 4 to 8 In one embodiment, the present invention provides a method for assembling a split-box mining crusher crushing shaft structure, which is applicable to the split-box mining crusher crushing shaft structure, and includes the following steps: Step S1: pre-assemble the crushing shaft assembly 1; the specific assembly method is as follows: S11: Install the bearing seat 16 into the square connecting seat 11, install the tapered hole double row self-aligning bearing 14, and use the bearing cover 13 and fasteners to position and fasten the bearing seat 16 and the tapered hole double row self-aligning bearing 14 to the square connecting seat 11; S12: The hammer crushing main shaft 17 is placed on the support 8, and the square connecting seat 11 with the tapered hole double row self-aligning bearing 14 installed is hoisted to one end of the hammer crushing main shaft 17 for alignment; S13: Use the tapered sleeve pressing tool 7 to assemble the bearing installation tapered sleeve 15 at the two ends of the hammer crushing main shaft 17, so that the bearing installation tapered sleeve 15 is pressed into the tapered hole of the tapered hole double row self-aligning bearing 14, and is respectively close to the tapered hole of the tapered hole double row self-aligning bearing 14 and the outer circle of the hammer crushing main shaft 17, and then 18 is installed and tightened; S14: Assemble the sealing cover on the bearing cover 13; S15: Assemble the sealing cover, bearing cover 13, tapered hole double row self-aligning bearing 14, bearing mounting tapered sleeve 15, and bearing seats 16 and 18 at the other end of the upper hammer crushing main shaft 17 in the same way; S16: Check whether the square connecting seat 11 can rotate flexibly and be aligned, and check and measure the parallelism between the shaft end of the hammer crusher main shaft 17 and the outer end surface of the square connecting seat 11. If it meets the requirements, record them respectively.
[0036] Step S2: Install the adjustment plate 6 into the door-type structure crushing slot 2. The door-type structure crushing slot 2 is composed of a crushing inlet slot 21 and a crushing slot 22 to form an integral structure, which serves as the installation and positioning body of the crushing shaft group 1 and the driving part 5; install the assembled crushing shaft group 1 on the adjustment plate 6, and ensure that the crushing shaft group 1 is adapted and connected to the crushing inlet slot 21.
[0037] Step S3: rotating the crushing shaft assembly 1, and making it rotate flexibly by fine-tuning the axial displacement of the square connecting seat 11 on the hammer crushing main shaft 17, and checking the parallelism between the shaft end of the hammer crushing main shaft 17 and the outer end surface of the square connecting seat 11; When assembling the crushing shaft assembly 1, the parallelism between the shaft end of the hammer crushing main shaft 17 and the outer end surface of the square connecting seat 11 measured is recorded as L1 and L2 respectively; After the crushing shaft assembly 1 is installed on the adjustment plate 6, the measured parallelism between the shaft end of the hammer crushing main shaft 17 and the outer end surface of the square connecting seat 11 is recorded as L11 and L21 respectively; Compare L1 and L11, as well as L2 and L21. If the differences are less than 0.15mm, tighten the fasteners on each positioning surface. If they do not meet the requirements, they need to be adjusted again and re-measured and calibrated until they meet the requirements.
[0038] Step S4: respectively install the U-shaped outlet groove 3, the coupling 4 and the driving part 5 in sequence, and fasten them with fasteners to complete the assembly.
[0039] Please see Figure 5 Specifically, the cone sleeve pressing tool 7 includes a pressing sleeve 71, a stud 72, a high-pressure hollow oil cylinder 73, and a locking knob 74; the stud 72 is installed in the threaded center hole of the shaft end of the hammer crushing main shaft 17, the pressing sleeve 71 supports the end face of the bearing installation cone sleeve 15, the high-pressure hollow oil cylinder 73 is sleeved on the stud 72, and the piston rod of the high-pressure hollow oil cylinder 73 axially presses the pressing sleeve 71, and the locking knob 74 is screwed on the stud 72 to press the high-pressure hollow oil cylinder 73.
[0040] What is disclosed above is only a preferred embodiment of the present invention, which certainly cannot be used to limit the scope of rights of the present invention. A person skilled in the art can understand that all or part of the processes of the above embodiments and equivalent changes made according to the claims of the present invention still fall within the scope of the invention.
Claims
1. A split-box mining crusher crushing shaft structure, characterized by: It includes a crushing shaft group, a gate-type crushing chute, a U-shaped outlet chute, and an adjustment plate; The gate-type structure crushing slot includes a crushing inlet slot and a crushing slot; the crushing inlet slot is arranged at the inlet end of the crushing slot, and the U-shaped outlet slot is arranged at the outlet end of the crushing slot; The adjustment plate is arranged on the crushing groove and is located between the U-shaped outlet groove and the crushing inlet groove; The crushing shaft group includes a square connecting seat, a sealing cover, a bearing cover, a tapered hole double-row self-aligning bearing, a bearing mounting tapered sleeve, a bearing seat, and a hammer crushing main shaft; the square connecting seat is arranged on the adjustment plate and is respectively connected to the U-shaped outlet groove and the crushing inlet groove, the bearing seat is arranged in the square connecting seat, the tapered hole double-row self-aligning bearing is installed in the bearing seat, and is sleeved on the two ends of the hammer crushing main shaft, the bearing mounting tapered sleeve is sleeved between the hammer crushing main shaft and the tapered hole double-row self-aligning bearing, the bearing cover is sleeved on both ends of the hammer crushing main shaft and is located on the outside of the tapered hole double-row self-aligning bearing, and the sealing cover is sleeved on the two ends of the hammer crushing main shaft and is located on the outside of the bearing cover.
2. The split-box mining crusher crushing shaft structure according to claim 1 is characterized in that: One end of the hammer crushing main shaft is also connected with a coupling.
3. The split-box mining crusher crushing shaft structure according to claim 2 is characterized in that: The input end of the coupling is connected with a driving part.
4. The split-box mining crusher crushing shaft structure according to claim 1 is characterized in that: The bearing mounting cone sleeve is fixed with axial displacement by a nut sleeved on the hammer crushing main shaft.
5. A method for assembling a crushing shaft structure of a split-box mining crusher, applicable to the split-box mining crusher shaft structure according to any one of claims 1 to 4, characterized in that: The following steps are included: S1: pre-assembled crushing shaft assembly; S2: Install the adjustment plate into the door-type structure crushing slot. The door-type structure crushing slot is composed of a crushing inlet slot and a crushing slot to form an integral structure, which serves as the installation and positioning body of the crushing shaft group and the driving part; install the assembled crushing shaft group on the adjustment plate, and ensure that the crushing shaft group is adapted and connected to the crushing inlet slot; S3: Rotate the crushing shaft assembly to make it rotate flexibly by fine-tuning the displacement of the square connecting seat in the axial direction of the hammer crushing main shaft, and check the parallelism between the shaft end of the hammer crushing main shaft and the outer end surface of the square connecting seat; S4: Install the U-shaped outlet groove, coupling and drive unit in sequence, fasten them with fasteners, and complete the assembly.
6. The method for assembling the crushing shaft structure of a split-type box mining crusher according to claim 5 is characterized in that: In step S1, the crushing shaft assembly is assembled in the following manner: S11: Install the bearing seat into the square connecting seat, install the tapered hole double row self-aligning bearing, and use the bearing cover and fasteners to position and fasten the bearing seat and the tapered hole double row self-aligning bearing to the square connecting seat; S12: Place the hammer crusher main shaft on the support, and hoist the square connecting seat with the tapered hole double row self-aligning bearing installed to one end of the hammer crusher main shaft for alignment; S13: Use the cone sleeve pressing tool to assemble the bearing installation cone sleeves at the two ends of the hammer crusher main shaft, so that the bearing installation cone sleeves are pressed into the cone hole of the cone hole double row self-aligning bearing, and are respectively close to the cone hole of the cone hole double row self-aligning bearing and the outer circle of the hammer crusher main shaft, and the locking nuts are installed and tightened; S14: Assemble the sealing cover on the bearing cover; S15: Use the same method to assemble the sealing cover, bearing cover, tapered hole double row self-aligning bearing, bearing mounting cone sleeve, bearing seat and locking nut on the other end of the upper hammer crusher main shaft; S16: Check that the square connecting seat can rotate flexibly and be aligned. Check and measure the parallelism between the main shaft end of the hammer crusher and the outer end face of the square connecting seat. If it meets the requirements, record them separately.
7. The method for assembling the crushing shaft structure of a split-type box mining crusher according to claim 6 is characterized in that: In step S3, the parallelism between the end of the hammer crushing main shaft and the outer end surface of the square connecting seat is checked in the following manner: When assembling the crushing shaft group, the parallelism between the hammer crushing main shaft end and the outer end surface of the square connecting seat measured is recorded as L1 and L2 respectively; After the crushing shaft assembly is installed on the adjustment plate, the measured parallelism between the hammer crushing main shaft end and the outer end surface of the square connecting seat is recorded as L11 and L21 respectively; Compare L1 and L11, as well as L2 and L21. If the differences are less than 0.15mm, tighten the fasteners on each positioning surface. If they do not meet the requirements, they need to be adjusted again and re-measured and calibrated until they meet the requirements.
8. The method for assembling the crushing shaft structure of a split-box mining crusher according to claim 6, characterized in that: The cone sleeve pressing tool comprises a pressing sleeve, a stud, a high-pressure hollow oil cylinder and a locking knob; the stud is installed in the threaded center hole at the end of the hammer crusher main shaft, the pressing sleeve supports the end face of the bearing installation cone sleeve, the high-pressure hollow oil cylinder is sleeved on the stud, and the piston rod of the high-pressure hollow oil cylinder axially presses the pressing sleeve, and the locking knob is screwed on the stud to press the high-pressure hollow oil cylinder.
9. A split-box mining crusher, characterized in that: The invention comprises a crushing shaft structure of a split-box mining crusher as described in any one of claims 1 to 4.
Citation Information
Patent Citations
Novel crusher
CN105312125A
Gradually-broken type and wheel type crusher for coal mine underground
CN108160272A
Portland cement production line
CN114433303A
Roll squeezer main shaft bearing compresses tightly frock
CN206568050U
Tool for assembling spherical roller bearing of wind power gear box
CN209319190U