Efficient gluing process and device for machining engineering vehicle cover

By using high-precision automated glue coating equipment and vacuum defoaming machine during the glue coating process of engineering vehicle covers, combined with control components, the problem of uneven glue bubbles and glue coating is solved, and efficient and accurate glue coating effect is achieved, improving the The quality and processing efficiency of the glue coating layer.

CN118926060APending Publication Date: 2024-11-12QINGDAO HONGLI COMPOSITES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410989721.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the glue coating process of engineering vehicle covers, the glue easily forms bubbles, resulting in uneven glue coating. The start-stop control of the glue coating equipment is difficult, and it is easy to miss or multiple coatings, which affects processing efficiency.

Method used

High-precision automated glue coating equipment is used to combine vacuum defoaming machines and control components to ensure uniform distribution of glue and continuous glue output, improve glue adhesion through pretreatment, and quality inspection is carried out after curing to ensure the quality of the glue coating layer.

Benefits of technology

It effectively eliminates bubbles in the glue, improves the stability and durability of the glue coating layer, achieves precise control of the glue production, reduces the probability of failure and usage costs, and improves processing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118926060A_ABST
    Figure CN118926060A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of engineering vehicle manufacturing, and discloses an efficient gluing process and device for engineering vehicle machine cover machining, and the efficient gluing device for engineering vehicle machine cover machining comprises a mechanical arm and a connecting base and further comprises an adapter pipe arranged at the end, away from the mechanical arm, of the connecting base. The gluing pipe is arranged at the end, away from the connecting base, of the adapter pipe, and the glue injection head is arranged on the outer side of the connecting base. According to the efficient gluing device for machining the engineering vehicle machine cover, by arranging the control assembly, during gluing, a gluing pipe is close to the machine cover, a trigger rod is pushed upwards, the trigger rod drives an insertion rod to move, glue can enter the gluing pipe from a communication hole and then is discharged through the gluing pipe, and therefore normal gluing work can be conducted; when the glue is discharged, the trigger rod and the insertion rod are reset, the communication hole is blocked, the glue is not discharged any more, stable glue discharging is achieved, control is more accurate, the fault probability is lower, and the use cost is lower.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of engineering vehicle manufacturing, and in particular to a high-efficiency glue coating process and device for machining an engineering vehicle hood. Background Art

[0002] Engineering vehicles are special vehicles that play an important role in various types of engineering construction. Common engineering vehicles include loaders, excavators, bulldozers, road rollers, cranes, etc.; due to the harsh and complex working environment of engineering vehicles, in order to enhance the sealing of the fuselage, reduce shock and noise, and improve structural strength, the inner side of the hood will be coated with glue during processing.

[0003] The gluing process plays a vital role in the quality of the engine cover. Choosing the right type of glue is the primary task, and the weather resistance, viscosity, elasticity and other properties of the glue must be taken into consideration. When applying the glue, it is necessary to ensure that the glue is evenly distributed without bubbles or areas where glue is missing. In addition, in order to ensure the quality of the gluing process, strict quality inspections are also required.

[0004] The prior art has the following defects: In order to ensure the full mixing of the glue main agent and the curing agent and avoid separation of the two during the gluing process, it is necessary to stir them at appropriate times. This will easily cause air to mix into the glue and form a large number of bubbles. These bubbles will affect the performance of the glue and cause interruptions or defects in the glue coating, which will need to be filled later, affecting processing efficiency.

[0005] Due to the complex shape of the machine cover, the position of the machine cover needs to be constantly adjusted during the gluing process. At the same time, the gluing route is not always continuous. The gluing equipment and the machine cover will often make separation and combination movements. This requires the cooperation of CNC programs to control the start and stop of the gluing equipment to avoid missing or over-coating. This method is not only costly, but also inevitably leads to omissions. Moreover, due to the fluidity of the glue, after the gluing equipment stops discharging glue, the glue remaining at the glue outlet may also drip, which requires later cleaning and affects the processing efficiency. Summary of the invention

[0006] In view of the problems in the prior art such as bubbles in the glue, missing or over-coating during the gluing process, etc., an efficient gluing process for machining engine covers of engineering vehicles is proposed.

[0007] The present application provides an efficient glue coating process for engineering vehicle hood processing, the purpose of which is to eliminate bubbles in the glue and accurately control the glue dispensing work.

[0008] The technical solution of the present invention is: a high-efficiency glue coating process for machining the engine cover of an engineering vehicle: Step 1: Pretreatment of the surface of the engine cover: First, use an organic solvent to clean the surface of the engine cover to remove oil and impurities, and then roughen the surface of the engine cover; Step 2: Glue preparation: Prepare glue according to the use environment and performance requirements of the engineering vehicle hood, and use a stirring device to fully mix the main agent and curing agent of the glue, and then use a vacuum degassing machine to eliminate bubbles in the glue; Step 3. Selection and debugging of gluing equipment: Select high-precision automatic gluing equipment, and set the gluing track, gluing speed, gluing pressure, and glue output parameters of the gluing equipment according to the shape and size of the cover; Step 4: Gluing operation: fix the pre-treated machine cover on the workbench of the glue coating equipment, start the glue coating equipment, and apply glue according to the set parameters. During the glue coating process, the glue is evenly and continuously applied to the designated position of the machine cover to form a glue layer with uniform thickness and uniform width; Step 5: Glue curing: Transfer the cover to the curing equipment for curing and complete all the gluing work; Step 6. Quality inspection: After curing is completed, the quality of the machine cover after glue coating is inspected. Visual inspection and sealing test are used to check whether there are defects such as bubbles, glue shortage, unevenness, etc. in the glue coating layer, and whether the sealing performance meets the requirements. Unqualified products are reworked in time.

[0009] Furthermore, the organic solvent is acetone or gasoline.

[0010] Furthermore, the glue is polyurethane glue.

[0011] Furthermore, the ratio of the main agent to the curing agent of the polyurethane glue is 10:1.

[0012] A high-efficiency glue coating device for machining an engine cover of an engineering vehicle comprises a mechanical arm and a connecting seat, a transfer tube arranged at an end of the connecting seat away from the mechanical arm, a glue coating tube arranged at an end of the transfer tube away from the connecting seat, a glue injection head arranged outside the connecting seat, and a control component and an auxiliary component arranged inside the transfer tube; The control assembly includes a fixing frame arranged in the transfer tube, a sleeve arranged inside the fixing frame, an insertion rod arranged inside the sleeve, a connecting hole arranged inside the insertion rod, a through hole arranged at the axis of the insertion rod, a trigger rod arranged inside the through hole to control the displacement of the insertion rod, and a side through hole arranged outside the sleeve; The insertion rod extends into the glue coating tube and completely blocks the inside of the glue coating tube. The upper opening of the communicating hole is located on the side of the sleeve, and the lower opening of the communicating hole is located at the bottom of the insertion rod. The sleeve is wrapped around the outside of the upper opening of the communicating hole. The lower end of the trigger rod passes through the insertion rod and the glue coating tube and extends to the outside of the glue coating tube. The upper end of the trigger rod extends into the auxiliary component.

[0013] Furthermore, a connecting port is provided at the bottom of the connecting seat, and the glue injection head is connected to the connecting port.

[0014] Furthermore, the transfer pipe includes an upper pipe and a lower pipe, the upper pipe and the lower pipe are threadedly connected, the upper pipe is threadedly connected to the connecting seat, the lower pipe is threadedly connected to the rubber-coated pipe, and the fixing frame is fixed to the bottom of the inner side of the upper pipe.

[0015] Furthermore, the auxiliary component includes a connection block arranged inside the sleeve, a threaded interface arranged on the top of the connection block, a sealing plug arranged above the threaded interface, a push-pull hole and a control hole arranged at the bottom of the connection block, and a push-pull rod arranged inside the push-pull hole; The sealing plug is composed of three sections of cylinders with different diameters arranged in a stepped manner, wherein the first section from top to bottom is located above the fixing frame, the second section is threadedly connected to the sleeve, the third section is threadedly connected to the threaded interface, the push-pull hole and the control hole are both connected to the threaded interface, and the push-pull rod is connected to the insertion rod.

[0016] Furthermore, a coating nozzle is threadedly connected to the bottom of the glue coating tube, and a trigger rod extends out of the coating nozzle.

[0017] Furthermore, a partition net is fixedly installed at the lower opening of the glue coating tube, and the trigger rod passes through the partition net.

[0018] Beneficial effects of the present invention: 1. By using a vacuum degassing machine to eliminate bubbles in the glue, it is beneficial to ensure the performance of the glue, while avoiding interruptions or defects in glue coating, reducing later work, and improving work efficiency to a certain extent.

[0019] 2. By pre-treating the surface of the engine cover, the adhesion of the glue is improved, and the stability and durability of the glue layer are enhanced. The optimized curing process ensures that the glue can be fully cured, thereby improving the performance and quality of the glue layer.

[0020] 3. By setting the control component, when applying glue, the glue tube is close to the machine cover, the trigger rod is pushed upward, and the trigger rod drives the insertion rod to move, so that the glue can enter the glue tube from the connecting hole and then be discharged through the glue tube. In this way, normal gluing work can be carried out. When the glue tube is away from the machine cover, the trigger rod and the insertion rod are reset, the connecting hole is blocked, and glue is no longer discharged, achieving stable glue discharge. In this way, the control is more precise, the probability of failure is lower, and the cost of use is also lower.

[0021] 4. By setting up auxiliary components, when the glue coating tube is away from the machine cover, the trigger rod moves downward due to gravity, and the push-pull rod drives the insertion rod to move upward. While closing the connecting hole, the glue in the glue coating tube is also sucked upward, so that the glue is away from the lower opening of the glue coating tube, and then under the action of air pressure, the possibility of glue dripping is further reduced, ensuring smooth gluing work. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A three-dimensional diagram of a high-efficiency glue coating device for machining an engineering vehicle hood according to the present invention; Figure 2 This is a disassembly diagram of the glue coating device of the present invention; Figure 3 This is a disassembly diagram of the transfer tube of the present invention; Figure 4 This is a disassembled diagram of the control assembly of the present invention; Figure 5 It is a cross-sectional view of the glue coating device of the present invention; Figure 6 It is a partial cross-sectional view of the transfer tube and the rubber-coated tube of the present invention; Figure 7 It is a cross-sectional view of the control assembly of the present invention; Figure 8 It is a cross-sectional view of the auxiliary component of the present invention; Fig. 9 It is a cross-sectional view of the rod of the present invention; Fig.10 This is a disassembly diagram of the coating nozzle and the coating tube of the present invention; Fig.11 It is a partial cross-sectional view of the coating nozzle and the glue coating tube of the present invention.

[0023] In the figure: 1. Robotic arm; 2. Connecting seat; 21. Connecting port; 3. Adapter tube; 31. Upper connecting tube; 32. Lower connecting tube; 4. Glue coating tube; 5. Glue injection head; 6. Control component; 61. Fixing bracket; 62. Sleeve; 63. Insert rod; 64. Connecting hole; 65. Through hole; 66. Trigger rod; 67. Side through hole; 7. Auxiliary component; 71. Connecting block; 72. Threaded interface; 73. Sealing plug; 74. Push-pull hole; 75. Control hole; 76. Push-pull rod; 8. Applicator nozzle; 9. Partition net. DETAILED DESCRIPTION

[0024] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0025] Embodiment 1 is the first embodiment of the present invention, which provides an efficient gluing process for machining the hood of an engineering vehicle: Step 1: Pretreatment of the engine cover surface: First, use acetone to clean the engine cover surface thoroughly to remove oil stains; then, use sandblasting to roughen the engine cover surface to a surface roughness of Ra6.3 to improve the adhesion of the glue; Step 2: Glue preparation: According to the use environment and performance requirements of the engineering vehicle hood, select polyurethane glue with good weather resistance, mix the main agent and curing agent in a ratio of 10:1, and use a stirring device to fully stir for 15 minutes; Step 3. Selection and debugging of glue coating equipment: Select a controlled glue coating machine, and set the glue coating trajectory to a combination of straight lines and curves according to the shape and size of the cover, the glue coating speed to 100mm / s, the glue coating pressure to 0.3MPa, and the glue output to 2g / s; Step 4: Gluing operation: fix the pre-treated machine cover on the workbench of the glue coating equipment, start the glue coating equipment, and apply glue according to the set parameters; during the glue coating process, ensure that the glue is evenly and continuously applied to the designated position of the machine cover to form a glue layer with a thickness of 2mm and a width of 10mm; Step 5: Glue curing: After the glue is applied, transfer the cover to the curing equipment for curing. Curing is carried out for 2 hours at a temperature of 80°C and a humidity of 60%. Step 6. Quality inspection: After curing is completed, the quality of the machine cover after glue coating is inspected; use visual inspection, sealing test and other methods to check whether there are defects such as bubbles, glue deficiency, unevenness, etc. in the glue coating layer, and whether the sealing performance meets the requirements. For unqualified products, rework them in time.

[0026] Embodiment 2 is the second embodiment of the present invention: a high-efficiency glue coating process for machining the hood of an engineering vehicle: Step 1: Pretreatment of the hood surface: First, use gasoline to thoroughly clean the hood surface to remove impurities; then, use grinding to roughen the hood surface to a surface roughness of Ra3.2 to improve the adhesion of the glue; Step 2: Glue preparation: According to the use environment and performance requirements of the engineering vehicle hood, select polyurethane glue with good weather resistance, mix the main agent and curing agent in a ratio of 10:1, and use a stirring device to fully stir for 15 minutes; Step 3. Selection and debugging of glue coating equipment: Select a controlled glue coating machine, and set the glue coating trajectory to a combination of straight lines and curves according to the shape and size of the cover, the glue coating speed to 80mm / s, the glue coating pressure to 0.4MPa, and the glue output to 1.5g / s; Step 4: Gluing operation: fix the pre-treated machine cover on the workbench of the glue coating equipment, start the glue coating equipment, and apply glue according to the set parameters; during the glue coating process, ensure that the glue is evenly and continuously applied to the designated position of the machine cover to form a glue layer with a thickness of 1.5mm and a width of 8mm; Step 5: Glue curing: After the glue is applied, transfer the cover to the curing equipment for curing. Curing is carried out for 3 hours at a temperature of 60°C and a humidity of 50%. Step 6. Quality inspection: After curing is completed, the quality of the machine cover after glue coating is inspected; use visual inspection, sealing test and other methods to check whether there are defects such as bubbles, glue deficiency, unevenness, etc. in the glue coating layer, and whether the sealing performance meets the requirements. For unqualified products, rework them in time.

[0027] Embodiment 3 is the third embodiment of the present invention, which provides a high-efficiency gluing device for processing engine covers of engineering vehicles, including a robotic arm 1 and a connecting seat 2, and also includes a transfer tube 3 arranged at the end of the connecting seat 2 away from the robotic arm 1, a glue coating tube 4 arranged at the end of the transfer tube 3 away from the connecting seat 2, a glue injection head 5 arranged on the outside of the connecting seat 2, and a control component 6 and an auxiliary component 7 arranged on the inside of the transfer tube 3.

[0028] The control assembly 6 includes a fixing frame 61 arranged in the transfer tube 3, a sleeve 62 arranged on the inner side of the fixing frame 61, an insertion rod 63 arranged inside the sleeve 62, a connecting hole 64 arranged inside the insertion rod 63, a through hole 65 arranged at the axis of the insertion rod 63, a trigger rod 66 arranged inside the through hole 65 for controlling the displacement of the insertion rod 63, and a side through hole 67 arranged on the outer side of the sleeve 62.

[0029] Specifically, the robot arm 1 is installed on the workbench. The robot arm 1 adopts a five-axis design. The connecting seat 2 is rotatably connected to the robot arm 1. A connecting port 21 is opened at the bottom of the connecting seat 2. The glue injection head 5 is connected to the connecting port 21. The end of the glue injection head 5 away from the connecting seat 2 is connected to the glue storage barrel. The fixing frame 61 is connected to the transfer tube 3 by glue, and the sleeve 62 is connected to the fixing frame 61 by glue. The insertion rod 63 is slidably inserted into the sleeve 62, and the insertion rod 63 extends into the glue coating tube 4 and completely blocks the inner side of the glue coating tube 4. The upper opening of the connecting hole 64 is located on the side of the sleeve 62, and the lower opening of the connecting hole 64 is located at the bottom of the insertion rod 63. The sleeve 62 is wrapped around the outside of the upper opening of the connecting hole 64. The lower end of the trigger rod 66 passes through the insertion rod 63 and the glue coating tube 4, and extends to the outside of the glue coating tube 4. The upper end of the trigger rod 66 extends into the auxiliary component 7.

[0030] By setting the control component 6, when applying glue, the glue tube 4 is close to the machine cover, the trigger rod 66 is pushed upward, and the trigger rod 66 drives the insertion rod 63 to move, so that the glue can enter the glue tube 4 from the connecting hole 64, and then be discharged through the glue tube 4, so that normal gluing work can be carried out. When the glue tube 4 is away from the machine cover, the trigger rod 66 and the insertion rod 63 are reset, the connecting hole 64 is blocked, and the glue is no longer discharged, so that stable glue discharge is achieved. In this way, the control is more precise, the probability of failure is lower, and the cost of use is also lower.

[0031] Specifically, the transfer tube 3 includes an upper tube 31 and a lower tube 32, the upper tube 31 and the lower tube 32 are threadedly connected, the upper tube 31 is threadedly connected to the connecting seat 2, the lower tube 32 is threadedly connected to the glue coating tube 4, and the fixing frame 61 is fixed to the bottom of the inner side of the upper tube 31, so as to facilitate the installation and disassembly of the control component 6.

[0032] The auxiliary component 7 includes a connecting block 71 arranged inside the sleeve 62, a threaded interface 72 arranged on the top of the connecting block 71, a sealing plug 73 arranged above the threaded interface 72, a push-pull hole 74 and a control hole 75 arranged at the bottom of the connecting block 71, and a push-pull rod 76 arranged inside the push-pull hole 74.

[0033] Specifically, the connecting block 71 is slidably inserted in the sleeve 62, and the sealing plug 73 is composed of three sections of cylinders with different diameters arranged in a stepped manner. The first section from top to bottom is located above the fixing frame 61, the second section is threadedly connected to the sleeve 62, and the third section is threadedly connected to the threaded interface 72. The push-pull hole 74 and the control hole 75 are both connected to the threaded interface 72. One end of the push-pull rod 76 is connected to the insertion rod 63 by glue, and the other end is slidably connected to the push-pull hole 74. A sealing ring is installed on the outside of the push-pull rod 76, and the upper end of the trigger rod 66 is slidably inserted in the control hole 75. A sealing ring is installed on the outside of the trigger rod 66. The push-pull hole 74 and the control hole 75 are connected in the threaded interface 72. The trigger rod 66 is made of alloy, and its gravity is greater than that of the insertion rod 63.

[0034] By setting the auxiliary component 7, when the glue coating tube 4 is away from the machine cover, the trigger rod 66 moves downward due to the action of gravity, and the push-pull rod 76 drives the insertion rod 63 to move upward, closing the connecting hole 64 while sucking the glue in the glue coating tube 4 upward, so that the glue is away from the lower opening of the glue coating tube 4, and then under the action of air pressure, the possibility of glue dripping is further reduced, thereby ensuring smooth gluing work.

[0035] Specifically, the bottom of the glue coating tube 4 is threadedly connected with a coating nozzle 8, and the trigger rod 66 extends out of the coating nozzle 8. After the glue in the coating nozzle 8 dries and hardens, the coating nozzle 8 can be directly removed for cleaning, which is more convenient to use.

[0036] Specifically, a partition net 9 is fixedly installed at the lower opening of the glue coating tube 4, and the trigger rod 66 passes through the partition net 9. The partition net 9 has a certain bearing capacity for the glue, which can reduce the possibility of glue dripping. At the same time, when the glue is discharged from the connecting hole 64, a small amount of glue cannot be discharged. When the glue coating tube 4 is gradually filled, the glue is squeezed and flows through the partition net 9, making the coated glue line full.

[0037] In conjunction with Example 3, the working principle of a high-efficiency glue coating device for processing an engineering vehicle hood of the present invention is as follows: After fixing the machine cover, start the corresponding control program, and the glue storage barrel injects glue into the connecting port 21 through the glue injection head 5. The glue slowly flows into the transfer tube 3 and fills it. The robotic arm 1 drives the glue coating tube 4 to approach the machine cover through the connecting seat 2. When the trigger rod 66 contacts the machine cover, the trigger rod 66 is pushed toward the connecting seat 2. The movement of the trigger rod 66 pushes the air in the control hole 75 into the threaded interface 72. The air in the threaded interface 72 flows into the push-pull hole 74, pushing the push-pull rod 76 away from the connecting seat 2. The push-pull rod 76 pushes the plug rod 63 toward the glue coating tube 4, so that the upper opening of the connecting hole 64 moves out of the sleeve 62, and the glue in the transfer tube 3 enters the connecting hole 64, and then flows into the glue coating tube 4 from the connecting hole 64. The glue falls on the partition net 9. When the glue coating tube 4 is gradually filled, the glue flows through the partition net 9 and flows out from the coating nozzle 8 and is coated on the machine cover.

[0038] When the gluing is completed or the gluing position needs to be adjusted, the glue coating tube 4 leaves the machine cover, the trigger rod 66 loses its supporting force and moves downward under the action of gravity. The trigger rod 66 moves to draw the air in the threaded interface 72 into the control hole 75, and the air in the push-pull hole 74 flows into the threaded interface 72, causing the push-pull rod 76 to move toward the sealing plug 73. The push-pull rod 76 drives the insertion rod 63 to move toward the transfer tube 3, so that the upper opening of the connecting hole 64 enters the sleeve 62, closing this end opening. At the same time, the insertion rod 63 gradually leaves the glue coating tube 4 to enlarge the internal space of the glue coating tube 4, and the glue in the glue coating tube 4 is sucked upward and away from the opening below the glue coating tube 4.

[0039] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. An efficient gluing process for machining an engineering vehicle hood, characterized in that: Step 1: Pretreatment of the surface of the engine cover: First, use an organic solvent to clean the surface of the engine cover to remove oil and impurities, and then roughen the surface of the engine cover; Step 2: Glue preparation: Prepare glue according to the use environment and performance requirements of the engineering vehicle hood, and use a stirring device to fully mix the main agent and curing agent of the glue, and then use a vacuum degassing machine to eliminate bubbles in the glue; Step 3. Selection and debugging of glue coating equipment: Select high-precision automatic glue coating equipment, and set the glue coating track, glue coating speed, glue coating pressure and glue output of the glue coating equipment according to the shape and size of the cover; Step 4: Gluing operation: fix the pre-treated machine cover on the workbench of the glue coating equipment, start the glue coating equipment, and apply glue according to the set parameters. During the glue coating process, the glue is evenly and continuously applied to the designated position of the machine cover to form a glue layer with uniform thickness and uniform width; Step 5: Glue curing: Transfer the cover to the curing equipment for curing and complete all the gluing work; Step 6. Quality inspection: After curing is completed, the quality of the machine cover after glue coating is inspected. Visual inspection and sealing test are used to check whether there are defects such as bubbles, glue shortage, unevenness, etc. in the glue coating layer, and whether the sealing performance meets the requirements. Unqualified products are reworked in time.

2. The high-efficiency glue coating process for machining the hood of an engineering vehicle according to claim 1 is characterized in that: The organic solvent is acetone or gasoline.

3. The high-efficiency glue coating process for machining the hood of an engineering vehicle according to claim 1 is characterized in that: The glue is polyurethane glue.

4. The high-efficiency glue coating process for machining the hood of an engineering vehicle according to claim 3 is characterized in that: The ratio of the main agent to the curing agent of the polyurethane glue is 10:

1.

5. An efficient glue coating device for processing an engineering vehicle hood, using the glue coating device as claimed in claim 1, comprising a mechanical arm (1) and a connecting seat (2), characterized in that: It also includes a transfer tube (3) arranged at one end of the connection base (2) away from the mechanical arm (1), a glue coating tube (4) arranged at one end of the transfer tube (3) away from the connection base (2), a glue injection head (5) arranged outside the connection base (2), and a control component (6) and an auxiliary component (7) arranged inside the transfer tube (3); The control assembly (6) comprises a fixing frame (61) arranged in the transfer tube (3), a sleeve (62) arranged inside the fixing frame (61), an insertion rod (63) arranged inside the sleeve (62), a connecting hole (64) arranged inside the insertion rod (63), a through hole (65) arranged at the axis of the insertion rod (63), a trigger rod (66) arranged inside the through hole (65) for controlling the displacement of the insertion rod (63), and a side through hole (67) arranged outside the sleeve (62); The insertion rod (63) extends into the glue coating tube (4) and completely blocks the inside of the glue coating tube (4); the upper opening of the communication hole (64) is located on the side of the sleeve (62); the lower opening of the communication hole (64) is located at the bottom of the insertion rod (63); the sleeve (62) wraps around the outer side of the upper opening of the communication hole (64); the lower end of the trigger rod (66) passes through the insertion rod (63) and the glue coating tube (4) and extends to the outside of the glue coating tube (4); the upper end of the trigger rod (66) extends into the auxiliary component (7).

6. The high-efficiency glue coating device for processing the engine cover of an engineering vehicle according to claim 5, characterized in that: The bottom of the connection seat (2) is provided with a connection port (21), and the glue injection head (5) is connected to the connection port (21).

7. The high-efficiency glue coating device for processing the hood of an engineering vehicle according to claim 5, characterized in that: The transfer pipe (3) comprises an upper pipe (31) and a lower pipe (32), the upper pipe (31) and the lower pipe (32) are threadedly connected, the upper pipe (31) is threadedly connected to the connecting seat (2), the lower pipe (32) is threadedly connected to the rubber coating pipe (4), and the fixing frame (61) is fixed to the bottom of the inner side of the upper pipe (31).

8. The high-efficiency glue coating device for processing the engine cover of an engineering vehicle according to claim 6, characterized in that: The auxiliary component (7) comprises a connection block (71) arranged inside the sleeve (62), a threaded interface (72) arranged at the top of the connection block (71), a sealing plug (73) arranged above the threaded interface (72), a push-pull hole (74) and a control hole (75) arranged at the bottom of the connection block (71), and a push-pull rod (76) arranged inside the push-pull hole (74); The sealing plug (73) is composed of three sections of cylindrical bodies with different diameters arranged in a stepped manner, wherein the first section from top to bottom is located above the fixing frame (61), the second section is threadedly connected to the sleeve (62), and the third section is threadedly connected to the threaded interface (72). The push-pull hole (74) and the control hole (75) are both connected to the threaded interface (72), and the push-pull rod (76) is connected to the insertion rod (63).

9. The high-efficiency glue coating device for machining the hood of an engineering vehicle according to claim 8, characterized in that: The bottom of the glue coating tube (4) is threadedly connected to a coating nozzle (8), and the trigger rod (66) extends out of the coating nozzle (8).

10. The high-efficiency glue coating device for processing the hood of an engineering vehicle according to claim 9, characterized in that: A partition net (9) is fixedly mounted at the lower opening of the glue coating tube (4), and the trigger rod (66) passes through the partition net (9).