Split cement-based material energy storage box and manufacturing method thereof
Through the design of the energy storage box of the piece-type cement-based material, simple assembly and disassembly are achieved by using reserved notches and bolt connections, which solves the problem of cumbersome and non-detachable production of existing cement-based material energy storage boxes, and is suitable for different capacity The energy storage operation and corrosion prevention through the lifting structure improves the stability and service life of the device.
Patent Information
- Application Number
- CN202410819189.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-11-12
AI Technical Summary
The existing cement-based material energy storage box is cumbersome in the production and assembly process and cannot be flexibly disassembled, so it cannot be suitable for energy storage work of different capacity.
A piece-type cement-based energy storage box was designed, and a cube structure was formed through six cement-based sheets. It uses reserved notches and bolt connections to achieve simple assembly and disassembly, and is equipped with a lifting structure and a support structure to improve the Flexibility and stability.
It realizes flexible disassembly and assembles the box after assembly, which is suitable for energy storage work of different capacity. At the same time, the lifting structure prevents corrosion of cement-based materials, which improves the stability and service life of the device.
Smart Images

Figure CN118928963A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy storage boxes, and in particular to a sliced cement-based material energy storage box and a manufacturing method thereof. Background Art
[0002] Cement-based energy storage boxes do not directly use cement as an energy storage medium, but use cement as a structural material to construct the box part of the energy storage device. This type of box is usually combined with other energy storage technologies, such as electrochemical energy storage technology, to achieve energy storage and release. It has good compressive and flexural strength, which can ensure the structural stability of the energy storage box and withstand the pressure and challenges under various complex environmental conditions.
[0003] The existing cement-based energy storage box has a complicated manufacturing and assembly process and cannot be flexibly disassembled after installation, and cannot be widely used in energy storage work of different capacities. Based on the existing technical deficiencies, the present invention designs a sliced cement-based energy storage box and a manufacturing method thereof. Summary of the invention
[0004] The present invention provides a piece-type cement-based material energy storage box and a manufacturing method thereof, which has the advantages that the box can be flexibly disassembled and assembled after assembly to meet the needs of energy storage work of different capacities, and solves the problems mentioned in the above background technology.
[0005] The present invention provides the following technical solution: a sliced cement-based material energy storage box, comprising a box body main structure, wherein the box body main structure is a cubic structure assembled from six cement-based material plates, wherein four circumferential cement-based material plates serve as side plates of the energy storage box, the top cement-based material plate serves as the top plate of the energy storage box, and the bottom cement-based material plate serves as the bottom plate of the energy storage box;
[0006] Two circumferential cement-based material panels are used to install closable doors;
[0007] A notch is reserved on the cement-based material plate at the bottom, and the side cement-based material plate and the bottom cement-based material plate are plugged in through the reserved notch;
[0008] The side cement-based material plates and the top cement-based material plates and the side cement-based material plates are connected by reserved bolts.
[0009] As a preferred embodiment of the present invention: a workbench and a ladder are provided on the cement-based material plate located on the side.
[0010] As a preferred embodiment of the present invention: a base is provided at the bottom of the cement-based material plate at the bottom, and a lifting structure is fixedly installed on the top of the base.
[0011] As a preferred embodiment of the present invention, the lifting structure comprises two fixing seats and two fixing rods, bidirectional screws are rotatably mounted inside the two fixing seats, and threaded blocks are threadedly mounted on the outer surfaces of the two bidirectional screws.
[0012] As a preferred embodiment of the present invention: a second hinged seat is installed on the top of the two threaded blocks, and a hinged rod is hingedly installed inside the two second hinged seats.
[0013] As a preferred embodiment of the present invention: one end of the two hinged rods is hingedly connected to the first hinged seat, and a reinforcing rod is installed between the two groups of the first hinged seats.
[0014] As a preferred embodiment of the present invention: the two fixing rods are fixedly connected to one side of the base, and a fixing ring is installed between the two fixing rods;
[0015] A servo motor is installed inside the fixed ring, a reducer is connected to one side of the servo motor, the output shaft of the servo motor passes through the reducer and is rotatably connected to the base, and two connecting belts are sleeved on the outer surface of the output shaft of the servo motor, and the two connecting belts are sleeved on two bidirectional screws through pulleys.
[0016] As a preferred embodiment of the present invention: two supporting structures are installed on both sides of the outer surface of the base, and the four supporting structures include a fixing sleeve;
[0017] The four fixing sleeves are fixedly connected to the base, a threaded ring is arranged on the top of the four fixing sleeves, threaded rods are installed on the internal threads of the four threaded rings, the four threaded rods are socketed with the fixing sleeves, an L-shaped plate is rotatably installed on the top of the four threaded rods, and two threaded holes are opened on one side of the four L-shaped plates.
[0018] In addition, the present invention provides a method for manufacturing a sliced cement-based material energy storage box, comprising the following steps:
[0019] S1: Six cement-based material panels are prepared by mixing raw materials, two of which are provided with doors, and one of which is used as a bottom plate and has a notch reserved;
[0020] S2: First, the side cement-based material plate and the bottom cement-based material plate are plugged into each other through the reserved grooves, and then connected through bolts and grouting materials;
[0021] S3: Then, the side cement-based material plates and the top cement-based material plates and the side cement-based material plates are connected by reserved bolts.
[0022] Beneficial effects:
[0023] (1) The sliced cement-based material energy storage box has a box body main structure. When assembling the box, the side cement-based material plate is first plugged into the bottom cement-based material plate through the reserved groove, and then connected through bolts and grouting material. Then, the top cement-based material plate is connected to the side cement-based material plate through the reserved bolts. At this time, the six surfaces are tightly connected and have good sealing. This connection method is simpler than the traditional assembly method. At the same time, the reserved bolt connection method can easily install or remove the top cement-based material plate when needed, which increases the flexibility of the structure.
[0024] (2) The connection between the cement-based material plates in the segmented cement-based material energy storage box is simple, which is particularly suitable for occasions where the structural form or layout needs to be changed frequently. After the device is assembled, it can be flexibly disassembled and assembled to meet the purpose of storing energy of different capacities.
[0025] (3) The sliced cement-based material energy storage box has a lifting structure. After the device is assembled, the servo motor can be started to drive the connecting belts on both sides to rotate through the reducer. Since the two connecting belts are connected to the two bidirectional screws through pulleys, the two bidirectional screws can rotate at the same time, thereby allowing the two groups of threaded blocks to move toward the middle of the bidirectional screws at the same time. Due to the hinge connection between the second hinge seat, the hinge rod and the first hinge seat, the main structure of the box can be lifted up as a whole when the two groups of threaded blocks move, thereby separating the main structure of the box from the ground by a certain distance, preventing the cement-based material plate from being corroded by some other substances from the ground, and reducing the sealing and service life of the main structure of the box.
[0026] (4) The sliced cement-based material energy storage box has a supporting structure. When the servo motor drives the lifting structure to lift the main structure of the box, the servo motor can be stopped at this time, and the four threaded rings can be rotated separately to rotate the threaded rod inside them out of the fixing sleeve. When the threaded rod drives the L-shaped plate to rise to the position of the bottom cement-based material plate, the threaded hole is connected to the fixing hole by bolts to connect and fix the bottom plate to the main structure of the box, thereby preventing the servo motor from working continuously and causing overload short circuit, and also improving the stability of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall appearance structure of the present invention;
[0028] Figure 2 It is a schematic diagram of the structure of the workbench of the present invention;
[0029] Figure 3 It is a schematic diagram of the structure of the connecting piece of the present invention;
[0030] Figure 4 This is a schematic diagram of the structure of the mounting plate of the present invention;
[0031] Figure 5 This is a schematic diagram of the reinforcing rod structure of the present invention;
[0032] Figure 6 It is a schematic diagram of the structure of the reducer of the present invention;
[0033] Figure 7 It is a schematic diagram of the supporting structure of the present invention.
[0034] In the figure: 1. main structure of the box; 101. cement-based material plate; 102. workbench; 103. ladder; 104. fixing hole; 105. mounting plate; 106. first hinge seat; 2. base; 3. lifting structure; 31. fixing seat; 32. bidirectional screw; 33. threaded block; 34. second hinge seat; 35. hinged rod; 36. reinforcing rod; 37. fixing rod; 38. fixing ring; 39. servo motor; 310. reducer; 311. connecting belt; 4. supporting structure; 41. fixing sleeve; 42. threaded ring; 43. threaded rod; 44. L-shaped plate; 45. threaded hole. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] Embodiment 1:
[0037] See also Figure 1-7 A sliced cement-based material energy storage box includes a box main structure 1, which is a cubic structure assembled from six cement-based material plates 101, wherein the four circumferential cement-based material plates 101 serve as side plates of the energy storage box, the top cement-based material plate 101 serves as the top plate of the energy storage box, and the bottom cement-based material plate 101 serves as the bottom plate of the energy storage box.
[0038] The two circumferential cement-based material plates 101 are used to install a closable door, and a notch is reserved on the bottom cement-based material plate 101; when assembling the box, first plug the side cement-based material plate 101 and the bottom cement-based material plate 101 through the reserved notch, and then connect them through bolts and grouting materials; then the side cement-based material plates 101 and the top cement-based material plate 101 and the side cement-based material plate 101 are connected through reserved bolts; at this time, the six surfaces are tightly connected and have good sealing. This connection method is simpler than the traditional assembly method. At the same time, the reserved bolt connection method can easily install or disassemble the top cement-based material plate 101 when needed, which increases the flexibility of the structure. This connection method is suitable for occasions where the structural form or layout needs to be changed frequently, and the device can be flexibly disassembled and assembled after assembly to meet the purpose of energy storage work of different capacities.
[0039] In addition, a workbench 102 and a ladder 103 are provided on one side of the four circumferential cement-based material plates 101 .
[0040] Embodiment 2:
[0041] On the basis of the above-mentioned implementation 1, further, a base 2 is provided at the bottom of the cement-based material plate 101 at the bottom, and a lifting structure 3 is fixedly installed on the base 2 for lifting the main structure 1 of the box body upward as a whole.
[0042] Two groups of fixing holes 104 are opened on both sides of the cement-based material plate 101 at the bottom, and mounting plates 105 are installed on both sides of the bottom of the cement-based material plate 101 at the bottom, and two first hinge seats 106 are arranged at the bottom of the two mounting plates 105 .
[0043] See also Figure 5-6A base 2 is provided at the bottom of the cement-based material plate 101 at the bottom, and a lifting structure 3 is fixedly installed on the base 2, which is used to lift the main structure 1 of the box body upward as a whole. The lifting structure 3 includes: two fixed seats 31 and two fixed rods 37, and the two fixed seats 31 are internally rotatably installed with bidirectional screws 32, and the outer surfaces of the two bidirectional screws 32 are threadedly installed with threaded blocks 33. A second hinge seat 34 is installed on the top of the two threaded blocks 33, and an articulated rod 35 is hingedly installed inside the two second articulated seats 34. One end of the two articulated rods 35 is hingedly connected to the first articulated seat 106, and a reinforcing rod 36 is installed between the two groups of first articulated seats 106. The two fixed rods 37 are fixedly connected to one side of the bottom plate 2, and a fixing ring 38 is installed between the two fixed rods 37. A servo motor 39 is installed inside the fixed ring 38, and a reducer 310 is connected to one side of the servo motor 39. The output shaft of the servo motor 39 passes through the reducer 310 and is rotatably connected to the base plate 2. Two connecting belts 311 are sleeved on the outer surface of the output shaft of the servo motor 39, and the two connecting belts 311 are sleeved on the two bidirectional screws 32 through pulleys.
[0044] By starting the servo motor 39, its output shaft can drive the connecting belts 311 on both sides to rotate through the reducer 310. Since the two connecting belts 311 are connected to the two bidirectional screws 32 through pulleys, the two bidirectional screws 32 can rotate at the same time, thereby allowing the two groups of threaded blocks 33 to move toward the middle of the bidirectional screws 32 at the same time. Due to the hinge of the second hinge seat 34, the hinge rod 35 and the first hinge seat 106, when the two groups of threaded blocks 33 move, the main structure 1 of the box body can be lifted up as a whole, thereby separating the main structure 1 of the box body from the ground by a certain distance, preventing the cement-based material plate 101 from being corroded by some other substances from the ground, and reducing the sealing and service life of the main structure 1 of the box body.
[0045] See also Figure 5 and Figure 7 Two support structures 4 are installed on both sides of the outer surface of the bottom plate 2, and the four support structures 4 include fixing sleeves 41. The four fixing sleeves 41 are fixedly connected to the bottom plate 2, and the tops of the four fixing sleeves 41 are provided with threaded rings 42, and the internal threads of the four threaded rings 42 are provided with threaded rods 43, and the four threaded rods 43 are sleeved with the fixing sleeves 41, and the tops of the four threaded rods 43 are rotatably installed with L-shaped plates 44, and one side of the four L-shaped plates 44 is provided with two threaded holes 45.
[0046] After the servo motor 39 drives the lifting structure 3 to lift the main structure 1 of the box body, the servo motor 39 can be stopped at this time, and the four threaded rings 42 can be rotated separately to screw the threaded rod 43 inside them out of the fixing sleeve 41. When the threaded rod 43 drives the L-shaped plate 44 to rise to the position of the bottom cement-based material plate 101, the threaded hole 45 is connected to the fixing hole 104 by bolts to connect and fix the bottom plate 2 to the main structure 1 of the box body.
[0047] The manufacturing method of the sliced cement-based material energy storage box comprises the following steps:
[0048] S1: Six cement-based material plates 101 are prepared by mixing raw materials, two of which are provided with doors, and the bottom one is provided with a groove;
[0049] S2: First, the side cement-based material plate 101 and the bottom cement-based material plate 101 are plugged into each other through the reserved groove, and then connected by bolts and grouting material;
[0050] S3: Then, the side cement-based material plates 101 and the top cement-based material plates 101 and the side cement-based material plates 101 are connected by reserved bolts.
[0051] Working principle: Six cement-based material plates 101 are prepared by proportioning the raw materials, two of which are provided with doors, and the bottom one is provided with a reserved groove, and then the side cement-based material plates 101 are first plugged with the bottom cement-based material plates 101 through the reserved groove, and then connected by bolts and grouting materials, and then the top cement-based material plates 101 are connected with the side cement-based material plates 101 through the reserved bolts. When the device is used, by starting the servo motor 39, its output shaft can drive the connecting belts 311 on both sides to rotate through the reducer 310. Since the two connecting belts 311 are connected to the two bidirectional screws 32 through pulleys, the two bidirectional screws 32 can rotate at the same time, thereby The two groups of threaded blocks 33 can be moved toward the middle of the bidirectional screw rod 32 at the same time. Due to the hinge of the second hinge seat 34, the hinge rod 35 and the first hinge seat 106, the main structure 1 of the box body can be lifted upward as a whole when the two groups of threaded blocks 33 move, so that the main structure 1 of the box body is separated from the ground by a certain distance. At the same time, by rotating the four threaded rings 42 respectively, the threaded rod 43 inside is screwed out of the fixing sleeve 41. When the threaded rod 43 drives the L-shaped plate 44 to rise to the position of the bottom cement-based material plate 101, the threaded hole 45 is connected to the fixing hole 104 by bolts to connect and fix the bottom plate 2 to the main structure 1 of the box body to prevent the servo motor 39 from working all the time and causing an overload short circuit.
[0052] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0053] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A sliced cement-based material energy storage box, comprising a box main structure (1), characterized in that: The box body main structure (1) is a cubic structure assembled from six cement-based material plates (101), wherein the four cement-based material plates (101) in the circumferential direction serve as side plates of the energy storage box, the cement-based material plate (101) at the top serves as the top plate of the energy storage box, and the cement-based material plate (101) at the bottom serves as the bottom plate of the energy storage box; Two circumferential cement-based material plates (101) are used to install a closable door; A notch is reserved on the bottom cement-based material plate (101), and the side cement-based material plate (101) and the bottom cement-based material plate (101) are plugged into each other through the reserved notch; The side cement-based material plates (101) and the top cement-based material plates (101) and the side cement-based material plates (101) are connected by reserved bolts.
2. The sliced cement-based material energy storage box according to claim 1 is characterized in that: A workbench (102) and a ladder (103) are provided on the cement-based material plate (101) located on the side.
3. The sliced cement-based material energy storage box according to claim 1 or 2, characterized in that: A base (2) is arranged at the bottom of the cement-based material plate (101) at the bottom, and a lifting structure (3) is fixedly installed on the top of the base (2).
4. The sliced cement-based material energy storage box according to claim 3 is characterized in that: The lifting structure (3) comprises two fixed seats (31) and two fixed rods (37), the two fixed seats (31) are internally rotatably mounted with bidirectional screws (32), and the outer surfaces of the two bidirectional screws (32) are threadedly mounted with thread blocks (33).
5. The sliced cement-based material energy storage box according to claim 4 is characterized in that: A second hinge seat (34) is installed on the top of the two threaded blocks (33), and a hinge rod (35) is hingedly installed inside the two second hinge seats (34).
6. The sliced cement-based material energy storage box according to claim 5 is characterized in that: One end of the two hinged rods (35) is hingedly connected to the first hinged seat (107), and a reinforcing rod (36) is installed between the two groups of the first hinged seats (107).
7. The sliced cement-based material energy storage box according to claim 4 is characterized in that: The two fixing rods (37) are fixedly connected to one side of the base (2), and a fixing ring (38) is installed between the two fixing rods (37); A servo motor (39) is installed inside the fixing ring (38), and a reducer (310) is connected to one side of the servo motor (39). The output shaft of the servo motor (39) passes through the reducer (310) and is rotatably connected to the base (2). Two connecting belts (311) are sleeved on the outer surface of the output shaft of the servo motor (39), and the two connecting belts (311) are sleeved on two bidirectional screws (32) through pulleys.
8. The sliced cement-based material energy storage box according to claim 3 is characterized in that: Two supporting structures (4) are installed on both sides of the outer surface of the base (2), and the four supporting structures (4) include fixing sleeves (41); The four fixing sleeves (41) are fixedly connected to the base (2); a threaded ring (42) is arranged on the top of the four fixing sleeves (41); a threaded rod (43) is installed on the internal threads of the four threaded rings (42); the four threaded rods (43) are sleeved with the fixing sleeves (41); an L-shaped plate (44) is rotatably installed on the top of the four threaded rods (43); and two threaded holes (45) are provided on one side of the four L-shaped plates (44).
9. A method for manufacturing a sliced cement-based material energy storage box, characterized in that: The method for preparing the sliced cement-based material energy storage box according to any one of claims 1 to 8 comprises the following steps: S1: six cement-based material plates (101) are prepared by mixing raw materials, two of which are provided with doors, and one of which is used as a bottom plate and has a notch reserved; S2: firstly plug the side cement-based material plate (101) and the bottom cement-based material plate (101) through the reserved notch, and then connect them through bolts and grouting material; S3: Then, the side cement-based material plates (101) and the top cement-based material plates (101) and the side cement-based material plates (101) are connected by reserved bolts.
Citation Information
Patent Citations
Unit cabin type building system
CN102561513A
Attaches prefabricated roof erection bracing support body of wall formula
CN208633584U
Stable prefabricated concrete member
CN212926438U
Container house
CN216665137U
Lifting and shoring jack assembly
US5680732A
