Pipe fitting hoisting device and system and control method
By designing the pipe fitting lifting device, the friction force and motor control of the lifting belt are used to achieve accurate rotation of large-diameter pipe fittings, solving the problem of difficult control of the rotation of pipe fittings in the prior art, and improving welding accuracy and construction efficiency.
Patent Information
- Application Number
- CN202310524700.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-12
AI Technical Summary
During the construction of large-diameter pipelines, the rotation process of spiral welding or straight-sea welding steel pipes is not easy to control, which makes it difficult to ensure welding accuracy and safety.
A pipe fitting lifting device is designed, including a lifting seat, a first motor and a second motor. Through a sling and a lifting belt wound on the motor output shaft, the friction force of the lifting belt realizes axial rotation of the pipe fittings, and controls it. The device and angle sensor accurately control the rotation angle.
The rotation process of pipe fittings is effectively controlled, welding accuracy and construction safety are improved, manpower and equipment demands are reduced, and installation efficiency is improved.
Smart Images

Figure CN118929398A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of long-distance pipeline installation and construction, and in particular to a pipe hoisting device, system and control method. Background Art
[0002] The construction of large-diameter pipelines is usually carried out by pipe section welding, and the pipe fittings used in the construction process are mostly spiral welded steel pipes or straight seam welded steel pipes. According to the requirements of the construction procedure documents, when spiral welded steel pipes or straight seam welded steel pipes are welded together, the pipe welding seams at the pipe ends need to be staggered.
[0003] In the related technology, the steel pipe is usually placed on a mound, slope, etc., and allowed to slide down the slope to make the steel pipe produce a predetermined circumferential rotation angle, thereby staggering the pipe welding seam at the pipe end. However, since the pipe fittings used in the construction of large-diameter pipelines are large in mass and volume, they are difficult to control during the rotation process. Therefore, how to effectively control the rotation process of the pipe fittings is an urgent problem to be solved. Summary of the invention
[0004] Based on this, the present application proposes a pipe lifting device, system and control method to solve the problem of how to effectively control the rotation process of the pipe.
[0005] A first aspect of an embodiment of the present application provides a pipe lifting device, comprising: a lifting seat, a first motor and a second motor connected to the lifting seat, a first sling wound around an output shaft of the first motor, a second sling wound around an output shaft of the second motor, and a lifting belt;
[0006] One end of the lifting belt is connected to an end of the first sling away from the first motor, and the other end of the lifting belt is connected to an end of the second sling away from the second motor.
[0007] Optionally, a first hanging plate is provided at one end of the lifting belt, the plate surface direction of the first hanging plate extends along the width direction of the lifting belt, and the length of the connection part between the first hanging plate and the lifting belt is greater than or equal to the width of the lifting belt;
[0008] A second hanging plate is provided at the other end of the lifting belt, the plate surface direction of the second hanging plate extends along the width direction of the lifting belt, and the length of the connecting portion between the second hanging plate and the lifting belt is greater than or equal to the width of the lifting belt.
[0009] Optionally, the first hanging plate is provided with a first hanging hole, and the second hanging plate is provided with a second hanging hole; a first hook is provided at one end of the first sling away from the first motor, and a second hook is provided at one end of the second sling away from the second motor;
[0010] The first hook is connected to the first hanging hole, and the second hook is connected to the second hanging hole.
[0011] Optionally, the first hanging plate is provided with a first connecting hole, one end of the lifting belt is provided with a second connecting hole, and the first hanging plate and the lifting belt are connected via a first connecting pin provided in the first connecting hole and the second connecting hole;
[0012] The second hanging plate is provided with a third connecting hole, the other end of the lifting belt is provided with a fourth connecting hole, and the second hanging plate and the lifting belt are connected through a second connecting pin provided in the third connecting hole and the fourth connecting hole.
[0013] Optionally, a first sprocket is arranged on the output shaft of the first motor, and the first sling is wound around the first sprocket; a second sprocket is arranged on the output shaft of the second motor, and the second sling is wound around the second sprocket.
[0014] The second aspect of the present application provides a pipe hoisting system, comprising: a hanger, the pipe hoisting device provided in the first aspect of the embodiment of the present application, and a controller;
[0015] The hanger is connected to the hanging seat of the pipe hanging device;
[0016] The controller is connected to the first motor and the second motor of the pipe lifting device respectively, and is used to control the rotation of the output shaft of the first motor and / or the output shaft of the second motor.
[0017] Optionally, the system further comprises: an angle sensor connected to the controller;
[0018] The angle sensor is used to obtain the axial rotation angle of the suspended pipe;
[0019] The controller is also used to control the output shaft of the first motor and the output shaft of the second motor to stop rotating when the axial rotation angle is equal to the target rotation angle.
[0020] Optionally, the pipe lifting device comprises: a first pipe lifting device and a second pipe lifting device;
[0021] The lifting seat of the first pipe lifting device is connected to one end of the hanger, and the lifting seat of the second pipe lifting device is connected to the other end of the hanger.
[0022] A third aspect of the present application provides a control method for a pipe lifting system, wherein the pipe lifting system comprises the pipe lifting device according to the first aspect of the embodiment of the present application, wherein the pipe lifting device comprises a first motor, a second motor and a lifting belt, and the method comprises:
[0023] Placing the pipe to be hoisted in the hoisting belt;
[0024] Obtaining the hoisting control instructions issued based on the user's triggering action;
[0025] Determining a first target rotation motion of the first motor and a second target rotation motion of the second motor according to the hoisting control instruction;
[0026] The first motor is controlled to perform the first target rotation motion, and the second motor is controlled to perform the second target rotation motion.
[0027] Optionally, the hoisting control instruction includes a target rotation angle of the hoisted pipe, and determining the first target rotation action of the first motor and the target rotation action of the second motor according to the hoisting control instruction includes:
[0028] determining a first rotation direction of an output shaft of the first motor and a second rotation direction of an output shaft of the second motor based on the direction of the target rotation angle;
[0029] The controlling the first motor to perform the first target rotation action, and controlling the second motor to perform the second target rotation action, comprises:
[0030] Controlling the output shaft of the first motor to rotate in the first rotation direction, and controlling the output shaft of the second motor to rotate in the second rotation direction;
[0031] During the rotation of the output shaft of the first motor and the output shaft of the second motor, obtaining the axial rotation angle of the suspended pipe;
[0032] When the axial rotation angle is equal to the target rotation angle, the output shaft of the first motor and the output shaft of the second motor are controlled to stop rotating.
[0033] The present application proposes a pipe lifting device, system and control method, wherein the pipe lifting device includes: a lifting seat, a first motor and a second motor connected to the lifting seat, a first sling wound around the output shaft of the first motor, a second sling wound around the output shaft of the second motor, and a lifting belt; one end of the lifting belt is connected to an end of the first sling away from the first motor, and the other end of the lifting belt is connected to an end of the second sling away from the second motor.
[0034] The present application provides a pipe hoisting device, which associates the movement direction of the end of the hoisting belt with the rotation of the first motor output shaft and the second motor output shaft through the first sling and the second sling respectively connected to the two ends of the hoisting belt, thereby realizing the lifting and lowering control of the end of the hoisting belt. Furthermore, in the process of lifting and lowering the end of the hoisting belt, the friction between the hoisted pipe and the surface of the hoisting belt is used to realize the axial rotation of the pipe, and finally the rotation angle of the pipe is controlled by the first motor and the second motor, realizing the effective control of the rotation process of the pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0036] Figure 1 It is a structural schematic diagram of a pipe hanging device provided in an embodiment of the present application;
[0037] Figure 2 is a cross-sectional view of a first hanging plate in a pipe hanging device provided in an embodiment of the present application;
[0038] Figure 3 is a cross-sectional view of a second hanging plate in a pipe hanging device provided in an embodiment of the present application;
[0039] Figure 4 It is a structural schematic diagram of a pipe hoisting system provided in an embodiment of the present application;
[0040] Figure 5 A control method for a pipe hoisting system provided in an embodiment of the present application;
[0041] Figure 6 A method for controlling a pipe hoisting system when a control instruction includes a target rotation angle of the pipe to be hoisted is provided in an embodiment of the present application.
[0042] Reference numerals:
[0043] 1- pipe lifting device, 101- lifting seat, 102- first motor, 103- second motor, 104- first sling, 105- second sling, 106- lifting belt, 107- first hanging plate, 108- second hanging plate, 109- first hanging hole, 110- second hanging hole, 111- first hook, 112- second hook, 113- first connecting hole, 114- second connecting hole, 115- first connecting pin, 116- third connecting hole, 117- fourth connecting hole, 118- second connecting pin, 119- first sprocket, 120- second sprocket, 2- hanger, 3- controller, 4- suspended pipe, 5- angle sensor, 6- control instruction sending device. DETAILED DESCRIPTION
[0044] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0045] The first aspect of the present application proposes an embodiment, such as Figure 1 As shown in the structural schematic diagram of a pipe lifting device, the device comprises:
[0046] A lifting base 101, a first motor 102 and a second motor 103 connected to the lifting base 101, a first sling 104 wound around an output shaft of the first motor 102, a second sling 105 wound around an output shaft of the second motor 103, and a lifting belt 106;
[0047] One end of the lifting belt 106 is connected to an end of the first sling 104 away from the first motor 102 , and the other end of the lifting belt 106 is connected to an end of the second sling 105 away from the second motor 103 .
[0048] The lifting seat 101 is a supporting component of the pipe lifting device 1, and is used to provide a mounting fulcrum for other components of the device. The lifting seat 101 is provided with a connection mechanism connected to the lifting device, such as a connection hanging hole or other types of connection parts. When the pipe lifting device 1 is used, the pipe lifting device 1 and the pipe 4 to be lifted by it are lifted to a preset position away from the ground by a pipe lifting machine or other lifting equipment connected thereto.
[0049] A first motor 102 and a second motor 103 are connected to opposite sides of the sling seat 101. A first sling 104 is wound around the output shaft of the first motor 102. When the first motor 102 rotates, the portion of the first sling 104 extending from the first motor 102 will be extended or shortened as the output shaft rotates. A second sling 105 is wound around the output shaft of the second motor 103. When the second motor 103 rotates, the portion of the second sling 105 extending from the second motor 103 will be extended or shortened as the output shaft rotates.
[0050] The pipe lifting device 1 further includes a lifting belt 106, which is used to carry the pipe 4. One end of the lifting belt 106 is connected to an end of the first sling 104 away from the first motor 102, and the other end is connected to an end of the second sling 105 away from the second motor 103. After the lifting belt 106 is connected to the first sling 104 and the second sling 105, the main part thereof forms a lifting bag for carrying the pipe 4.
[0051] When the output shaft of the first motor 102 rotates, the end of the lifting belt 106 connected to the first sling 104 is lowered or raised as the portion of the first sling 104 extending out of the motor is extended or shortened. Similarly, when the output shaft of the second motor 103 rotates, the end of the lifting belt 106 connected to the second sling 105 is lowered or raised as the portion of the second sling 105 extending out of the motor is extended or shortened. After being placed in the sling pocket formed by the lifting belt 106, when one or both ends of the lifting belt 106 move, the suspended pipe 4 will rotate under the action of the friction between it and the surface of the lifting belt 106.
[0052] When one end of the lifting belt 106 rises or falls with the first motor 102 or the second motor 103, and the other end of the lifting belt 106 is fixed, the suspended pipe 4 will rotate in the sling bag while rising or falling with one end of the lifting belt 106. When one end of the lifting belt 106 rises or falls at a certain speed, and the other end falls or rises at the same speed as the end, the suspended pipe 4 will maintain the current height and rotate in the sling bag. When one end of the lifting belt 106 rises or falls at a certain speed, and the other end rises or falls at the same speed as the end, the suspended pipe 4 will rise or fall with both ends of the lifting belt 106 and remain relatively stationary with the lifting belt 106.
[0053] When one end of the lifting belt 106 rises or falls with the first motor 102 or the second motor 103, and the other end of the lifting belt 106 is fixed, the relationship between the rotation speed of the suspended pipe 4 and the speed of the moving end of the lifting belt 106 (hereinafter referred to as the lifting belt speed) is:
[0054] W=2×V / D×(180 / π)
[0055] Wherein, V is the lifting belt speed, in mm / min; D is the outer wall diameter of the suspended pipe, in mm; π is the circumference of a circle; W is the rotation speed of the suspended pipe, in ° / min.
[0056] Optionally, a first hanging plate 107 is provided at one end of the lifting belt 106, the plate surface direction of the first hanging plate 107 extends along the width direction of the lifting belt 106, and the length of the connection part between the first hanging plate 107 and the lifting belt 106 is equal to the width of the lifting belt 106;
[0057] A second hanging plate 108 is provided at the other end of the lifting belt 106 . The plate surface direction of the second hanging plate 108 extends along the width direction of the lifting belt 106 . The length of the connecting portion between the second hanging plate 108 and the lifting belt 106 is equal to the width of the lifting belt 106 .
[0058] The pipe hoisting device 1 is often used in the construction site of long-distance pipeline installation. The pipe used to build the long-distance pipeline is a large-diameter steel pipe with a large mass. Therefore, the pulling force on the lifting belt 106 is also large during actual use. The lifting belt 106 is made of fabrics such as flexible nylon belts. The part where it is connected to the first sling 104 and the second sling 105 is prone to stress concentration, so it is a vulnerable point in the pipe hoisting device 1. This vulnerable point is prone to breakage under the pulling force of the suspended pipe 4 on the lifting belt 106.
[0059] Therefore, in order to optimize the force on the end of the lifting belt 106 and avoid stress concentration at the portion where the lifting belt 106 is connected to the first sling 104, the lifting belt 106 is provided with a first hanging plate 107 at the portion where the lifting belt 106 is connected to the first sling 104. The plate surface direction of the first hanging plate 107 extends along the width direction of the lifting belt 106, and the length of the portion where the first hanging plate 107 is connected to the lifting belt 106 is equal to the width of the lifting belt 106. Similarly, in order to avoid stress concentration at the portion where the lifting belt 106 is connected to the second sling 105, the lifting belt 106 is provided with a second hanging plate 108 at the portion where the lifting belt 106 is connected to the second sling 105. The plate surface direction of the second hanging plate 108 extends along the width direction of the lifting belt 106, and the length of the portion where the second hanging plate 108 is connected to the lifting belt 106 is equal to the width of the lifting belt 106.
[0060] Optionally, the first hanging plate 107 is provided with a first hanging hole 109, and the second hanging plate 108 is provided with a second hanging hole 110; the end of the first sling 104 away from the first motor 102 is provided with a first hook 111, and the end of the second sling 105 away from the second motor 103 is provided with a second hook 112;
[0061] The first hook 111 is connected to the first hanging hole 109 , and the second hook 112 is connected to the second hanging hole 110 .
[0062] Since the lifting belt 106 is usually made of fabrics such as flexible nylon, and the lifting belt 106 is in a tension state for a long time during use, it is necessary to replace the lifting belt 106 regularly to ensure construction safety. To facilitate the replacement of the lifting belt 106, the lifting belt 106 can be connected to the first sling 104 and the second sling 105 by means of hook hanging holes. Specifically, a first hanging hole 109 is set on the first hanging plate 107, a second hanging hole 110 is set on the second hanging plate 108, a first hook 111 is set at the end of the first sling 104 away from the first motor 102, and a second hook 112 is set at the end of the second sling 105 away from the second motor 103. The lifting belt 106 is connected to the first sling 104 and the second sling 105 by hooking the first hook 111 into the first hanging hole 109 and the second hook 112 into the second hanging hole 110. When the lifting belt 106 needs to be replaced, the first hook 111 is directly separated from the first hanging hole 109 and the second hook 112 is separated from the second hanging hole 110, so that the lifting belt 106 can be quickly disassembled.
[0063] Optionally, the first hanging plate 107 is provided with a first connecting hole 113, one end of the lifting belt 106 is provided with a second connecting hole 114, and the first hanging plate 107 and the lifting belt 106 are connected via a first connecting pin 115 provided in the first connecting hole 113 and the second connecting hole 114;
[0064] The second hanging plate 108 is provided with a third connecting hole 116 , and the other end of the lifting belt 106 is provided with a fourth connecting hole 117 . The second hanging plate 108 and the lifting belt 106 are connected via a second connecting pin 118 provided in the third connecting hole 116 and the fourth connecting hole 117 .
[0065] Before the pipe 4 is hoisted, it is necessary to put the pipe 4 in the sling pocket surrounded by the hoisting belt 106. However, the large-diameter pipes used in pipeline installation have large volume and mass, and are inconvenient to move and transport. If the pipe 4 is directly placed in the sling pocket surrounded by the hoisting belt 106, more tools and personnel are required for the placement process, which will greatly reduce the efficiency of pipeline installation.
[0066] Therefore, in order to reduce the tools and personnel required for placing the suspended pipe 4 and improve the installation efficiency of the pipeline, Figure 2As shown in the cross-sectional view of the first hanging plate in the pipe fitting lifting device shown in FIG. 1 and the cross-sectional view of the second hanging plate in the pipe fitting lifting device shown in FIG. 3 , the pipe fitting lifting device 1 is provided with a first connecting hole 113 on the first hanging plate 107, and a second connecting hole 114 is provided at one end of the lifting belt 106. The first hanging plate 107 and the lifting belt 106 are connected by a first connecting pin 115 provided in the first connecting hole 113 and the second connecting hole 114; a third connecting hole 116 is provided on the second hanging plate 108, and a fourth connecting hole 117 is provided at the other end of the lifting belt 106. The second hanging plate 108 and the lifting belt 106 are connected by a second connecting pin 118 provided between the third connecting hole 116 and the fourth connecting hole 117. When it is necessary to place the pipe 4 to be suspended, the first connecting pin 115 or the second connecting pin 118 is removed from the connecting hole where it is placed, and then the lifting belt 106 is separated from the first hanging plate 107 or the second hanging plate 108. Afterwards, place the end of the lifting belt 106 separated from the hanging plate on the ground, and push the suspended pipe 4 to make it roll from the separated end to the lifting belt 106, and finally reconnect the lifting belt 106 and the hanging plate with the first connecting pin 115 or the second connecting pin 118, so as to finally achieve the quick placement of the suspended pipe 4.
[0067] Optionally, a first sprocket 119 is provided on the output shaft of the first motor 102 , and the first sling 104 is wound around the first sprocket 119 ; a second sprocket 120 is provided on the output shaft of the second motor 103 , and the second sling 105 is wound around the second sprocket 120 .
[0068] In order to improve the efficiency of pipe hoisting and increase the speed of pipe movement and rotation, a first sprocket 119 can be provided on the output shaft of the first motor 102, and a second sprocket 120 can be provided on the output shaft of the second motor 103. By winding the first sling 104 around the first sprocket 119 and the second sling 105 around the second sprocket 120, the speed of the extension or shortening of the part of the sling extending out of the sprocket is accelerated, thereby increasing the speed of pipe movement and rotation.
[0069] The second aspect of the present application proposes an embodiment, showing a Figure 4 As shown in the structural schematic diagram of a pipe lifting system, the system includes:
[0070] A hanger 2, at least one pipe hanging device 1 according to an embodiment of the present application, and a controller 3;
[0071] The hanger 2 is connected to the hanging seat 101 of the pipe hanging device 1;
[0072] The controller 3 is respectively connected to the first motor 102 and the second motor 103 of the pipe lifting device 1 , and is used to control the rotation of the output shaft of the first motor 102 and / or the output shaft of the second motor 103 .
[0073] The pipe hanging system includes at least one pipe hanging device 1 as described in the present application. When two or more pipe hanging devices are provided in the pipe hanging system, the hanger 2 is used to connect the pipe hanging devices 1, and specifically, the hanger 2 is connected to the hanging seat 101 in the pipe hanging device 1.
[0074] In order to enhance the structural strength of the hanger 2, the hanger 2 includes a vertical plate, an anti-bending plate connected to the end of the vertical plate, and a reinforcing rib arranged on the vertical plate, wherein the anti-bending plate can be divided into a transverse anti-bending plate and an oblique anti-bending plate according to the different connection positions between the anti-bending plate and the vertical plate. In addition, the hanger 2 is also provided with a hanger suspension plate for connecting with a pipelayer or other lifting equipment.
[0075] The controller 3 is connected to the first motor 102 and the second motor 103 in the pipe lifting device 1 respectively, and is used to control the rotation of the output shaft of each motor in each pipe lifting device 1. The controller 3 can be an electrical control box. For example, when the pipe 4 to be lifted needs to move up and down while rotating, the controller 3 controls the output shaft of one of the first motor 102 or the second motor 103 to rotate; when the pipe 4 to be lifted needs to rotate at the current height, the controller 3 controls the first motor 102 and the second motor 103 to rotate in opposite directions and at the same speed; when the pipe 4 to be lifted needs to remain relatively stationary with the lifting belt 106 and move up and down, the controller 3 controls the first motor 102 and the second motor 103 to rotate in the same direction and at the same speed.
[0076] Optionally, the pipe lifting system further includes: a control instruction sending device 6 for sending a lifting control instruction to the controller 3 based on a user's triggering action, so that the controller 3 controls the rotation of the first motor 102 and the second motor 103 based on the lifting control instruction.
[0077] The control instruction sending device 6 can be a wireless manual remote control box, and a plurality of control buttons can be arranged on the surface of the box body, and each control button corresponds to a hoisting control instruction. For example, the control buttons include an ascending button, a descending button, a pipe rotation button, etc. When the user presses the pipe rotation button, the controller 3 controls the first motor 102 and the second motor 103 to rotate in opposite directions and at the same speed, so that the suspended pipe 4 rotates with the current height.
[0078] Optionally, the system includes: an angle sensor 5 connected to the controller 3;
[0079] The angle sensor 5 is used to obtain the axial rotation angle of the suspended pipe 4;
[0080] The controller 3 is further configured to control the output shaft of the first motor 102 and the output shaft of the second motor 103 to stop rotating when the axial rotation angle is equal to the target rotation angle.
[0081] In order to accurately control the rotation angle of the suspended pipe 4, the pipe hoisting system further includes an angle sensor 5 connected to the controller 3. The angle sensor 5 is used to obtain the axial rotation angle of the suspended pipe 4, and transmit the axial rotation angle of the suspended pipe 4 to the controller 3 in real time or periodically through the connection with the controller 3. When the axial rotation angle of the suspended pipe 4 is equal to the target rotation angle, the controller 3 controls the output shaft of the first motor 102 and the output shaft of the second motor 103 to stop rotating. In an optional embodiment, the user can send the target rotation angle to the controller 3 through the control instruction sending device 6.
[0082] According to different angle measurement principles, the angle sensor 5 can be divided into multiple types, and different types of angle sensors 5 have different installation positions when in use. Taking a magnetic angle sensor as an example, the magnetic angle sensor needs to be connected to a rotating body when in use. Therefore, when the angle sensor 5 is a magnetic angle sensor, the angle sensor should be connected to the suspended pipe 4.
[0083] In an optional embodiment, when the angle sensor 5 is a magnetic angle sensor, the angle sensor 5 can be integrated into the automatic pipe rotation control box to facilitate the disassembly and assembly of the angle sensor 5 and the suspended pipe 4, and the angle sensor 5 transmits the axial rotation angle to the controller 3. The automatic pipe rotation control box is provided with the angle sensor 5, a wireless signal transmission device connecting the angle sensor 5 and the controller 3, and a battery for supplying power to the angle sensor 5 and the wireless signal transmission device.
[0084] Optionally, the pipe hoisting device 1 comprises: a first pipe hoisting device 1 and a second pipe hoisting device 1;
[0085] The lifting seat 101 of the first pipe lifting device 1 is connected to one end of the hanger 2 , and the lifting seat 101 of the second pipe lifting device 1 is connected to the other end of the hanger 2 .
[0086] In order to further realize the flexible control of the suspended pipe 4 and prevent the suspended pipe from falling due to unbalanced weight, the pipe lifting device 1 includes a first pipe lifting device 1 and a second pipe lifting device 1. The first pipe lifting device 1 and the second pipe lifting device 1 are respectively arranged at both ends of the hanger 2, and the pitch angle of the suspended pipe 4 can be adjusted by respectively adjusting the height of the lifting belt 106 in the first pipe lifting device 1 and the second pipe lifting device 1.
[0087] In addition, the pipe hoisting system is also equipped with a generator set and an external power cord. Different power supply methods can be selected to provide power to the electrical equipment in the pipe hoisting system according to the power supply conditions at the pipeline installation site.
[0088] The third aspect of the present application proposes an embodiment, showing that Figure 5A control method for a pipe hoisting system shown includes:
[0089] Step S101 , placing the pipe 4 to be suspended in the suspension belt 106 .
[0090] Step S102, obtaining a hoisting control instruction issued based on a user triggering action.
[0091] The hoisting control instruction is issued based on the user's triggering action, and is used to represent the user's control intention on the suspended pipe 4. When the user needs to control the suspended pipe 4 to rise, the hoisting control instruction representing the control of the suspended pipe 4 to rise can be sent to the controller 3, and then the controller 3 controls the first motor 102 and the second motor 103 to drive the suspended pipe 4 to rise.
[0092] Step S103 , determining a first target rotation motion of the first motor 102 and a target rotation motion of the second motor 103 according to the hoisting control instruction.
[0093] The controller 3 determines the target rotation motion of the first motor 102 and the target rotation motion of the second motor 103 based on the hoisting control instruction. The first target rotation motion and the second target rotation motion should at least include: the rotation direction of the output shaft of the first motor 102 and the output shaft of the second motor 103.
[0094] Step S104 , controlling the first motor 102 to perform a first target rotation motion, and controlling the second motor 103 to perform a second target rotation motion.
[0095] Optionally, when the hoisting control instruction includes the target rotation angle of the hoisted pipe 4, as Figure 6 A method for controlling a pipe hoisting system when a control instruction includes a target rotation angle of a pipe to be hoisted is shown, the method comprising:
[0096] Step S201 , determining a first rotation direction of an output shaft of the first motor 102 and a second rotation direction of an output shaft of the second motor 103 based on a direction of a target rotation angle.
[0097] The target angle includes a value of the target angle and a direction of the target angle, wherein the direction of the target angle includes a clockwise direction and a counterclockwise direction. The user can send a hoisting control instruction including the target angle to the controller 3 via the control instruction sending device 6 .
[0098] Assuming that the user wants the suspended pipe fitting 4 to rotate at the current height, if the output shaft of the first motor 102 rotates clockwise and the output shaft of the second motor 103 rotates counterclockwise, the suspended pipe fitting 4 can rotate counterclockwise; if the output shaft of the first motor 102 rotates counterclockwise and the output shaft of the second motor 103 rotates clockwise, the suspended pipe fitting 4 can rotate clockwise. Then, when the direction of the target rotation angle is counterclockwise, the first rotation direction is determined as the clockwise rotation direction, and the second rotation direction is determined as the counterclockwise rotation direction. When the direction of the target rotation angle is clockwise, the first rotation direction is determined as the counterclockwise rotation direction, and the second rotation direction is determined as the clockwise rotation direction.
[0099] Step S202 , controlling the output shaft of the first motor 102 to rotate in a first rotation direction, and controlling the output shaft of the second motor 103 to rotate in a second rotation direction.
[0100] After determining the first rotation direction and the second rotation direction, the controller 3 controls the output shaft of the first motor 102 to rotate in the first rotation direction, and at the same time, controls the output shaft of the second motor 103 to rotate in the second rotation direction.
[0101] Step S203 , obtaining the axial rotation angle of the suspended pipe 4 during the rotation of the output shaft of the first motor 102 and the output shaft of the second motor 103 .
[0102] Step S204 , when the axial rotation angle is equal to the target rotation angle, the output shaft of the first motor 102 and the output shaft of the second motor 103 are controlled to stop rotating.
[0103] The angle sensor 5 continuously acquires the axial rotation angle of the suspended pipe 4 during the rotation of the motor, and sends the axial rotation angle of the suspended pipe 4 to the controller 3, so that the controller 3 determines whether the suspended pipe 4 is in the position expected by the user based on the acquired axial rotation angle.
[0104] When the axial rotation angle is equal to the target rotation angle, that is, the direction and value of the axial rotation angle are equal to the direction and value of the target rotation angle, it is determined that the suspended pipe 4 is currently in the position expected by the user. At this time, the output shaft of the first motor 102 and the output shaft of the second motor 103 should be controlled to stop rotating.
[0105] The present application provides a pipe hoisting device, system and control method, wherein the device associates the movement direction of the end of the hoisting belt 106 with the rotation of the output shaft of the first motor 102 and the output shaft of the second motor 103 through the first sling 104 and the second sling 105 respectively connected to the two ends of the hoisting belt 106, thereby realizing the lifting and lowering control of the end of the hoisting belt 106. Furthermore, during the lifting and lowering process of the end of the hoisting belt 106, the friction between the hoisted pipe 4 and the surface of the hoisting belt 106 is used to realize the axial rotation of the pipe, and finally the first motor 102 and the second motor 103 are used to control the rotation angle of the pipe, thereby realizing effective control of the rotation process of the pipe.
[0106] Although the preferred embodiments of the present application have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the embodiments of the present application.
[0107] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or terminal device including the elements.
[0108] The above is a detailed introduction to a pipe lifting device, system and control method provided by the present application. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea; at the same time, for general technical personnel in this field, according to the idea of the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.
Claims
1. A pipe lifting device, It is characterized in that include: A lifting seat, a first motor and a second motor connected to the lifting seat, a first sling wound around an output shaft of the first motor, a second sling wound around an output shaft of the second motor, and a lifting belt; One end of the lifting belt is connected to an end of the first sling away from the first motor, and the other end of the lifting belt is connected to an end of the second sling away from the second motor.
2. The pipe lifting device according to claim 1, It is characterized in that A first hanging plate is provided at one end of the lifting belt, the plate surface direction of the first hanging plate extends along the width direction of the lifting belt, and the length of the connection part between the first hanging plate and the lifting belt is equal to the width of the lifting belt; A second hanging plate is provided at the other end of the lifting belt, the plate surface direction of the second hanging plate extends along the width direction of the lifting belt, and the length of the connecting portion between the second hanging plate and the lifting belt is equal to the width of the lifting belt.
3. The pipe lifting device according to claim 2, It is characterized in that The first hanging plate is provided with a first hanging hole, and the second hanging plate is provided with a second hanging hole; the first sling is provided with a first hook at one end away from the first motor, and the second sling is provided with a second hook at one end away from the second motor; The first hook is connected to the first hanging hole, and the second hook is connected to the second hanging hole.
4. The pipe lifting device according to claim 2, It is characterized in that The first hanging plate is provided with a first connecting hole, one end of the lifting belt is provided with a second connecting hole, and the first hanging plate and the lifting belt are connected through a first connecting pin provided in the first connecting hole and the second connecting hole; The second hanging plate is provided with a third connecting hole, the other end of the lifting belt is provided with a fourth connecting hole, and the second hanging plate and the lifting belt are connected through a second connecting pin provided in the third connecting hole and the fourth connecting hole.
5. The pipe lifting device according to claim 1, It is characterized in that A first sprocket is arranged on the output shaft of the first motor, and the first sling is wound around the first sprocket; a second sprocket is arranged on the output shaft of the second motor, and the second sling is wound around the second sprocket.
6. A pipe lifting system, It is characterized in that include: A hanger, at least one pipe hanging device as described in any one of claims 1 to 5, and a controller; The hanger is connected to the hanging seat of the pipe hanging device; The controller is connected to the first motor and the second motor of the pipe lifting device respectively, and is used to control the rotation of the output shaft of the first motor and / or the output shaft of the second motor.
7. The pipe lifting system according to claim 6, It is characterized in that The system includes: an angle sensor connected to the controller; The angle sensor is used to obtain the axial rotation angle of the suspended pipe; The controller is also used to control the output shaft of the first motor and the output shaft of the second motor to stop rotating when the axial rotation angle is equal to the target rotation angle.
8. The pipe lifting system according to claim 6, It is characterized in that The pipe hoisting device comprises: a first pipe hoisting device and a second pipe hoisting device; The lifting seat of the first pipe lifting device is connected to one end of the hanger, and the lifting seat of the second pipe lifting device is connected to the other end of the hanger.
9. A control method for a pipe hoisting system, It is characterized in that The method is applied to the pipe hoisting system according to any one of claims 6 to 8, wherein the pipe hoisting device in the pipe hoisting system comprises a first motor, a second motor and a hoisting belt, and the method comprises: Placing the pipe to be hoisted in the hoisting belt; Obtaining the hoisting control instructions issued based on the user's triggering action; Determining a first target rotation motion of the first motor and a second target rotation motion of the second motor according to the hoisting control instruction; The first motor is controlled to perform the first target rotation motion, and the second motor is controlled to perform the second target rotation motion.
10. The control method of the pipe hoisting system according to claim 9, It is characterized in that The hoisting control instruction includes a target rotation angle of the hoisted pipe, and determining a first target rotation action of the first motor and a target rotation action of the second motor according to the hoisting control instruction includes: determining a first rotation direction of an output shaft of the first motor and a second rotation direction of an output shaft of the second motor based on the direction of the target rotation angle; The controlling the first motor to perform the first target rotation action, and controlling the second motor to perform the second target rotation action, comprises: Controlling the output shaft of the first motor to rotate in the first rotation direction, and controlling the output shaft of the second motor to rotate in the second rotation direction; During the rotation of the output shaft of the first motor and the output shaft of the second motor, obtaining the axial rotation angle of the suspended pipe; When the axial rotation angle is equal to the target rotation angle, the output shaft of the first motor and the output shaft of the second motor are controlled to stop rotating.