Limestone calcining process

By partitioning preheating and particle size distinction in limestone calcination process, the problem of preheating is solved, the efficiency and quality of limestone calcination are improved, and energy consumption and production costs are reduced.

CN118930078AActive Publication Date: 2024-11-12XIANGFEN XINGSHENG BUILDING MATERIALS CO LTD

Patent Information

Application Number
CN202411176687.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-12
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

During the limestone calcination process, the gap between the coarse material particles and the fine material particles on the preheating platform is blocked by the fine material, resulting in poor penetration of hot air, affecting the uniform preheating and decomposition of the raw materials, leading to raw and overburning, and seriously affecting the phenomenon of burning and overburning. The quality of calcium oxide.

Method used

By setting the first and second preheating zones in the preheater, inputting coarse materials from the top and fine materials from the side respectively, and preheating with high-temperature gas is used to ensure that the hot air can completely penetrate the coarse material layer and improve preheating Effect. The coarse and fine materials are preheated in different preheating zones respectively, with particle sizes divided into 1cm to 4cm and less than 1cm. The structure of the blanking tube and preheating table is adjusted to optimize the thickness of the material layer and the preheating effect.

Benefits of technology

The preheating effect of coarse and fine materials is improved, ensuring their uniform decomposition in the rotary kiln, improving the quality of calcium oxide, reducing energy loss and production costs, and improving resource utilization and production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118930078A_ABST
    Figure CN118930078A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of limestone calcination, and particularly discloses a limestone calcination process which comprises a crushing procedure, a material screening procedure, a preheating procedure and a calcination procedure, a preheater in the preheating procedure comprises a first preheating area and a second preheating area, and coarse materials and fine materials are screened out through the crushing procedure and the material screening procedure; coarse materials are input into a first preheating area and a second preheating area from the top of the preheater to be preheated, and enter a calcination procedure after preheating; and the fine material is input into the second preheating area from the side part of the preheater and enters a calcining process after being preheated. According to the invention, the preheating effect on coarse particles is improved; fine particles are fully utilized, the preheating effect on the fine particles is improved, the fine particles can be decomposed more completely after entering the rotary kiln, the quality of calcium oxide is further improved, the energy loss is reduced on the whole, the utilization rate of raw materials and resources and the overall production efficiency are improved, and the production cost is greatly saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of limestone calcining, and in particular relates to a limestone calcining process. Background Art

[0002] The rotary kiln and its matching preheater are the main equipment in the limestone calcining system. The preheater plays an important role in energy saving and consumption reduction, improving clinker quality, extending the service life of rotary kiln refractory bricks and kiln body, improving operation rate, expanding resource utilization, and reducing harmful gas NO. x Emissions play a decisive role.

[0003] When limestone is calcined, it is usually fed uniformly from the top of the preheater. The limestone raw materials are transported to the preheating platform of the preheating chamber through a drop pipe, and then the preheated raw materials are pushed out by a pushing mechanism, so that the raw materials enter the rotary kiln for calcination. However, during the preheating process, the limestone raw materials will accumulate on the preheating platform, and the gaps formed by the coarse particles will be blocked by the fine particles, resulting in the inability of hot air to penetrate the material layer, causing poor ventilation, which will not only lead to incomplete combustion of coal powder, but also the inability to evenly and fully preheat the raw materials, and the raw materials entering the rotary kiln cannot be evenly and fully decomposed, which will lead to the occurrence of raw burning, over-burning and other phenomena, which seriously affect the quality of calcium oxide. Summary of the invention

[0004] In order to overcome the deficiencies of the prior art and solve the problems existing in the prior art, the present invention provides a limestone calcining process.

[0005] The present invention is achieved through the following technical solutions.

[0006] The present invention provides a limestone calcining process, which comprises a crushing process, a screening process, a preheating process and a calcining process. The preheating process comprises a preheater, and the preheater comprises a first preheating zone and a second preheating zone. Coarse materials and fine materials are screened out through the crushing process and the screening process; the screened coarse materials are input into the first preheating zone from the top of the preheater for preheating, and after the coarse materials are preheated in the first preheating zone, they are preheated again in the second preheating zone and then enter the calcining process for calcination; the screened fine materials are input into the second preheating zone from the side of the preheater, and after the fine materials are preheated in the second preheating zone, they enter the calcining process for calcination.

[0007] As a further improvement of the above solution, the coarse material is a limestone raw material with a minimum particle size of not less than 1 cm, and the fine material is a limestone raw material with a maximum particle size of not more than 1 cm.

[0008] As a further improvement of the above solution, the coarse material is a limestone raw material with a particle size of 1 cm to 4 cm, and the fine material is a limestone raw material with a maximum particle size not greater than 1 cm.

[0009] As a further improvement of the above scheme, the preheating process is: using the high-temperature gas generated in the calcining process to introduce it into the second preheating zone and the first preheating zone through a high-temperature induced draft fan from the rotary kiln to preheat the input raw materials.

[0010] As a further improvement of the above scheme, the preheating temperature of the first preheating zone is 850°C to 1050°C, and the preheating pressure is -1500Pa to -2500Pa.

[0011] As a further improvement of the above scheme, the preheating temperature of the second preheating zone is 950 to 1100°C, and the preheating pressure is -80 to -200Pa.

[0012] As a further improvement of the above solution, a preheating table for receiving coarse materials is provided in the second preheating zone, and a fine material inlet is constructed on the side wall of the preheater in the second preheating zone.

[0013] As a further improvement of the above scheme, the preheating table is constructed in a ring shape, a circular discharge port is constructed in the middle of the preheating table, the ring width of the preheating table is not less than 1.5m, and a slope is constructed on one side of the preheating table close to the circular discharge port, and the angle between the slope and the horizontal plane is 20°.

[0014] As a further improvement of the above solution, a coarse material bin is located above the first preheating zone, and the coarse material bin is connected to the first preheating zone via a plurality of material dropping pipes, and the material dropping pipes are telescopic pipes.

[0015] As a further improvement of the above scheme, according to the particle size of the coarse material, the distance between the lower port of the drop pipe and the preheating table is adjusted to adjust the material layer thickness on the preheating table, and the adjustment range of the distance is 1m to 2.8m.

[0016] The beneficial effects achieved by the present invention are:

[0017] Compared with the prior art, the limestone calcining process provided by the present invention modifies the feeding mode into top coarse material feeding and side fine material feeding according to the different particle sizes of the limestone, separates the coarse material particles from the fine material particles, and preheats the two separately, so that the gaps between the coarse material particles will not be blocked by the fine material particles, and the hot air can completely penetrate the coarse material layer, so that it has a larger preheating area that can directly contact with the hot air, improves the preheating effect of the coarse material particles, and enables them to be more completely decomposed after entering the rotary kiln, thereby improving the quality of calcium oxide; at the same time, compared with the prior art, due to the technology proposed by the present invention, The problem cannot be solved. Most manufacturers choose to directly remove the fine particles, increase the preheating temperature or directly use coarse particles as raw materials. In the present invention, the fine particles are fully and completely utilized. Due to their small particle size and increased preheating area, better preheating effect can be achieved in the process of sliding from the second preheating zone to the rotary kiln, so that they can be more completely decomposed after entering the rotary kiln, thereby improving the quality of calcium oxide. In summary, the limestone calcining process provided by the present invention reduces energy loss, improves the utilization rate of raw materials and resources and the overall production efficiency, and greatly saves production costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic flow diagram of the process of the present invention;

[0019] Figure 2 It is a structural schematic diagram of the preheater in the present invention;

[0020] Figure 3 It is a schematic diagram of the structure of the preheater and the rotary kiln in the present invention;

[0021] Figure 4 It is a structural schematic diagram of the preheating station in the present invention;

[0022] Figure 5 It is a structural schematic diagram of the regulating mechanism in the present invention;

[0023] Figure 6 The present invention Figure 2 A magnified view of middle;

[0024] Figure 7 The present invention Figure 5 Enlarged view of B.

[0025] In the figure: coarse material bin 1, coarse material inlet 101, first preheating zone 2, second preheating zone 3, rotary kiln 4, discharge chute 5, drop pipe 6, outer upper pipe 601, inner lower pipe 602, lifting ring 603, preheating table 7, circular discharge port 701, slope 702, pushing mechanism 8, fine material inlet 9, high temperature resistant layer 901, first screw conveyor 10, second screw conveyor 11, extension port 1101, fine material feeding hopper 12, weighing and transporting belt 13, elevator 14, interlayer 15, adjustment mechanism 16, electric hoist 1601, hook 1602. DETAILED DESCRIPTION

[0026] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0027] like Figures 1 to 7 As shown, a limestone calcining process provided by the present invention includes a crushing process, a screening process, a preheating process and a calcining process. The preheating process includes a preheater, and the preheater includes a first preheating zone 2 and a second preheating zone 3. The limestone material is crushed by the crushing process, and the coarse material and the fine material are screened out by the screening process. The screened coarse material is input from the top of the preheater to the first preheating zone 2 for preheating. After the coarse material is preheated in the first preheating zone 2, it is preheated again in the second preheating zone and then enters the calcining process for calcination. The screened fine material is input from the side of the preheater to the second preheating zone 3. After the fine material is preheated in the second preheating zone 3, it enters the calcining process for calcination. In addition, the side wall of the second preheating zone 3 of the preheater is a chute structure with a certain slope, which is convenient for the material to slide down into the rotary kiln 4.

[0028] Furthermore, the coarse material is a limestone raw material with a minimum particle size of not less than 1 cm, and the fine material is a limestone raw material with a maximum particle size of not more than 1 cm. Specifically, in this embodiment, the coarse material is a limestone raw material with a particle size of 1 to 4 cm.

[0029] Furthermore, in the preheating process, the high-temperature gas generated in the calcining process is introduced into the second preheating zone 3 and the first preheating zone 2 through the high-temperature induced draft fan from the rotary kiln 4 to preheat the raw materials. The preheating temperature of the second preheating zone 3 is 950-1100°C, and the preheating pressure is -80--200Pa. The preheating temperature of the first preheating zone 2 is 850-1050°C, and the preheating pressure is -1500Pa--2500Pa. The preheating effect of the coarse particle material preheated in the first preheating zone 2 can reach 30%, that is, 30% of the coarse particles from the outside to the inside are decomposed into calcium oxide. The preheating effect of the fine particle material preheated in the second preheating zone 3 can reach 50%, that is, 50% of the fine particle material from the outside to the inside is decomposed into calcium oxide, and then enters the rotary kiln 4.

[0030] Specifically, the preheater is provided with a coarse material bin 1, a first preheating zone 2, a second preheating zone 3 and a discharge chute 5 connected to the feed port of the rotary kiln 4 at the bottom from top to bottom. The side wall of the second preheating zone 3 has a certain slope and smoothly transitions with the discharge chute 5 to facilitate the entry of fine materials into the rotary kiln 4.

[0031] Furthermore, a coarse material inlet 101 is provided at the top of the coarse material bin 1, and the coarse material bin 1 is connected to the first preheating zone 2 through a plurality of drop pipes 6. A preheating table 7 for receiving the drop is provided in the second preheating zone 3, and a pushing mechanism 8 for pushing the material on the preheating table 7 into the discharge chute 5 is provided on the preheater. The pushing mechanism is a prior art and will not be described in detail here.

[0032] A fine material inlet 9 is configured on the side wall of the preheater of the second preheating zone 3, and the fine material inlet 9 is externally connected to a fine material feeding mechanism.

[0033] Furthermore, in the present embodiment, 12 to 14 drop tubes 6 are provided, the drop tubes 6 are distributed in a ring shape, and a push mechanism 8 is provided corresponding to each drop tube 6 .

[0034] Furthermore, the preheating table 7 is constructed in a ring shape, and a circular discharge port 701 is constructed in the middle of the preheating table 7 . The pushing mechanism 8 pushes the falling material into the circular discharge port 701 and drops it to the discharge chute 5 .

[0035] Furthermore, the width of the preheating station 7 is not less than 1.5 m.

[0036] Furthermore, a slope 702 is constructed on one side of the preheating table 7 close to the circular discharge port 701. The angle between the slope 702 and the horizontal plane is 20 degrees, which facilitates the coarse material to slide into the rotary kiln 4 and prevents the pusher head of the pusher mechanism 8 from extending excessively.

[0037] Furthermore, the lower end of the blanking pipe 6 extends into the first preheating zone 2, and the distance between the lower end of the blanking pipe 6 and the upper surface of the preheating table 7 is 1m to 2.8m.

[0038] Specifically, the fine material feeding mechanism includes a first screw conveyor 10 and a second screw conveyor 11. The discharge port of the first screw conveyor 10 is connected to the feed port of the second screw conveyor 11, and the discharge port of the second screw conveyor 11 is connected to the fine material inlet 9. The feed port of the first screw conveyor 10 is externally connected to a feeding mechanism.

[0039] Specifically, the first screw conveyor 10 is located above the second screw conveyor 11 , the discharge port of the first screw conveyor 10 is downwardly connected to the feed port of the second screw conveyor 11 , and the discharge port of the second screw conveyor 11 is connected to the fine material inlet 9 .

[0040] Furthermore, a high temperature resistant layer 901 is provided on the inner wall of the fine material inlet 9, and the high temperature resistant layer 901 is made of refractory bricks to prevent the discharge port of the second screw conveyor 11 from being deformed due to high temperature.

[0041] Furthermore, the discharge port of the second screw conveyor 11 is connected to the fine material inlet 9 via an extension port 1101 , and the extension port 1101 is made of heat-resistant steel to prevent the extension port 1101 from being deformed.

[0042] Furthermore, the length of the extension port 1101 is 30 to 50 cm, and the extension port 1101 can be integrated with the discharge port of the second screw conveyor 11. While avoiding damage to the second screw conveyor 11 caused by high temperature, the material is squeezed forward and accumulated in the extension port 1101 to form a seal, which plays a good role in locking the wind and preventing hot air from leaking out and causing problems in the production system.

[0043] Furthermore, the blade thickness of the first screw conveyor 10 is not less than 10 mm. The limestone raw material particles are hard in texture, so the blades are prevented from being deformed or stuck.

[0044] Furthermore, to prevent the shaft end of the second screw conveyor 11 from being deformed due to high temperature, the second screw conveyor 11 is a shaftless screw conveyor, and the blade thickness of the second screw conveyor 11 is not less than 15 mm. The limestone raw material particles are hard, so deformation or jamming of the blades is avoided.

[0045] Specifically, the feeding mechanism includes a fine material feeding hopper 12, a weighing and conveying belt 13 is arranged below the fine material feeding hopper 12, a hoist 14 is arranged at the tail end of the weighing and conveying belt 13, and the discharge port of the hoist 14 is connected to the feed port of the first screw conveyor 10 from top to bottom.

[0046] Furthermore, in order to ensure production efficiency and production benefits, in the prior art, the rotary kiln has strict requirements on the particle size of raw material particles, and usually directly calcines limestone raw material particles with a particle size of 2cm to 4cm. However, the maximum recovery rate of raw material particles with a particle size of 2cm to 4cm does not exceed 60% during the crushing process, which is a great waste for rotary kiln calcination mines. The remaining particles below 2cm cannot be reasonably utilized. Therefore, the price of limestone raw materials with a particle size of 2cm to 4cm will be much higher than that of 1cm to 2cm, which increases the production cost. The present invention solves the problem of calcining particles below 1cm by feeding fine materials from the side, and makes further improvements to limestone raw material particles with a particle size of 2 to 4cm.

[0047] Further improvement, in the prior art, the length of the drop tube 6 is selected according to the actual production demand, and the length is fixed. The present invention has made a more in-depth study on the above problem, and the drop tube 6 is changed to a telescopic tube structure. The principle is that the material has a material layer thickness on the preheating table, and the material layer thickness depends on the distance between the lower end of the drop tube 6 and the upper surface of the preheating table 7. In this embodiment, for raw material particles with a particle size of 2cm to 4cm, a tube-to-table distance of 2.8m is adopted. Under this distance, raw material particles with a particle size of 2cm to 4cm can maintain sufficient gaps between each other, so that hot air can penetrate smoothly and achieve the expected preheating effect, but 2.8m The spacing between the tube platforms cannot be applied to 1cm~2cm. Since the particle size of the raw materials with a particle size of 1cm~2cm is smaller, the material layer height is too high, which will cause the hot air to be unable to penetrate the material layer, resulting in poor ventilation, and then incomplete combustion of the coal powder. The raw materials cannot be fully preheated, and the insufficiently preheated raw materials cannot be evenly and fully decomposed after entering the rotary kiln 4, resulting in raw burning and overburning, affecting the quality of calcium oxide. Therefore, by changing the drop tube 6 to a telescopic tube structure, the lower end of the drop tube 6 can be lowered, and then after adjusting the material layer, when the raw material particles with a particle size of 1cm~2cm are calcined in this embodiment, the lower end of the drop tube drops to 1m above the upper surface of the preheating platform 6.

[0048] Specifically, the material dropping pipe 6 is a telescopic pipe. According to the particle size of the coarse material, the distance between the lower end of the material dropping pipe 6 and the preheating table 7 is adjusted to adjust the material layer thickness on the preheating table 7. The adjustment range of the distance is 1m to 2.8m.

[0049] Specifically, an interlayer 15 is provided between the coarse material bin 1 and the first preheating zone 2, and the drop pipe 6 includes an outer upper tube 601, which is located in the interlayer 15 and fixed to the bottom of the coarse material bin 1 and communicated with the drop port at the bottom of the coarse material bin 1, and the outer upper tube 601 is slidably connected with the inner lower tube 602, and the lower end of the inner lower tube 602 extends into the first preheating zone 2, and an adjusting mechanism 16 for adjusting the distance between the lower end of the inner lower tube 602 and the upper surface of the preheating table 7 is provided in the interlayer 15, and the adjustment range of the distance is 1m to 2.8m.

[0050] Specifically, compared to the telescopic tube structure in which the inner tube is on the top and the outer tube is on the bottom, in this embodiment, the outer upper tube 601 and the inner lower tube 602 can also play a good sealing role to prevent hot air from leaking out.

[0051] Specifically, the adjustment mechanism 16 is an electric hoist 1601 installed at the bottom of the coarse material bin 1. The electric hoist 1601 has a hook 1602. A hanging ring 603 is provided on the outer wall of the inner lower tube 602 corresponding to the hook 1602. The hanging ring is located in the interlayer 15. The electric hoist 1601 is a chain electric hoist or a wire rope electric hoist.

[0052] Specifically, the use of electric hoist 1601 is the preferred solution, which is more convenient, faster, and saves manpower. According to the actual production scale, there can be other implementation solutions. For example, a beam or pulley is set at the bottom of the coarse material bin 1, and the lifting ring 603 is directly pulled by a pull rope by manpower, and then the pulling end of the pull rope is fixed to achieve the effect of adjusting the height of the lower port of the inner lower tube 602.

[0053] The above describes in detail the implementation modes of the present invention in conjunction with the accompanying drawings, but the present invention is not limited to the above implementation modes. The implementation modes can still be changed within the knowledge scope of ordinary technicians in the field. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A limestone calcining process, comprising a crushing process, a screening process, a preheating process and a calcining process, wherein the preheating process comprises a preheater, and the preheater comprises a first preheating zone (2) and a second preheating zone (3). Features: The coarse and fine materials are selected through the crushing process and the screening process; The screened coarse material is fed from the top of the preheater into the first preheating zone (2) for preheating. After the coarse material is preheated in the first preheating zone (2), it is preheated again in the second preheating zone (3) and then enters the calcination process for calcination. The screened fine material is input into the second preheating zone (3) from the side of the preheater. After the fine material is preheated in the second preheating zone (3), it enters the calcination process for calcination.

2. A limestone calcining process according to claim 1, Features: The coarse material is a limestone raw material with a minimum particle size of not less than 1 cm, and the fine material is a limestone raw material with a maximum particle size of not more than 1 cm.

3. A limestone calcining process according to claim 1, Features: The coarse material is a limestone raw material with a particle size of 1 cm to 4 cm, and the fine material is a limestone raw material with a maximum particle size not greater than 1 cm.

4. A limestone calcining process according to claim 1, Features: The preheating process comprises: utilizing the high temperature gas generated in the calcining process to be introduced into the second preheating zone (3) and the first preheating zone (2) through a high temperature induced draft fan from a rotary kiln (4) to preheat the input raw materials.

5. A limestone calcining process according to claim 1, Features: The preheating temperature of the first preheating zone (2) is 850°C to 1050°C, and the preheating pressure is -1500Pa to -2500Pa.

6. A limestone calcining process according to claim 1, Features: The preheating temperature of the second preheating zone (3) is 950 to 1100°C, and the preheating pressure is -80 to -200Pa.

7. A limestone calcining process according to claim 1, Features: A preheating table (7) for receiving coarse materials is arranged in the second preheating zone (3), and a fine material inlet (9) is constructed on the side wall of the preheater of the second preheating zone (3).

8. A limestone calcining process according to claim 7, Features: The preheating table (7) is constructed in a ring shape, a circular discharge opening (701) is constructed in the middle of the preheating table (7), the ring width of the preheating table (7) is not less than 1.5 m, and a slope (702) is constructed on one side of the preheating table (7) close to the circular discharge opening (701), and the angle between the slope (702) and the horizontal plane is 20°.

9. A limestone calcining process according to claim 7, Features: Above the first preheating zone (2) is a coarse material bin (1), and the coarse material bin (1) and the first preheating zone (2) are connected via a plurality of drop pipes (6), and the drop pipes (6) are telescopic pipes.

10. A limestone calcining process according to claim 9, Features: According to the particle size of the coarse material, the distance between the lower end of the drop pipe (6) and the preheating table (7) is adjusted to adjust the thickness of the material layer on the preheating table (7), and the adjustment range of the distance is 1m to 2.8m.

Citation Information

Patent Citations

  • Energy-conservation and emission-reduction type active lime calcination method and apparatus

    CN103304157A

  • Internal circulation type fine lime shaft kiln and calcination method thereof

    CN109160749A

  • Limestone calcining device

    CN118912897A

  • Energy conservation and emission reduction type production device for active lime

    CN202482227U

  • Preheater for active lime production line

    CN219771994U

Cited By

  • Rotary kiln mixed material calcining method for calcining limestone with high pulverization rate

    CN121377570A

  • Rotary kiln staged zone calcination process

    CN122774871A