Steel box girder for bridge and manufacturing method
By using a trapezoidal cross-section design and a precise drilling and welding method for manufacturing steel box girders, the problems of excessive weight and processing quality were solved, achieving lightweight and efficient bridge construction.
Patent Information
- Application Number
- CN202310529905.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-11
- Publication Date
- 2024-11-12
AI Technical Summary
The existing steel box girders are too heavy, and the processing quality during manufacturing is substandard, resulting in extended construction period and increased construction costs.
The steel box girder structure, designed with a trapezoidal cross section, is composed of spliced box bodies, including a bottom plate, web plate, top plate, diaphragms, ribs, and stiffening plates. Precise drilling and welding are carried out using templates. The manufacturing method of processing the top first and then flipping it over is adopted to reduce overhead welds. The welding methods of gas shielded welding and submerged arc welding are combined, and the process parameters are optimized.
The overall weight of the steel box girder was reduced, the welding quality was improved, the requirements for manufacturing and transportation equipment were reduced, and the bridge installation period was shortened.
Smart Images

Figure CN118932839A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of steel box girders for construction, and in particular to a steel box girder for bridges and a manufacturing method thereof. Background Art
[0002] At present, steel box girder structures have been widely used in the process of building construction. For example, in the field of bridges, the structural design of steel box girders is relatively complex and has high quality requirements. In the actual production process, steel box girders are often reworked due to unqualified quality, resulting in extended construction period and increased construction costs. In addition, the steel box girder itself is composed of steel structure, which makes it heavier and more demanding on the equipment required for its manufacturing and handling. Summary of the invention
[0003] The present invention provides a box column and a manufacturing method thereof, and aims to provide a steel box girder for a bridge and a manufacturing method thereof, and aims to solve the problems of excessive weight of the steel box girder and processing quality during the manufacturing process of the steel box girder in the prior art.
[0004] In order to achieve the above object, the present invention adopts the following scheme: The present invention provides a steel box girder, which includes a plurality of box bodies spliced with each other, wherein the box bodies include: a bottom plate; a web plate, wherein the number of the web plates is two, and the web plates are obliquely arranged at the left and right edges of the bottom plate, and the inclination direction of the web plates is toward the two sides of the bottom plate; a top plate, wherein the top plate is arranged on the top of the web plate, and the top plate is parallel to the bottom plate; a plurality of transverse partitions, wherein the plurality of transverse partitions are arranged between the web plates on adjacent sides, and the bottom of the transverse partitions contacts the upper surface of the bottom plate; and a plurality of rib plates, wherein the plurality of rib plates are arranged on the surface of one side close to the web plate.
[0005] Optionally, a plurality of clamping plates are arranged in parallel on the bottom plate along its width direction; a plurality of clamping plates are arranged in parallel on the surface of one side close to the web along its height direction; a plurality of slots for accommodating the clamping plates are arranged on the edge of the transverse partition; wherein, when the transverse partition is arranged between the webs on two adjacent sides, the slots at the bottom and both side edges of the transverse partition correspond to the clamping plates on the bottom plate and the web to achieve clamping connection.
[0006] Optionally, the top plate disposed on the top of the web can be inserted into the slot on the diaphragm.
[0007] Optionally, the cross-sectional shape of the rib plate is T-shaped, and a plurality of the clamping grooves are provided on the rib plate, wherein when the rib plate is provided on the web plate, the clamping grooves on the rib plate are clamped to the clamping plate on the web plate.
[0008] Optionally, it also includes a template, which is provided with drill holes; when adjacent box bodies along the length direction of the steel box girder are spliced, the top plate, the web plate, the bottom plate, and the pallet that are in contact with each other are provided with the drill holes, and the templates are respectively placed at the connection points of the top plate, the web plate, the bottom plate, and the pallet, and the drill holes on the template correspond to the drill holes on the top plate, the web plate, the bottom plate, and the pallet.
[0009] Optionally, it also includes a plurality of cross beams, which are sequentially arranged between adjacent box bodies along the length direction of the steel box beam; both sides of the cross beam are connected to the webs of the adjacent box bodies on both sides through steel beam corbels; a drill hole is provided between the top of the cross beam and the top plate of the box body, and the top of the cross beam is connected to the top plate of the box body through the template; and it also includes a longitudinal beam, which is arranged between adjacent cross beams.
[0010] Optionally, a stiffening plate is further included, wherein the stiffening plate is arranged on the diaphragm.
[0011] The present invention provides a method for manufacturing a steel box beam, characterized in that it comprises the following steps: S100, blanking: processing the components that make up the box body, including the production and processing of the top plate, belly plate, bottom plate, diaphragm, pallet and rib plate, and then shot blasting, rust removal and painting; S200, tyre frame erection: tyre frame erection shall be carried out according to the drawings. A tyre frame shall be provided at the bottom of the box body transverse partition. The length of the tyre frame shall be at least sufficient for the production and assembly of three boxes; S300, make the box, including: 1) Assemble the components of the bottom plate and the web plate separately: weld the clamping plate to the bottom plate and the web plate according to the predetermined position, and flame correct the uneven parts after welding; 2) Assemble the bottom plate, web plate, and diaphragm in the following order: ① Place the top plate on the tire frame, confirm the distance between adjacent top plates, and temporarily fix them with angle steel; ② Assemble the diaphragm: The top plate and the groove on the diaphragm are matched, and the diaphragm is vertically set between the adjacent top plates; ③ Assemble the web and ribs: the slots on the ribs match the clamps on the webs, and the ribs are set on the webs; the clamps on the webs match the slots on both sides of the diaphragms, and the webs are set on the diaphragms; the top plate and the webs are welded by root cleaning; ④ Welding seams, including: welds between diaphragms and webs, welds between diaphragms and top plates, welds between ribs and webs, and full penetration welds between webs and top plates; ⑤ Raise the two ends of the top plate according to the length of the box. The ratio of the height of the two ends of the top plate to the length of the box is 1:1000; 3) After welding is completed, turn it over so that the top originally located on the tire frame is turned over to the top of the box; 4) Assemble the bottom plate and the welded part of the box: Place the bottom plate on the tire frame and fix it through the horse plate. The clamping plate on the bottom plate matches the clamping groove of the diaphragm. Set the welded part of the box on the bottom plate and weld it. The web plate and the bottom plate are fully penetrated, and the diaphragm and the web plate clamping plate are welded to the root. The box is completed; S400, simultaneously manufacturing two sections of box bodies on the tire frame along the width direction of the steel box beam according to steps S100-S300, and controlling the distance between the two sections of box bodies; S500, assemble the cross beam and the longitudinal beam between the two sections of the box in S400, and drill matching holes between the cross beam and the longitudinal beam, and between the cross beam and the steel beam corbel through the template; S600, simultaneously with step S400, manufacturing and assembling two sections of box bodies along the length direction of the steel box beam on the tire frame according to steps S100-S300; S700, assemble the cross beam and longitudinal beam between the two sections of the box in S600; drill matching holes between the cross beam and the longitudinal beam, and between the cross beam and the steel beam corbel through the template; S800, using templates to drill holes in the adjacent two sections of the box body along the length direction of the steel box beam obtained by S400-S500 and S600-S700 in sequence; S900, at the same time as step S400, two sections of box bodies are manufactured and assembled on the tire frame according to steps S100-S300 along the length direction of the steel box beam, the cross beam and the longitudinal beam are assembled between the two sections of box bodies, and matching holes are drilled between the cross beam and the longitudinal beam, and between the cross beam and the steel beam bracket through the template; the template is used to sequentially match the two adjacent sections of box bodies along the length direction of the steel box beam obtained in S900 and S600-S700; S1000, assemble the stiffening plate, the stiffening plate adopts the de-installation welding process, the processing sequence is: ① The transverse partition at the end of the box: a. Assembly and welding of the diaphragm; b. Assembly of the webs and stiffening plates on both sides; c. Assembly and welding of the inner stiffening plate, and coating of the sealing area after welding; d. Assembly and welding of the outer stiffening plate; the stiffening plate adopts single-sided groove welding; ② The horizontal partition located in the middle of the box: a. Assembly and welding of the diaphragm; b. Assembly of the web plates on both sides; c. Assembly and welding of the inner stiffening plate; d. Assembly and welding of the outer stiffening plate; the stiffening plate adopts single-sided groove welding; S1100. Derust and spray paint the assembled steel box girders.
[0012] Optionally, in the process of manufacturing steel box girders, the welding process adopts gas shielded welding and submerged arc welding methods, and the process parameters are as follows: ER55-G is used as the welding wire for gas shielded welding; welding current is 220-280A, voltage is 28-36V, and welding speed is 25-45cm / min; H08MnMoA is used as the welding wire for submerged arc welding; CHF101 is used as the flux, and the flux needs to be dried at 300-350°C for 1.5-2.5 hours before use; welding current is 450-700A, voltage is 34-40V, and welding speed is 27-50cm / min; before welding, preheating is carried out according to the material strength and plate thickness. The preheating area is on both sides of the weld groove, and the preheating range is 75-125mm. During welding, the interlayer temperature is less than or equal to 250°C.
[0013] A bridge provided by the present invention comprises a steel box girder and also comprises: a prefabricated bridge deck, the prefabricated bridge deck is paved on the top surface of the box body; and a post-cast strip, the post-cast strip is arranged between the prefabricated bridge decks.
[0014] Compared with the prior art, the present invention has the following advantages: 1. The cross-section of the steel box girder is trapezoidal, which reduces the use of steel structures, reduces the overall weight of the steel box girder, and reduces the harshness of the equipment used in the manufacturing and transportation of the steel box girder; 2. In the process of manufacturing the box, the manufacturing method of first processing the top and then flipping it is adopted, so that the original overhead welding seam in the box is changed into a flat welding seam, which reduces the difficulty of welding and makes the welding quality of the weld more guaranteed; 3. When steel box girders are used in bridges, the bridge deck is prefabricated in the factory, and the prefabricated bridge deck is laid between the box girders. Post-cast strips are reserved between the prefabricated bridge decks, which saves the installation time of the bridge. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0016] Figure 1 It is a stereoscopic diagram of a steel box girder body provided by an embodiment of the present invention.
[0017] Figure 2 This is an assembly diagram of a bottom plate and a transverse partition in a steel box girder box body provided by an embodiment of the present invention.
[0018] Figure 3 This is a structural diagram of a bottom plate in a steel box girder box body provided by an embodiment of the present invention.
[0019] Figure 4 The present invention provides a diagram of adjacent box bodies of a steel box girder in the length direction.
[0020] Figure 5This is a first installation state diagram of a steel box girder provided by an embodiment of the present invention.
[0021] Figure 6 This is a second installation state diagram of a steel box girder provided in an embodiment of the present invention.
[0022] Figure 7 This is a third installation state diagram of a steel box girder provided by an embodiment of the present invention.
[0023] Figure 8 This is a fourth installation state diagram of a steel box girder provided in an embodiment of the present invention.
[0024] Fig. 9 This is a fifth installation state diagram of a steel box girder provided in an embodiment of the present invention.
[0025] Fig.10 This is a sixth installation state diagram of a steel box girder provided in an embodiment of the present invention.
[0026] Fig.11 The present invention provides a manufacturing flow chart of a transverse diaphragm stiffening plate at the middle end of a steel box girder box body.
[0027] Fig.12 The present invention provides a manufacturing flow chart of a middle transverse diaphragm stiffening plate of a steel box girder box body.
[0028] Fig.13 This is a first state diagram of a steel box girder structure for a bridge provided by an embodiment of the present invention.
[0029] Fig.14 It is a second state diagram of a steel box girder structure for a bridge provided by an embodiment of the present invention.
[0030] Main component symbols: 1. Box body; 11. Bottom plate; 12. Web plate; 13. Top plate; 14. Transverse partition; 141. Slot; 15. Rib plate; 16. Plate; 17. Steel beam corbel; 2. Template; 21. Drilling; 3. Beam; 4. Stringer; 5. Prefabricated bridge deck; 51. Post-cast joint. DETAILED DESCRIPTION
[0031] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] The term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure or characteristic that may be included in at least one implementation of the present invention. In the description of the present invention, it should be understood that the orientation or positional relationship indicated by the terms "upper", "lower", "top", "bottom", etc. is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are used only for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may include one or more of the features explicitly or implicitly. Moreover, the terms "first", "second", etc. are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein.
[0033] Example Refer to the attached drawings of the specification, such as Figure 1-Figure 12 As shown, a steel box girder proposed in the present application includes a plurality of box bodies 1 spliced to each other, wherein the box body 1 includes; Bottom plate 11. A plurality of clamping plates 16 are arranged in parallel on the bottom plate 11 along its width direction.
[0034] The web 12 is two in number and is obliquely arranged at the left and right edges of the bottom plate 11. The web 12 is inclined toward the sides of the bottom plate 12, and the box cross-section formed by the web 12 and the bottom plate 11 is trapezoidal. A plurality of clamping plates 16 are arranged parallel to the surface of one side of the web 12 along its height direction.
[0035] The top plate 13 is arranged on the top of the web plate 12. The top plate 13 is parallel to the bottom plate 11.
[0036] A plurality of transverse partitions 14 are provided between the webs 12 on the adjacent two sides. The bottom of the transverse partition 14 contacts the upper surface of the bottom plate 11. The edge of the transverse partition 14 is provided with a plurality of slots 141 for accommodating the clips 16. When the transverse partition 14 is provided between the webs 12 on the adjacent two sides, the slots 141 on the bottom and the edges of the transverse partition 14 correspond to the clips 16 on the bottom plate 11 and the webs 12 to achieve snap connection. The top plate provided on the top of the webs 12 can be inserted into the slots 141 on the transverse partition 14.
[0037] A plurality of ribs 15 are arranged on a surface of a side close to the web 12. The cross-section of the rib 15 is T-shaped, and a plurality of slots 141 are arranged on the rib 15. When the rib 15 is arranged on the web 12, the slots 141 on the rib 15 correspond to the clips 16 on the web 52 to achieve clip connection.
[0038] In the process of splicing the box body 1 into a steel box girder, the steel box girder also includes: The template 2 is provided with a drill hole 21. When adjacent boxes 1 along the length direction of the steel box girder are spliced, the top plate 13, the web plate 12, the bottom plate 11, and the clamping plate 16 that are in contact with each other are provided with a drill hole 21. The template 2 is placed at the connection of the top plate 13, the web plate 12, the bottom plate 11, and the clamping plate 16. The drill holes 21 on the template 2 correspond to the drill holes 21 on the top plate 13, the web plate 12, the bottom plate 11, and the clamping plate 16.
[0039] A plurality of cross beams 3 are sequentially arranged between adjacent boxes 1 along the length direction of the steel box beam. Both sides of the cross beam 3 are connected to the webs 12 of the adjacent boxes 1 on both sides through steel beam brackets 17. A drilling hole 21 is arranged between the top of the cross beam 3 and the top plate 13 of the box 1. The top of the cross beam 3 is connected to the top plate 13 of the box 1 through a template 2.
[0040] The longitudinal beam 4 is arranged between adjacent cross beams 3 .
[0041] The stiffening plate is arranged on the diaphragm 14 .
[0042] Refer to the attached drawings of the specification, such as Figure 1-Figure 12 As shown, the method for manufacturing a steel box beam proposed in the present application includes a box-type column and the following steps: S100, Cutting: The main material is cut by a straight-bar cutting machine, and a 5mm welding shrinkage allowance is added in the length direction. After cutting, the main material needs to be shot blasted and sprayed with shop primer, and the welding parts do not need to be painted. The parts are cut by CNC cutting machine or straight-bar cutting. The diaphragm and stiffening plate can be assembled and welded into parts before being shot blasted and sprayed with shop primer, and the welding parts do not need to be painted. The length of the top plate, web plate, and bottom plate is greater than or equal to 1000mm, the width is greater than or equal to 200mm, and the distance from the axis of the horizontal weld to the center line of the nearest row of bolt holes is greater than or equal to 100mm.
[0043] S200, tyre frame erection: The left and right steel box girders are made on separate tyres, and the two boxes of the left and right lines need to be made on the same tyre frame. The width of the tyre frame is 10 meters, and the crossbeams, longitudinal beams and steel box girders need to be assembled and positioned as a whole to ensure the penetration rate of the bolt holes on site. The tyre frame is erected according to the arch drawing, and the position of the tyre frame needs to be set at the cross diaphragm of the steel box girder. The height of the tyre frame is 400-600mm, and specifically, it can be set to 500mm. The height setting is based on the convenience of the staff to operate. The tyre frame is arranged and placed along the length direction of the steel box girder. After the tyre frame is erected, it is inspected according to the arch drawing and welded firmly. In order to increase the stability of the tyre frame, the longitudinal tyre frame can be welded with slats.
[0044] S300, make the box, including: 1) Assemble the components of the bottom plate and the web respectively: the drilling of the ends of the bottom plate and the web is not performed here. If the bottom plate or the web has a butt joint, the butt weld must be completed and the flaw detection must be qualified. Weld the clamping plate to the bottom plate and the web according to the predetermined position, and flame correct the unevenness after welding.
[0045] 2) Assemble the top plate, web plate and diaphragm by reverse manufacturing method. The specific steps are as follows: ① Place the top plate on the tire frame or platform plate, confirm the distance between adjacent top plates, and use angle steel to temporarily fix them; ② Assemble the diaphragm according to the dimensions on the drawing: the top plate matches the slots on the diaphragm, and the diaphragm is vertically set between adjacent top plates; ③ Assemble the web and ribs: the slots on the ribs match the clamps on the webs, and the ribs are set on the webs; the clamps on the webs match the slots on both sides of the diaphragms, and the webs are set on the diaphragms; the top plate and the webs are welded by root cleaning; ④ Welding seams, including: welds between diaphragms and webs, welds between diaphragms and top plates, welds between ribs and webs, and full penetration welds between webs and top plates; ⑤ Raise both ends of the top plate according to the length of the box. The ratio of the height of both ends of the top plate to the length of the box is 1:1000 to ensure the arch of the steel beam.
[0046] 3) After welding is completed, turn it over so that the top originally located on the tire frame is flipped to the top of the box.
[0047] 4) Assemble the bottom plate and the welded part of the box: Place the bottom plate on the tire frame and fix it through the horse plate. The clamping plate on the bottom plate matches the clamping groove of the diaphragm. Set the welded part of the box on the bottom plate and weld it. The web plate and the bottom plate are fully penetrated, and the diaphragm and the web plate clamping plate are welded to the root. The production of a single box is completed. Figure 1 shown.
[0048] After manufacturing a single box, multiple boxes are spliced together, such as Figure 4 As shown. When splicing, the top plate, web plate, bottom plate and rib plate are matched with holes through the template. The holes can be drilled with a magnetic drill. When splicing, bolts or rivets are used in the template and the holes to achieve the splicing of adjacent boxes in the length direction.
[0049] When splicing adjacent boxes in the width direction of the box, they are spliced through longitudinal beams and transverse beams. Specifically, the longitudinal beams can be assembled, welded, corrected, and drilled using an H-shaped steel production line. One end needs to be reserved for temporary non-drilling, and the actual template will be drilled after assembly with the transverse beam. The main welds of the transverse beams and longitudinal beams need to be fully penetrated. Assembly of the transverse beam and steel box beam: Connect the manufactured transverse beam to the corbel of one of the steel box beams, and do not assemble the corbel of the other steel box beam for the time being. After the bolt holes of the transverse beam and the corbel are penetrated, position the corbel and weld it; the longitudinal beams between the transverse beams are executed according to the same process.
[0050] like Figure 5-Figure 10 As shown, this embodiment takes six boxes as an example. When multiple boxes are spliced together, the splicing process is as follows: S400, at the same time, two sections of box bodies are made on the tire frame along the width direction of the steel box beam according to steps S100-S300, and the distance between the two sections of box bodies is controlled, such as Figure 5 shown.
[0051] S500, assemble the crossbeam and longitudinal beam between the two sections of the box in S400, and drill matching holes between the crossbeam and longitudinal beam, and between the crossbeam and the steel beam bracket through the template, such as Figure 6 shown.
[0052] S600: At the same time as step S400, two sections of box bodies are manufactured and assembled on the tire frame according to steps S100-S300 along the length direction of the steel box beam. Figure 7 shown.
[0053] S700, assemble the crossbeam and longitudinal beam between the two sections of the box in S600; drill matching holes between the crossbeam and longitudinal beam, and between the crossbeam and the steel beam bracket through the template, such as Figure 8 shown.
[0054] S800, use the template to drill holes in the adjacent two sections of the steel box girder along the length direction of S400-S500 and S600-S700, such as Fig. 9 shown.
[0055] S900, at the same time as step S400, two sections of box bodies are manufactured and assembled on the tire frame according to steps S100-S300 along the length direction of the steel box beam, and the cross beam and the longitudinal beam are assembled between the two sections of the box bodies, and matching holes are drilled between the cross beam and the longitudinal beam, and between the cross beam and the steel beam bracket through the template; the template is used to sequentially match the two adjacent sections of the box bodies along the length direction of the steel box beam obtained in S900 and S600-S700. Fig.10 shown.
[0056] S1000, assemble the stiffening plate, the stiffening plate adopts the de-installation welding process, the processing sequence is: ① The transverse partition at the end of the box, such as Fig.11 As shown: a. Assembly and welding of the diaphragm; b. Assembly of the webs and stiffening plates on both sides; c. Assembly and welding of the inner stiffening plate, and painting of the sealing area after welding; d. Assembly and welding of the outer stiffening plate; the stiffening plate adopts single-sided groove welding.
[0057] ② The horizontal partition located in the middle of the box, such as Fig.12 As shown: a. Assembly and welding of the diaphragm; b. Assembly of the web plates on both sides; c. Assembly and welding of the inner stiffening plate; d. Assembly and welding of the outer stiffening plate; the stiffening plate adopts single-sided groove welding.
[0058] S1100. The assembled steel box girders are rust-removed and painted to complete the assembly of the steel box girders.
[0059] In the process of assembling steel box girders, weld welding is required, and its specific parameters and requirements are as follows: ①Welding materials: CO2 gas shielded welding: welding wire is ER55-G, specification φ1.2; Submerged arc welding: The welding wire is Jintai H08MnMoA, specification φ4.0; the flux is CHF101, and the flux should be dried at 300-350℃ for 2 hours before use; ②Welding parameters: Preparation: Before welding, clean the moisture, oil, and debris in the welding area; Gas shielded welding parameters: welding current: 220~280A, voltage: 28~36V, welding speed: 25~45cm / min; Submerged arc welding parameters: welding current: 450~700A, voltage: 34~40V, welding speed: 27~50㎝ / min; ③Preheating requirements and temperature selection are as follows: The preheating heating area is on both sides of the weld groove, and the preheating width is within 100mm.
[0060] When the plate thickness is different, select the preheating temperature according to the thicker plate.
[0061] When the material strength is different, select the preheating temperature according to the higher strength steel.
[0062] During welding, the maximum interlayer temperature should not exceed 250℃.
[0063] Refer to the attached drawings of the specification, such as Figure 13-14 As shown, a bridge proposed in the present application includes a steel box girder and further includes: The prefabricated bridge deck 5 is paved on the top surface of the box body 1 .
[0064] The post-cast strip 51 is arranged between the prefabricated bridge panels 5 .
[0065] The bridge deck is prefabricated in a factory, and the prefabricated bridge deck 5 is laid between the box girders. Post-cast strips 51 are reserved between the prefabricated bridge decks 5, which greatly saves the construction period of bridge installation.
[0066] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.
Claims
1. A steel box girder, characterized in that: The steel box girder comprises a plurality of boxes spliced to each other, wherein the box comprises: Base plate; Web plates, the number of which is two, which are obliquely arranged at the left and right edges of the bottom plate, and the inclination direction of the web plates is toward the two sides of the bottom plate; A top plate, the top plate is arranged on the top of the web plate, and the top plate is parallel to the bottom plate; A plurality of transverse partitions, wherein the plurality of transverse partitions are arranged between the webs on two adjacent sides, and the bottom of the transverse partitions contacts the upper surface of the bottom plate; A plurality of ribs are arranged on a surface of one side close to the web.
2. A steel box girder according to claim 1, characterized in that: A plurality of card plates are arranged in parallel on the bottom plate along the width direction thereof; A plurality of the clamping plates are arranged in parallel on the surface of one side of the web along the height direction thereof; The edge of the transverse partition is provided with a plurality of slots for accommodating the card plates; Wherein, when the transverse partition is arranged between the webs on two adjacent sides, the bottom of the transverse partition and the clamping grooves on the two side edges correspond to the clamping plates on the bottom plate and the webs to achieve clamping connection.
3. A steel box girder according to claim 2, characterized in that: The top plate arranged on the top of the web plate can be inserted into the slot on the diaphragm plate.
4. A steel box girder according to claim 3, characterized in that: The cross-sectional shape of the rib plate is T-shaped, and a plurality of the clamping grooves are arranged on the rib plate. When the rib plate is arranged on the web plate, the clamping grooves on the rib plate are clamped to the clamping plate on the web plate.
5. A steel box girder according to claim 4, characterized in that: Also included is a template, wherein the template is provided with drill holes; When adjacent boxes along the length direction of the steel box girder are spliced, the top plate, the web plate, the bottom plate and the pallet that are in contact with each other are provided with the drill holes, and the templates are respectively placed at the connection points of the top plate, the web plate, the bottom plate and the pallet, and the drill holes on the template correspond to the drill holes on the top plate, the web plate, the bottom plate and the pallet.
6. A steel box girder according to claim 5, characterized in that: It also includes a plurality of cross beams, which are sequentially arranged between adjacent boxes along the length direction of the steel box beam; Both sides of the crossbeam are connected to the webs of the boxes on the adjacent two sides through steel beam brackets; A drill hole is provided between the top of the cross beam and the top plate of the box body, and the top of the cross beam and the top plate of the box body are connected through the template; It also includes a longitudinal beam, which is arranged between adjacent transverse beams.
7. The steel box girder according to claim 6, characterized in that: It also includes a stiffening plate, which is arranged on the diaphragm.
8. A method for manufacturing a steel box girder, characterized in that: The steps include: S100, blanking: processing the components that make up the box body, including the production and processing of the top plate, belly plate, bottom plate, diaphragm, pallet and rib plate, and then shot blasting, rust removal and painting; S200, scaffolding: scaffolding shall be erected according to the drawings. The scaffolding shall be set at the bottom of the box body transverse partition. The length of the scaffolding shall be at least sufficient for the production and assembly of three boxes. S300, make the box, including: 1) Assemble the components of the bottom plate and the web plate respectively: weld the clamping plate to the bottom plate and the web plate according to the predetermined position, and flame correct the uneven parts after welding; 2) Assemble the bottom plate, web plate, and diaphragm in the following order: ① Place the top plate on the tire frame, confirm the distance between adjacent top plates, and temporarily fix them with angle steel; ② Assemble the diaphragm: The top plate and the groove on the diaphragm are matched, and the diaphragm is vertically set between the adjacent top plates; ③ Assemble the web and ribs: the slots on the ribs match the clamps on the webs, and the ribs are set on the webs; the clamps on the webs match the slots on both sides of the diaphragms, and the webs are set on the diaphragms; the top plate and the webs are welded by root cleaning; ④ Welding seams, including: welds between diaphragms and webs, welds between diaphragms and top plates, welds between ribs and webs, and full penetration welds between webs and top plates; ⑤ Raise the two ends of the top plate according to the length of the box. The ratio of the height of the two ends of the top plate to the length of the box is 1:1000; 3) After welding is completed, turn it over so that the top originally located on the tire frame is turned over to the top of the box; 4) Assemble the bottom plate and the welded part of the box: Place the bottom plate on the tire frame and fix it through the horse plate. The clamping plate on the bottom plate matches the clamping groove of the diaphragm. Set the welded part of the box on the bottom plate and weld it. The web plate and the bottom plate are fully penetrated, and the diaphragm and the web plate clamping plate are welded to the root. The box is completed; S400, simultaneously manufacturing two sections of box bodies along the width direction of the steel box beam on the tire frame according to steps S100-S300, and controlling the distance between the two sections of box bodies; S500, assemble the cross beam and the longitudinal beam between the two sections of the box in S400, and drill matching holes between the cross beam and the longitudinal beam, and between the cross beam and the steel beam corbel through the template; S600, simultaneously with step S400, manufacturing and assembling two sections of box bodies along the length direction of the steel box beam on the tire frame according to steps S100-S300; S700, assemble the cross beam and longitudinal beam between the two sections of the box in S600; drill matching holes between the cross beam and the longitudinal beam, and between the cross beam and the steel beam corbel through the template; S800, using templates to drill holes in the adjacent two sections of the box body along the length direction of the steel box beam obtained by S400-S500 and S600-S700 in sequence; S900, at the same time as step S400, two sections of box bodies are manufactured and assembled on the tire frame according to steps S100-S300 along the length direction of the steel box beam, the cross beam and the longitudinal beam are assembled between the two sections of box bodies, and matching holes are drilled between the cross beam and the longitudinal beam, and between the cross beam and the steel beam bracket through the template; the template is used to sequentially match the two adjacent sections of box bodies along the length direction of the steel box beam obtained in S900 and S600-S700; S1000, assemble the stiffening plate, the stiffening plate adopts the de-installation welding process, the processing sequence is: ① The transverse partition at the end of the box: a. Assembly and welding of the diaphragm; b. Assembly of the webs and stiffening plates on both sides; c. Assembly and welding of the inner stiffening plate, and coating of the sealing area after welding; d. Assembly and welding of the outer stiffening plate; the stiffening plate adopts single-sided groove welding; ② The horizontal partition located in the middle of the box: a. Assembly and welding of the diaphragm; b. Assembly of the web plates on both sides; c. Assembly and welding of the inner stiffening plate; d. Assembly and welding of the outer stiffening plate; the stiffening plate adopts single-sided groove welding; S1100. Remove rust and spray paint on the assembled steel box girders.
9. A method for manufacturing a steel box beam according to claim 8, characterized in that: In the process of manufacturing steel box girders, the welding process adopts gas shielded welding and submerged arc welding methods, and the process parameters are as follows: The welding wire for gas shielded welding is ER55-G; welding current is 220-280A, voltage is 28-36V, welding speed is 25-45cm / min; The welding wire for submerged arc welding is H08MnMoA; the flux is CHF101. During welding, the flux needs to be dried at 300-350℃ for 1.5-2.5 hours before use; the welding current is 450-700A, the voltage is 34-40V, and the welding speed is 27-50cm / min; Before welding, preheating is carried out according to the material strength and plate thickness. The preheating area is on both sides of the weld groove, and the preheating range is 75-125mm. During welding, the interlayer temperature is less than or equal to 250℃.
10. A bridge, characterized in that: The steel box girder comprises the steel box girder according to claims 1 to 8, and further comprises: A prefabricated bridge deck, wherein the prefabricated bridge deck is paved on the top surface of the box body; A post-cast strip is arranged between the prefabricated bridge panels.