Large cantilever bent cap bottom die dismantling construction method

By combining slide rails and trolleys, the bottom formwork of the large cantilever cap beam was safely and reliably dismantled, solving the problems of narrow construction site and safety risks, and reducing the impact on traffic.

CN118932857APending Publication Date: 2024-11-12ROAD & BRIDGE INT CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410936589.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In urban highway construction, the dismantling of the bottom formwork of large cantilever cap beams under the condition of horizontal collinearity is difficult, occupies a lot of space, and poses safety risks. Existing integral or segmented hoisting methods are difficult to implement under conditions of narrow space and limited clearance.

Method used

The system employs a combination of slide rails, trolleys, and suspension components. Pre-embedded steel plates are welded to the slide rails for fixation. Electric hoists and other lifting drive components are installed on the trolleys. The system is hoisted by sliding the trolleys to the outer enclosed area, thus avoiding construction directly above the roadway.

Benefits of technology

It reduces the difficulty and space required for dismantling the bottom formwork of the large cantilever cap beam, lowers safety risks, ensures the normal flow of traffic, and has significant economic benefits and safety reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932857A_ABST
    Figure CN118932857A_ABST
Patent Text Reader

Abstract

The invention discloses a large cantilever bent cap bottom die dismantling construction method which is characterized by comprising the following steps that S1, a bent cap bottom die is assembled, and a steel plate and a sliding rail are embedded in the upper portion of a bent cap body; s2, a tackle and a suspension assembly are installed on the sliding rail; s3, debugging and trial hoisting; s4, the bottom die unit is suspended by the suspension assembly; s5, the bottom die unit moves to the enclosure construction area along the sliding rail along with the tackle; s6, the bottom die unit is hoisted and unloaded through a hoisting and unloading device in the enclosure construction area; and S7, the tackle moves back, and the steps S4 and S5 are repeated. According to the method, a method of firstly sliding to the outer side enclosure interval and then hoisting is adopted, the construction step of directly hoisting operation above a carriageway is avoided, the difficulty and occupied space of dismantling a large cantilever bent cap bottom die can be reduced, the situation that social vehicles are interfered and normal passing of the large cantilever bent cap bottom die is affected is prevented, and therefore the safety risk level is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a construction method for removing a bottom formwork of a large cantilever cap beam. Background Art

[0002] Urban highway construction often adopts a three-dimensional traffic design with colinear planes in order to save land or due to site limitations. The upper layer is a large cantilever viaduct and the lower layer is a city trunk road. The piers of the large cantilever viaduct are arranged in the center dividing strip of the city trunk road. During construction, it is required to open to traffic while constructing, and generally one or two lanes are required, resulting in a very narrow construction site and limited clearance. After the cap beam is cast, the space is even more limited. The removal of the bottom formwork of this type of large cantilever cap beam is more difficult and extremely dangerous.

[0003] The removal of the bottom formwork of the cantilever part of the large cantilever cap beam under the condition of plane colinearity generally adopts integral or block-by-block lifting construction. The integral method is to make the bottom formwork of the cantilever part of the cap beam into a whole, and then use a car crane or crawler crane to lift and remove it at one time; the block-by-block lifting method is to divide the bottom formwork of the cantilever part of the cap beam into several parts, and then use a crane to remove it.

[0004] Both integral and block lifting require sufficient lifting space and no one or vehicles are allowed to stand under the boom or the object being lifted, which is difficult to achieve under plane collinearity conditions. This greatly increases the difficulty of disassembling the bottom formwork of the large cantilever cap beam and the space occupied. Therefore, it is necessary to design a sliding method for the bottom formwork of the cap beam that is easy to disassemble and occupies a small construction space. Summary of the invention

[0005] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention provides a large cantilever cap beam bottom formwork removal construction method.

[0006] The technical solution adopted by an embodiment of the present invention to solve the technical problem is: a large cantilever cap beam bottom formwork removal construction method, comprising the following steps:

[0007] S1, assembling the cap beam bottom formwork, casting on the cap beam bottom formwork to form a cap beam body, and pre-embedding a steel plate and a slide rail above the cap beam body;

[0008] S2, installing the pulley and suspension assembly on the slide rail;

[0009] S3, the pulley is debugged and the suspension components are tested;

[0010] S4, loosening the bottom mold unit of the cap beam bottom mold, the bottom mold unit is separated from the assembly beam, and the suspension assembly suspends the bottom mold unit;

[0011] S5, the bottom mold unit moves along the slide rail with the pulley to the enclosed construction area;

[0012] S6, lifting and unloading the bottom formwork unit in the enclosed construction area by using a lifting and unloading device;

[0013] S7, the pulley moves back and steps S4 and S5 are repeated.

[0014] Optionally, in step S1, the cap beam bottom mold is assembled from a plurality of separately arranged bottom mold units.

[0015] Optionally, in step S1, at least two slide rails are arranged at intervals along the extension direction of the main beam arm of the cap beam.

[0016] Optionally, in step S2, the suspension assembly is provided with a suspension rod and a lifting drive member, and the lifting drive member can suspend the bottom mold unit through the suspension rod.

[0017] Optionally, the pulley is arranged in a centrally symmetrical structure, with both ends leaking out along the side of the cap beam body; the hanger is arranged at the ends of the pulley that leak out from the end of the cap beam body.

[0018] Optionally, the pulley is arranged in a rectangular structure; there are four suspension rods, which are respectively arranged at the four top corners of the rectangular pulley.

[0019] Optionally, in step S2, two pulleys are provided.

[0020] Optionally, in step S5, the enclosed construction area is located at both ends of the large cantilever cap beam and outside the carriageway.

[0021] The beneficial effects of the present invention are as follows: the slide rail, pulley and suspension assembly are used, the slide rail is welded to the pre-buried steel plate before pouring the cap beam concrete to fix the slide rail, the pulley is provided with an electric hoist or other lifting driving parts for suspension, the bottom form can be lifted to the detached distribution beam, the pulley movement principle is similar to the movement principle of the truss crane, the pulley is controlled by a remote control to lift the cap beam bottom form to the designated area and fall. The present invention adopts a method of first sliding to the outer enclosure area and then lifting, this method avoids the construction steps of lifting operations directly above the roadway, can reduce the difficulty and space occupied by dismantling the large cantilever cap beam bottom form, prevent interference with social vehicles and affect their normal passage, thereby reducing the safety risk level. It solves the unsafe problem of the lifting construction position being located directly above the roadway and the problem of occupying the road for a long time, reduces the lifting distance, has greater economic benefits, and is safe and reliable.

[0022] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0024] Figure 1 It is a top view of the bottom mold sliding structure of the large cantilever cap beam of the present invention;

[0025] Figure 2 for Figure 1 Cross-sectional view of the bottom formwork sliding structure of medium and large cantilever cap beams.

[0026] Description of main component symbols:

[0027] 10. Cap beam body; 11. Slide rail; 20. Cap beam bottom mold; 30. Pulley; 40. Suspension assembly; 41. Hanging rod; 42. Lifting drive component. DETAILED DESCRIPTION

[0028] This section will describe in detail the specific embodiments of the present invention. The preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present invention, but it cannot be understood as a limitation on the scope of protection of the present invention.

[0029] In the description of the present invention, the meaning of "above", "below", "exceed", etc. is not inclusive of the number itself, and the meaning of "above", "below", "within", etc. is inclusive of the number itself. If there is a description of "first" or "second", it is only used to distinguish the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0030] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0031] In the present invention, unless otherwise clearly defined, the words "set", "install", "connect" and the like should be understood in a broad sense, for example, they can be directly connected or indirectly connected through an intermediate medium; they can be fixedly connected or detachably connected or integrally formed; they can be mechanically connected; they can be the internal connection of two elements or the interaction relationship between two elements. Those skilled in the art can reasonably determine the specific meanings of the above words in the present invention in combination with the specific content of the technical solution.

[0032] Example

[0033] Reference Figure 1 and Figure 2 The present invention proposes a method for dismantling a large cantilever cap beam bottom formwork 20, comprising the following steps:

[0034] S1, assembling the cap beam bottom formwork 20, casting the cap beam body 10 on the cap beam bottom formwork 20, and pre-embedding the steel plate and the slide rail 11 above the cap beam body 10;

[0035] S2, installing the pulley 30 and the suspension assembly 40 on the slide rail 11;

[0036] S3, the pulley 30 is debugged and the suspension assembly 40 is tested;

[0037] S4, loosen the bottom mold unit of the cap beam bottom mold 20, the bottom mold unit is separated from the assembly beam, and the suspension assembly 40 suspends the bottom mold unit;

[0038] S5, the bottom mold unit moves along the slide rail 11 with the pulley 30 to the enclosed construction area;

[0039] S6, lifting and unloading the bottom formwork unit in the enclosed construction area by using a lifting and unloading device;

[0040] S7, the pulley 30 moves back, and steps S4 and S5 are repeated.

[0041] In the present invention, a slide rail 11, a pulley 30 and a suspension assembly 40 are used. The slide rail 11 is welded to the slide rail 11 by pre-embedded steel plates before pouring the cap beam concrete, thereby fixing the slide rail 11. The pulley 30 is provided with a lifting driving member 42 for suspension, such as an electric hoist, which can lift the bottom formwork to the detached distribution beam. The walking principle of the pulley 30 is similar to the walking principle of the truss crane. The pulley 30 is controlled by a remote control to lift the cap beam bottom formwork 20 and walk to the designated area to fall. The present invention adopts a method of first sliding to the outer enclosure area and then lifting. This method avoids the construction steps of lifting operations directly above the roadway, can reduce the difficulty and space occupied by dismantling the large cantilever cap beam bottom formwork 20, and prevents interference with social vehicles and affecting their normal passage, thereby reducing the safety risk level. It solves the unsafe problem of the lifting construction position being located directly above the roadway and the problem of occupying the road for a long time, reduces the lifting distance, has greater economic benefits, and is safe and reliable.

[0042] In the present invention, the cantilever cap beam cantilever section bottom formwork and the distribution beam are first hoisted to the outer enclosure area and then removed using a truck crane. This method is different from the current construction method of removing the cantilever section bottom formwork of the cap beam. The current method of removing the cap beam bottom formwork 20 is to perform hoisting operations in situ. It is necessary to occupy most of the area below the cap beam for construction, which occupies a large area of ​​the construction site and occupies a large area of ​​the roadway, seriously affecting the flow of urban traffic.

[0043] In step S1 , in order to facilitate the unitized assembly and disassembly of the cap beam bottom mold 20 , the cap beam bottom mold 20 is assembled from a plurality of separately arranged bottom mold units.

[0044] In step S1, in order to ensure that the slide trolley 30 slides stably and reliably above the cap beam body 10, at least two slide rails 11 are arranged at intervals along the extension direction of the beam arm of the cap beam body 10. Preferably, two slide rails 11 are provided.

[0045] In step S2 , the suspension assembly 40 is provided with a suspension rod 41 and a lifting drive 42 , and the lifting drive 42 can suspend the bottom mold unit through the suspension rod 41 .

[0046] Specifically, the pulley 30 is arranged in a central symmetrical structure, with both ends leaking out along the side of the cap beam body 10; the suspension rod 41 is arranged at both ends of the pulley 30 and leaking out of the end of the cap beam body 10. For example, the pulley 30 adopts a frame structure such as a circular frame or a rectangular frame.

[0047] Preferably, the pulley 30 is arranged in a rectangular structure; four suspension rods 41 are arranged, respectively arranged at the four corners of the rectangular pulley 30. The rectangular pulley 30 structure can be assembled by welding steel beams, and a plurality of reinforcing beams can be conveniently arranged inside the frame.

[0048] Furthermore, in step S2, two pulleys 30 are provided. The two pulleys 30 can move independently at both ends of the slide rail 11 of the cap beam body 10, so as to independently perform construction in the enclosed construction area under the large cantilevers on both sides, thereby improving construction efficiency.

[0049] In this embodiment, in order to reduce the impact of the enclosed area on the driving lane, in step S5, the enclosed construction area is located at both ends of the large cantilever cap beam, which is located outside the driving lane.

[0050] Of course, the present invention is not limited to the above-mentioned embodiments, and those skilled in the art may make equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications and substitutions are all included in the scope defined by the claims of this application.

Claims

1. A method for dismantling the bottom formwork of a large cantilever cap beam, characterized in that: The steps include: S1, assembling a cap beam bottom mold (20), casting a cap beam body (10) on the cap beam bottom mold (20), and pre-embedding a steel plate and a slide rail (11) above the cap beam body (10); S2, installing a pulley (30) and a suspension assembly (40) on the slide rail (11); S3, the pulley (30) is debugged and the suspension assembly (40) is tested; S4, loosening the bottom mold unit of the cap beam bottom mold (20), the bottom mold unit is separated from the assembly beam, and the suspension assembly (40) suspends the bottom mold unit; S5, the bottom mold unit moves along the slide rail (11) with the pulley (30) to the enclosed construction area; S6, lifting and unloading the bottom formwork unit in the enclosed construction area by using a lifting and unloading device; S7, the pulley (30) moves back, and steps S4 and S5 are repeated.

2. The method for dismantling the bottom formwork of a large cantilever cap beam according to claim 1 is characterized in that: In step S1, the cap beam bottom mold (20) is assembled from a plurality of separately arranged bottom mold units.

3. The method for dismantling the bottom formwork of a large cantilever cap beam according to claim 2 is characterized in that: In step S1, at least two of the slide rails (11) are arranged at intervals along the extension direction of the beam arm of the cap beam body (10).

4. The method for dismantling the bottom formwork of a large cantilever cap beam according to claim 3 is characterized in that: In step S2, the suspension assembly (40) is provided with a suspension rod (41) and a lifting drive member (42), and the lifting drive member (42) can suspend the bottom mold unit through the suspension rod (41).

5. The method for dismantling the bottom formwork of a large cantilever cap beam according to claim 4 is characterized in that: The pulley (30) is arranged in a centrally symmetrical structure, with both ends protruding laterally from the cap beam body (10); the suspension rod (41) is arranged at the ends of the pulley (30) protruding from the cap beam body (10).

6. The method for dismantling the bottom formwork of a large cantilever cap beam according to claim 5 is characterized in that: The pulley (30) is arranged in a rectangular structure; four suspension rods (41) are arranged respectively at the four top corners of the rectangular pulley (30).

7. The method for dismantling the bottom formwork of a large cantilever cap beam according to claim 1 is characterized in that: In step S2, two pulleys (30) are provided.

8. The method for dismantling the bottom formwork of a large cantilever cap beam according to claim 1 is characterized in that: In step S5, the enclosed construction area is located at both ends of the large cantilever cap beam and outside the carriageway.

Citation Information

Patent Citations

  • Construction method for casting and prefabricating large-section bent cap wet joint based on suspended formwork

    CN117211189A

  • Device is demolishd to bent cap die block

    CN207484292U

  • Large cantilever bent cap formwork dismounting device

    CN210262742U

  • Cantilever bent cap template removing device

    CN219731665U

  • Large cantilever bent cap bottom die sliding device

    CN222961899U