Steel truss girder chord member and web member connecting structure and construction method thereof
Through the bolted connection structure and adhesive layer reinforcement between the chord and the belly rod, the problems of low welding quality and high construction difficulty are solved, the safety and construction efficiency of steel trusses are improved, and the construction process is simplified.
Patent Information
- Application Number
- CN202411030984.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-12
AI Technical Summary
The welding of steel truss web and chord rods is greatly affected by the environment during the construction process, the low welding quality leads to microcracks, and the welding construction is difficult and dangerous, affecting the safety of the structure.
The chord rod and the belly rod are connected by bolts on the connecting plate to replace the welded structure, and the connection is reinforced by bolts and adhesive layers to simplify the construction process and avoid cracks caused by low weld quality.
It improves the safety of the steel truss structure, simplifies the construction process, shortens the construction cycle, and avoids dangers and quality problems during the welding process.
Smart Images

Figure CN118932861A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of steel truss bridge construction, and in particular relates to a steel truss chord and web member connection structure and a construction method thereof. Background Art
[0002] At present, steel trusses are widely used in bridges due to their advantages of light weight and high bearing capacity. A single steel truss consists of a chord and a web, and the members are usually connected by welding. The welding between the chord and the web is usually carried out on the construction site, using large lifting equipment to connect the web and the chord, and then manually welded.
[0003] In the prior art, the welding of steel truss webs and chords has the following problems: 1. During the construction process, the welding connection is greatly affected by the construction environment. For example, factors such as the butt-jointing error between the members, ambient temperature changes, and ambient humidity will directly affect the welding quality, resulting in limited application of the welding connection; 2. Construction defects such as defects in the structure itself and low weld quality will cause different degrees of microcracks in different parts of the bridge during operation; with the long-term traffic load, the microcracks will continue to expand until macroscopic cracks appear in the steel and continue to develop, eventually leading to structural damage; 3. The welding construction method is difficult and dangerous. Summary of the invention
[0004] The purpose of the present invention is to provide a steel truss chord and web connection structure and a construction method thereof, so as to avoid the welding structure of the steel truss chord and web, avoid the dangers of cracks caused by low weld quality, and improve the structural safety; eliminate the welding steps in the construction process, simplify the construction process and shorten the construction period while ensuring the construction quality of the steel truss.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] In the first aspect, the present invention provides a steel truss chord and web connection structure, including a chord, a web and a connecting plate, the chord is provided with a first screw hole; the web is provided with a second screw hole; the connecting plate is provided with a third screw hole and a fourth screw hole; the connecting plate and the chord are connected by a first bolt arranged in the first screw hole and the third screw hole, and the connecting plate and the web are connected by a second bolt arranged in the second screw hole and the fourth screw hole.
[0007] In the steel truss chord and web connection structure of the present invention, the chord and the connecting plate are connected by the first bolt, and the connecting plate is connected to the web by the second bolt, so that the chord and the web are connected by the connecting plate, thereby avoiding the welding structure of the chord and the web of the steel truss, avoiding the dangers of cracks caused by low weld quality, and improving structural safety.
[0008] Preferably, a first adhesive layer is connected between the connecting plate and the chord rod.
[0009] Preferably, a second adhesive layer is connected between the connecting plate and the web.
[0010] Preferably, the upper portion of the chord is set as a first I-shaped rod, the first I-shaped rod includes first wing plates and a first web plate on both sides, the first web plate is connected between the first wing plates on both sides, and the first wing plates on both sides are respectively provided with the first screw holes;
[0011] The web member is configured as a second I-shaped rod, the second I-shaped rod comprises second wing plates and a second web plate at two sides, the second web plate is connected between the second wing plates at two sides, and the second wing plates at two sides are respectively provided with the second screw holes;
[0012] The connecting plate comprises a first connecting plate, and the first connecting plates are respectively arranged on the outer sides of the first wing plate and the second wing plate on both sides; the first connecting plate is connected to the first wing plate by a first bolt arranged in the first screw hole and the third screw hole, and the first connecting plate is connected to the second wing plate by a second bolt arranged in the second screw hole and the fourth screw hole;
[0013] The first adhesive layer is connected between the first wing plate and the first connecting plate, respectively, and the second adhesive layer is connected between the second wing plate and the first connecting plate, respectively.
[0014] Preferably, the first web is provided with the first screw hole, and the second web is provided with the second screw hole;
[0015] The connecting plate comprises a second connecting plate, and the second connecting plates are respectively arranged on both sides of the first web and the second web; the second connecting plate is connected to the first web via a first bolt arranged in the first screw hole and the third screw hole, and the second connecting plate is connected to the second web via a second bolt arranged in the second screw hole and the fourth screw hole;
[0016] The first adhesive layer is connected between the first web and the second connecting plate, respectively, and the second adhesive layer is connected between the second web and the second connecting plate, respectively.
[0017] Preferably, the connecting plate includes a third connecting plate, two third connecting plates are respectively arranged on the inner sides of the first wing plate and the second wing plate on both sides, and the two third connecting plates are respectively arranged on both sides of the first web plate and the second web plate; the third connecting plate is connected to the first wing plate by a first bolt arranged in the first screw hole and the third screw hole, and the third connecting plate is connected to the second wing plate by a second bolt arranged in the second screw hole and the fourth screw hole;
[0018] The first adhesive layer is connected between the first wing plate and the third connecting plate, respectively, and the second adhesive layer is connected between the second wing plate and the third connecting plate, respectively.
[0019] Preferably, the lower portion of the chord is configured as a square bar, and one end of the first wing plate and the first web of the first I-shaped bar are both connected to one side wall of the chord;
[0020] The upper part of the chord rod is arranged as two first I-shaped rods, and the two first I-shaped rods are arranged at a V-shaped angle.
[0021] Preferably, the connecting plate is configured as a rectangular plate, and the first screw hole and the third screw hole and the second screw hole and the fourth screw hole are respectively configured as at least two, and are respectively symmetrically distributed or evenly distributed.
[0022] In a second aspect, the present invention provides a construction method of the steel truss beam chord and web member connection structure as described in the first aspect of the present invention, comprising the following steps:
[0023] Manufacturing chord members and web members: manufacturing the chord members and web members according to the design documents;
[0024] Assembling the chord rod and the web rod: setting the chord rod at a preset position, and setting the web rod at a position connected with the chord rod;
[0025] Connecting the chord and the web: connecting the connecting plate and the chord through the first bolts set in the first screw hole and the third screw hole, and connecting the connecting plate and the web through the second bolts set in the second screw hole and the fourth screw hole.
[0026] The construction method of the steel truss chord and web connecting structure of the present invention eliminates the welding step in the traditional construction process, and can simplify the construction process and shorten the construction period while ensuring the construction quality of the steel truss.
[0027] Preferably, after the step of manufacturing the chord and the web and before the step of assembling the chord and the web, the following steps are performed:
[0028] Bolt performance test: testing the tensile strength of the first bolt and the second bolt;
[0029] After the step of assembling the chord and the web, and before the step of connecting the chord and the web, the following steps are performed:
[0030] Glue-spreading chord rod and web rod: the first adhesive layer is arranged on the chord rod, and the second adhesive layer is arranged on the web rod;
[0031] Adhesive connecting plate: connecting the first adhesive layer and the second adhesive layer on the connecting plate;
[0032] After completing the steps for connecting the chords and webs, proceed with the following steps:
[0033] Anti-corrosion treatment: Anti-corrosion treatment is performed on the surfaces of the chord, the web and the connecting plate.
[0034] The steel truss chord and web member connection structure and the construction method thereof provided by the present invention have the following beneficial effects:
[0035] The steel truss beam chord and web connecting structure of the present invention can avoid the welding structure of the chord and web of the steel truss beam, avoid the danger of cracks caused by low weld quality, and improve the structural safety.
[0036] The construction method of the steel truss chord and web connecting structure of the present invention eliminates the welding step in the traditional construction process, simplifies the construction process and shortens the construction period while ensuring the construction quality of the steel truss. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a structural schematic diagram of a steel truss chord and web member connection structure provided by an embodiment of the present invention.
[0038] Figure 2 It is a top view of the connection position of the first wing plate, the second wing plate and the first connecting plate provided by one embodiment of the present invention.
[0039] Figure 3 It is a top view of the connection position of the first web, the second web and the second connecting plate provided by one embodiment of the present invention.
[0040] Figure 4 It is a structural schematic diagram of a first connecting plate provided in one embodiment of the present invention.
[0041] Figure 5 It is a structural schematic diagram of a second connecting plate provided in one embodiment of the present invention.
[0042] Figure 6 It is a schematic structural diagram of a third connecting plate provided in one embodiment of the present invention.
[0043] Figure 7 It is a flow chart of a construction method of a steel truss chord and web member connection structure provided by one embodiment of the present invention.
[0044] Figure 8 It is a flow chart of a construction method of a steel truss chord and web member connection structure provided by another embodiment of the present invention.
[0045] Reference numerals in the figures:
[0046] 1 is a chord, 101 is a first wing plate, 102 is a second web plate, 2 is a web member, 201 is a second wing plate, 202 is a second web plate, 210 is a second adhesive layer, 3 is a connecting plate, 301 is a first connecting plate, 302 is a second connecting plate, 303 is a third connecting plate, 310 is a third screw hole, 311 is a first bolt, 320 is a fourth screw hole, 321 is a second bolt, 4 is a bolt head, 5 is a nut, and 6 is a gasket. DETAILED DESCRIPTION
[0047] The present invention is further described in detail below through the accompanying drawings and specific embodiments.
[0048] Example
[0049] Please refer to Figures 1 to 6 In a first aspect, the present embodiment provides a steel truss chord and web connection structure, comprising a chord 1, a web 2 and a connecting plate 3, wherein the chord is provided with a first screw hole; the web 2 is provided with a second screw hole; the connecting plate 3 is provided with a third screw hole 310 and a fourth screw hole 320; the connecting plate 3 and the chord 1 are connected by a first bolt 311 arranged in the first screw hole and the third screw hole 310, and the connecting plate 3 and the web 2 are connected by a second bolt 321 arranged in the second screw hole and the fourth screw hole 320.
[0050] In the steel truss chord and web connection structure of the present embodiment, the chord 1 and the connecting plate 3 are connected by a first bolt 311, and the connecting plate 3 is connected to the web 2 by a second bolt 321, so that the chord 1 and the web 2 are connected by the connecting plate 3, thereby avoiding the welding structure of the chord 1 and the web 2 of the steel truss, avoiding the dangers of cracks caused by low weld quality, and improving the structural safety.
[0051] In some embodiments, a first adhesive layer is connected between the connecting plate 3 and the chord rod 1 , and the connection between the connecting plate 3 and the chord rod 1 can be reinforced by the first adhesive layer.
[0052] like Figure 2 and Figure 3 As shown, in some embodiments, a second adhesive layer 210 is connected between the connecting plate 3 and the web member 2 , and the connection between the connecting plate 3 and the web member 2 can be reinforced by the second adhesive layer 210 .
[0053] like Figures 1 to 4 As shown, in some embodiments, the upper portion of the chord 1 is set as a first I-shaped bar, the first I-shaped bar includes first wing plates 101 and a first web 102 on both sides, the first web 102 is connected between the first wing plates 101 on both sides, and the first wing plates 101 on both sides are respectively provided with first screw holes;
[0054] The web member 2 is configured as a second I-shaped rod, the second I-shaped rod comprises second wing plates 201 and second web plates 202 on both sides, the second web plates 202 are connected between the second wing plates 201 on both sides, and second screw holes are respectively provided on the second wing plates 201 on both sides;
[0055] The connecting plate 3 includes a first connecting plate 301, and the first connecting plates 301 are respectively arranged on the outer sides of the first wing plate 101 and the second wing plate 201 on both sides; the first connecting plate 301 is connected to the first wing plate 101 through a first bolt 311 arranged in the first screw hole and the third screw hole 310, and the first connecting plate 301 is connected to the second wing plate 201 through a second bolt 321 arranged in the second screw hole and the fourth screw hole 320;
[0056] A first adhesive layer is connected between the first wing plate 101 and the first connecting plates 301 on both sides, and a second adhesive layer 210 is connected between the second wing plate 201 and the first connecting plates 301 on both sides.
[0057] The upper part of the chord 1 is set as a first I-shaped bar, the web 2 is set as a second I-shaped bar, a third screw hole 310 and a fourth screw hole 320 are opened on the first connecting plate 301, and a first connecting plate 301 is set on the outer sides of the first wing plate 101 of the first I-shaped bar and the second wing plate 201 of the second I-shaped bar, so that the first wing plate 101 of the first I-shaped bar and the second wing plate 201 of the second I-shaped bar are connected through the first connecting plate 301 and the first bolt 311 and the second bolt 321, so as to facilitate the connection between the chord 1 and the web 2, for example, it is convenient to connect the chord 1 to the bottom of the web 2 through the connecting plate 3.
[0058] The first adhesive layer can reinforce the connection between the first wing panel 101 and the first connecting plate 301 , and the second adhesive layer 210 can reinforce the connection between the second wing panel 201 and the first connecting plate 301 , thereby reinforcing the connection between the chord member 1 and the web member 2 .
[0059] like Figures 1 to 5 As shown, in some embodiments, a first screw hole is opened on the first web 102, and a second screw hole is opened on the second web 202;
[0060] The connecting plate 3 includes a second connecting plate 302, and the second connecting plates 302 are respectively arranged on both sides of the first web 102 and the second web 202; the second connecting plate 302 is connected to the first web 102 by a first bolt 311 arranged in the first screw hole and the third screw hole 310, and the second connecting plate 302 is connected to the second web 202 by a second bolt 321 arranged in the second screw hole and the fourth screw hole 320;
[0061] A first adhesive layer is connected between the first web 102 and the second connecting plate 302 , respectively. A second adhesive layer 210 is connected between the second web 202 and the second connecting plate 302 , respectively.
[0062] A third screw hole 310 and a fourth screw hole 320 are opened through the second connecting plate 302, and the first web 102 of the first I-shaped bar and the second web 202 of the second I-shaped bar are connected through the second connecting plate 302 and the first bolt 311 and the second bolt 321, thereby facilitating the connection between the chord 1 and the web 2 to be strengthened.
[0063] The first adhesive layer can reinforce the connection between the first web 102 and the second connecting plate 302 , and the second adhesive layer 210 can reinforce the connection between the second web 202 and the second connecting plate 302 , thereby reinforcing the connection between the chord 1 and the web 2 .
[0064] like Figures 1 to 6 As shown, in some embodiments, the connecting plate 3 includes a third connecting plate 303, two third connecting plates 303 are respectively arranged on the inner sides of the first wing plate 101 and the second wing plate 201 on both sides, and the two third connecting plates 303 are respectively arranged on both sides of the first web plate 102 and the second web plate 202; the third connecting plate 303 is connected to the first wing plate 101 through a first bolt 311 arranged in the first screw hole and the third screw hole 310, and the third connecting plate 303 is connected to the second wing plate 201 through a second bolt 321 arranged in the second screw hole and the fourth screw hole 320;
[0065] A first adhesive layer is connected between the first wing plate 101 and the third connecting plate 303 , and a second adhesive layer 210 is connected between the second wing plate 201 and the third connecting plate 303 .
[0066] A third screw hole 310 and a fourth screw hole 320 are opened through the third connecting plate 303. By arranging the third connecting plate 303 on the inner sides of the first wing plate 101 of the first I-shaped rod and the second wing plate 201 of the second I-shaped rod, and connecting the first wing plate 101 and the second wing plate 201 through the third connecting plate 303 and the first bolt 311 and the second bolt 321, the connection between the chord 1 and the web 2 is further strengthened.
[0067] The first adhesive layer can reinforce the connection between the first wing panel 101 and the third connecting plate 303 , and the second adhesive layer 210 can reinforce the connection between the second wing panel 201 and the third connecting plate 303 , thereby reinforcing the connection between the chord member 1 and the web member 2 .
[0068] like Figure 1 As shown, in some embodiments, the lower portion of the chord 1 is configured as a square bar, and one end of the first wing plate 101 and the first web 102 of the first I-shaped bar are both connected to one side wall of the chord 1, thereby facilitating the connection between the first I-shaped bar at the upper portion of the chord 1 and the square bar at the lower portion of the chord 1.
[0069] The upper part of the chord 1 is provided with two first I-shaped rods, which are arranged at a V-shaped angle, so that the two first I-shaped rods at the upper part of the chord 1 are conveniently connected to a second I-shaped rod of the web 2 respectively.
[0070] Specifically, the square bar at the bottom of the chord 1 is arranged horizontally, and the lower end of the first I-shaped bar at the top of the chord 1 is connected to one side wall of the square bar. The lower end of the second I-shaped bar of the web member 2 is connected to the upper end of the first I-shaped bar at the top of the chord 1.
[0071] like Figure 1 and Figures 4 to 6 As shown, specifically, a third screw hole 310 is opened at the lower part of the connecting plate 3, and a fourth screw hole 320 is opened at the upper part.
[0072] like Figure 1 As shown, specifically, the first I-shaped rod at the upper portion of the chord rod 1 and the square rod at the lower portion are connected to form an integrated structure.
[0073] like Figure 2 and Figure 3 As shown, specifically, the first bolt 311 and the second bolt 321 are both provided with a bolt head 4, and the bolt head 4 is both arranged at the outer end. The first bolt 311 and the second bolt 321 are both connected with a nut 5, and the nut 5 is both arranged at the inner end, so that the structure in which the chord 1 and the web 2 are connected through the connecting plate 3 is neat and orderly.
[0074] The outer end refers to the end of the first bolt 311 located on the side of the first wing plate 101 away from the first web plate 102, the end of the second bolt 321 located on the side of the second wing plate 102 away from the second web plate 202, and the end of the first bolt 311 located on the side of the first web plate 102 away from the adjacent first web plate 102. The inner end refers to the end of the first bolt 311 located on the side of the first wing plate 101 close to the first web plate 102, the end of the second bolt 321 located on the side of the second wing plate 102 close to the second web plate 202, and the end of the first bolt 311 located on the side of the first web plate 102 close to the adjacent first web plate 102.
[0075] Washers 6 are provided between the bolt heads 4 and nuts 5 and the adjacent connecting plates 3, respectively, so as to reinforce the structure in which the chord members 1 and the web members 2 are connected via the connecting plates 3, making the connection structure more firm and reliable.
[0076] like Figures 1 to 6 As shown, in some embodiments, the connecting plate 3 is configured as a rectangular plate, and the first screw hole and the third screw hole 310 and the second screw hole and the fourth screw hole 320 are respectively configured as at least two, and are respectively symmetrically distributed or evenly distributed, so as to facilitate setting the number of the third screw hole 310 and the fourth screw hole 320 on the connecting plate 3 according to actual conditions.
[0077] Specifically, Figure 4 As shown, the first connecting plate 301 is set as a rectangular plate, and four first screw holes and four second screw holes are respectively opened on the first wing plate 101 and the second wing plate 201, and four third screw holes 310 and four fourth screw holes 320 are opened on the first connecting plate 301. The four first screw holes, the four second screw holes, the four third screw holes 310 and the four fourth screw holes 320 are respectively distributed in groups of two. For example, two third screw holes 310 are respectively opened on the left and right sides of the lower part of the first connecting plate 301, and two fourth screw holes 320 are respectively opened on the left and right sides of the upper part; the two third screw holes 310 and the two fourth screw holes 320 on the left side of the first connecting plate 301 are distributed in a rectangular shape, and the two third screw holes 310 and the two fourth screw holes 320 on the right side are also distributed in a rectangular shape.
[0078] like Figure 5 As shown, the second connecting plate 302 is set as a rectangular plate, and the first web 102 and the second web 202 are respectively provided with seven first screw holes and seven second screw holes, and the second connecting plate 302 is provided with seven third screw holes 310 and seven fourth screw holes 320. The seven first screw holes, the seven second screw holes, the seven third screw holes 310 and the seven fourth screw holes 320 are respectively evenly distributed. For example, the lower part of the second connecting plate 302 is provided with seven third screw holes 310, and the upper part is provided with seven fourth screw holes 320.
[0079] like Figure 6 As shown, the third connecting plate 303 is set as a rectangular plate and has two third screw holes 310 and two fourth screw holes 320. The two third screw holes 310 and the two fourth screw holes 320 are evenly distributed and rectangularly distributed. For example, the lower part of the third connecting plate 303 has two third screw holes 310, and the upper part has two fourth screw holes 320.
[0080] like Figure 7 As shown, the second aspect of this embodiment provides a construction method of the steel truss beam chord and web member connection structure as described in the first aspect of this embodiment, comprising the following steps:
[0081] Step S1, manufacturing chord members and web members: manufacturing chord members 1 and web members 2 according to design documents;
[0082] Step S2, assembling the chord bar and the web bar: setting the chord bar 1 at a preset position, and setting the web bar 2 at a position connected to the chord bar 1;
[0083] Step S3, connecting the chord member and the web member: connecting the first screw hole and the third screw hole 310 with the first bolt 311, connecting the second screw hole and the fourth screw hole 320 with the second bolt 321, and connecting the chord member 1 and the web member 2 through the connecting plate 3.
[0084] The construction method of the steel truss chord and web connection structure of this embodiment eliminates the welding step in the traditional construction process, and can simplify the construction process and shorten the construction period while ensuring the construction quality of the steel truss.
[0085] like Figure 8 As shown, in some embodiments, after the step of manufacturing the chord and the web and before the step of assembling the chord and the web, the following steps are performed:
[0086] Step S11, bolt performance test: testing the tensile strength of the first bolt 311 and the second bolt 321;
[0087] After the step of assembling the chord and the web, and before the step of connecting the chord and the web, the following steps are performed:
[0088] Step S21, applying glue to the chord member and the web member: a first adhesive layer is provided on the chord member 1, and a second adhesive layer 210 is provided on the web member 2;
[0089] Step S22, gluing the connecting plate: connecting the first adhesive layer and the second adhesive layer 210 to the connecting plate 3;
[0090] After completing the steps for connecting the chords and webs, proceed with the following steps:
[0091] Step S31, anti-corrosion treatment: performing anti-corrosion treatment on the surfaces of the chord member 1, the web member 2 and the connecting plate 3.
[0092] After the step of performing the bolt performance test and before the step of assembling the chord member and the web member, the following steps are performed: Step S12, grinding the friction surface: grinding the connecting plate 3 and the friction surfaces thereof in contact with the chord member 1 and the web member 2.
[0093] The construction method of the steel truss beam chord and web member connection structure of this embodiment may specifically include the following steps:
[0094] Step S1, manufacturing chord and web: manufacturing chord 1 and web 2 according to the design documents. In the design process of each component of the bridge, the first screw hole and the second screw hole are respectively set at the local connection of the chord 1 and the web 2, and the local force requirements of the steel truss connection node are verified according to the design and construction specifications, and the size, quantity, and position of the first screw hole and the second screw hole, the first bolt 311 and the second bolt 321 on the chord 1 and the web 2 are specifically determined.
[0095] Step S11, bolt performance test: The first bolt 311 and the second bolt 321 used in the connection structure between the steel truss chord and the web are high-strength bolts. According to the apertures of the first screw hole and the second screw hole determined in the step of manufacturing the chord and the web, the nominal diameters of the first bolt 311 and the second bolt 321 are determined respectively. The diameters of the first bolt 311 and the second bolt 321 are respectively smaller than the apertures of the first screw hole and the second screw hole, for example, 2 mm smaller; at the same time, according to the diameters of the first bolt 311 and the second bolt 321 and the thickness of the chord 1 and the web 2, the appropriate lengths of the first bolt 311 and the second bolt 321 and the thickness of the nut 4 are selected to meet the requirement that the exposed threads of the first bolt 311 and the second bolt 321 are two to three buckles after installation. The tensile strength of the first bolt 311 and the second bolt 321 is not less than 0.8 times the design value of the tensile bearing capacity, and the shear bearing capacity is calculated according to the number of shear surfaces of the first bolt 311 and the second bolt 321 and the engineering diameter of the bolt.
[0096] Step S12, grinding friction surface: grinding the connection plate 3 and its friction surfaces in contact with the chord 1 and the web 2. The friction surface includes the contact surfaces of the chord 1, the web 2 and the connection plate 3. Use a wire brush or sandpaper to remove the surface corrosion of the chord 1, the web 2 and the connection plate 3. When using a wire bundle to remove rust, the rust removal direction is perpendicular to the force direction. After rust removal, use a pneumatic angle grinder to grind the friction surface. After grinding, the anti-slip coefficient of each friction surface of the steel chord 1, the web 2 and the connection plate 3 is not less than 0.4. The connection plate 3 is made of steel plate.
[0097] Step S2, assembling the chord and the web: first install the chord 1 to the specified position and fix it, then use a large lifting device to lift the web 2, accurately assemble the connection between the web 2 and the chord 1, keep the interface connection smooth, and then fix the posture of the chord 1 and the web 2, waiting for the subsequent installation of the first bolt 311 and the second bolt 321.
[0098] Step S21, glue chord and web: Set an adhesive layer on the chord 1 and web 2. The adhesive layer includes adhesive material at the joint. Before construction, process the metal structural adhesive to a usable state. Check whether there are bubbles in the colloid before use. If there are bubbles, reprocess it. Then evenly apply the colloid to the friction surface of the chord 1 and web 2. The thickness of the adhesive layer is 2mm.
[0099] Step S22, gluing the connecting plate: align the third screw hole 310 with the first screw hole, and the fourth screw hole 320 with the second screw hole between the connecting plate 3 and the chord 1 and the web 2, and firmly and stably adhere the connecting plate 3 to the connection between the chord 1 and the web 2.
[0100] Step S3, connecting the chord and the web: This step is completed before the adhesive layer gels. First, place gaskets 6 at the positions of the first screw hole, the second screw hole, the third screw hole 310 and the fourth screw hole 320, respectively, so that the gaskets 6 are aligned with the centers of the screw holes, then pass the first bolt 311 through the first screw hole and the third screw hole 310, pass the second bolt 321 through the second screw hole and the fourth screw hole 320, and then screw on the nuts 4 respectively, and then use 50% of the final tightening torque to complete the initial tightening and re-tightening, and complete the final tightening within one day, and scrape off the glue of the adhesive layer overflowing from the boundary after the tightening is completed.
[0101] Step S31, anti-corrosion treatment: performing anti-corrosion treatment on the surface of the steel structure.
[0102] The above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
[0103] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0104] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to has a specific orientation, is constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0105] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
Claims
1. A steel truss beam chord and web member connection structure, characterized in that: include: The chord rod is provided with a first screw hole; The belly bar is provided with a second screw hole; A connecting plate is provided with a third screw hole and a fourth screw hole; the connecting plate and the chord are connected by a first bolt arranged in the first screw hole and the third screw hole, and the connecting plate and the web are connected by a second bolt arranged in the second screw hole and the fourth screw hole.
2. The steel truss beam chord and web connection structure according to claim 1, characterized in that: A first adhesive layer is connected between the connecting plate and the chord rod.
3. The steel truss beam chord and web connection structure according to claim 2, characterized in that: A second adhesive layer is connected between the connecting plate and the web.
4. The steel truss beam chord and web connection structure according to claim 3, characterized in that: The upper part of the chord is set as a first I-shaped rod, the first I-shaped rod includes first wing plates and a first web plate on both sides, the first web plate is connected between the first wing plates on both sides, and the first wing plates on both sides are respectively provided with the first screw holes; The web member is configured as a second I-shaped rod, the second I-shaped rod comprises second wing plates and a second web plate at two sides, the second web plate is connected between the second wing plates at two sides, and the second wing plates at two sides are respectively provided with the second screw holes; The connecting plate comprises a first connecting plate, and the first connecting plates are respectively arranged on the outer sides of the first wing plate and the second wing plate on both sides; the first connecting plate is connected to the first wing plate by a first bolt arranged in the first screw hole and the third screw hole, and the first connecting plate is connected to the second wing plate by a second bolt arranged in the second screw hole and the fourth screw hole; The first adhesive layer is connected between the first wing plate and the first connecting plate, respectively, and the second adhesive layer is connected between the second wing plate and the first connecting plate, respectively.
5. The steel truss beam chord and web connection structure according to claim 4, characterized in that: The first web is provided with the first screw hole, and the second web is provided with the second screw hole; The connecting plate comprises a second connecting plate, and the second connecting plates are respectively arranged on both sides of the first web and the second web; the second connecting plate is connected to the first web via a first bolt arranged in the first screw hole and the third screw hole, and the second connecting plate is connected to the second web via a second bolt arranged in the second screw hole and the fourth screw hole; The first adhesive layer is connected between the first web and the second connecting plate, respectively, and the second adhesive layer is connected between the second web and the second connecting plate, respectively.
6. The steel truss beam chord and web connection structure according to claim 4, characterized in that: The connecting plate includes a third connecting plate, two third connecting plates are respectively arranged on the inner sides of the first wing plate and the second wing plate on both sides, and the two third connecting plates are respectively arranged on both sides of the first web plate and the second web plate; the third connecting plate is connected to the first wing plate by a first bolt arranged in the first screw hole and the third screw hole, and the third connecting plate is connected to the second wing plate by a second bolt arranged in the second screw hole and the fourth screw hole; The first adhesive layer is connected between the first wing plate and the third connecting plate, respectively, and the second adhesive layer is connected between the second wing plate and the third connecting plate, respectively.
7. The steel truss beam chord and web connection structure according to claim 6, characterized in that: The lower part of the chord is set as a square rod, and one end of the first wing plate and the first web of the first I-shaped rod are both connected to one side wall of the chord; The upper part of the chord rod is arranged as two first I-shaped rods, and the two first I-shaped rods are arranged at a V-shaped angle.
8. The steel truss chord and web connection structure according to any one of claims 1 to 7, characterized in that: The connecting plate is configured as a rectangular plate, and the first screw hole and the third screw hole as well as the second screw hole and the fourth screw hole are configured as at least two, and are symmetrically or evenly distributed.
9. A construction method for a steel truss chord and web connection structure according to any one of claims 1 to 8, characterized in that: The following steps are involved: Manufacturing chord members and web members: manufacturing the chord members and web members according to the design documents; Assembling the chord rod and the web rod: setting the chord rod at a preset position, and setting the web rod at a position connected with the chord rod; Connecting the chord and the web: connecting the connecting plate and the chord through the first bolts set in the first screw hole and the third screw hole, and connecting the connecting plate and the web through the second bolts set in the second screw hole and the fourth screw hole.
10. The construction method of the steel truss beam chord and web member connection structure according to claim 9, characterized in that: After the step of manufacturing the chord and the web, and before the step of assembling the chord and the web, the following steps are performed: Bolt performance test: testing the tensile strength of the first bolt and the second bolt; After the step of assembling the chord and the web, and before the step of connecting the chord and the web, the following steps are performed: Glue-spreading chord rod and web rod: the first adhesive layer is arranged on the chord rod, and the second adhesive layer is arranged on the web rod; Adhesive connecting plate: connecting the first adhesive layer and the second adhesive layer on the connecting plate; After completing the steps for connecting the chords and webs, proceed with the following steps: Anti-corrosion treatment: Anti-corrosion treatment is performed on the surfaces of the chord, the web and the connecting plate.