Beam body turning system and construction method
By using a combined installation method of components such as adjustable elevation level brackets, ball hinges, etc. in the bridge rotary system, the problems of complex installation and inconvenient disassembly are solved, and more efficient construction and lower cost engineering operations are achieved.
Patent Information
- Application Number
- CN202410558638.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-08
- Publication Date
- 2024-11-12
AI Technical Summary
The existing bridge rotary system has complex installation methods and is inconvenient to disassemble, resulting in low reuse rate.
The combined installation method of the rotary system is simplified by the installation process of the rotary system and the auxiliary disassembly through auxiliary disassembly The device enables safer and more efficient disassembly.
It improves the installation convenience and disassembly efficiency of the rotary system, makes the components easier to reuse, reduces engineering costs, and ensures installation accuracy and safety.
Smart Images

Figure CN118932885A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of bridge construction, and in particular to a beam rotation system and a construction method. Background Art
[0002] In recent years, with the rapid development of my country's transportation infrastructure construction, there are more and more cases of new bridges crossing with existing railways, highways, etc. In order to reduce or eliminate the impact on existing lines and ensure that the project can be completed in a high-quality, safe and fast manner, bridge rotation schemes have been increasingly used, and the rotation method has evolved from pier bottom rotation to pier top high-position rotation. Although conventional pier top rotation is safer and more economical than pier bottom rotation, it still has some disadvantages, such as low reuse rate of rotation parts. Conventional pier top rotation systems mostly only recycle the legs and sand boxes after the rotation is completed, and the reuse rate of parts is low. At the same time, the installation method of the rotation parts is relatively complicated and inconvenient to disassemble. Summary of the invention
[0003] The invention provides a construction method of a beam body rotation system, which is used to solve the defects of the prior art that the installation method of the rotation body parts is relatively complicated and the disassembly is inconvenient.
[0004] To achieve the above object, the technical solution of the present invention is: a construction method of a beam rotation system, comprising:
[0005] Step 1: Install the height adjustable bracket;
[0006] Step 2: Pre-embed steel plates on the pier top;
[0007] Step 3: Install the ball joint;
[0008] Step 4: Install the support legs and sand box;
[0009] Step 5: Install the slideway;
[0010] Step 6: Install the hydraulic motor and curved rack.
[0011] Preferably, before the steel plate is embedded in the pier top, an I-beam truss is installed inside the pier cap.
[0012] Preferably, horizontal and vertical adjustable screw rods are welded around the top of the elevation-adjustable bracket, and the elevation and horizontal position are adjusted by the horizontal and vertical adjustable screw rods after the embedded steel plate is installed, and then the concrete is poured after welding and reinforcement.
[0013] Preferably, the pier top steel plate is hoisted on the I-beam truss, and grooves and reserved holes are processed on the pier top steel plate.
[0014] Preferably, before installing the ball joint, the RPC seat plate embedded in the pier top needs to be cleaned.
[0015] Preferably, the upper end of the support leg is fixed to the embedded steel plate at the bottom of the beam by bolts, maintaining a 2 cm gap with the bottom slide; the sand box is bolted to the embedded steel plate at the bottom of the beam and is tightly attached to the steel plate.
[0016] A second aspect of the present invention further provides a beam rotation system applied to the construction method of the beam rotation system described in any one of the above embodiments, comprising:
[0017] A ball joint, the ball joint comprises a ball joint base, a ball joint clamp, a ball joint wedge block, a ball joint lower plate, and a ball joint upper plate, the ball joint base contacts the top of the pier, the upper end of the ball joint base contacts the bottom surface of the ball joint wedge block, the ball joint clamp comprises two integral annular steel plates, the ball joint wedge block comprises two slidable inclined steel blocks, the two inclined steel blocks are juxtaposed together, the ball joint lower plate contacts the upper part of the ball joint wedge block, and the ball joint upper plate contacts the bottom steel plate of the beam; a sand box, used to provide vertical bearing capacity for the beam during construction; a support leg, fixedly connected to the embedded steel plate at the bottom of the beam; a hydraulic motor mounting system, comprising a hydraulic motor and an arc-shaped rack, the arc-shaped rack is bolted to the bottom of the embedded steel plate, and the hydraulic motor is used to drive the beam to rotate.
[0018] Preferably, the upper portion of the ball joint lower plate is a concave surface, and the lower portion of the ball joint upper plate is a convex surface.
[0019] Preferably, the sand box includes a sand bucket, a steel bucket inserted into the sand bucket and supported on the bottom of the beam, and bolts connecting the sand bucket and the steel bucket.
[0020] The outside of the support leg is a steel cylinder, and the inside of the steel cylinder is filled with high-strength concrete.
[0021] Compared with the prior art, the beneficial effects of the present invention are: the swivel system is installed by installing a horizontally adjustable bracket, pre-embedding a steel plate on the pier top, installing a ball joint, installing a support leg and a sand box, installing a slide, installing a hydraulic motor and an arc rack, thereby improving the construction method of the swivel system, making the installation of the swivel system more convenient and thus making the disassembly more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] Figure 1 It is one of the flow diagrams of the construction method provided by the present invention;
[0024] Figure 2 is a cross-sectional schematic diagram of a rotary system provided by the present invention;
[0025] Figure 3 is a top view of the swivel system provided by the present invention;
[0026] Figure 4 It is a structural schematic diagram of the ball joint provided by the present invention;
[0027] Figure 5 It is a structural schematic diagram of the hydraulic motor installation device provided by the present invention;
[0028] Figure 6 It is a structural schematic diagram of the ball joint auxiliary disassembly device provided by the present invention.
[0029] In the figure:
[0030] 10. Ball joint; 11. Ball joint base; 12. Ball joint clamp; 13. Ball joint wedge block; 14. Ball joint lower plate; 15. Ball joint upper plate; 20. Support foot; 30. Hydraulic motor; 40. Arc rack; 50. Slide; 60. Mounting device; 61. Adjusting screw rod; 62. Fixing nut; 63. Adjusting nut; 70. Disassembly device; 71. I-beam; 72. Steel plate; 73. Bolt; 80. Hydraulic motor base connecting steel plate; 81. Connecting hole; 90. Pier top connecting steel plate; 91. Adjusting hole. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] like Figures 1 to 6 As shown, an embodiment of the present application provides a beam rotation system, including a ball joint 10, a sand box, a support leg 20 and a hydraulic motor 30 system.
[0033] The ball joint 10 includes a ball joint base 11, a ball joint hoop 12, a ball joint wedge block 13, a ball joint lower plate 14, and a ball joint upper plate 15. The ball joint base 11 contacts the top of the pier, and the upper end of the ball joint base 11 contacts the bottom surface of the ball joint wedge block 13. The ball joint hoop 12 includes two whole annular steel plates, which are spliced together by the two annular steel plates and are used to restrain the components of the internal ball joint 10. The ball joint wedge block 13 includes two slidable inclined steel blocks, which are juxtaposed and non-connected together. The ball joint lower plate 14 contacts the upper part of the ball joint wedge block 13, and the upper part of the ball joint lower plate 14 is concave. The ball joint upper plate 15 is connected to the bottom steel plate of the beam. The lower part of the ball joint upper plate 15 is a downward convex surface, the sand box includes a sand bucket, a steel bucket inserted into the sand bucket and supported at the bottom of the beam, and bolts connecting the sand bucket and the steel bucket. The sand box provides vertical bearing capacity for the beam during construction. The support leg 20 fixes the embedded steel plate at the bottom of the beam. The outside of the support leg 20 is a steel cylinder filled with high-strength concrete. Each swivel system is composed of 6 groups of sand boxes, which provide anti-overturning effect during the rotation process. The hydraulic motor 30 installation system includes a hydraulic motor 30 and an arc rack 40. The arc rack 40 is bolted under the embedded steel plate. The hydraulic motor 30 is used to drive the beam to rotate. Multiple groups of hydraulic motors 30 are arranged and connected in parallel with each other.
[0034] A second aspect of the present invention further provides a construction method using the beam rotation system of any one of the above embodiments, comprising:
[0035] Step 1: Install the height adjustable bracket;
[0036] Before pouring the pier cap concrete, an I-beam truss is installed inside the pier cap to fix the embedded steel plate on the pier top. Since the embedded steel plate on the pier top has high horizontal accuracy requirements, it is very important for the accurate installation of the entire rotation system device. The use of height-adjustable horizontal bracket tooling construction ensures installation accuracy. Horizontal and vertical adjustable screws are welded around the top of the height-adjustable horizontal bracket. After the embedded steel plate is installed, the elevation and horizontal position are adjusted by the screw to meet the design requirements of no more than 3mm in plane height difference and no more than 2mm in horizontal deviation. After welding and reinforcement, pour concrete.
[0037] Step 2: Pre-embed steel plates on the pier top;
[0038] The pier top steel plate is hoisted on the leveled and firmly fixed I-beam truss. The steel plate is processed in advance, and a groove for embedding the base of the support, a support leg 20 and a reserved hole for installing the support are arranged on the top.
[0039] Step 3: Install the ball joint 10;
[0040] Before installing the ball joint 10, clean the stains and rust on the surface of the RPC (RPC is a high-performance cement-based material with ultra-high strength, high durability, high toughness and good volume stability) seat plate embedded on the pier top, evenly apply silicone grease on the surface of the slider, and install the ball joint base 11, the ball joint 10 wedge block (that is, the ball joint wedge block 13 is spliced), the ball joint upper plate 15 and the ball joint lower plate 14 in sequence. The ball joint base 11 is accurately placed in the groove of the ball joint 10 of the seat plate reserved on the pier top, a group of ball joint 10 wedge blocks are arranged between the ball joint lower plate 14 and the ball joint base 11, and an ultra-high molecular weight polyethylene slider is laid on the contact surface, the ball joint lower plate 14 is provided with an upward concave spherical surface, and the ball joint upper plate 15 is provided with a convex spherical surface matching it, and the ultra-high molecular weight polyethylene slider is laid on the spherical surface. An annular hoop is provided outside the ball joint 10, which is fastened with bolts and fixed to the reserved hole of the pier top seat plate by bolts. The gap between the annular hoop and the upper plate 15 of the ball joint is filled with grease and sealed with tape. The top surface of the ball joint 10 is installed horizontally, and the error between any two points on the top surface is no more than 1mm. The rotation center of the ball joint 10 is located at the designed position, and its error is: ±1mm along the bridge direction and ±1.5mm across the bridge direction.
[0041] Step 4: Install the support legs 20 and the sand box;
[0042] The upper end of the support leg 20 is bolted to the embedded steel plate at the bottom of the beam, and a 2cm gap is maintained with the bottom slide 50; the sand box is bolted to the embedded steel plate at the bottom of the beam, and the upper and lower ends are closely attached to the steel plate, bearing the load during the cantilever casting of the continuous beam. The lower end of the support leg 20 is provided with a circular 25# channel steel clamp for mutual connection and force transmission. The circular channel steel clamp also serves as the force support for the auxiliary jack during the rotation start.
[0043] Step 5: Install the slideway 50;
[0044] The pre-buried seat plate on the pier top is used as a slideway 50 with a diameter of 4 meters. The seat plate is 0.20 meters thick. A steel walkway with a length of 1.2 meters, a width of 0.65 meters, and a thickness of 30 mm is provided under the support leg 20. A 2 mm thick stainless steel plate is laid on the bottom of the steel walkway, and a tetrafluoroethylene plate is laid on the slideway 50.
[0045] Step 6: Install the hydraulic motor 30 and the arc rack 40.
[0046] First, bolt the arc rack 40 to the embedded steel plate of the beam body, and then install the hydraulic motor 30. The precise installation of the hydraulic motor 30 is very important, which will determine the bite effect of the gear and the arc rack 40, and then affect the stability of the rotation. By developing the installation device 60 of the hydraulic motor 30, the hydraulic motor 30 is placed on the installation device 60. The installation device 60 is installed between the base connecting steel plate of the hydraulic motor 30 and the pier top connecting steel plate 90. A connecting hole 81 is set on the base connecting steel plate of the hydraulic motor 30, and an adjustment hole 91 is set on the pier top connecting steel plate 90. The installation device 60 includes an adjusting screw 61, a fixing nut 62 and an adjusting nut 63. The adjusting nut 63 is turned to make the device roughly horizontal. The adjusting hole 91 is placed at the position of the reserved hole on the pier top along the center direction of the ball joint 10 and initially fixed by bolt connection. The mechanical transmission group of the hydraulic motor 30 is fixed to the installation device 60 by bolt connection. Turn the adjusting nut 63 to adjust the horizontal height of the hydraulic motor 30 to ensure that the gear on the top of the hydraulic motor 30 and the arc-shaped rack 40 have enough reserved space. Appropriately loosen the bolts at the adjustment hole 91, and fine-tune the horizontal position of the installation device 60 so that the gear on the hydraulic motor 30 and the arc-shaped rack 40 engage with each other and have an appropriate gap. After confirming that they are correct, tighten the bolts to fix them. Fine-tune the adjusting nut 63 again to make the hydraulic motor 30 level. Turn the fixing nut 62 on the top of the installation device 60 and the fixing nut 62 under the adjusting nut 63 to lock the adjustment system of the device, and complete the entire installation of the installation device 60.
[0047] The swivel system is installed by installing a horizontally adjustable bracket, embedding a steel plate on the pier top, installing a ball joint, installing a support leg and a sand box, installing a slide, and installing a hydraulic motor and an arc rack. This improves the construction method of the swivel system, making the installation of the swivel system more convenient and making it easier to disassemble.
[0048] Correspondingly, after the swivel system is installed, it will be dismantled accordingly to facilitate reuse.
[0049] The removal method includes the following steps:
[0050] (1) Removal of the sand box and support legs 20
[0051] After the rotation is in place, the beam body is temporarily locked and the side span closing section is constructed. After the closing section is constructed, the sand box is taken out, and the arc rack 40 at the bottom of the beam, the hydraulic motor 30 at the top of the pier and the support leg 20 at the top of the beam that affects the installation of the support are disassembled in turn, and the pier top working platform is moved out, the support leg 20 clamping hoop and the support leg 20 that affects the installation of the support are removed, and the support installation device 60 is used to push the support to the support position, tighten the upper support plate connecting bolts, tie the pad stone steel bars to complete the construction of the pad stone concrete, and remove the remaining support legs 20 after the pad stone reaches the strength requirements.
[0052] (2) Support installation and pad stone pouring
[0053] Lift the support to the top of the support placement frame, use a hand winch to pull the support to the bottom of the beam at the support on the other side, adjust the support plane position, align the support anchor bolts with the reserved support bolt holes at the bottom of the beam, and use a hand-cranked jack to push up the lower support plate of the support until the upper support plate of the support is in close contact with the steel plate at the bottom of the beam without any gaps, screw the upper support plate connection bolts into the reserved bolt holes of the support at the bottom of the beam, firmly connect the support to the bottom of the beam, and install the lower support plate anchor bolts; move the support placement device to the opposite support position. Tie the support pad stone steel bars, install the formwork, and complete the pouring of the pad stone concrete.
[0054] (3) Removal of ball joint 10
[0055] During the disassembly of the ball joint 10, the weight of the continuous beam will be transferred from the ball joint 10 to the support. The load during the system conversion process is extremely large, and the ball joint clamp 12 is subjected to a large lateral pressure. The stress is released during the removal of the clamp bolts, which will cause the bolts to crack, posing a safety risk.
[0056] The auxiliary disassembly device 70 of the ball joint 10 is used. The auxiliary disassembly device 70 of the ball joint 10 includes an I-beam 71. The I-beam 71 is constructed to be cocircular with the outer side of the ball joint clamp 12. A steel plate 72 is provided at the end of the I-beam 71. Two I-beams 71 are provided and connecting holes 81 are opened on the steel plates 72 at the connection between each other and connected with bolts 73. The stress of the ball joint clamp 12 is slowly and evenly released. First, the auxiliary disassembly device 70 is installed on the outer side of the ball joint clamp 12 to constrain the ball joint clamp 12 and reduce the tension of the bolts outside the ball joint clamp 12.
[0057] To remove the annular sleeve bolts of the ball joint 10, the ball joint 10 must be tightened symmetrically on both sides, and all bolts must be removed simultaneously. The length of the thread screwed out each time must be the same, so that the bolt group is always in an overall stress state, avoiding excessive stress on a single bolt, resulting in cracking and injury.
[0058] As the clamp bolts are loosened, the bolts of the auxiliary disassembly device 70 are loosened synchronously and slowly, and the space inside the ball joint 10 gradually increases. The wedge-shaped block of the ball joint 10 slides out laterally under the pressure of the beam body, and the load of the beam body is converted to be borne by the support, thereby achieving the purpose of non-destructive disassembly of the ball joint 10 and realizing the reuse of the ball joint 10.
[0059] In summary, the present invention has the following beneficial effects:
[0060] Compared with the conventional pier top swivel, the components of the patent of the present invention, such as the ball joint 10, the sand box, the support leg 20, the hydraulic motor 30, the auxiliary installation device 60, the auxiliary disassembly device 70, etc., can be reused, thereby effectively reducing the engineering cost.
[0061] The embedded steel plate of the pier cap adopts an elevation and horizontal adjustable bracket, which makes the installation of the pier top steel plate more precise and ensures the installation accuracy of the entire rotation system.
[0062] The auxiliary installation device 60 of the hydraulic motor 30 is easy to operate and can be precisely adjusted, so that the engagement between the gear of the hydraulic motor 30 and the arc-shaped rack 40 is more closely matched, thereby ensuring uniform and stable driving force.
[0063] The use of a support auxiliary sliding positioning device makes support installation faster, reduces operating difficulty and labor intensity for operators, and makes support installation positioning more accurate and efficient.
[0064] The auxiliary disassembly device 70 of the ball joint 10 is simple in structure, safe and firm, and easy to operate. It eliminates the bolt cracking that is easy to occur due to the stress release of the clamp during the disassembly process of the ball joint 10, making the disassembly of the ball joint 10 safer and more efficient.
[0065] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A construction method for a beam rotation system, characterized in that: include: Step 1: Install the height adjustable bracket; Step 2: Pre-embed steel plates on the pier top; Step 3: Install the ball joint; Step 4: Install the support legs and sand box; Step 5: Install the slideway; Step 6: Install the hydraulic motor and curved rack.
2. The construction method of the beam rotation system according to claim 1, characterized in that: Before the steel plate is embedded on the pier top, the I-beam truss is installed inside the pier cap.
3. The construction method of the beam rotation system according to claim 1, characterized in that: Horizontal and vertical adjustable screw rods are welded around the top of the elevation-adjustable bracket. After the embedded steel plate is installed, the elevation and horizontal position are adjusted by the horizontal and vertical adjustable screw rods, and then the concrete is poured after welding and reinforcement.
4. The construction method of the beam rotation system according to claim 2, characterized in that: The pier top steel plate is hoisted on the I-beam truss, and grooves and reserved holes are processed on the pier top steel plate.
5. The construction method of the beam rotation system according to claim 1, characterized in that: Before installing the ball joint, the RPC base plate embedded on the pier top needs to be cleaned.
6. The construction method of the beam rotation system according to claim 1, characterized in that: The upper end of the support leg is fixed to the embedded steel plate at the bottom of the beam by bolts and maintains a 2 cm gap with the bottom slide; the sand box is bolted to the embedded steel plate at the bottom of the beam by bolts and is tightly attached to the steel plate.
7. A beam rotation system used in the construction method of the beam rotation system according to any one of claims 1 to 6, characterized in that: include: A ball joint, the ball joint comprises a ball joint base, a ball joint hoop, a ball joint wedge block, a ball joint lower plate, and a ball joint upper plate. The ball joint base contacts the top of the pier, the upper end of the ball joint base contacts the bottom surface of the ball joint wedge block, the ball joint hoop comprises two integral annular steel plates, the ball joint wedge block comprises two slidable inclined steel blocks, the two inclined steel blocks are juxtaposed, the ball joint lower plate contacts the upper part of the ball joint wedge block, and the ball joint upper plate contacts the steel plate at the bottom of the beam; Sand box, used to provide vertical bearing capacity of the beam during its construction; Support legs, fixing the embedded steel plate at the bottom of the connecting beam; The hydraulic motor installation system comprises a hydraulic motor and an arc-shaped rack. The arc-shaped rack is connected under the embedded steel plate with bolts. The hydraulic motor is used to drive the beam body to rotate.
8. The beam rotation system according to claim 7, characterized in that: The upper part of the ball joint lower plate is a concave surface, and the lower part of the ball joint upper plate is a convex surface.
9. The beam rotation system according to claim 7, characterized in that: The sand box comprises a sand bucket, a steel bucket inserted into the sand bucket and supported on the bottom of a beam, and bolts connecting the sand bucket and the steel bucket.
10. The beam rotation system according to claim 7, characterized in that: The outside of the support leg is a steel cylinder, and the inside of the steel cylinder is filled with high-strength concrete.