Desilting construction method for comprehensive improvement of river channel

By using reamers and drive mechanisms to clean silt in the river channel, the problem of damage to the river channel environment in the existing technology is solved, and efficient and environmentally friendly river channel dredging is achieved, which is suitable for sluice expansion projects.

CN118932918AInactive Publication Date: 2024-11-12东莞市运河治理中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411109744.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing river siltation methods are prone to damage the river ecological environment, resulting in deterioration of water quality and poor ecological restoration results.

Method used

A dredging boat is used to clean the river silt, determine the dredging position through the gate position and the water flow direction, and efficiently clean the silt with a reamer and a driving mechanism to avoid direct contact between the dredging device and the river channel and reduce environmental damage.

Benefits of technology

It has achieved efficient, environmentally friendly and intelligent cleaning of river silt, reduced damage to the river ecological environment, and is suitable for sluice expansion projects, improving cleaning efficiency and environmental protection effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932918A_ABST
    Figure CN118932918A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of river regulation, in particular to a dredging construction method for comprehensive regulation of a river, which comprises the following steps: acquiring a gate position and a river water flow direction; determining an upper gate swimming desilting position based on the gate position and the river flow direction; according to the dredging device, the dredging ship is used for cleaning the sludge at the dredging position, the dredging ship is used for cleaning the sludge in the riverway, contact between parts except the dredging mechanism in the dredging device and the riverway is avoided, damage to the normal riverway is avoided while dredging is conducted, efficient, environment-friendly and intelligent cleaning of the riverway sludge can be achieved, and the dredging efficiency is improved. And meanwhile, ecological environment damage to the river channel is reduced, and the method is suitable for sluice extension projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of river channel regulation, and in particular to a dredging construction method for comprehensive river channel regulation. Background Art

[0002] River desilting refers to an engineering activity to clean up sediments, garbage, weeds, etc. in rivers, lakes and other water bodies. The purpose of this work is to maintain the cleanliness of water bodies, improve water quality, ensure the survival of aquatic organisms and promote the sustainable use of water resources. The main purpose of river desilting is to dredge rivers, revet banks and purify water bodies and restore the ecology.

[0003] However, the prior art still has shortcomings. For example, a river dredging method with patent number: CN202410040776.X includes: obtaining various parameters of the river and the part to be dredged; arranging a number of dredging devices at each of the dredging target positions; determining the concentration ratio of aerobic bacteria to anaerobic bacteria in the sludge sample; determining the working parameters of the dredging device according to the water flow velocity at the corresponding position and the concentration ratio; obtaining the suspended turbidity of river water at the dredging target position, and calculating the sludge deposition rate at the dredging target position according to the suspended turbidity and the water flow velocity; determining the adjustment method of the dredging device according to the sludge deposition rate at each of the dredging target positions. This method is easy to cause damage to the ecological environment of the river during the process of cleaning the river. Summary of the invention

[0004] The invention provides a dredging construction method for comprehensive river channel regulation, which is used to solve the problem raised by the background technology.

[0005] In order to achieve the above-mentioned invention object, the present invention provides the following technical solution: a dredging construction method for comprehensive river regulation, comprising the following steps:

[0006] Obtain gate location and river flow direction;

[0007] Determine the desilting position of the upper gate based on the gate location and the direction of river flow;

[0008] Use dredging boats to clean up the silt at the dredging location.

[0009] Preferably, the step: when determining the dredging position upstream of the gate based on the gate position and the direction of river flow, calculate the speed difference of the water flow between the upstream and downstream of the gate, determine the river channel within 100m upstream of the gate as the main dredging channel, and determine the bottom of the main dredging channel as the dredging position.

[0010] Preferably, the dredging elevation of the dredging position is 6.74 m.

[0011] Preferably, in the step: when the silt at the dredging position is cleaned by using a dredging vessel, the cylinder is started and the reamer at the end of the pipe is adjusted to move below the silt at the river bottom.

[0012] Preferably, after the reamer moves to below the riverbed silt, the motor in the driving mechanism is started to start dredging, and the silt is discharged through the pipe 4.

[0013] Preferably, after the dredging position reaches the dredging elevation, the motor is turned off to end the dredging, and the cylinder is started again and the reamer at the end of the pipe is adjusted to move above the river surface.

[0014] Preferably, the dredging vessel is equipped with pipeline three, the bottom end of pipeline three is connected to pipeline four, the top end of pipeline three is connected to pipeline two, the end of pipeline two is connected to the end of the pipeline by a hinge, the other end of the pipeline is rotatably connected to a reamer, the reamer is installed on the output end of the driving mechanism, the driving mechanism is arranged in the pipeline and pipeline two, the output end of the cylinder is hinged to the side wall of the top of the pipeline, the other end of the cylinder is hinged to the mounting rod, and the mounting rod is arranged on the dredging vessel.

[0015] Preferably, the driving mechanism includes: an auger and an auger 2, a disc is installed in the middle of the reamer, a plurality of suction holes are opened on the disc, the end of the auger is installed in the middle of the disc, the auger is rotatably matched with the inner wall of the pipe, the other end of the auger is connected to the end of the coupling, the other end of the coupling is connected to the end of the auger 2, the auger 2 is rotatably matched with the inner wall of the second pipe, the end of the second pipe away from the coupling is installed with the second disc, and the end of the second auger extending outside the second disc is connected to the output end of the motor.

[0016] Preferably, a disc three is coaxially installed in the pipe three, a plurality of guide holes are opened on the disc three, the top surface of the disc three is rotatably matched with the bottom surface of the disc four, the disc four is coaxially arranged with the disc three, the area of ​​the disc four is larger than the area of ​​the disc three, a plurality of guide holes two are opened on the disc four, the aperture of the guide holes two is larger than the aperture of the guide holes, an annular groove is opened on the inner wall of the pipe three, the inner wall of the annular groove is slidably matched with the side wall of the disc four, the top wall of the annular groove is slidably matched with the top surface of the disc four, a suction mechanism is provided in the pipe three, the top of the suction mechanism is connected to the disc four, and the middle part of the disc three is rotatably matched with the suction mechanism.

[0017] Preferably, the suction mechanism includes: a turntable, paddles, a rod body and a spring, the bottom wall of the pipe three is rotatably connected to the turntable, a plurality of paddles are mounted on the top surface of the turntable in a circular array, a circular hole is provided in the middle of the turntable, a longitudinal guide groove is provided on the inner wall of the circular hole, the longitudinal guide groove is slidably matched with a slider, the slider is mounted on the rod body, the rod body is coaxially arranged with the circular hole, the top end of the rod body is connected with the circular disk four, a circular hole two is penetrated in the middle of the circular disk three, the circular hole two is rotatably matched with the rod body, the bottom end of the spring is mounted on the top surface of the turntable, the top end of the spring is connected with the mounting ring, and the mounting ring is coaxially arranged on the rod body.

[0018] The beneficial effects of the present invention are as follows:

[0019] In the scheme of the present invention:

[0020] By using dredging ships to clear the silt in the river channel, the contact between the components other than the dredging mechanism in the dredging device and the river channel is avoided, and the damage to the normal river channel is avoided while dredging. The silt in the river channel can be cleaned efficiently, environmentally friendly and intelligently, while reducing the damage to the ecological environment of the river channel. It is suitable for the expansion project of the sluice. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 is a flow chart of the present invention;

[0022] Figure 2 It is a schematic diagram of the main structure of the present invention;

[0023] Figure 3 It is a schematic diagram of the rotational connection relationship between the reamer and the pipe end of the present invention;

[0024] Figure 4 It is a schematic diagram of the installation position of the auger and the second auger of the present invention;

[0025] Figure 5 It is three cross-sectional views of the pipeline of the present invention;

[0026] Figure 6 This is a schematic diagram of the location of the second diversion hole of the present invention;

[0027] Figure 7 It is a schematic diagram of the spring installation position of the present invention;

[0028] Figure 8 A schematic diagram of the location of the water replenishment hole of the present invention;

[0029] Fig. 9 It is a schematic diagram of the flushing pipe structure of the present invention;

[0030] Fig.10 It is a schematic diagram of the structure of the catheter 2 of the present invention;

[0031] Fig.11 It is a schematic diagram of the structure of the guide slider of the present invention;

[0032] Fig.12 It is a schematic diagram of the pump blade structure of the present invention.

[0033] Among them: reamer 1, pipeline 2, pipeline two 3, pipeline three 4, pipeline four 5, auger 6, auger two 7, disc four 8, guide hole two 9, annular groove 10, turntable 11, paddle 12, rod body 13, spring 14, rod body two 15, cylindrical slider 16, water supply hole 17, conduit 18, conduit two 19, flushing pipe 20, gear 21, gear two 22, gear three 23, gear four 24, lifting plate 25, rod body four 26, gear six 27, guide slider 28, shaft tube 29, pump blade 30. DETAILED DESCRIPTION

[0034] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0035] Example 1: Reference Figure 1-Figure 12 A dredging construction method for comprehensive river regulation comprises the following steps:

[0036] Obtain gate location and river flow direction;

[0037] Determine the desilting position of the upper gate based on the gate location and the direction of river flow;

[0038] Use dredging boats to clean up the silt at the dredging location.

[0039] The principle of the above scheme is:

[0040] The gate position and the direction of the river flow are obtained on the river channel, and then the dredging position upstream of the gate is determined based on the gate position and the direction of the river flow, and the silt at the dredging position is cleared using a dredging ship.

[0041] The beneficial effects of the above scheme are:

[0042] By using dredging ships to clear the silt in the river channel, the contact between the components other than the dredging mechanism in the dredging device and the river channel is avoided, and the damage to the normal river channel is avoided while dredging. The silt in the river channel can be cleaned efficiently, environmentally friendly and intelligently, while reducing the damage to the ecological environment of the river channel. It is suitable for the expansion project of the sluice.

[0043] Example 2: Reference Figure 1-Figure 12 The steps are as follows: when determining the desilting position upstream of the gate based on the gate position and the direction of river flow, the velocity difference of the water flow between the upstream and downstream of the gate is calculated, and the river channel within 100m upstream of the gate is determined as the main desilting river channel, and the riverbed of the main desilting river channel is determined as the desilting position.

[0044] The principle of the above scheme is:

[0045] Affected by the opening and closing of the gate, the water flow in the river channel will change its flow velocity before and after passing through the gate. The water flow velocity upstream of the gate is lower than the water flow velocity downstream of the gate. The sediment in the water flow will accumulate in large quantities under the state of low water flow velocity, and then form silt. Since the amount of silt accumulated in the river channel 100m upstream of the gate is the largest, it is set as the main dredging river channel.

[0046] The beneficial effects of the above scheme are:

[0047] Based on the location of the gate and the water flow velocity in the river channel, the river channel 100m upstream of the gate is determined as the main dredging channel, which is convenient for accurately calculating the dredging position and the length of the upstream river channel for dredging, reducing the workload during dredging and improving the efficiency of dredging.

[0048] Example 3: Reference Figure 1-Figure 12 The dredging elevation of the dredging location is 6.744m.

[0049] The principle of the above scheme is:

[0050] The desilting elevation of the desilting location is set at 6.744m.

[0051] The beneficial effects of the above scheme are:

[0052] Setting the dredging elevation of the dredging position to 6.744m can not only prevent the riverbed from being damaged during dredging, but also maximize the dredging effect of the river, ensure the flow effect of the river water in the river, and further reduce the complexity of the sluice expansion project.

[0053] Example 4: Reference Figure 1-Figure 12 , the steps are as follows: when the silt at the silt removal position is cleaned by using a silt removal boat, the cylinder is started and the reamer 1 at the end of the pipe 2 is adjusted to move below the silt at the bottom of the river.

[0054] After the reamer 1 moves to below the riverbed silt, the motor in the driving mechanism is started and then silt removal begins, and the silt is discharged through the pipe 24 5.

[0055] After the desilting position reaches the desilting elevation, the motor is turned off to end the desilting, and the cylinder is started again to adjust the reamer 1 at the end of the pipeline 2 to move above the river surface.

[0056] The principle of the above scheme is:

[0057] After determining the dredging position and dredging elevation, move the dredging boat above the dredging position, start the cylinder and adjust the reamer 1 at the end of the pipe 2 to move below the riverbed silt, start the motor to use the pipe 2 to suck the silt, and then discharge it through the pipe 2 5. The discharged silt can be discharged to the shore or to a transport vessel for unified collection. When the silt in the river channel is cleaned up, turn off the motor, start the cylinder again and adjust the reamer 1 at the end of the pipe 2 to move above the river surface.

[0058] The beneficial effects of the above scheme are:

[0059] Before cleaning the silt, the cylinder is started, and the reamer 1 at the end of the pipe 2 is adjusted to move below the river bottom. After the cleaning of the silt is completed, the cylinder is started again and the reamer 1 at the end of the pipe 2 is adjusted to move above the river surface to prevent water accumulation in the pipe 2 and corrosion of the pipe 2. The reamer 1 is set on the dredging boat, and the reamer 1 can be moved by the dredging boat to dredge in a designated river channel or a designated dredging position, thereby improving the practicability and convenience of the dredging process.

[0060] Example 5: Reference Figure 1-Figure 12 The dredging boat is equipped with a pipe three 4, the bottom end of the pipe three 4 is connected to a pipe four 5, the top end of the pipe three 4 is connected to a pipe two 3, the end of the pipe two 3 is connected to the end of the pipe 2 through a hinge, the other end of the pipe 2 is rotatably connected to a reamer 1, the reamer 1 is installed on the output end of the driving mechanism, the driving mechanism is arranged in the pipe 2 and the pipe two 3, the top side wall of the pipe 2 is hinged with the output end of the cylinder, the other end of the cylinder is hinged to the mounting rod, and the mounting rod is arranged on the dredging boat.

[0061] The hinged part includes: a spherical shell, a second spherical shell, a through hole and a second through hole. The end of the pipeline 2 is connected to the spherical shell, a through hole is penetrated on the spherical shell, and the axis of the through hole is coaxially arranged with the axis of the pipeline 2. The end of the pipeline 23 is connected to the second spherical shell, a second through hole is penetrated on the second spherical shell, and the axis of the second through hole is coaxially arranged with the axis of the pipeline 23. The spherical shell is rotatably installed in the second spherical shell.

[0062] The principle of the above scheme is:

[0063] When dredging is performed, the cylinder is started, and the other end of the cylinder rotates downward relative to the mounting rod, and the output end of the cylinder drives the pipe 2 to move downward, and the other end of the pipe 2 moves downward relative to the pipe 2 3. When the reamer 1 at the other end of the pipe 2 moves below the riverbed silt, the cylinder is closed and the driving mechanism is started. While the reamer 1 stirs and crushes the silt, the silt enters the pipe 2, the pipe 2 3, the pipe 3 4 and the pipe 4 5 through the driving mechanism, and is discharged to the shore or a transport vessel through the pipe 4 5 for unified collection;

[0064] After the silt is cleaned, the cylinder is started again, and the other end of the cylinder rotates upward relative to the mounting rod. The output end of the cylinder drives the pipe 2 to move upward, and the other end of the pipe 2 moves upward relative to the pipe 2 3. When the reamer 1 at the other end of the pipe 2 moves above the river surface, the cylinder is closed, and the driving mechanism is closed at the same time, and the reamer 1 stops rotating.

[0065] The beneficial effects of the above scheme are:

[0066] The output end of the cylinder is arranged to drive the pipe 2 to move up and down relative to the pipe 2 3, and the pipe 2 is hinged with the pipe 2 3, so as to facilitate the adjustment of the position of the reamer 1 in the river channel;

[0067] The reamer 1 is connected to a driving mechanism, and the driving mechanism is arranged in the pipeline 2 and the pipeline 3. The driving mechanism cooperates with the pipeline 2 and the pipeline 3 to facilitate the suction of the sludge and the crushing of the sludge by the reamer 1.

[0068] Example 6: Reference Figure 1-Figure 12 The driving mechanism includes: an auger 6 and an auger 2 7. A disc is installed in the middle of the reamer 1, and a plurality of suction holes are opened on the disc. The end of the auger 6 is installed in the middle of the disc. The auger 6 rotates with the inner wall of the pipe 2. The other end of the auger 6 is connected to the end of the coupling. The other end of the coupling is connected to the end of the auger 2 7. The auger 2 7 rotates with the inner wall of the pipe 2 3. The end of the pipe 2 3 away from the coupling is equipped with a disc 2. The end of the auger 2 7 that passes through the disc 2 is connected to the output end of the motor.

[0069] The side wall of one end of the coupling is rotatably connected to the inner wall of the pipe 2, and the other side wall of the coupling is rotatably connected to the inner wall of the pipe 2 3.

[0070] The principle of the above scheme is:

[0071] When sludge is sucked out, the output end of the motor rotates to drive the auger 2 7 to rotate, the auger 2 7 drives the auger 6 to rotate through the coupling, the auger 6 drives the reamer 1 to rotate, the auger 6 and the auger 2 7 generate negative pressure in the pipeline 2 and the pipeline 2 3 respectively, and the crushed sludge and river water are sucked into the pipeline 2 and the pipeline 2 3 in turn under the action of the negative pressure.

[0072] The beneficial effects of the above scheme are:

[0073] The reamer 1 is rotatably connected to the pipe 2, which improves the stability of the reamer 1 during rotation;

[0074] The auger 6 and the auger 7 cooperate with the pipeline 2 and the pipeline 3 respectively, so as to create negative pressure in the pipeline 2 and the pipeline 3, and suck the sludge broken by the reamer 1, and at the same time prevent the broken sludge from being thrown out into the river channel by the reamer 1, so as to prevent the sludge from polluting the water quality;

[0075] The auger 6 and the auger 2 7 are connected by a coupling, and the coupling cooperates with the pipeline 2 and the pipeline 2 3. When the height of the pipeline 2 is adjusted, the auger 6 can move synchronously to prevent interference between components.

[0076] Example 7: Reference Figure 1-Figure 12 The pipeline three 4 is coaxially provided with a disk three, on which a plurality of guide holes are provided, the top surface of the disk three is rotatably matched with the bottom surface of the disk four 8, the disk four 8 is coaxially arranged with the disk three, the area of ​​the disk four 8 is larger than the area of ​​the disk three, the disk four 8 is provided with a plurality of guide holes two 9, the aperture of the guide hole two 9 is larger than the aperture of the guide hole, the inner wall of the pipeline three 4 is provided with an annular groove 10, the inner wall of the annular groove 10 is slidably matched with the side wall of the disk four 8, the top wall of the annular groove 10 is slidably matched with the top surface of the disk four 8, a suction mechanism is provided in the pipeline three 4, the top of the suction mechanism is connected with the disk four 8, and the middle part of the disk three is rotatably matched with the suction mechanism.

[0077] The principle of the above scheme is:

[0078] When the reamer 1 starts working, the suction mechanism of the pipe three 4 starts to drive the disc four 8 to rotate. The disc four 8 rotates in coordination with the annular groove. The silt and river water enter the diversion hole in the disc three through the diversion hole two 9 of the disc four 8, and are finally discharged through the pipe four 5. The rotating diversion hole two 9 cooperates with the diversion hole to crush the consolidation or weeds in the pipe three 4.

[0079] The beneficial effects of the above scheme are:

[0080] When there are hard-to-break consolidation objects or weeds in the crushed sludge, the consolidation objects first pass through the diversion hole 2 9, and then pass through the diversion hole of the disc 3. The aperture of the diversion hole 2 9 is larger than that of the diversion hole. The flow velocity of the flowing consolidation objects or weeds passing through the diversion hole 2 9 and the diversion hole changes from small to large, increasing the flow velocity of the water on the surface of the consolidation objects or weeds and reducing the volume of the consolidation objects or weeds.

[0081] The rotating disc 4 8 drives the guide hole 2 9 to rotate relative to the guide hole, further crushing the consolidation or weeds, thereby achieving complete crushing of the consolidation or weeds, reducing the difficulty of processing the sludge after collection, and preventing the pipeline 3 4 from being blocked during operation, thereby ensuring the safety of the device during operation.

[0082] Example 8: Reference Figure 1-Figure 12The suction mechanism includes: a turntable 11, a paddle 12, a rod body 13 and a spring 14. The bottom wall of the pipe three 4 is rotatably connected with the turntable 11, and a plurality of paddles 12 are arranged in a circular array on the top surface of the turntable 11. A circular hole is arranged in the middle of the turntable 11, and a longitudinal guide groove is opened on the inner wall of the circular hole. The longitudinal guide groove is slidably matched with the slider. The slider is installed on the rod body 13. The rod body 13 is coaxially arranged with the circular hole. The top end of the rod body 13 is connected with the disc four 8. A circular hole two is opened through the middle of the disc three. The circular hole two is rotatably matched with the rod body 13. The bottom end of the spring 14 is arranged on the top surface of the turntable 11. The top end of the spring 14 is connected with the mounting ring. The mounting ring is coaxially arranged on the rod body 13.

[0083] A mounting hole is provided on the bottom wall of the pipe 3 4 , the mounting hole is coaxially arranged with the circular hole, and the mounting hole is slidably matched with the rod body 13 .

[0084] The end of the rod body 13 arranged outside the bottom surface of the pipeline three 4 is connected with the rod body two 15, the rod body two 15 and the circular hole three are slidably matched, the circular hole three is arranged on the top surface of the rod body three, the bottom end of the circular hole three is connected with the circular hole four, the inner diameter of the circular hole four is larger than the inner diameter of the circular hole three, the circular hole four is slidably matched with the cylindrical slider 16, the cylindrical slider 16 is installed at the bottom end of the rod body two 15, the side wall of the rod body three is penetrated with a water replenishment hole 17, the side wall of the rod body three is equipped with a slider, the slider is slidably connected with the slide groove, the slide groove is arranged on the inner wall of the conduit 18, one side of the conduit 18 is connected to the end of the conduit two 19, the other end of the conduit two 19 is connected to the water storage tank, the other side of the conduit 18 is connected to the end of the conduit three, the other end of the conduit three is connected to the ends of two flushing pipes 20, the other end of one flushing pipe 20 is connected to the side wall of the pipeline 2, and the other end of the other flushing pipe 20 is connected to the side wall of the pipeline two 3;

[0085] The water replenishment hole 17 is arranged below the conduit 2 19 and the conduit 3;

[0086] The rod body 13 is provided with a gear 21 and a second gear 22 from top to bottom. The number of teeth of the gear 21 is smaller than that of the second gear 22. The second gear 22 is meshed with the third gear 23. The third gear 23 is installed on the output shaft of the second motor. The second motor and the water storage tank are installed on the dredging boat. The output shaft of the second motor is provided with a fourth gear 24. The fourth gear 24 is arranged above the gear 21. The fourth gear 24 is meshed with the fifth gear. The fifth gear is rotatably installed on the second conduit 19.

[0087] The end of a lifting plate 25 is rotatably connected to the rod body 13, and the other end of the lifting plate 25 is rotatably connected to the rod body 26. A gear 6 27 is installed at the top of the rod body 26, and the gear 6 27 is arranged below the gear 5. A plurality of guide sliders 28 are installed on the side wall of the rod body 26, and the guide sliders 28 are slidably connected to the guide chute. The guide chute is opened on the inner wall of the shaft tube 29, and a plurality of pump blades 30 are installed on the shaft tube 29. A pump casing is installed on the conduit 19, and the pump casing is rotatably connected to the shaft tube 29, and the pump blades 30 are arranged in the pump casing.

[0088] The principle of the above scheme is:

[0089] When the reamer 1 starts working, the motor 2 is started, the output shaft of the motor 2 drives the gear 3 23 to rotate, the gear 3 23 drives the gear 2 22 meshing with it to rotate, the gear 22 drives the rod 2 15 and the rod 13 to rotate, the slider on the rod 13 drives the rotating disk 11 and the paddle 12 to rotate by driving the longitudinal guide groove, the rotating paddle 12 sucks the mixture of sludge and water crushed by the reamer 1 in the pipe 3 4, and transports it to the pipe 4 5 through the centrifugal action of the paddle 12;

[0090] When the reamer 1 is working and sludge and water appear intermittently in the pipe three 4, it can be inferred that sludge blockage begins to occur in the pipes 2 and 3, and the pressure on the disc four 8 is reduced. The disc four 8 moves upward under the action of the spring 14, and the disc four 8 drives the rod body 13 and the rod body two 15 to move upward. The gear four 24 is meshed with the gear 21. Since the gear four 24 is larger than the gear three 23, the rotation speed of the rod body 13 and the rod body two 15 becomes faster, and the rod body 13 further drives the rotation speed of the turntable 11 and the blade 12 to accelerate; while the rod body two 15 moves upward, the cylindrical slider 16 moves upward, and the cylindrical slider 16 cooperates with the circular hole three to drive the rod body three to move upward. The slider on the side wall of the rod body three slides with the slide groove, and the rod body three moves upward in the conduit 18. At the same time, the water replenishment hole 17 connects the conduit two 19 and the conduit three; while the rod body 13 moves upward, it drives the lifting plate 25 connected to it to move upward, and the lifting plate 25 carries The rod body 4 26 connected thereto moves upward, and the rod body 4 26 drives the gear 6 27 to move upward. The guide slider 28 on the rod body 4 26 slides with the guide slide groove, and the gear 6 27 is meshed with the gear 4 24 through the gear 5. The synchronous rod body 4 26 starts to rotate. When the rod body 4 26 rotates, the shaft tube 29 and the pump blade 30 are driven to rotate. The water in the water storage tank enters the pipe 2 and the pipe 2 3 through the conduit 2 19, the water replenishment hole 17, the conduit 3 and the flushing pipe 20, The blocked silt is flushed; when the flushing of the silt in pipe 2 and pipe 2 3 is completed, pipe 3 4 starts to continuously transport silt and water to pipe 4 5 again, disc 4 8 moves downward and resets to drive rod body 13 and rod body 2 15 to move downward, gear 3 23 re-engages with gear 2 22, lifting plate 25 drives rod body 4 26 to move downward, gear 6 27 ends the meshing connection with gear 5, and the water supply hole 17 closes conduit 2 19 and conduit 3, ending the water supply to the flushing pipe 20.

[0091] The beneficial effects of the above scheme are:

[0092] A spring 14 is arranged on the rotating disk 11. When there is discontinuous flow of silt and water in the pipe three 4, or when there is no flow of silt and water in the pipe three 4, it can be inferred that there is silt blockage in the pipe 2 and the pipe two 3. Therefore, the pressure on the disc four 8 is reduced, and the spring 14 drives the rod body 13 to move upward. The device can immediately and autonomously flush the pipe 2 and the pipe two 3 to avoid blockage of the device during operation, ensure that the device always works in a safe state, prevent damage to other parts, and reduce the requirements for the operator's operating experience. The device can autonomously handle the fault and reduce the setting of the monitoring and control device, thereby improving the practicality and applicability of the device.

[0093] The water flushing the pipe 2 and the pipe 2 3 can increase the fluidity of the sludge in the pipe 2 and the pipe 2 3, and can also assist in flushing the small amount of sludge in the pipe 3 4, so as to avoid blockage in the pipe 3 4 again;

[0094] When the disc 4 8 rises in the pipe 3 4, since there are blocky solids or gravels that are not easy to break in the pipe 3 4, the solids or gravels first pass through the guide hole 2 9, then enter the guide hole on the disc 3, and then are crushed by the rotation of the blade 12, and are discharged by its centrifugal action; when the volume of the above-mentioned solids or gravels is too large, the solids or gravels first pass through the guide hole 2 9, and then are retained on the disc 3, or the guide hole on the disc 3, and the solids or gravels are ground by the relative rotation of the disc 4 8 and the disc 3, and then crushed into crushed products of qualified volume, which are discharged through the guide hole. While improving the ability of the device to handle large-volume solids or gravels, it can also ensure the continuous operation of the device, avoid the cleaning process of the device, and greatly improve the practicality and automation of the device.

[0095] When the rod 13 moves upward, it drives the lifting plate 25 upward, and after the gear 6 27 is meshed with the gear 5, the pump blade 30 starts to pump the water in the water tank into the flushing pipe 20. When the rod 13 moves downward, it drives the lifting plate 25 downward, and after the gear 6 27 is meshed with the gear 5, the pump blade 30 stops working, which can prevent the water pressure in the water tank from decreasing and causing damage to the device.

[0096] After the water supply hole 17 is closed, the silt or impurities in the flushing pipe 20 can be prevented from entering the water storage tank. When the water supply hole 17 is opened, the flushing pipe 20 can be first cleaned autonomously by the water flow, and then the pipe 2 and the pipe 3 are flushed.

[0097] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation methods. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.

Claims

1. A dredging construction method for comprehensive river regulation, characterized in that: The following steps are involved: Obtain gate location and river flow direction; Determine the desilting position of the upper gate based on the gate location and the direction of river flow; Use dredging boats to clean up the silt at the dredging location.

2. A dredging construction method for comprehensive river regulation according to claim 1, characterized in that: The steps are as follows: when determining the desilting position upstream of the gate based on the gate position and the direction of river flow, the velocity difference of the water flow between the upstream and downstream of the gate is calculated, and the river channel within 100m upstream of the gate is determined as the main desilting river channel, and the riverbed of the main desilting river channel is the desilting position.

3. A dredging construction method for comprehensive river regulation according to claim 2, characterized in that: The dredging elevation of the dredging location is 6.744m.

4. A dredging construction method for comprehensive river regulation according to claim 3, characterized in that: The steps include: when using a dredging boat to clean the silt at the dredging position, starting the cylinder and adjusting the reamer (1) at the end of the pipeline (2) to move below the silt at the river bottom.

5. A dredging construction method for comprehensive river regulation according to claim 4, characterized in that: After the reamer (1) moves to below the riverbed silt, the motor in the driving mechanism is started to start silting, and the silt is discharged through the pipe four (5).

6. A dredging construction method for comprehensive river regulation according to claim 5, characterized in that: After the desilting position reaches the desilting elevation, the motor is turned off to end the desilting, and the cylinder is started again to adjust the reamer (1) at the end of the pipeline (2) to move above the river surface.

7. A dredging construction method for comprehensive river regulation according to claim 6, characterized in that: The dredging vessel is provided with a pipe three (4), the bottom end of the pipe three (4) is connected to a pipe four (5), the top end of the pipe three (4) is connected to a pipe two (3), the end of the pipe two (3) is connected to the end of the pipe (2) via a hinge, the other end of the pipe (2) is rotatably connected to a reamer (1), the reamer (1) is mounted on the output end of a driving mechanism, the driving mechanism is arranged in the pipe (2) and the pipe two (3), the top side wall of the pipe (2) is hinged to the output end of a cylinder, the other end of the cylinder is hinged to a mounting rod, and the mounting rod is arranged on the dredging vessel.

8. A dredging construction method for comprehensive river regulation according to claim 7, characterized in that: The driving mechanism comprises: an auger (6) and an auger 2 (7). A disc is arranged in the middle of the reamer (1), and a plurality of suction holes are opened on the disc. The end of the auger (6) is arranged in the middle of the disc. The auger (6) is rotatably matched with the inner wall of the pipe (2). The other end of the auger (6) is connected with the end of a coupling. The other end of the coupling is connected with the end of the auger 2 (7). The auger 2 (7) is rotatably matched with the inner wall of the pipe 2 (3). The end of the pipe 2 (3) away from the coupling is equipped with the disc 2. The end of the auger 2 (7) extending out of the disc 2 is connected with the output end of the motor.

9. A dredging construction method for comprehensive river regulation according to claim 7, characterized in that: The pipeline three (4) is coaxially provided with a disk three, on which a plurality of flow guide holes are provided, the top surface of the disk three is rotatably matched with the bottom surface of the disk four (8), the disk four (8) and the disk three are coaxially arranged, the area of ​​the disk four (8) is larger than the area of ​​the disk three, the disk four (8) is provided with a plurality of flow guide holes two (9), the aperture of the flow guide holes two (9) is larger than the aperture of the flow guide holes, the inner wall of the pipeline three (4) is provided with an annular groove (10), the inner wall of the annular groove (10) is slidably matched with the side wall of the disk four (8), the top wall of the annular groove (10) is slidably matched with the top surface of the disk four (8), a suction mechanism is provided in the pipeline three (4), the top end of the suction mechanism is connected with the disk four (8), and the middle part of the disk three is rotatably matched with the suction mechanism.

10. A dredging construction method for comprehensive river regulation according to claim 9, characterized in that: The suction mechanism comprises: a rotating disk (11), a paddle (12), a rod body (13) and a spring (14); the bottom wall of the pipe three (4) is rotatably connected with the rotating disk (11); a plurality of paddles (12) are arranged in a circular array on the top surface of the rotating disk (11); a circular hole is arranged in the middle of the rotating disk (11); a longitudinal guide groove is opened on the inner wall of the circular hole; the longitudinal guide groove is slidably matched with a slider; the slider is mounted on the rod body (13); the rod body (13) is coaxially arranged with the circular hole; the top end of the rod body (13) is connected with the circular disk four (8); a circular hole two is opened through the middle of the circular disk three; the circular hole two is rotatably matched with the rod body (13); the bottom end of the spring (14) is arranged on the top surface of the rotating disk (11); the top end of the spring (14) is connected with a mounting ring; the mounting ring is coaxially arranged on the rod body (13).