Cast-in-place pile structural frame, cast-in-place concrete pile and construction method of cast-in-place concrete pile
By using a combination of casing and corrugated pipes in the cast pile structure frame in karst areas, the problem of backfill of caves is solved, the construction efficiency is improved and the cost is reduced, and the efficient construction of concrete cast piles is achieved.
Patent Information
- Application Number
- CN202411344129.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-11-12
AI Technical Summary
When constructing concrete cast-injected piles in karst areas, the backfill measures of the cave are time-consuming and difficult to locate the concrete casing, which increases the construction difficulty and cost.
A cast pile structure frame is adopted, including a casing and a corrugated pipe. The casing is supported on the bottom cave. The corrugated pipe sleeve is set outside the steel cage. The corrugated pipe with an alternating structure is connected to the steel cage to prevent concrete from entering the cave and reduce the Backfill requirements.
Improve construction efficiency and reduce costs. The lightweight corrosion resistance of corrugated pipes and the alternating structure of concave and convex structure enhance the concrete extrusion pressure and simplify the construction process.
Smart Images

Figure CN118932988A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of cast-in-place piles, and in particular to a cast-in-place pile structural frame, a concrete cast-in-place pile and a construction method for the concrete cast-in-place pile. Background Art
[0002] There are caves in karst areas. When constructing concrete cast-in-place piles in karst areas, backfilling is mainly used to fill the caves. This method has a long construction period. Especially when the caves are large, backfilling takes a lot of time and high economic costs. If backfilling is not done, the concrete will enter the cave during pouring. In order to avoid backfilling, concrete casing can be used to prevent concrete from flowing into the cave. When there are multiple caves at the location of the pile hole, if concrete casing is used for the cave located above, the concrete lacks the necessary support, and the concrete casing is heavy, so it is not easy to position it in the appropriate position of the cave, which increases the difficulty of construction. Summary of the invention
[0003] The invention provides a cast-in-place pile structural frame, a concrete cast-in-place pile and a construction method of the concrete cast-in-place pile, which improves construction efficiency and reduces cost.
[0004] On the one hand, the present invention provides a cast-in-place pile structure frame for use in karst areas, wherein the karst areas are provided with pile holes penetrating a plurality of caves, wherein the cave located at the bottom of the plurality of caves is a first cave, and the remaining caves are second caves; the pile holes include a first pile hole and a second pile hole, wherein the first pile hole is located below the second pile hole, the aperture of the first pile hole is smaller than the aperture of the second pile hole, and the second pile hole penetrates the first cave and the second cave;
[0005] The cast-in-place pile structure frame includes a casing, a steel cage and at least one corrugated pipe, wherein the steel cage is used to be arranged in the pile hole; the inner diameter of the casing is equal to or larger than the aperture of the first pile hole, and is supported above the first pile hole; the casing is sleeved outside the steel cage and arranged corresponding to the first karst cave, and both ends of the casing protrude from the first karst cave; the corrugated pipe is made of plastic material, and its pipe wall has an alternating concave and convex structure along the axial direction; the corrugated pipe is sleeved outside the steel cage, and the two are connected, and each of the corrugated pipes is at a position corresponding to each of the second karst caves, and both ends of each corrugated pipe protrude from the corresponding second karst cave.
[0006] Wherein, the length of the corrugated pipe is equal to or greater than the sum of the height of the corresponding second cave and twice the diameter of the second pile hole.
[0007] Among them, the alternating concave and convex structure of the corrugated pipe includes a first concave portion and a first convex portion, the first convex portion is protruding toward the outside of the pipe relative to the first concave portion, and the first concave portion and the first convex portion are both spirally arranged around the axial direction of the corrugated pipe and are alternately connected; the outer diameter of the corrugated pipe is smaller than the aperture of the second pile hole, and a spiral outer band is arranged on the outer side of the top end of the corrugated pipe; the spiral outer band is made of plastic material, is spirally shaped, and has more than 1.5 spiral turns, and extends along the spiral direction of the first concave portion and the first convex portion; the lower side of the spiral outer band is fixedly connected to the first convex portion, the upper side protrudes outward from the first convex portion and is arranged radially corresponding to the first concave portion.
[0008] The spiral outer band includes a second concave portion and a second convex portion, the second concave portion is connected in parallel to the lower side of the second convex portion, and the lower side of the second concave portion is fixedly connected to the first convex portion; the cross section of the second convex portion protrudes outward from the second concave portion in a convex arc shape, and is spaced apart from the first concave portion;
[0009] or,
[0010] The spiral outer band is in a straight line shape with the upper side tilted outwards.
[0011] The cross section of the first convex portion is in the shape of a convex arc protruding outward from the tube, and the lower side of the spiral outer band is connected to the lower side of the first convex portion.
[0012] The cross section of the first recessed portion is in a straight line shape parallel to the axial direction of the corrugated tube.
[0013] Among them, a first connecting hole and a second connecting hole are provided at the lower edge of the first convex portion; the corrugated pipe is fixedly connected to the steel cage through connecting ribs, and the connecting ribs include a first connecting section, a second connecting section and a third connecting section; the first connecting section is penetrated by the first connecting hole; the second connecting section is located at the outer side of the corrugated pipe and extends along the lower edge of the first convex portion, and one end of the second connecting section is connected to the first connecting section; the third connecting section is penetrated by the second connecting hole, one end of which is connected to the other end of the second connecting section, and the other end is fixedly connected to the steel cage.
[0014] On the other hand, the present invention provides a concrete bored pile, comprising concrete and the aforementioned bored pile structure frame, wherein the bored pile structure frame is arranged in a pile hole, and the concrete is poured in the pile hole.
[0015] In another aspect, the present invention provides a method for constructing a concrete cast-in-place pile, comprising the following steps:
[0016] Survey the location of the concrete piles and record the number, location and height of the caves in the site; the cave at the bottom is the first cave, and the remaining caves are the second caves;
[0017] A bored pile structure frame is manufactured; the bored pile structure frame comprises a casing, a steel cage and at least one corrugated pipe; the height of the casing is determined according to the height of the first cave, the number of the corrugated pipes, the positions of the corrugated pipes in the steel cage, and the length of the corrugated pipes are determined according to the number, position and height of the second caves, and the corrugated pipes are installed in the steel cage;
[0018] The first drilling forms a second pile hole, the second pile hole passes through the second karst cave and the first karst cave, the bottom of the second pile hole is lower than the bottom surface of the first karst cave; the diameter of the second pile hole matches the outer diameter of the casing;
[0019] The casing is sunk to the bottom of the second pile hole; the top of the casing is higher than the top surface of the first cave;
[0020] The second drilling forms a first pile hole, the hole diameter of the first pile hole is equal to or smaller than the inner diameter of the casing, and the depth is the preset depth of the concrete cast-in-place pile; the bottom surface of the first pile hole forms the bottom surface of the concrete cast-in-place pile;
[0021] Lowering a steel cage with the corrugated pipe; the steel cage is located in the first pile hole and the second pile hole, each of the corrugated pipes corresponds to the position of each of the second karst caves, and two ends of the corrugated pipe protrude from the top surface and the bottom surface of the corresponding second karst cave respectively;
[0022] Pouring underwater concrete.
[0023] Among them, the step of making the cast-in-place pile structure frame also includes installing a spiral outer band on the top outer side of the corrugated pipe; the spiral outer band is spirally wrapped around the corrugated pipe, its lower side is connected to the corrugated pipe, and its upper side is spaced apart from the corrugated pipe.
[0024] Wherein, the step of pouring underwater concrete includes the following sub-steps:
[0025] Pouring concrete into the corrugated pipe, so that the concrete inside the corrugated pipe exceeds the top of the corrugated pipe, so that the concrete overflows onto the spiral outer belt, and the concrete on the spiral outer belt is lower than the top of the spiral outer belt, and a layer of concrete is retained on the spiral outer belt;
[0026] After the concrete inside the corrugated pipe solidifies, concrete is injected again so that the concrete at the outer peripheral band of the spiral is flush with the top of the corrugated pipe;
[0027] After the concrete at the outer peripheral zone of the spiral is solidified, the concrete is continued to be injected.
[0028] The cast-in-place pile structure frame, concrete cast-in-place pile and concrete cast-in-place pile construction method provided by the present invention are provided with a casing at the first karst cave at the bottom and a corrugated pipe at the second karst cave at the top to prevent concrete from flowing into the karst cave during the pouring process, thereby avoiding backfilling, improving construction efficiency and reducing construction costs; the corrugated pipe is made of plastic material, which is low in cost, has good corrosion resistance and is light in weight. The corrugated pipe can be installed on the steel cage on the ground, and hoisted together with the steel cage and placed in the pile hole, which is convenient for construction. The pipe wall of the corrugated pipe is an alternating concave-convex structure along the axial direction, has a large structural strength, and can withstand the extrusion force of large concrete. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 A schematic diagram of a cast-in-place pile structure provided in a preferred embodiment of the present invention being arranged in a pile hole;
[0030] Figure 2 for Figure 1 Schematic diagram of the structure of the cast-in-place pile frame, including the steel cage, corrugated pipe and spiral outer belt;
[0031] Figure 3 for Figure 2 Schematic cross-section of the steel cage, corrugated pipe and spiral outer belt of the cast-in-place pile structure;
[0032] Figure 4 yes Figure 2 Schematic diagram of the structure of the peripheral band of the middle spiral;
[0033] Figure 5 yes Figure 2 Schematic diagram of the structure of the steel cage and connecting bars. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0035] In the figures, structurally similar elements are denoted by the same reference numerals.
[0036] Please refer to Figure 1 and Figure 2The present invention provides a concrete bored pile, which includes concrete and a bored pile structure frame 100, and is used in karst areas with caves. The karst area is provided with a pile hole 9 penetrating a plurality of caves. The bored pile structure frame 100 is arranged in the pile hole 9, and concrete is poured into the pile hole 9. The concrete and the bored pile structure frame 100 form a concrete bored pile in the pile hole 9. The bored pile structure frame 100 includes a casing 3, a steel cage 2, and at least one corrugated pipe 1. The steel cage 2 is used to be arranged in the pile hole 9 to improve the structural strength of the entire concrete bored pile. The casing 3 is sleeved on the outside of the steel cage 2; the corrugated pipe 1 is located above the casing 3 and sleeved on the outside of the steel cage 2. The corrugated pipe 1 can be lowered into the pile hole 9 together with the steel cage 2.
[0037] Among the multiple caves, the cave located at the bottom is the first cave 81, and the remaining caves are the second caves 82. The pile hole 9 includes a first pile hole 91 and a second pile hole 92. The first pile hole 91 is located below the second pile hole 92. The hole diameter of the first pile hole 91 is smaller than the hole diameter of the second pile hole 92. The second pile hole 92 penetrates the first cave 81 and the second cave 82.
[0038] The inner diameter of the casing 3 is equal to or greater than the aperture of the first pile hole 91, and is supported above the first pile hole 91. The casing 3 is sleeved outside the steel cage 2 and arranged corresponding to the first karst cave 81, and both ends of the casing 3 protrude from the first karst cave 81. By arranging the casing 3 at the first karst cave 81, and both ends of the casing 3 protrude from the first karst cave 81, it is possible to effectively prevent concrete from entering the first karst cave 81 during pouring. The inner diameter of the casing 3 is equal to or greater than the aperture of the first pile hole 91, and the top of the hole wall of the first pile hole 91 can be used to effectively support the casing 3. The casing 3 can be a heavy pipe fitting such as a steel casing 3 or a concrete casing 3, and it can be sunk to the bottom of the second pile hole 92 by a pile sinking and extraction machine.
[0039] The corrugated pipe 1 is made of plastic, has low cost, good corrosion resistance, and is lightweight. The corrugated pipe 1 can be installed on the steel cage 2 on the ground, and hoisted together with the steel cage 2 and placed in the pile hole 9. The corrugated pipe 1 is sleeved outside the steel cage 2, and the two are connected. Each corrugated pipe 1 is at a position corresponding to each second karst cave 82, and both ends of each corrugated pipe 1 protrude from the corresponding second karst cave 82. By arranging the corrugated pipe 1 at the second karst cave 82, and both ends of the corrugated pipe 1 protrude from the second karst cave 82, it is possible to effectively prevent concrete from entering the second karst cave 82 during pouring, thereby reducing the pouring cost, eliminating the need to backfill the karst cave, improving construction efficiency, reducing labor and material costs, and shortening the construction period.
[0040] The corrugated tube 1 can be made of plastic materials such as PVC (polyvinyl chloride), PE (polyethylene), and PP (polypropylene).
[0041] The wall of the corrugated pipe 1 has an alternating concave-convex structure along the axial direction, and has a large structural strength, which can withstand a large concrete extrusion force. The alternating concave-convex structure on the outer side of the corrugated pipe 1 can support the hole wall structure at the position of the second karst cave 82. If the second pile hole 92 at the second karst cave 82 collapses, the alternating concave-convex structure can reduce the degree of sliding of the soil structure at the second karst cave 82 along the outer wall of the corrugated pipe 1, reduce the degree of collapse, and prevent the collapse from expanding to the top of the corrugated pipe 1 and causing the poured concrete to enter the second karst cave 82; at the same time, during the pouring process, the concrete that enters the gap between the corrugated pipe 1 and the second pile hole 92 from the top of the corrugated pipe 1 will be retained on the outer wall of the corrugated pipe 1 due to the alternating concave-convex structure and gradually solidified, thereby gradually filling the gap and preventing the concrete from entering the second karst cave 82.
[0042] The alternating concave-convex structure inside the corrugated pipe 1 can make the outer wall of the concrete pile inside the corrugated pipe 1 have a concave-convex structure, thereby improving the structural strength of the concrete pile.
[0043] The length of the corrugated pipe 1 is equal to or greater than the sum of the height of the corresponding second cave 82 and twice the aperture of the second pile hole 92 , so that the length of the corrugated pipe 1 is relatively large, which can effectively prevent concrete from entering the second cave 82 .
[0044] The size of the top end of the bellows 1 protruding upward from the second cave 82 is greater than or equal to the aperture of the second pile hole 92, so that there is a sufficient length of the bellows 1 above the top surface of the second cave 82, and even if the bellows 1 is deformed downward, it will not cause concrete to enter the second cave 82 from the top of the bellows 1, and if the top of the second cave 82 collapses, the bellows 1 can also effectively support the collapsed soil. The size of the bottom end of the bellows 1 protruding downward from the second cave 82 is greater than or equal to the aperture of the second pile hole 92, which can prevent concrete from overflowing from the gap between the bottom of the bellows 1 and the wall of the second pile hole 92 into the second cave 82.
[0045] The concave-convex alternating structure of the corrugated tube 1 includes a first concave portion 11 and a first convex portion 12, the first convex portion 12 is protruding outward from the tube relative to the first concave portion 11, and the first concave portion 11 and the first convex portion 12 are spirally connected around the axial direction of the corrugated tube 1 and are alternately connected, so as to facilitate the processing and preparation of the corrugated tube 1. In this embodiment, the cross section of the first convex portion 12 is a convex arc protruding outward from the tube, and the cross section of the first concave portion 11 is a straight line parallel to the axial direction of the corrugated tube 1, so as to facilitate the processing and forming of the corrugated tube 1. Of course, in other embodiments, the cross section of the first concave portion 11 can also be a concave arc sunken into the tube.
[0046] like Figure 1 As shown, the outer diameter of the corrugated tube 1 is smaller than the aperture of the second pile hole 92. Figure 2 and Figure 3As shown, a spiral outer band 4 is arranged on the outer side of the top of the corrugated pipe 1. The spiral outer band 4 is made of plastic material and is spiral-shaped. The number of spiral turns is more than 1.5 turns, and it extends along the spiral direction of the first concave portion 11 and the first convex portion 12. The lower side of the spiral outer band 4 is fixedly connected to the first convex portion 12, and the upper side protrudes outward from the first convex portion 12 and is arranged radially corresponding to the first concave portion 11. The spiral outer band 4 is located at the outer side of the top of the corrugated pipe 1. When the corrugated pipe 1 is lowered into the second pile hole 92, the spiral outer band 4 can keep a certain distance between the corrugated pipe 1 and the hole wall of the second pile hole 92, so that the structure of the corrugated pipe 1 below the spiral outer band 4 will not contact the hole wall of the second pile hole 92, and only the spiral outer band 4 contacts the hole wall of the second pile hole 92, thereby reducing the friction between the corrugated pipe 1 and the second pile hole 92 during the lowering process, making the lowering process smoother and improving the lowering efficiency.
[0047] The spiral outer band 4 is made of plastic material, which can give it a certain deformation. During the pouring of concrete, the concrete overflowing from the top of the corrugated pipe 1 will flow into the gap between the spiral outer band 4 and the corrugated pipe 1, so that the gap between the corrugated pipe 1 and the second pile hole 92 can be filled with concrete, thereby preventing the concrete from entering the second cave 82.
[0048] The spiral outer band 4, the first concave portion 11, and the first convex portion 12 are all spiral-shaped, and the number of spiral turns of the spiral outer band 4 is more than 1.5 turns. The concrete can move downward along the spiral structure, so that the concrete enters the bottom circle of the spiral outer band 4, further improving the connection tightness between the spiral outer band 4 and the hole wall of the second pile hole 92. The concrete gradually solidifies during the downward movement, ensuring that the concrete is retained in the spiral outer band 4.
[0049] The first convex portion 12 is in a convex arc shape, and the lower side of the spiral outer band 4 is connected to the lower side of the first convex portion 12. By utilizing the lower arc shape of the first convex portion 12, the upper side structure of the spiral outer band can be naturally tilted toward the outside of the pipe, so that the upper side outer diameter of the spiral outer band 4 is larger than the outer diameter of the corrugated pipe 1, thereby facilitating contact with the hole wall of the pile hole.
[0050] As a preference, Figure 4 As shown, the spiral peripheral band 4 includes a second concave portion 41 and a second convex portion 42, the second concave portion 41 is connected in parallel to the lower side of the second convex portion 42, and the lower side of the second concave portion 41 is fixedly connected to the first convex portion 12. The cross section of the second convex portion 42 protrudes outward from the second concave portion 41 in a convex arc shape, and the second convex portion 42 is spaced from the first concave portion 11 so that concrete can be accommodated therebetween.
[0051] During the pouring of concrete, the concrete overflowing from the top of the corrugated pipe 1 will flow into the gap between the second convex portion 42 of the spiral peripheral band 4 and the first concave portion 11 of the corrugated pipe 1, and the gap between the corrugated pipe 1 and the second pile hole 92 can be filled with concrete to prevent the concrete from entering the second karst cave 82. The second convex portion 42 and the first concave portion 11 are spaced apart, and the concrete entering between the two can squeeze the second convex portion 42, so that the second convex portion 42 deforms toward the hole wall of the second pile hole 92, and the second convex portion 42 squeezes the hole wall of the second pile hole 92, and the two are tightly connected, preventing the concrete from flowing from the outside of the second convex portion 42 into the second karst cave 82. The convex arc shape of the second convex portion 42 can facilitate the retention of concrete.
[0052] The first protrusion 12 and the second recess 41 can be connected by riveting or fixedly connected by hot melting.
[0053] The spiral peripheral band 4 is made of the same material as the corrugated pipe 1, and adopts the structure of the second concave portion 41 and the second convex portion 42. During the construction process, the corrugated pipe raw material can be cut according to the height of the second cave 82 to form the corrugated pipe 1, and the remaining material after cutting can be directly used to prepare the spiral peripheral band 4. Specifically, the upper edge of the first convex portion 12 and the lower edge of the first concave portion 11 are divided, and the lower edge of the first convex portion 12 is connected to the upper edge of the first concave portion 11 to form a band structure. The first convex portion after division forms the second convex portion, and the first concave portion forms the second concave portion. In this way, the spiral peripheral band 4 is prepared to facilitate the processing and preparation of the spiral peripheral band 4, and the remaining cutting materials are fully utilized to reduce the cost. The band structure is formed after the upper edge of the first convex portion and the lower edge of the first concave portion are divided so that its diameter can be expanded so that it can be sleeved on the outside of the corrugated pipe 1. In the above manner, the cross section of the second concave portion 41 can be an arc that bends outward from the pipe, and the cross section of the second convex portion 42 can be a straight line.
[0054] Here, in other embodiments, the cross section of the spiral outer band 4 can also be straight as a whole, and after the lower side thereof is connected to the lower side of the first protrusion 12, the upper side of the spiral outer band 4 is inclined outward, so that the structure of the spiral outer band 4 is simpler, and an ordinary belt-shaped structural member can be used to be arranged along the spiral direction of the first protrusion 12. The axial ends of the corrugated pipe 1 are fixedly connected to the steel cage 2. Since the corrugated pipe 1 is made of plastic material and is light in weight, it is only necessary to connect the two ends of the corrugated pipe 1 to the steel cage 2 so that the two can be placed in the second pile hole 92 as a whole. Since the steel cage 2 and the corrugated pipe 1 are relatively large in size, construction personnel can easily connect the ends of the corrugated pipe 1 to the steel cage 2 outside the corrugated pipe 1 without entering the steel cage 2 or the inside of the corrugated pipe 1, which facilitates construction and improves efficiency.
[0055] like Figure 5As shown, a first connection hole 131 and a second connection hole 132 are provided at the lower edge of the first protrusion 12. The corrugated pipe 1 is fixedly connected to the steel cage 2 through the connecting rib 5, and the connecting rib 5 includes a first connecting section 51, a second connecting section 52 and a third connecting section 53. The first connecting section 51 is provided with a first connection hole 131. The second connecting section 52 is located at the outer side of the corrugated pipe 1 and extends along the lower edge of the first protrusion 12, and one end of the second connecting section 52 is connected to the first connecting section 51. The third connecting section 53 is provided with a second connection hole 132, one end of which is connected to the other end of the second connecting section 52, and the other end is fixedly connected to the steel cage 2.
[0056] The third connecting section 53 can maintain a certain gap between the steel cage 2 and the corrugated pipe 1, so that a certain thickness of concrete can be accommodated between the steel cage 2 and the corrugated pipe 1, so as to use the concrete to protect the steel cage 2. Of course, additional positioning structures such as a cross structure frame can be provided between the steel cage 2 and the corrugated pipe 1 to ensure that there is a predetermined distance between the steel cage 2 and the corrugated pipe 1.
[0057] The second connecting section 52 extends along the lower edge of the first convex portion 12, and the second connecting section 52 can better support the first convex portion 12. The first connecting section 51 and the third connecting section 53 are respectively provided with a first connecting hole 131 and a second connecting hole 132, which can realize a reliable connection between the connecting rib 5 and the corrugated tube 1 and are not easy to loosen.
[0058] The diameter of the first connection hole 131 may be smaller than the diameter of the first connection section 51, and the diameter of the second connection hole 132 may be smaller than the diameter of the third connection section 53. When assembling the corrugated tube 1 and the connecting rib 5, the first connection hole 131 and the second connection hole 132 may be heated first, and then the first connection section 51 and the third connection section 53 are inserted. After the first connection hole 131 and the second connection hole 132 are cooled, the first connection section 51 and the third connection section 53 can be fixed firmly and reliably.
[0059] The connecting ribs 5 can be bent by steel bars of suitable diameter to form a first connecting section 51, a second connecting section 52 and a third connecting section 53. The third connecting section 53 is preferably welded to the steel cage 2, or various fasteners can be used to connect them. There can be multiple connecting ribs 5, which are arranged along the circumference of the corrugated tube 1 to improve the connection strength between the corrugated tube 1 and the steel cage 2.
[0060] In this embodiment, only the third connecting section 53 of the connecting bar 5 is connected to the steel cage 2, and the first connecting section 51 can be of a shorter length, and only needs to be able to play a hooking role in the first connecting hole 131. Of course, in other embodiments, the length of the first connecting section 51 can also be increased, and the length of the first connecting section 51 can be increased and connected to the steel cage 2.
[0061] The upper and lower ends of the corrugated pipe 1 can be connected to the steel cage 2 through the connecting ribs 5. After the connecting ribs 5 at the top of the corrugated pipe 1 are installed to the corrugated pipe 1, the spiral outer band 4 is installed to the outside of the corrugated pipe 1, and the second connecting section 52 of the connecting ribs 5 at the top of the corrugated pipe 1 is located between the corrugated pipe 1 and the spiral outer band 4. When pouring continues, the concrete entering the spiral outer band 4 can cover the second connecting section 52 to protect the second connecting section 52.
[0062] The steel cage 2 includes a plurality of main bars 21, a plurality of longitudinal bars 22, and stirrups 23. The main bars 21 are annular, and the plurality of main bars 21 are arranged at intervals along the axial direction of the main bars 21. Each longitudinal bar 22 is arranged along the axial direction of the main bars 21. The plurality of longitudinal bars 22 are fixed around the outside of the main bars 21, and the stirrups 23 are fixed to the outside of the plurality of longitudinal bars 22 along the circumferential direction of the main bars 21. The corrugated tube 1 is located outside the stirrups 23 and is connected to the main bars 21 or the longitudinal bars 22. By connecting the corrugated tube 1 to the main bars 21 or the longitudinal bars 22, the connection strength between the corrugated tube 1 and the steel cage 2 can be ensured, and the connection can be welded.
[0063] The invention also provides a construction method of a concrete cast-in-place pile, which comprises the following steps.
[0064] Step S100, survey the location of the concrete piles, record the number, location and height of the caves in the site; the cave at the bottom is the first cave 81, and the remaining caves are the second caves 82. In this embodiment, there are two caves in total, that is, there is only one second cave 82.
[0065] Step S200, manufacturing the cast-in-place pile structure frame 100. Determine the height of the casing according to the height of the first cave, determine the number of corrugated pipes, the length of the corrugated pipes, and the position of the corrugated pipes in the steel cage according to the number, height, and position of the second caves, and install the corrugated pipes in the steel cage. The details are as follows.
[0066] Step S201, making a steel cage 2 according to the height of the concrete pile.
[0067] Step S202, determine the height of the casing 3 according to the height of the first cave, so that the height of the casing 3 is greater than the height of the first cave, so that the two ends of the casing protrude from the first cave; determine the number of corrugated pipes according to the number of second caves. There is one second cave, that is, there is one corrugated pipe. Determine the length of the corrugated pipe according to the height of the second cave, that is, the length of the corrugated pipe is the height of the second cave plus twice the aperture of the second pile hole. Cut the raw material of the corrugated pipe to form the corrugated pipe. Determine the position of the corrugated pipe on the steel cage according to the position of the second cave. The corrugated pipe 1 can adopt a spiral concave-convex alternating structure in which the aforementioned first concave portion and the first convex portion cooperate.
[0068] Step S203, the corrugated tube 1 is put on the steel cage 2, and the two are connected. Specifically, the corrugated tube 1 can be punched to form a first connection hole 131 and a second connection hole 132, and the aforementioned connecting ribs 5 connect the corrugated tube 1 and the steel cage 2.
[0069] Step S204, a spiral outer band 4 is installed on the outer side of the top of the corrugated pipe 1. The spiral outer band 4 is spirally wound around the corrugated pipe 1, and its lower side is connected to the corrugated pipe 1, and its upper side is spaced from the corrugated pipe 1, so as to accommodate concrete on the spiral outer band 4. The spiral outer band 4 can avoid friction between the outer side of the corrugated pipe and the pile hole, reduce subsequent lowering resistance, and improve construction efficiency. The concrete accommodated on the spiral outer band 4 can fill the gap between the corrugated pipe 1 and the hole wall of the pile hole, and prevent the concrete from entering the cave.
[0070] The spiral outer band 4 may adopt the structure of the aforementioned second concave portion 41 and the second convex portion 42. Specifically, the spiral outer band 4 may be made by cutting the remaining corrugated tube 1, and then the spiral outer band 4 may be fixed at the top of the corrugated tube 1. Of course, the aforementioned spiral outer band with an inclined straight line section may be adopted.
[0071] Step S300, the first drilling forms a second pile hole 92, the second pile hole 92 passes through the second cave 82 and the first cave 81, the bottom of the second pile hole 92 is lower than the bottom of the first cave 81; the diameter of the second pile hole 92 matches the outer diameter of the casing 3. After the drilling is completed, the hole can be cleaned.
[0072] Step S400 , sinking the casing to the bottom of the second pile hole 92 ; the top of the casing 3 is higher than the top surface of the first cave 81 .
[0073] Step S500, the second drilling forms the first pile hole 91, the hole diameter of the first pile hole 91 is equal to or less than the inner diameter of the casing, and the depth is the preset depth of the concrete cast-in-place pile; the bottom surface of the first pile hole 91 forms the bottom surface of the concrete cast-in-place pile. Here, the drilling depth of the first pile hole 91 can be determined according to the preset depth of the concrete cast-in-place pile. After the first pile hole 91 is completed, the first pile hole 91 and the second pile hole 92 can be cleaned.
[0074] Step S600, lowering a steel cage with a corrugated pipe; the steel cage is located in the first pile hole 91 and the second pile hole 92, each corrugated pipe 1 corresponds to the position of each second cave 82, and both ends of the corrugated pipe 1 protrude from the top and bottom surfaces of the corresponding second cave 82 respectively.
[0075] Step S700: pouring underwater concrete.
[0076] The perfusion process includes the following sub-steps.
[0077] Step S701, pouring concrete into the corrugated pipe 1, making the concrete inside the corrugated pipe 1 exceed the top of the corrugated pipe 1, so that the concrete overflows onto the spiral outer band 4, and makes the concrete on the spiral outer band 4 lower than the top of the spiral outer band 4, and a layer of concrete is retained on the spiral outer band 4.
[0078] Step S702 , after the concrete inside the corrugated pipe 1 solidifies, concrete is injected again so that the concrete at the spiral outer band 4 (ie, the outside of the corrugated pipe) is flush with the top of the corrugated pipe 1 .
[0079] Step S703, after the concrete at the spiral outer band 4 solidifies, continue to inject concrete.
[0080] By adopting the above-mentioned method, the concrete can be better retained in the spiral outer band 4, thereby effectively filling the gap between the top of the corrugated pipe and the pile hole, and preventing the concrete from entering the cave.
[0081] The positions of the corrugated pipe are poured in sequence in the above manner, and finally the pile hole is filled with concrete.
[0082] Through the above steps, a concrete cast-in-place pile can be prepared. In the above construction method, the above cast-in-place pile structure frame 100 can be used for construction.
[0083] The cast-in-place pile structure frame, concrete cast-in-place pile and concrete cast-in-place pile construction method provided by the present invention are provided with a casing at the first karst cave at the bottom and a corrugated pipe at the second karst cave at the top to prevent concrete from flowing into the karst cave during the pouring process, thereby avoiding backfilling, improving construction efficiency and reducing construction costs; the corrugated pipe is made of plastic material, which is low in cost, has good corrosion resistance and is light in weight. The corrugated pipe can be installed on the steel cage on the ground, and hoisted together with the steel cage and placed in the pile hole, which is convenient for construction. The pipe wall of the corrugated pipe is an alternating concave-convex structure along the axial direction, has a large structural strength, and can withstand the extrusion force of large concrete.
[0084] In summary, although the present invention has been disclosed as above in terms of preferred embodiments, the above preferred embodiments are not intended to limit the present invention. A person skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the scope of protection of the present invention shall be based on the scope defined in the claims.
Claims
1. A cast-in-place pile structure frame, used in karst areas, wherein the karst areas are provided with pile holes penetrating a plurality of karst caves, It is characterized in that Among the multiple caves, the cave located at the bottom is the first cave, and the remaining caves are the second caves; the pile holes include a first pile hole and a second pile hole, the first pile hole is located below the second pile hole, the aperture of the first pile hole is smaller than the aperture of the second pile hole, and the second pile hole passes through the first cave and the second cave; The cast-in-place pile structure frame includes a casing, a steel cage and at least one corrugated pipe, wherein the steel cage is used to be arranged in the pile hole; the inner diameter of the casing is equal to or larger than the aperture of the first pile hole, and is supported above the first pile hole; the casing is sleeved outside the steel cage and arranged corresponding to the first karst cave, and both ends of the casing protrude from the first karst cave; the corrugated pipe is made of plastic material, and its pipe wall has an alternating concave and convex structure along the axial direction; the corrugated pipe is sleeved outside the steel cage, and the two are connected, and each of the corrugated pipes is at a position corresponding to each of the second karst caves, and both ends of each corrugated pipe protrude from the corresponding second karst cave.
2. The cast-in-place pile structure frame according to claim 1, It is characterized in that The length of the corrugated pipe is equal to or greater than the sum of the height of the corresponding second cave and twice the diameter of the second pile hole.
3. The cast-in-place pile structure frame according to claim 1, It is characterized in that The concave-convex alternating structure of the bellows comprises a first concave portion and a first convex portion, the first convex portion is protruding outward from the first concave portion, and the first concave portion and the first convex portion are both spirally arranged around the axial direction of the bellows and are alternately connected; the outer diameter of the bellows is smaller than the aperture of the second pile hole, and a spiral outer band is arranged on the outer side of the top end of the bellows; the spiral outer band is made of plastic material, is spirally arranged, has more than 1.5 spiral turns, and extends along the spiral direction of the first concave portion and the first convex portion; the lower side of the spiral outer band is fixedly connected to the first convex portion, the upper side protrudes outward from the first convex portion, and is arranged radially corresponding to the first concave portion.
4. The cast-in-place pile structure frame according to claim 3, It is characterized in that The spiral outer band includes a second concave portion and a second convex portion, the second concave portion is connected in parallel to the lower side of the second convex portion, and the lower side of the second concave portion is fixedly connected to the first convex portion; the cross section of the second convex portion protrudes outward from the second concave portion in a convex arc shape, and is spaced apart from the first concave portion; or, The spiral outer band is in a straight line shape with the upper side tilted outwards.
5. The cast-in-place pile structure frame according to claim 3 or 4, It is characterized in that The cross section of the first convex portion is in a convex arc shape protruding outward from the tube, and the lower side of the spiral outer band is connected to the lower side of the first convex portion. The cross section of the first recessed portion is in a straight line shape parallel to the axial direction of the corrugated tube.
6. The cast-in-place pile structure frame according to claim 4, It is characterized in that A first connecting hole and a second connecting hole are provided at the lower edge of the first protrusion; the corrugated tube is fixedly connected to the steel cage through connecting ribs, and the connecting ribs include a first connecting section, a second connecting section and a third connecting section; the first connecting section passes through the first connecting hole; the second connecting section is located at the outer side of the corrugated tube and extends along the lower edge of the first protrusion, and one end of the second connecting section is connected to the first connecting section; the third connecting section passes through the second connecting hole, one end of which is connected to the other end of the second connecting section, and the other end is fixedly connected to the steel cage.
7. A concrete cast-in-place pile, It is characterized in that It comprises concrete and the cast-in-place pile structure frame according to any one of claims 1 to 6, wherein the cast-in-place pile structure frame is arranged in a pile hole, and the concrete is cast in the pile hole.
8. A method for constructing a concrete cast-in-place pile. It is characterized in that The following steps are involved: Survey the location of the concrete piles and record the number, location and height of the caves in the site; the cave at the bottom is the first cave, and the remaining caves are the second caves; A bored pile structure frame is manufactured; the bored pile structure frame comprises a casing, a steel cage and at least one corrugated pipe; the height of the casing is determined according to the height of the first cave, the number of the corrugated pipes, the positions of the corrugated pipes in the steel cage, and the length of the corrugated pipes are determined according to the number, position and height of the second caves, and the corrugated pipes are installed in the steel cage; The first drilling forms a second pile hole, the second pile hole passes through the second karst cave and the first karst cave, the bottom of the second pile hole is lower than the bottom surface of the first karst cave; the diameter of the second pile hole matches the outer diameter of the casing; The casing is sunk to the bottom of the second pile hole; the top of the casing is higher than the top surface of the first cave; The second drilling forms a first pile hole, the hole diameter of the first pile hole is equal to or smaller than the inner diameter of the casing, and the depth is the preset depth of the concrete cast-in-place pile; the bottom surface of the first pile hole forms the bottom surface of the concrete cast-in-place pile; Lowering a steel cage with the corrugated pipe; the steel cage is located in the first pile hole and the second pile hole, each of the corrugated pipes corresponds to the position of each of the second karst caves, and two ends of the corrugated pipe protrude from the top surface and the bottom surface of the corresponding second karst cave respectively; Pouring underwater concrete.
9. The method for constructing a concrete cast-in-place pile according to claim 8, It is characterized in that The step of making the cast-in-place pile structure frame also includes installing a spiral outer band on the outside of the top of the corrugated pipe; the spiral outer band is spirally wound around the corrugated pipe, with its lower side connected to the corrugated pipe and its upper side spaced apart from the corrugated pipe.
10. The method for constructing a concrete cast-in-place pile according to claim 9, It is characterized in that The step of pouring underwater concrete includes the following sub-steps: Pouring concrete into the corrugated pipe, so that the concrete inside the corrugated pipe exceeds the top of the corrugated pipe, so that the concrete overflows onto the spiral outer belt, and the concrete on the spiral outer belt is lower than the top of the spiral outer belt, and a layer of concrete is retained on the spiral outer belt; After the concrete inside the corrugated pipe solidifies, concrete is injected again so that the concrete at the outer peripheral band of the spiral is flush with the top of the corrugated pipe; After the concrete at the outer peripheral zone of the spiral is solidified, the concrete is continued to be injected.