Construction method for steel sheet pile cofferdam in hard shale stratum in river

By combining island building and steel sheet piles in hard shale formations, setting up anchor steel sheet piles and performing foundation pit drainage treatment, the problem that traditional steel sheet piles cannot pass through shale formations is solved, and the stability of steel sheet piles is achieved and The water-stop effect reduces construction costs.

CN118933034APending Publication Date: 2024-11-12THE THIRD CONSTRUCTION CO OF CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411050940.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In hard shale formations, traditional steel sheet piles cannot pass through and anchor, making it difficult to solve the problem of foundation pit support and water stop of cross-river bridges.

Method used

Using the method of combining island building and steel sheet piles, a pull anchor is set behind the steel sheet piles, and a passive soil is reserved on the inner side of the steel sheet pile to provide passive soil pressure. The construction is carried out in combination with island building and steel sheet piles, and a pull anchor steel sheet piles are set to fix the steel sheet piles. And drainage treatment is carried out on the inside of the foundation pit.

Benefits of technology

It improves the stability and water stop effect of steel sheet piles, reduces construction costs, and achieves safe and economical construction in hard shale formations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933034A_ABST
    Figure CN118933034A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for a steel sheet pile cofferdam in a hard shale stratum in a river. The construction method comprises the following steps that S1, river sand is taken in situ in the river to build an island; s2, cofferdam steel sheet pile construction is conducted after island building, and cofferdam steel sheet piles are driven to the top of a shale layer; and S3, a plurality of anchor pulling steel sheet piles are arranged behind the cofferdam steel sheet piles in the length direction and the width direction of the cofferdam correspondingly, and the cofferdam steel sheet piles and the ground anchor steel sheet piles are subjected to anchor pulling and fixing through finish rolling deformed steel bars. According to the method, island building is combined with the steel sheet piles, the pull anchors are arranged behind the steel sheet piles, soil reserved on the inner sides of the steel sheet piles provides passive soil pressure, and the problems of stability and water stopping of the steel sheet piles are solved. The method is high in safety, good in water stopping effect and low in construction cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of high-speed railway bridges, and more specifically, to a method for constructing a steel sheet pile cofferdam in a hard shale formation in a river. Background Art

[0002] The bridge cap across the river is located in the water, and the bottom of the cap is located on the top of the shale layer. The conventional steel sheet pile construction method cannot pass through the hard shale layer for anchoring. Therefore, it is necessary to develop a steel sheet pile cofferdam construction method suitable for this layer to solve the foundation pit support and water stopping problems. Summary of the invention

[0003] The purpose of the present invention is to provide a method for constructing a steel sheet pile cofferdam in a hard shale formation in a river, a method combining island construction with steel sheet piles, setting a pull anchor behind the steel sheet piles, and reserving soil inside the steel sheet piles to provide passive earth pressure, thereby solving the stability and water-stopping problems of the steel sheet piles. The method has high safety, good water-stopping effect, and low construction cost.

[0004] The technical solution adopted by the present invention to solve this technical problem is: a method for constructing a steel sheet pile cofferdam in a hard shale formation in a river, comprising the following steps:

[0005] S1. Take river sand from the river to build the island;

[0006] S2. After the island is built, the cofferdam steel sheet pile construction is carried out and the cofferdam steel sheet piles are driven to the top of the shale layer;

[0007] S3. Set multiple anchor steel sheet piles behind the cofferdam steel sheet piles along the length and width of the cofferdam. The cofferdam steel sheet piles and the anchor steel sheet piles are anchored and fixed with φ20 fine-rolled threaded steel.

[0008] As a further solution of the present invention, the following steps are also included:

[0009] S4. Excavate the foundation pit inside the cofferdam steel sheet piles with a slope of 1:1, set a 1m reserved platform at the top and a 1m operating space at the bottom;

[0010] S5. Set up a 0.3m×0.3m drainage ditch along the bottom of the foundation pit and set up 0.5m×0.5m×0.5m collection wells at the four corners of the foundation pit.

[0011] As a further solution of the present invention, the island building material in S1 is taken locally from the river and filled with medium sand, and the island building elevation exceeds the river water surface elevation by 1.0m.

[0012] As a further solution of the present invention, part of the soil is reserved inside the cofferdam steel sheet piles in S2 and is not removed, so as to prevent the steel sheet piles from tilting inwards.

[0013] As a further solution of the present invention, the anchor steel sheet piles in S3 are steel sheet piles of the same specifications and models as the cofferdam steel sheet piles, and the anchor steel sheet piles are driven into the top surface of the shale.

[0014] The present invention includes at least the following beneficial effects: the method uses local materials to build the island, and adopts a method combining island building with steel sheet piles, which effectively solves the construction problem that traditional steel sheet piles cannot pass through shale formations, has high economic benefits, and has high promotion value in similar projects.

[0015] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a top view of the steel sheet pile driven in the present invention;

[0017] Figure 2 It is a structural schematic diagram of foundation pit excavation of the present invention.

[0018] Among them, 1-cap pedestal, 2-island cofferdam, 3-high-quality rolled rebar, 4-cofferdam steel sheet piles, 5-anchor steel sheet piles. DETAILED DESCRIPTION

[0019] The present invention is described in detail and completely below in conjunction with the accompanying drawings. A person of ordinary skill in the art will be able to implement the present invention based on these descriptions. Before describing the present invention in conjunction with the accompanying drawings, it should be particularly pointed out that the technical solutions and technical features provided in each part of the present invention, including the following description, can be combined with each other without conflict.

[0020] In addition, the embodiments of the present invention involved in the following description are generally only a part of the embodiments of the present invention, rather than all the embodiments. Therefore, based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0021] The present invention is further described in detail below in conjunction with the accompanying drawings and implementations, and its specific implementation process is as follows:

[0022] Example 1

[0023] like Figure 1 As shown, the present invention provides a method for constructing a steel sheet pile cofferdam in a hard shale formation in a river, comprising the following steps:

[0024] 1. Building islands and cofferdams in the river:

[0025] The size of the foundation is 12.5m×8.3m, and the size of the island is 47.5m×43.3m. The island building materials are taken from the river and filled with medium sand. The island building elevation is 1.0m higher than the river surface elevation.

[0026] 2. Driving cofferdam steel sheet piles:

[0027] like Figure 1 As shown, below the bottom of the pedestal is hard shale, and above is coarse gravel soil. The cofferdam steel sheet piles are driven through the coarse gravel soil to the top of the shale (the top of the shale is too strong for the steel sheet piles to pass through). The size of the cofferdam steel sheet piles is 27.5m×23.5m, and each side is 7.5m wider than the pedestal. Some soil is reserved on the inside of the steel sheet piles and is not excavated to resist the steel sheet piles from tilting inward. The innovation of this application is that the steel sheet piles are not long, only reaching the bottom of the pedestal, which is equivalent to the steel sheet piles having basically no anchoring at the bottom after the foundation pit is excavated. The cofferdam steel sheet piles are combined with the island cofferdam and anchor steel sheet piles to stabilize the cofferdam steel sheet piles and realize the construction of hard shale steel sheet piles in the river.

[0028] 3. Anchor setting:

[0029] Post-anchor steel sheet piles are set along the length and width of the cofferdam steel sheet piles. Four anchor steel sheet piles are set in the length direction and three anchor steel sheet piles are set in the width direction. The anchor steel sheet piles are of the same specifications and models as the cofferdam steel sheet piles. They are driven into the top surface of the shale. The anchor steel sheet piles and the cofferdam steel sheet piles are connected and anchored with φ20 fine-rolled threaded steel.

[0030] 4. Excavation of foundation pit in steel sheet pile:

[0031] like Figure 2 As shown, the foundation pit is sloped at a ratio of 1:1, with 1m reserved at the top of the slope as a platform, 1m at the bottom of the slope as construction operation space, and a 0.3m×0.3m drainage ditch at the bottom.

[0032] 5. Pumping of foundation pit:

[0033] Four collection wells are set up along the drainage ditch at the four corners of the foundation pit. The size of the collection wells is 0.5m×0.5m, the depth is 0.5m, and water pumps are installed in the collection wells to pump water.

[0034] In this embodiment, the hard shale formation in the river is located 20 cm below the cap, and conventional steel sheet pile cofferdams cannot penetrate the shale formation for support. A method combining island construction and steel sheet piles is adopted, and anchors are set behind the steel sheet piles. The reserved soil inside the steel sheet piles provides passive earth pressure to solve the stability and water-stopping problems of the steel sheet piles. This method has high safety, good water-stopping effect, and low construction cost.

[0035] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the embodiments shown and described herein.

Claims

1. A method for constructing a steel sheet pile cofferdam in a hard shale formation in a river. It is characterized in that The following steps are involved: S1. Take river sand from the river to build the island; S2. After the island is built, the cofferdam steel sheet pile construction is carried out and the cofferdam steel sheet piles are driven to the top of the shale layer; S3. Multiple anchor steel sheet piles are set behind the cofferdam steel sheet piles along the length and width of the cofferdam. The cofferdam steel sheet piles and the anchor steel sheet piles are fixed with fine-rolled threaded steel bars.

2. The method for constructing a steel sheet pile cofferdam in a hard shale formation in a river as claimed in claim 1, It is characterized in that The following steps are also included: S4. Excavate the foundation pit inside the cofferdam steel sheet piles with a slope of 1:1, set a reserved platform on the top and an operating space at the bottom; S5. Set up drainage ditches along the bottom of the foundation pit and water collection wells at the four corners of the foundation pit.

3. The method for constructing a steel sheet pile cofferdam in a hard shale formation in a river as claimed in claim 1, It is characterized in that The island building materials in S1 are taken from the river and filled with medium sand, and the island building elevation exceeds the river water surface elevation by 1.0m.

4. The method for constructing a steel sheet pile cofferdam in a hard shale formation in a river as claimed in claim 1, It is characterized in that In the S2, part of the soil inside the cofferdam steel sheet pile is reserved and not excavated.

5. The method for constructing a steel sheet pile cofferdam in a hard shale formation in a river as claimed in claim 1, It is characterized in that The anchor steel sheet piles in S3 are steel sheet piles of the same specifications and models as the cofferdam steel sheet piles, and the anchor steel sheet piles are driven into the top surface of the shale.