Road retaining wall structure and construction equipment thereof

By using L-shaped bent parts and limit bumps in the retaining wall structure, combining the adsorption force of the rubber telescopic tube and the magnetic block, a stable C-shaped connection is formed, which solves the problem of anchor rods leaving the roadbed and improves the Stability and construction efficiency of retaining walls.

CN118933067APending Publication Date: 2024-11-12CCCC SHEC FOURTH ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411306502.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

When the existing retaining wall structure is installed, the anchor rods are prone to break away from the roadbed, resulting in insufficient stability of the retaining wall unit on the roadbed.

Method used

A retaining wall structure including an L-shaped bent portion and a limiting bump is designed. The bending angle of the bent portion is adjusted through the cooperation of the rubber telescopic tube and the magnetic block, and the adsorption of the magnetic block is carried out through the tightening device and the magnetic block. The force forms a stable C-shaped connection, enhancing the fixity between the anchor rod and the soil slope, and at the same time, step edges are arranged on the baffle body for easier splicing.

Benefits of technology

It improves the connection strength and stability between the retaining wall structure and the soil slope, simplifies the construction process, improves the construction efficiency, and enhances the structural strength and splicing convenience of the baffle body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933067A_ABST
    Figure CN118933067A_ABST
Patent Text Reader

Abstract

The invention relates to the field of retaining walls, and discloses a road retaining wall structure and construction equipment thereof.The road retaining wall structure comprises a retaining wall structure body mounted on a soil slope, the retaining wall structure body comprises a baffle body, a fixing body is mounted on the back of the baffle body, and a mounting cavity allowing the fixing body to be inserted is formed in the surface of the soil slope; an L-shaped bending part is arranged at the tail end of the fixing body, the L-shaped bending part and an L-shaped pouring cavity are designed to be matched with a limiting protruding block, so that the fixing body is inserted into a mounting cavity of a soil slope, the bending part further provides additional support, the contact area between the fixing body and the soil slope is increased, the stability between the fixing body and the soil slope is improved, and meanwhile the fixing body is not prone to falling off. And the limiting protruding blocks are embedded into the pouring cavities, the limiting protruding blocks and the pouring cavities form a whole during concrete pouring, the connecting strength and stability between the retaining wall structure and the soil slope are further enhanced, through the design of the limiting protruding blocks and the pouring cavities, concrete pouring can be conducted while the baffle body is installed, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of retaining walls, in particular to a highway retaining wall structure and construction equipment thereof. Background Art

[0002] In the prior art, in order to facilitate the installation and replacement of retaining walls, an assembled retaining wall structure is usually adopted. When installing the retaining wall structure on the highway roadbed, a plurality of retaining wall units are spliced ​​together, and each retaining wall unit is fixed to the roadbed by an anchor rod. However, when installing the anchor rod, it is first necessary to open a plurality of installation holes at designated positions, and then insert the anchor rods into the installation holes, and finally pour concrete into the anchor rods. After the concrete solidifies, the prefabricated retaining wall unit is fixed to the anchor rods by bolts, thereby realizing the installation of the retaining wall. When installing the retaining wall unit, it is necessary to insert the anchor rod first, and then pour concrete into the anchor rod to improve the strength of the anchor rod in the roadbed. However, the anchor rod is not fixed along its own direction, and it is easy for the anchor rod and the retaining wall to separate from the roadbed, thereby causing the retaining wall unit to be insufficiently stable on the roadbed. Summary of the invention

[0003] The invention provides a highway retaining wall structure and construction equipment thereof, which overcome the shortcomings described in the background technology.

[0004] The technical solution adopted by the present invention to solve its technical problem is: A highway retaining wall structure and construction equipment thereof, comprising a retaining wall structure installed on a soil slope, the retaining wall structure comprising a baffle body, a fixing body installed on the back of the baffle body, and a mounting cavity for inserting the fixing body, an L-shaped bending portion is arranged at the end of the fixing body, the bending portion is bent downward, a casting cavity is arranged on the surface of the soil slope, and a limiting convex block is arranged at the corresponding position of the baffle body and the casting cavity, the limiting convex block is embedded in the casting cavity, the limiting convex block is a hollow structure, the casting cavity is connected to the outside through the limiting convex block, and when the baffle body is installed, concrete is poured into the casting cavity through the limiting convex block; The casting cavity is an L-shaped structure; The fixed body and the limiting protrusion form a C-shaped connection, and the fixed body adjusts the bending angle of its bending portion through an adjustment mechanism. A rubber telescopic tube is provided at the connection end between the bending portion and the fixed body, and the two ends of the rubber telescopic tube are respectively connected to the bending portion and the fixed body. A spring and a magnetic block are provided in the rubber telescopic tube. The magnetic blocks are arrayed on the same side surface of the spring, and two adjacent magnetic blocks are magnetically attracted to each other. The magnetic blocks arranged at the head and tail ends of the spring are respectively connected to the fixed body and the bending portion. When the bending portion bends downward, the spring and the magnetic blocks arranged at the head and tail ends of the spring are squeezed at the same time until all the magnetic blocks are attracted to each other and the bending portion stops bending downward.

[0005] A preferred technical solution, the fixed body includes a first embedded rod, the bending portion includes a second embedded rod, the second embedded rod is swingably connected to the end of the first embedded rod, and a rubber telescopic tube is arranged near the connection between the first embedded rod and the second embedded rod, and the rubber telescopic tube is wrapped around the spring and the magnetic block.

[0006] A preferred technical solution, the adjustment mechanism includes a tightening device and a tightening rope, the tightening device is arranged on a side surface of the baffle body away from the fixed body, the tightening rope is wound around the end of the second embedded rod and the other end passes through the baffle body and extends and winds into the tightening device, the tightening rope is wound through the tightening device, so that the tightening rope pulls the second embedded rod to swing and compresses the spring; A clamp ring is provided at the lower end of the first embedded rod, and the tightening rope passes through the clamp ring; The tightening device comprises a rotating disk inside, a first gear disk is arranged on the rotating disk, a groove for winding a tightening rope is formed between the rotating disk and the first gear disk, the tightening rope is inserted into the inside from a side opening arranged on the side, and the end of the tightening rope is wound around the surface of the groove, a strip-shaped opening is arranged on the surface of the first gear disk, and an upper opening is arranged at a position corresponding to the strip-shaped opening; The rotating disk is fixed to the surface of the baffle body through a supporting roller arranged at the lower end thereof.

[0007] A preferred technical solution is that a step edge is respectively provided on the left and right sides of the baffle body, and the two step edges are respectively arranged on the upper and lower end surfaces of the baffle body, and the surfaces of the two step edges are respectively provided with a first limit block and a second limit block. When the two baffle bodies are spliced ​​together, the step edges on adjacent sides of the two baffle bodies overlap, and the adjacent first limit blocks and second limit blocks are arranged in an interval.

[0008] A construction device for a highway retaining wall structure, applied to the highway retaining wall structure, comprises a construction device, the construction device comprises a mounting shell and a motor, a second gear, a third gear, and a fixed block mounted in the mounting shell, the fixed block is fixed to the inner wall of the mounting shell, the fixed block is provided with a support pipe bent at 90 degrees, the second gear and the third gear are rotatably mounted on both ends of the support pipe respectively, and the second gear is meshed with the third gear, the second gear is connected to the output shaft of the motor to drive the third gear to rotate through the motor, and the third gear protrudes from the lower end surface of the mounting shell; The shell A is replaced with the shell B, and the surface of the shell B is provided with an embedding opening. When installing the retaining wall structure, the construction equipment is placed against the surface of the shell B. The third gear is embedded in the shell B through the embedding opening and meshes with the first gear plate. When the third gear rotates, it drives the first gear plate to reel in and tighten the rope.

[0009] Compared with the prior art, this technical solution has the following advantages: The casting cavity is an L-shaped structure. By designing an L-shaped bending portion and cooperating with the L-shaped casting cavity and the limiting protrusion, the fixed body is not only inserted into the installation cavity of the earth slope, but its bending portion also provides additional support, thereby increasing the contact area and stability between the fixed body and the earth slope. At the same time, the limiting protrusion is embedded in the casting cavity and forms a whole with the casting cavity when pouring concrete, thereby further enhancing the connection strength and stability between the retaining wall structure and the earth slope. Through the design of the limiting protrusion and the casting cavity, concrete can be poured while the baffle body is installed, thereby simplifying the construction process and improving construction efficiency.

[0010] In the design of the baffle body, the step edges set on the left and right sides are an ingenious and practical concept. These step edges not only enhance the structural strength of the baffle body, but also provide great convenience for its splicing and installation. Specifically, each step edge is located on the upper and lower end surfaces of the baffle body. This design enables the step edges on their adjacent sides to overlap perfectly when two baffle bodies need to be spliced. This overlapping design not only ensures the tightness and stability of the splicing, but also makes the entire splicing process simple and efficient.

[0011] Under the continuous pulling of the tightening rope, the second embedded rod gradually bends and squeezes the spring. At the same time, since a clamp is provided at the lower end of the first embedded rod, the tightening rope passes through the clamp, which ensures that the first embedded rod remains stable during the adjustment process and does not move with the swing of the second embedded rod. Finally, when the second embedded rod is bent to a predetermined angle, it forms a stable C-shaped structure together with the limiting protrusion. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0013] Figure 1 This is an overall diagram of the present invention.

[0014] Figure 2 It is a structural schematic diagram of the retaining wall structure 1 and the earth slope 100.

[0015] Figure 3 This is a schematic diagram of the side structure of the retaining wall structure 1.

[0016] Figure 4 It is a three-dimensional schematic diagram of the retaining wall structure 1.

[0017] Figure 5 Schematic diagram of the structure of the baffle body 11.

[0018] Figure 6 It is a schematic structural diagram of the first embedded rod 12 , the second embedded rod 13 and the rubber telescopic tube 14 .

[0019] Figure 7It is a schematic diagram of the state process of the spring 141 and the magnetic block 142 being squeezed.

[0020] Figure 8 for Figure 7 A three-dimensional schematic diagram of .

[0021] Fig. 9 This is a schematic diagram of the half-section structure of the shell A151A.

[0022] Fig.10 It is a schematic diagram of the structure of the shell B151B.

[0023] In the figure: soil slope 100, installation cavity 101, casting cavity 102, retaining wall structure 1, construction equipment 2; Baffle body 11, limiting protrusion 111, first limiting block 112, second limiting block 113, first embedded rod 12, snap ring 121, second embedded rod 13, rubber telescopic tube 14, spring 141, magnetic block 142, tightening device 15, shell A151A, shell B151B, upper opening 1511, side opening 1512, embedded opening 1513, rotating disk 152, first gear disk 153, strip opening 1531, support roller 154, tightening rope 16; The mounting shell 21, the motor 22, the second gear 23, the third gear 24, and the fixing block 25. DETAILED DESCRIPTION

[0024] like Figures 1 to 10 As shown, the present invention proposes a highway retaining wall structure and a construction equipment thereof, including a retaining wall structure 1 installed on a soil slope 100, the retaining wall structure 1 includes a baffle body 11, a fixed body is installed on the back of the baffle body 11, and a mounting cavity 101 for inserting the fixed body is provided on the surface of the soil slope 100, and an L-shaped bending portion is provided at the end of the fixed body, and the bending portion is bent downward, and a casting cavity 102 is provided on the surface of the soil slope 100, and a limiting protrusion 111 is provided at the corresponding position of the baffle body 11 and the casting cavity 102, and the limiting protrusion 111 is embedded in the casting cavity 102, and the limiting protrusion 111 is a hollow structure, and the casting cavity 102 is connected to the outside through the limiting protrusion 111. When the baffle body 11 is installed, concrete is poured into the casting cavity 102 through the limiting protrusion 111; The casting cavity 102 is an L-shaped structure. By designing an L-shaped bending portion and cooperating the L-shaped casting cavity 102 with the limiting protrusion 111, the fixed body is not only inserted into the installation cavity 101 of the earth slope 100, but its bending portion also provides additional support, thereby increasing the contact area and stability between the fixed body and the earth slope. At the same time, the limiting protrusion 111 is embedded in the casting cavity 102 and forms a whole with the casting cavity 102 when pouring concrete, thereby further enhancing the connection strength and stability between the retaining wall structure 1 and the earth slope 100. Through the design of the limiting protrusion 111 and the casting cavity 102, concrete can be poured while the baffle body 11 is installed, thereby simplifying the construction process and improving the construction efficiency.

[0025] The fixed body and the limiting protrusion 111 form a C-shaped connection, and the fixed body adjusts the bending angle of its bending portion through an adjustment mechanism. The connecting end of the bending portion and the fixed body is provided with a rubber telescopic tube 14, and the two ends of the rubber telescopic tube 14 are respectively connected to the bending portion and the fixed body. A spring 141 and a magnetic block 142 are arranged in the rubber telescopic tube 14. The magnetic blocks 142 are arrayed on the same side surface of the spring 141, and two adjacent magnetic blocks 142 are magnetically attracted to each other. The magnetic blocks 142 arranged at the head and tail ends of the spring 141 are respectively connected to the fixed body and the bending portion. When the bending portion bends downward, the spring 141 and the magnetic blocks 142 arranged at the head and tail ends of the spring 141 are squeezed at the same time until all the magnetic blocks 142 are attracted to each other, and the bending portion stops bending downward; The magnetic blocks 142 are arrayed on the same side surface of the spring 141, and two adjacent magnetic blocks 142 are magnetically attracted to each other. This design allows the spring 141 to be squeezed when the bending portion bends downward, and the magnetic blocks 142 at both ends of the spring 141 also approach each other and generate an adsorption force, which provides additional resistance to the bending of the bending portion, making the bending process more stable, and also helps to achieve precise positioning when bending to a predetermined angle; When all the magnetic blocks 142 are adsorbed, the bending portion stops bending downward, which means that the adsorption function of the magnetic blocks 142 not only controls the bending angle of the bending portion, but also enhances the stability of the connection between the bending portion and the fixed body. After the bending portion stops bending, the adsorption force between the magnetic blocks 142 continues to exist, which helps to keep the position of the bending portion stable and prevent displacement due to external force.

[0026] Among them, the fixed body includes a first embedded rod 12, the bending part includes a second embedded rod 13, the second embedded rod 13 is swingably connected to the end of the first embedded rod 12, and the rubber telescopic tube 14 is arranged near the connection between the first embedded rod 12 and the second embedded rod 13, and the rubber telescopic tube 14 is wrapped around the spring 141 and the magnet block 142.

[0027] Furthermore, the adjustment mechanism includes a tightening device 15 and a tightening rope 16. The tightening device 15 is disposed on a side surface of the baffle body 11 away from the fixed body. The tightening rope 16 is wound around the end of the second embedded rod 13 and the other end passes through the baffle body 11 and extends and winds into the tightening device 15. The tightening rope 16 is wound by the tightening device 15, so that the tightening rope 16 pulls the second embedded rod 13 to swing and compress the spring 141. A clamp ring 121 is provided at the lower end of the first embedded rod 12, and the tightening rope 16 passes through the clamp ring 121; The tightening device 15 comprises 151, wherein a rotating disk 152 is provided in 151, and a first gear disk 153 is provided on the rotating disk 152. A groove for winding a tightening rope 16 is formed between the rotating disk 152 and the first gear disk 153. The tightening rope 16 passes through 151 from a side opening 1512 provided on the side of 151, and the end of the tightening rope 16 is wound around the surface of the groove. A strip-shaped opening 1531 is provided on the surface of the first gear disk 153, and an upper opening 1511 is provided at a position corresponding to the strip-shaped opening 1531 of 151; The rotating disk 152 is fixed to the surface of the baffle body 11 via a supporting roller 154 disposed at the lower end thereof.

[0028] Furthermore, the baffle body 11 is provided with a step edge on both sides, and the two step edges are respectively provided on the upper and lower end surfaces of the baffle body 11, and the surfaces of the two step edges are respectively provided with a first limit block 112 and a second limit block 113. When the two baffle bodies 11 are spliced ​​together, the step edges on the adjacent sides of the two baffle bodies 11 overlap, and the adjacent first limit blocks 112 and second limit blocks 113 are arranged in an interval. In the design of the baffle body 11, the steps arranged on the left and right sides are an ingenious and practical concept. These steps not only enhance the structural strength of the baffle body 11, but also provide great convenience for its splicing and installation. Specifically, each step is located at the upper and lower end surfaces of the baffle body 11. Such a design enables the steps on the adjacent sides of the two baffle bodies 11 to overlap perfectly when they need to be spliced. Such overlapping design not only ensures the tightness and stability of the splicing, but also makes the entire splicing process simple and efficient. What is more ingenious is that a first limit block 112 and a second limit block 113 are respectively arranged on the surface of the step edge. When the two baffle bodies 11 are spliced ​​together, the adjacent first limit blocks 112 and the second limit blocks 113 are arranged in a spaced arrangement. This spaced arrangement not only plays a role of limiting, preventing the baffle bodies 11 from being dislocated or sliding during the splicing process, but also further enhances the overall structural strength after splicing. In addition, this design also makes the layout and installation of the baffle body 11 more flexible and diversified. Due to the interval arrangement of the first limit block 112 and the second limit block 113, the baffle body 11 can be combined and arranged differently according to actual needs during splicing, thereby meeting the usage requirements in different scenarios and needs.

[0029] A construction device for a highway retaining wall structure, applied to the highway retaining wall structure, comprises a construction device 2, the construction device 2 comprises a mounting shell 21 and a motor 22, a second gear 23, a third gear 24, and a fixing block 25 mounted in the mounting shell 21, the fixing block 25 being fixed to the inner wall of the mounting shell 21, the fixing block 25 being provided with a supporting tube bent at 90 degrees, the second gear 23 and the third gear 24 being rotatably mounted on both ends of the supporting tube respectively, and the second gear 23 and the third gear 24 being meshed, the second gear 23 being connected to the output shaft of the motor 22 so as to drive the third gear 24 to rotate through the motor 22, and the third gear 24 protruding from the lower end surface of the mounting shell 21; The housing A151A is replaced with a housing B151B. The surface of the housing B151B is provided with an embedding opening 1513. When the retaining wall structure 1 is installed, the construction equipment 2 is placed against the surface of the housing B151B. The third gear 24 is embedded in the housing B151B through the embedding opening 1513 and meshes with the first gear plate 153. When the third gear 24 rotates, the first gear plate 153 is driven to reel in the tightening rope 16. During the construction of the highway retaining wall structure, the construction equipment 2 plays a key role in regulation, especially in winding up the tightening rope 16 through its internal mechanical structure, thereby driving the second embedded rod 13 to bend and form a stable C-shaped structure together with the limiting protrusion 111. The following is a detailed regulation process: First, the specially designed housing B151B replaces the original housing A151A. The special embedding opening 1513 on the surface of the housing B151B provides a possibility for the construction equipment 2 to be connected. When installing the retaining wall structure 1, the construction equipment 2 is tightly placed against the surface of the housing B151B to ensure that the third gear 24 can be accurately embedded in the housing B151B through the embedding opening 1513. Once the third gear 24 is embedded in place, it forms a meshing relationship with the first gear plate 153. At this time, the motor 22 in the construction equipment 2 is started, and the output shaft of the motor 22 starts to rotate, and drives the second gear 23 connected thereto to rotate synchronously. Since the second gear 23 and the third gear 24 are rotatably mounted through the two ends of the support tube and they are kept in a meshing state, the rotation of the second gear 23 will further drive the third gear 24 to rotate in the housing B151B; As the third gear 24 rotates, it starts to drive the first gear plate 153 to rotate. The tightening rope 16 is wound in the groove between the first gear plate 153 and the rotating plate 152. Therefore, when the first gear plate 153 rotates, it gradually reels the tightening rope 16 on the groove. One end of the tightening rope 16 is wound around the end of the second embedded rod 13. Therefore, as the tightening rope 16 is reeled in, the second embedded rod 13 is subjected to tension and starts to swing. Under the continuous pulling of the tightening rope 16, the second embedded rod 13 gradually bends and squeezes the spring 141. At the same time, since the lower end of the first embedded rod 12 is provided with a clamping ring 121, the tightening rope 16 passes through the clamping ring 121, which ensures that the first embedded rod 12 remains stable during the adjustment process and does not move with the swing of the second embedded rod 13. Finally, when the second embedded rod 13 is bent to a predetermined angle, it forms a stable C-shaped structure together with the limiting protrusion 111. To sum up, through the cooperation of the motor 22, the second gear 23, the third gear 24 inside the construction equipment 2, the embedding port 1513 on the outer shell B151B, and the first gear plate 153, the winding degree of the tightening rope 16 can be accurately adjusted, thereby driving the second embedded rod 13 to bend and form a stable C-shaped structure with the limiting protrusion 111. This process not only improves the installation efficiency of the retaining wall structure 1, but also ensures its stability and safety.

[0030] The above description is only a preferred embodiment of the present invention, and therefore cannot be used to limit the scope of the present invention. That is, equivalent changes and modifications made according to the patent scope of the present invention and the contents of the specification should still fall within the scope of the present invention.

Claims

1. A highway retaining wall structure, characterized in that: The retaining wall structure (1) comprises a retaining plate body (11), a fixing body is installed on the back of the retaining plate body (11), and a mounting cavity (101) for inserting the fixing body is provided on the surface of the soil slope (100), an L-shaped bending portion is provided at the end of the fixing body, and the bending portion is bent downward, a casting cavity (102) is provided on the surface of the soil slope (100), and a limiting protrusion (111) is provided at a corresponding position between the retaining plate body (11) and the casting cavity (102), the limiting protrusion (111) is embedded in the casting cavity (102), the limiting protrusion (111) is a hollow structure, the casting cavity (102) is connected to the outside through the limiting protrusion (111), and when the retaining plate body (11) is installed, concrete is poured into the casting cavity (102) through the limiting protrusion (111); The casting cavity (102) is an L-shaped structure; The fixed body and the limiting protrusion (111) form a C-shaped connection, and the fixed body adjusts the bending angle of its bending portion through an adjustment mechanism. A rubber telescopic tube (14) is provided at the connection end of the bending portion and the fixed body. The two ends of the rubber telescopic tube (14) are respectively connected to the bending portion and the fixed body. A spring (141) and a magnetic block (142) are provided in the rubber telescopic tube (14). The magnetic blocks (142) are arrayed on the same side surface of the spring (141). Two adjacent magnetic blocks (142) are magnetically attracted to each other. The magnetic blocks (142) arranged at the head and tail ends of the spring (141) are respectively connected to the fixed body and the bending portion. When the bending portion bends downward, the spring (141) and the magnetic blocks (142) arranged at the head and tail ends of the spring (141) are squeezed at the same time until all the magnetic blocks (142) are attracted to each other and the bending portion stops bending downward.

2. A highway retaining wall structure according to claim 1, characterized in that: The fixed body comprises a first embedded rod (12), the bent portion comprises a second embedded rod (13), the second embedded rod (13) is swingably connected to the end of the first embedded rod (12), a rubber telescopic tube (14) is arranged near the connection between the first embedded rod (12) and the second embedded rod (13), and the rubber telescopic tube (14) is wrapped around the spring (141) and the magnet (142).

3. A highway retaining wall structure according to claim 2, characterized in that: The adjustment mechanism comprises a tightening device (15) and a tightening rope (16); the tightening device (15) is arranged on a side surface of the baffle body (11) away from the fixed body; one end of the tightening rope (16) is wound around the end of the second embedded rod (13) and the other end passes through the baffle body (11) and extends and is wound into the tightening device (15); the tightening rope (16) is wound through the tightening device (15), so that the tightening rope (16) pulls the second embedded rod (13) to swing and compress the spring (141); A snap ring (121) is provided at the lower end of the first embedded rod (12), and the tightening rope (16) passes through the snap ring (121); The tightening device (15) comprises (151), a rotating disk (152) is arranged in (151), a first gear disk (153) is arranged on the rotating disk (152), a groove for winding a tightening rope (16) is formed between the rotating disk (152) and the first gear disk (153), the tightening rope (16) is inserted into (151) from a side opening (1512) arranged on the side of (151), and the end of the tightening rope (16) is wound around the surface of the groove, a strip-shaped opening (1531) is arranged on the surface of the first gear disk (153), and an upper opening (1511) is arranged at a position of (151) corresponding to the strip-shaped opening (1531); The rotating disk (152) is fixed to the surface of the baffle body (11) via a supporting roller (154) arranged at the lower end thereof.

4. A highway retaining wall structure according to claim 3, characterized in that: The baffle body (11) is provided with a step edge on both sides, respectively. The two step edges are respectively arranged on the upper and lower end surfaces of the baffle body (11). The surfaces of the two step edges are respectively provided with a first limit block (112) and a second limit block (113). When the two baffle bodies (11) are spliced ​​together, the step edges on adjacent sides of the two baffle bodies (11) overlap, and the adjacent first limit blocks (112) and second limit blocks (113) are arranged in an interval.

5. A construction device for a highway retaining wall structure, applied to the highway retaining wall structure according to any one of claims 1 to 4, characterized in that: The construction equipment (2) comprises a mounting shell (21), a motor (22) mounted in the mounting shell (21), a second gear (23), a third gear (24), and a fixing block (25), wherein the fixing block (25) is fixed to the inner wall of the mounting shell (21), the fixing block (25) is provided with a support tube bent at 90 degrees, the second gear (23) and the third gear (24) are rotatably mounted on two ends of the support tube respectively, and the second gear (23) and the third gear (24) are meshed, the second gear (23) is connected to the output shaft of the motor (22) so as to drive the third gear (24) to rotate through the motor (22), and the third gear (24) protrudes from the lower end surface of the mounting shell (21); The housing A (151A) is replaced with a housing B (151B), the surface of the housing B (151B) being provided with an embedding opening (1513). When the retaining wall structure (1) is installed, the construction equipment (2) is placed against the surface of the housing B (151B), the third gear (24) is embedded in the housing B (151B) through the embedding opening (1513), and meshes with the first gear plate (153). When the third gear (24) rotates, the first gear plate (153) is driven to reel in the tightening rope (16).