Safe closure method for hazardous waste flexible landfill
By employing a combined structure of silica fume layer, air guiding layer, seepage prevention layer, drainage layer and vegetation layer in the flexible landfill for hazardous waste, combined with geogrid and activated carbon adsorption tower, the problems of structural instability and waste gas treatment after landfill closure were solved, achieving a stable and environmentally friendly landfill closure effect.
Patent Information
- Application Number
- CN202410857189.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-11-12
AI Technical Summary
Existing flexible landfills for hazardous waste lack safety after closure, are prone to landslides due to rainwater erosion, and have particulate matter entrained in exhaust gases that can clog the gas delivery structure. They also lack effective treatment devices, posing an environmental threat.
The system employs a combination of silica powder layer, air guiding layer, seepage prevention layer, drainage layer and vegetation layer, combined with geogrid and activated carbon adsorption tower, to form a stable sealing system through laying and fixing steps, preventing landslides and filtering and purifying waste gas.
It improves the stability of the landfill structure, prevents landslides, filters particulate matter in exhaust gas, purifies exhaust gas, ensures the safety of the landfill and the speed of ecological restoration, and promotes land reclamation and utilization.
Smart Images

Figure CN118933084A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of flexible landfills, in particular to a method for safely sealing a flexible landfill for hazardous wastes. Background Art
[0002] Hazardous waste refers to solid waste that is listed in the national hazardous waste list or identified as having hazardous characteristics according to the national hazardous waste identification standards and identification methods. Hazardous waste that is discharged and stored at random will pollute water bodies and soil under the long-term infiltration and diffusion of rainwater and groundwater, and reduce the environmental function level of the region; hazardous waste can cause harm through ingestion, inhalation, skin absorption, eye contact, or cause dangerous events such as combustion and explosion; in addition, the pollution of the atmosphere, water sources, soil, etc. caused by the untreated or improperly treated disposal of hazardous waste will also become a bottleneck restricting economic activities.
[0003] Hazardous wastes are generally disposed of in flexible landfills. When the flexible landfill reaches its designed capacity, it should be sealed and covered in time. The purpose of sealing and covering is to reduce the amount of leachate generated, improve the safety and stability of the pile, increase the speed of ecological restoration and reclamation of the landfill, and promote the subsequent use of the land. Reasonable and standardized landfill closure can minimize the pollution to the environment while improving the stabilization and harmlessness of the landfill.
[0004] In the prior art, the flexible landfill for hazardous waste lacks safety after closure. It is easy to cause soil landslides under the erosion and infiltration of rainwater, resulting in instability of the closure structure. In addition, the particles entrained in the exhaust gas easily block the gas guide structure. There is a lack of further treatment equipment for the exhaust gas, which easily poses a threat to the environment of the landfill area. In view of this, we propose a safe closure method for flexible landfill for hazardous waste. Summary of the invention
[0005] The object of the present invention is to provide a method for safely sealing a flexible landfill of hazardous wastes to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A method for safely closing a hazardous waste flexible landfill comprises the following steps:
[0008] S1. Measure the paving area of the landfill and select matching paving materials according to the measured size;
[0009] S2, compacting the hazardous waste layer and laying a silicon powder layer on the hazardous waste layer;
[0010] S3, laying an air conducting layer, an impermeable layer, a drainage layer, and a vegetation layer in order from bottom to top on the silicon powder layer, wherein the edge of the impermeable layer is arranged inside the anchoring ditch, the edge of the drainage layer is arranged inside the flood intercepting ditch, and the flood intercepting ditch is arranged on the side of the anchoring ditch away from the landfill body;
[0011] S4. Fix the edges of the anti-seepage layer and the drainage layer;
[0012] S5. Fix the geogrid to the vegetation layer;
[0013] S6. Inspect and accept the completed closure system.
[0014] Preferably, the silicon powder layer is nano-scale silicon dioxide, and the thickness of the silicon powder layer is 20-50 mm.
[0015] Preferably, the air guide layer is composed of a gravel layer and a filter membrane, the filter membrane is arranged on the top of the gravel layer, the air guide layer has a thickness of 30-50 mm, and the filter membrane is made of polytetrafluoroethylene.
[0016] Preferably, the anti-seepage layer includes, from bottom to top, a first HDPE geomembrane, a first clay layer, a second HDPE geomembrane, a second clay layer, and a third HDPE geomembrane, wherein the thickness of the first HDPE geomembrane, the second HDPE geomembrane, and the third HDPE geomembrane is greater than 1.5 mm, and the thickness of the first clay layer and the second clay layer is 30-50 mm. The fixing of the edge of the anti-seepage layer includes the following steps:
[0017] S41. Conduct trial welding first to inspect and adjust the welding equipment, and then conduct production welding;
[0018] S42. After welding is completed, the inside of the anchor trench is filled with a sand and gravel layer, and the top of the sand and gravel layer fits the bottom of the drainage layer.
[0019] Preferably, the drainage layer includes a gravel layer and a geofilter. The geofilter is arranged above the gravel layer. The thickness of the gravel layer is 300 mm. The specification of the geofilter is 200 g / m 2 The drainage layer of the slope is composed of a geocomposite drainage net with a thickness greater than 6 mm. The drainage layer is connected to the drainage ditch around the landfill area. The edge of the drainage layer is fixed including the following steps:
[0020] S51. Conduct trial welding first to inspect and adjust the welding equipment, and then conduct production welding;
[0021] S52. After welding is completed, the edge of the drainage layer is compacted and fixed with bagged sand and gravel.
[0022] Preferably, the vegetation layer consists of a nutrient vegetation layer and a covering support soil layer, the nutrient vegetation layer has a thickness of 150-300 mm, and the covering support soil layer is a compacted soil layer with a thickness of 450-600 mm.
[0023] Preferably, geogrids are provided at the bottom of the covering support soil layer and between the nutrient vegetation layer and the covering support soil layer, and the nutrient vegetation layer is a greening layer grown by sowing grass seeds in the upper geogrid.
[0024] Preferably, the geogrid is a steel-plastic geogrid, and the geogrid has a topological structure composed of regular hexagons.
[0025] Preferably, an air guide hood is provided above the filter membrane, the top of the air guide hood is sealed and connected with an air guide pipe, the top of the air guide pipe passes through the anti-seepage layer, the drainage layer, the vegetation layer and is connected with an activated carbon adsorption tower, the activated carbon adsorption tower is fixedly arranged above the vegetation layer, an HDPE film is sleeved on the outside of the air guide pipe, and the HDPE film is respectively welded to the anti-seepage layer, the drainage layer and the vegetation layer.
[0026] Preferably, a plurality of air guide pipes are provided, and the plurality of air guide pipes are all fixedly connected to the activated carbon adsorption tower.
[0027] Compared with the prior art, the present invention has the following beneficial effects:
[0028] 1. The safe closure method of the hazardous waste flexible landfill is achieved by installing geogrids at the bottom of the covering support soil layer and between the nutrient vegetation layer and the covering support soil layer. The nutrient vegetation layer is a green layer grown by sowing grass seeds in the upper geogrid. The geogrid has a topological structure composed of regular hexagons, which has high stability, efficient mechanical properties, excellent load-bearing capacity, and energy-saving and lightweight characteristics. It can avoid soil landslides caused by rain erosion and make the closure structure more stable.
[0029] 2. The method for safely sealing a hazardous waste flexible landfill is to lay a silicon powder layer on the hazardous waste layer, which can effectively isolate the hazardous waste layer, prevent fire in the hazardous waste layer, and ensure the safety of the landfill itself.
[0030] 3. The method for safely sealing a hazardous waste flexible landfill can filter particulate matter entrained in the gas generated by the hazardous waste layer by setting a filter membrane on the top of the air guide layer, thereby avoiding blockage of the air guide pipe.
[0031] 4. The method of safely sealing the hazardous waste flexible landfill site uses an activated carbon adsorption tower to purify the waste gas until it meets the standards before discharging it, which can reduce the harm to the environment and is safer.
[0032] 5. The safe closure method of the hazardous waste flexible landfill has a stable structure and is environmentally friendly. It improves the safety and stability of hazardous waste piles, increases the speed of ecological restoration and reclamation of landfills, and promotes the subsequent use of land. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0034] In the figure: 1. Hazardous waste layer; 11. Silica powder layer; 2. Air guide layer; 21. Gravel layer; 22. Filter membrane; 23. Air guide hood; 24. Air guide pipe; 3. Anti-seepage layer; 31. First HDPE geomembrane; 32. First clay layer; 33. Second HDPE geomembrane; 34. Second clay layer; 35. Third HDPE geomembrane; 4. Drainage layer; 41. Gravel layer; 42. Geofilter; 5. Vegetation layer; 51. Nutritional vegetation layer; 52. Covering support soil layer; 53. Geogrid; 6. Activated carbon adsorption tower. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0037] In the description of this patent, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "set" should be understood in a broad sense, for example, it can be fixedly connected or set, or it can be detachably connected or set, or connected or set in one piece. For ordinary technicians in this field, the specific meanings of the above terms in this patent can be understood according to specific circumstances.
[0038] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "several" is two or more, unless otherwise clearly and specifically defined.
[0039] See also Figure 1 As shown, a technical solution provided by the present invention is:
[0040] A method for safely closing a hazardous waste flexible landfill comprises the following steps:
[0041] S1. Measure the paving area of the landfill and select matching paving materials according to the measured size;
[0042] S2, compacting the hazardous waste layer 1, and laying a silicon powder layer 11 on the hazardous waste layer 1;
[0043] S3, laying the air conducting layer 2, the anti-seepage layer 3, the drainage layer 4, and the vegetation layer 5 in order from bottom to top, wherein the edge of the anti-seepage layer 3 is arranged inside the anchoring ditch, the edge of the drainage layer 4 is arranged inside the flood intercepting ditch, and the flood intercepting ditch is arranged on the side of the anchoring ditch away from the landfill body;
[0044] S4, fixing the edges of the anti-seepage layer 3 and the drainage layer 4;
[0045] S5, fixing the geogrid to the vegetation layer 5;
[0046] S6. Inspect and accept the completed closure system.
[0047] In this embodiment, the silicon powder layer 11 is nano-scale silicon dioxide, and the thickness of the silicon powder layer 11 is 20-50 mm. The silicon powder layer 11 has good insulation and corrosion resistance, and can isolate the hazardous waste layer 1 to prevent the hazardous waste layer 1 from causing fire.
[0048] In this embodiment, the air guide layer 2 is composed of a gravel layer 21 and a filter membrane 22. The filter membrane 22 is arranged on the top of the gravel layer 21. The thickness of the air guide layer 2 is 30-50 mm. The filter membrane 22 is made of polytetrafluoroethylene. An air guide cover 23 is arranged above the filter membrane 22. The top of the air guide cover 23 is sealed and connected to an air guide pipe 24. The top of the air guide pipe 24 penetrates the anti-seepage layer 3, the drainage layer 4, and the vegetation layer 5 and is connected to an activated carbon adsorption tower 6. The activated carbon adsorption tower 6 is fixedly arranged on the vegetation layer 5. Above the layer 5, an HDPE film is sleeved on the outside of the air duct 24, and the HDPE film is welded to the anti-seepage layer 3, the drainage layer 4, and the vegetation layer 5 respectively. The filter membrane 22 is used to filter the entrained particulate matter in the gas generated by the hazardous waste layer to avoid clogging the air duct 24; in the present embodiment, a plurality of air ducts 24 are provided, and the plurality of air ducts 24 are fixedly connected to the activated carbon adsorption tower 6 to improve the air guide efficiency, and the generated exhaust gas meets the emission standards after adsorption treatment in the activated carbon adsorption tower 6.
[0049] In this embodiment, the anti-seepage layer 3 includes, from bottom to top, a first HDPE geomembrane 31, a first clay layer 32, a second HDPE geomembrane 33, a second clay layer 34, and a third HDPE geomembrane 35. The thickness of the first HDPE geomembrane 31, the second HDPE geomembrane 33, and the third HDPE geomembrane 35 is greater than 1.5 mm, and the thickness of the first clay layer 32 and the second clay layer 34 is 30-50 mm. The anti-seepage performance of the anti-seepage layer is improved by setting the three layers of HDPE geomembrane to prevent rainwater from penetrating into the hazardous waste layer; the fixing of the edge of the anti-seepage layer 3 includes the following steps:
[0050] S41. Conduct trial welding first to inspect and adjust the welding equipment, and then conduct production welding;
[0051] S42. After welding is completed, the inside of the anchoring trench is filled with a sand and gravel layer, and the upper part of the sand and gravel layer is in contact with the bottom of the drainage layer 4.
[0052] The welding parts are further fixed by the sand and gravel layer, and rainwater is prevented from penetrating into the anchor trench.
[0053] In this embodiment, the drainage layer 4 includes a gravel layer 41 and a geofilter 42. The geofilter 42 is arranged above the gravel layer 41. The thickness of the gravel layer 41 is 300 mm. The specification of the geofilter 42 is 200 g / m 2 The drainage layer 4 of the slope is composed of a geocomposite drainage net with a thickness greater than 6 mm. The drainage layer 4 is connected to the drainage ditch around the landfill area. The fixing of the edge of the drainage layer includes the following steps:
[0054] S51. Conduct trial welding first to inspect and adjust the welding equipment, and then conduct production welding;
[0055] S52. After welding is completed, the edge of the drainage layer 4 is compacted and fixed with bagged sand and gravel.
[0056] In this embodiment, the vegetation layer 5 is composed of a nutrient vegetation layer 51 and a covering support soil layer 52. The nutrient vegetation layer 51 has a thickness of 150-300 mm. The covering support soil layer 52 is a compacted soil layer with a thickness of 450-600 mm. Geogrids 53 are arranged at the bottom of the covering support soil layer 52 and between the nutrient vegetation layer 51 and the covering support soil layer 52. The nutrient vegetation layer 51 is a greening layer grown by sowing grass seeds in the upper geogrid 53. The geogrid 53 can not only prevent the covering support soil layer 52 from landslides, but also fix the greening layer to prevent wind and sand.
[0057] Preferably, the geogrid 53 is a steel-plastic geogrid, which has a topological structure composed of regular hexagons, that is, a honeycomb structure, which has the characteristics of high stability, efficient mechanical properties, excellent load-bearing capacity, and energy saving and lightweight, and can further improve the stability of the nutritional vegetation layer 51 and the covering support soil layer 52.
[0058] The method for safely sealing a hazardous waste flexible landfill of the present invention has a stable structure and is environmentally friendly, improves the safety and stability of hazardous waste piles, increases the speed of ecological restoration and reclamation of landfills, and promotes subsequent utilization of land.
[0059] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A method for safely closing a hazardous waste flexible landfill, characterized in that: The following steps are involved: S1. Measure the paving area of the landfill and select matching paving materials according to the measured size; S2, compacting the hazardous waste layer (1), and laying a silicon powder layer (11) on the hazardous waste layer (1); S3, laying an air conducting layer (2), an impermeable layer (3), a drainage layer (4), and a vegetation layer (5) in order from bottom to top on the silicon powder layer (11), wherein the edge of the impermeable layer (3) is arranged inside the anchoring ditch, the edge of the drainage layer (4) is arranged inside the flood intercepting ditch, and the flood intercepting ditch is arranged on the side of the anchoring ditch away from the landfill body; S4, fixing the edges of the anti-seepage layer (3) and the drainage layer (4); S5, fixing the vegetation layer (5) with a geogrid; S6. Inspect and accept the completed sealing system.
2. The method for safely closing a hazardous waste flexible landfill according to claim 1 is characterized in that: The silicon powder layer (11) is nano-scale silicon dioxide, and the thickness of the silicon powder layer (11) is 20-50 mm.
3. The method for safely closing a hazardous waste flexible landfill according to claim 2 is characterized in that: The air guide layer (2) is composed of a gravel layer (21) and a filter membrane (22), the filter membrane (22) is arranged on the top of the gravel layer (21), the air guide layer (2) has a thickness of 30-50 mm, and the filter membrane (22) is made of polytetrafluoroethylene.
4. The method for safely closing a hazardous waste flexible landfill according to claim 1, characterized in that: The anti-seepage layer (3) comprises, from bottom to top, a first HDPE geomembrane (31), a first clay layer (32), a second HDPE geomembrane (33), a second clay layer (34), and a third HDPE geomembrane (35). The thickness of the first HDPE geomembrane (31), the second HDPE geomembrane (33), and the third HDPE geomembrane (35) is greater than 1.5 mm, and the thickness of the first clay layer (32) and the second clay layer (34) is 30-50 mm. Fixing the edge of the anti-seepage layer (3) comprises the following steps: S41. Conduct trial welding first to inspect and adjust the welding equipment, and then conduct production welding; S42. After welding is completed, the interior of the anchoring trench is filled with a sand and gravel layer, and the upper part of the sand and gravel layer is in contact with the bottom of the drainage layer (4).
5. The method for safely closing a hazardous waste flexible landfill according to claim 1, characterized in that: The drainage layer (4) comprises a gravel layer (41) and a geotextile filter (42). The geotextile filter (42) is arranged above the gravel layer (41). The thickness of the gravel layer (41) is 300 mm. The specification of the geotextile filter (42) is 200 g / m 2 The drainage layer of the slope is composed of (4) a geocomposite drainage net with a thickness greater than 6 mm, the drainage layer (4) is connected to the drainage ditch around the landfill area, and the edge of the drainage layer (4) is fixed including the following steps: S51. Conduct trial welding first to check and adjust the welding equipment, and then conduct production welding; S52. After welding is completed, the edge of the drainage layer (4) is compacted and fixed with bagged sand and gravel.
6. The method for safely closing a hazardous waste flexible landfill according to claim 1, characterized in that: The vegetation layer (5) is composed of a nutrient vegetation layer (51) and a covering support soil layer (52). The nutrient vegetation layer (51) has a thickness of 150-300 mm, and the covering support soil layer (52) is a compacted soil layer with a thickness of 450-600 mm.
7. The method for safely closing a hazardous waste flexible landfill according to claim 6 is characterized in that: Geogrids (53) are arranged at the bottom of the covering support soil layer (52) and between the nutrient vegetation layer (51) and the covering support soil layer (52); the nutrient vegetation layer (51) is a greening layer grown by sowing grass seeds in the upper geogrid (53).
8. The method for safely closing a hazardous waste flexible landfill according to claim 7, characterized in that: The geogrid (53) is a steel-plastic geogrid, and the geogrid (53) is a topological structure composed of regular hexagons.
9. The method for safely closing a hazardous waste flexible landfill according to claim 3, characterized in that: An air guide cover (23) is arranged above the filter membrane (22); an air guide pipe (24) is sealedly connected to the top of the air guide cover (23); the top of the air guide pipe (24) penetrates the anti-seepage layer (3), the drainage layer (4), and the vegetation layer (5) and is connected to an activated carbon adsorption tower (6); the activated carbon adsorption tower (6) is fixedly arranged above the vegetation layer (5); an HDPE film is sleeved on the outside of the air guide pipe (24); and the HDPE film is welded to the anti-seepage layer (3), the drainage layer (4), and the vegetation layer (5) respectively.
10. The method for safely closing a hazardous waste flexible landfill according to claim 9, characterized in that: A plurality of air guide pipes (24) are provided, and the plurality of air guide pipes (24) are all fixedly connected to the activated carbon adsorption tower (6).