Water and soil conservation anti-scouring slope protection pile

By designing secondary reinforced soil and water conservation anti-short slope protection piles and easy-to-install metal mesh structures, the problems of existing slope protection piles being unable to reinforce and inconveniently install metal mesh are solved, and the effective reinforcement and protection effect of slope protection piles is achieved.

CN222349724UActive Publication Date: 2025-01-14XINJIANG INST OF WATER RESOURCES & HYDRAULIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421195717.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2025-01-14
Estimated Expiration
2034-05-29

AI Technical Summary

Technical Problem

The existing soil and water conservation slope protection piles are formed in one piece, and secondary reinforcement cannot be carried out, and the metal mesh is not convenient to mount with slope protection piles, which increases the workload.

Method used

A soil and water conservation anti-shrink slope protection pile was designed, including a pile body that can be reinforcing and a reinforcement component that is easy to install the metal mesh. The structures of movable grooves, reinforced piles, support plates, hanging rods, clamp rods and torsion springs are realized. 次加固和金属网安装。

Benefits of technology

The secondary reinforcement of slope protection piles and the convenient installation of metal mesh are achieved, which improves the protection effect of soil slopes or rock slopes and reduces workload.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222349724U_ABST
    Figure CN222349724U_ABST
Patent Text Reader

Abstract

The utility model relates to an anti-scour slope protection pile for water and soil conservation, which belongs to the field of water and soil conservation and comprises a pile body, a stabilizing head is arranged at the top of the pile body, a movable groove is arranged in the pile body, and a reinforcing pile is movably connected in the movable groove. According to the water and soil conservation anti-scouring slope protection pile, by rotating a sealing cover, a hook is pulled out from an open hole upwards, the hook drives a hanging rod to move upwards, through the characteristics of a torsional spring, when a clamping rod moves to a limiting hole, the clamping rod is driven to reset and rotate to be clamped into the limiting hole, and the clamping rod can be limited and fixed; the upper semi-ring and the lower semi-ring are conveniently disassembled and assembled through the bolts, the upper semi-ring and the lower semi-ring are separated, then the metal net is clamped between the upper semi-ring and the lower semi-ring, the inserting rod of the upper semi-ring penetrates through the metal net for limiting, then the upper semi-ring and the lower semi-ring are conveniently fixed through the bolts, and therefore the metal net is installed. And the effect of convenient installation is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of soil and water conservation, in particular to a soil and water conservation anti-scouring slope protection pile. Background Art

[0002] Soil and water conservation refers to the preventive and control measures taken against soil and water loss caused by natural factors and human activities. Its purpose is to maintain and improve soil productivity, maintain the sustainable use of water resources, reduce natural disasters, protect the ecological environment, and promote the sustainable development of the economy and society.

[0003] Slope protection piles are a kind of soil and water conservation engineering measure, mainly used to protect earth slopes or rock slopes, prevent soil erosion and slope landslides. Slope protection piles are particularly widely used in areas with severe soil erosion such as the Loess Plateau.

[0004] The current soil and water conservation slope protection piles are formed in one piece, resulting in a fixed length and inability to perform secondary reinforcement. In addition, when the slope protection piles need to be combined with metal mesh to enhance the protective effect, the metal mesh is not convenient to be hung with the slope protection piles, which increases the workload. Therefore, a soil and water conservation anti-scouring slope protection pile is proposed to solve the above problems. Utility Model Content

[0005] In view of the shortcomings of the prior art, the utility model provides a soil and water conservation anti-scour slope protection pile, which has the advantages of secondary reinforcement and easy installation in conjunction with a metal mesh. It solves the problem that secondary reinforcement cannot be performed, the metal mesh is inconvenient to hang with the slope protection pile, and the workload is increased.

[0006] To achieve the above object, the utility model provides the following technical solution: a soil and water conservation anti-scour slope protection pile, comprising a pile body, a stabilizing head is arranged on the top of the pile body, a movable groove is opened inside the pile body, a reinforcement pile is movably connected inside the movable groove, and a reinforcement assembly is arranged inside the reinforcement pile;

[0007] The reinforcement assembly includes a support plate fixedly connected to the outer surface of a reinforcement pile, an opening is provided on the top of the reinforcement pile, and limiting holes are provided inside the reinforcement pile on both sides of the opening, the limiting holes are communicated with the opening, a hanging rod is movably connected inside the opening, a bracket is fixedly connected to the bottom of the hanging rod, a clamping rod is rotatably connected to the surface of the bracket, the limiting rod is fixedly connected to the front of the bracket, a hook is fixedly connected to the top of the hanging rod, and a cover is rotatably connected to the left side of the support plate.

[0008] Furthermore, the support plate is circular, and the top of the support plate and the top of the stabilizing head are located in the same plane.

[0009] The above technical solution has the beneficial effect of making the support plate and the stabilizing head located in the same plane, and the stabilizing head can be used to protect the support plate.

[0010] Furthermore, a clearance groove is provided at the top of the stabilizing head and on the left side of the sealing cover, and the clearance groove is communicated with the movable groove.

[0011] The above technical solution has the beneficial effect of reserving space for the cover when the cover is rotating, thereby preventing the cover from being unable to rotate.

[0012] Furthermore, a torsion spring is installed at the connection between the bracket and the clamping rod, and the limiting rod is perpendicular to the bracket.

[0013] The above technical solution has the beneficial effect that, through the characteristics of the torsion spring, when the clamping rod moves to the limiting hole, it drives the clamping rod to reset and clamp into the inside of the limiting hole.

[0014] Furthermore, a rubber pad is fixedly mounted on the inner wall of the limiting hole, and the cross section of the limiting hole is fan-shaped.

[0015] The above technical solution has the beneficial effect that the friction between the hanging rod and the limiting hole can be increased by arranging the rubber pad inside the limiting hole.

[0016] Furthermore, the bottom of the pile body is conical, the stabilizing head is circular, and the axis of the pile body and the axis of the stabilizing head are located on the same straight line.

[0017] The above technical solution has the beneficial effect that the pile body is conveniently driven into the soil due to the conical bottom of the pile body, and the stabilizing head can effectively play a limiting role.

[0018] Furthermore, the hook is composed of an upper half ring and a lower half ring, the upper half ring and the lower half ring are fixedly connected by bolts, and a plug rod is fixedly installed on the inner wall of the upper half ring.

[0019] The above technical solution has the following beneficial effects: the upper half ring and the lower half ring can be easily disassembled and assembled by bolts, the metal mesh can be clamped between the upper half ring and the lower half ring, the inserted rod can pass through the metal mesh for limiting the position, and then the upper half ring and the lower half ring can be easily fixed by bolts, thereby realizing the installation of the metal mesh.

[0020] Furthermore, the cross section of the bracket is in an inverted "T" shape, and the bracket is located at the center of the hanging rod.

[0021] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0022] 1. The soil and water conservation and anti-scour slope protection pile can pull the hook upward from the opening by rotating the cover, so that the hook drives the hanging rod to move upward. Since a torsion spring is installed at the connection between the bracket and the clamping rod, the characteristics of the torsion spring can drive the clamping rod to return and rotate and clamp into the inside of the limiting hole when the clamping rod moves to the limiting hole. Therefore, the clamping rod can be limited and fixed, and the upper half ring and the lower half ring can be easily disassembled and assembled by bolts to separate the upper half ring and the lower half ring. Then, the metal mesh is clamped between the upper half ring and the lower half ring, so that the insertion rod of the upper half ring penetrates the metal mesh for limiting, and then the upper half ring and the lower half ring are conveniently fixed by bolts, thereby realizing the installation of the metal mesh and achieving the effect of easy installation.

[0023] 2. The soil and water conservation anti-scour slope protection pile drives the pile body into the soil, and then puts the reinforcement pile into the soil from the movable groove. Since the length of the reinforcement pile is greater than the length of the pile body, the entire pile body can be reinforced twice, effectively protecting the earth slope or rock slope, preventing soil erosion and slope landslide. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the structure of the utility model;

[0025] Figure 2 For this utility model Figure 1 A magnified view of the local structure of the middle part A;

[0026] Figure 3 It is a three-dimensional diagram of the structure of the utility model.

[0027] In the figure: 1 pile body, 2 stabilizing head, 3 movable groove, 4 reinforcement pile, 5 reinforcement assembly, 501 support plate, 502 opening, 503 limiting hole, 504 hanging rod, 505 bracket, 506 clamping rod, 507 limiting rod, 508 hook, 509 cover. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0029] See also Figure 1-3A soil and water conservation and anti-scour slope protection pile in this embodiment includes a pile body 1, a stabilizing head 2 is arranged on the top of the pile body 1, the bottom of the pile body 1 is conical, the stabilizing head 2 is circular, and the axis of the pile body 1 and the axis of the stabilizing head 2 are located on the same straight line. The bottom of the pile body 1 is conical, which makes it easy to drive the pile body 1 into the soil. The stabilizing head 2 can effectively play a limiting role. A movable groove 3 is opened inside the pile body 1, and a reinforcement pile 4 is movably connected inside the movable groove 3, and a reinforcement component 5 is arranged inside the reinforcement pile 4.

[0030] By driving the pile body 1 into the soil, and then putting the reinforcement pile 4 into the movable groove 3, the reinforcement pile 4 is driven into the soil. Since the length of the reinforcement pile 4 is greater than the length of the pile body 1, the entire pile body can be reinforced twice, effectively protecting the earth slope or rock slope, preventing soil erosion and slope landslide. When it is necessary to install a metal mesh, the reinforcement component 5 is used to facilitate installation with the metal mesh.

[0031] The reinforcement assembly 5 includes a support plate 501 fixedly connected to the outer surface of the reinforcement pile 4. The support plate 501 is circular, and the top of the support plate 501 and the top of the stabilizing head 2 are located in the same plane, so that the support plate 501 and the stabilizing head 2 are located in the same plane, and the stabilizing head 2 can be used to protect the support plate 501. The top of the reinforcement pile 4 is provided with an opening 502, and the inside of the reinforcement pile 4 is provided with a limiting hole 503 on both sides of the opening 502. The limiting hole 503 is connected to the opening 502, and the limiting hole 503 is connected to the opening 502. The inner wall of the opening 502 is fixedly installed with a rubber pad, and the cross section of the limiting hole 503 is fan-shaped. The rubber pad is arranged inside the limiting hole 503 to increase the friction between the hanging rod 504 and the limiting hole 503. The inside of the opening 502 is movably connected with the hanging rod 504. The bottom of the hanging rod 504 is fixedly connected with a bracket 505. The cross section of the bracket 505 is in an inverted "T" shape, and the bracket 505 is located at the center of the hanging rod 504. The surface of the bracket 505 is rotatably connected with a clamping rod 506. The bracket 505 and the clamping rod 506 are connected. 6 is installed at the connection of the bracket 505, and the limit rod 507 is perpendicular to the bracket 505. Through the characteristics of the torsion spring, when the clamping rod 506 moves to the limit hole 503, the clamping rod 506 is driven to reset and snap into the inside of the limit hole 503. The front of the bracket 505 is fixedly connected to the limit rod 507, and the top of the hanging rod 504 is fixedly connected to the hook 508. The hook 508 consists of an upper half ring and a lower half ring. The upper half ring and the lower half ring are fixedly connected by bolts. The inner wall of the upper half ring is fixedly installed with a plug rod, which is convenient for the upper half ring to be fixed by bolts. The upper half ring and the lower half ring are disassembled and assembled, and the metal mesh is clamped between the upper half ring and the lower half ring. The inserted rod can pass through the metal mesh for limiting the position, and then the upper half ring and the lower half ring are fixed with bolts to realize the installation of the metal mesh. The left side of the support plate 501 is rotatably connected with the cover 509, and a clearance groove is opened at the top of the stabilizing head 2 and on the left side of the cover 509, and the clearance groove is connected with the movable groove 3, so that when the cover 509 is rotated, space can be reserved for the cover 509 to prevent the cover 509 from being unable to rotate.

[0032] By rotating the cover 509, the hook 508 is pulled out from the opening 502, so that the hook 508 drives the hanging rod 504 to move upward. Since a torsion spring is installed at the connection between the bracket 505 and the clamping rod 506, the characteristics of the torsion spring can make the clamping rod 506 move to the limiting hole 503, drive the clamping rod 506 to return and rotate to be clamped into the inside of the limiting hole 503, so that the clamping rod 506 can be limited and fixed, and the upper half ring and the lower half ring can be easily disassembled and assembled by bolts to separate the upper half ring and then the metal mesh is clamped between the upper half ring and the lower half ring, so that the insertion rod of the upper half ring passes through the metal mesh for limiting, and then the upper half ring and the lower half ring are conveniently fixed by bolts, thereby realizing the installation of the metal mesh and achieving the purpose of facilitating installation.

[0033] The working principle of the above embodiment is:

[0034] By driving the pile body 1 into the soil, and then putting the reinforcement pile 4 into the movable groove 3, the reinforcement pile 4 is driven into the soil. Since the length of the reinforcement pile 4 is greater than the length of the pile body 1, the entire pile body can be reinforced twice, effectively protecting the soil slope or rock slope, preventing soil erosion and slope landslide. When the metal mesh needs to be installed, the cover 509 is rotated to pull the hook 508 upward from the opening 502, so that the hook 508 drives the hanging rod 504 to move upward. Since a torsion spring is installed at the connection between the bracket 505 and the clamping rod 506, Due to the characteristics of the torsion spring, when the clamping rod 506 moves to the limiting hole 503, it drives the clamping rod 506 to reset and rotate and clamp into the inside of the limiting hole 503. Therefore, the clamping rod 506 can be limited and fixed, and the upper half ring and the lower half ring can be easily disassembled and assembled by bolts to separate the upper half ring and the lower half ring. Then, the metal mesh is clamped between the upper half ring and the lower half ring, so that the insertion rod of the upper half ring passes through the metal mesh for limiting, and then the upper half ring and the lower half ring are easily fixed by bolts, thereby realizing the installation of the metal mesh and achieving the purpose of facilitating installation.

[0035] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A soil and water conservation anti-scour slope protection pile, comprising a pile body (1), characterized in that: A stabilizing head (2) is arranged on the top of the pile body (1), a movable groove (3) is provided inside the pile body (1), a reinforcement pile (4) is movably connected inside the movable groove (3), and a reinforcement component (5) is arranged inside the reinforcement pile (4); The reinforcement assembly (5) comprises a support plate (501) fixedly connected to the outer surface of the reinforcement pile (4); an opening (502) is provided at the top of the reinforcement pile (4); limiting holes (503) are provided inside the reinforcement pile (4) on both the left and right sides of the opening (502); the limiting holes (503) are communicated with the opening (502); a hanging rod (504) is movably connected inside the opening (502); a bracket (505) is fixedly connected to the bottom of the hanging rod (504); a clamping rod (506) is rotatably connected to the surface of the bracket (505); a limiting rod (507) is fixedly connected to the front of the bracket (505); a hook (508) is fixedly connected to the top of the hanging rod (504); and a cover (509) is rotatably connected to the left side of the support plate (501).

2. The soil and water conservation anti-scouring slope protection pile according to claim 1, characterized in that: The support plate (501) is circular, and the top of the support plate (501) and the top of the stabilizing head (2) are located in the same plane.

3. The soil and water conservation anti-scouring slope protection pile according to claim 1, characterized in that: A clearance groove is provided at the top of the stabilizing head (2) and on the left side of the sealing cover (509), and the clearance groove is communicated with the movable groove (3).

4. The soil and water conservation anti-scouring slope protection pile according to claim 1, characterized in that: A torsion spring is installed at the connection between the bracket (505) and the clamping rod (506), and the limiting rod (507) is perpendicular to the bracket (505).

5. The soil and water conservation anti-scouring slope protection pile according to claim 1, characterized in that: A rubber pad is fixedly mounted on the inner wall of the limiting hole (503), and the cross section of the limiting hole (503) is fan-shaped.

6. The soil and water conservation anti-scouring slope protection pile according to claim 1, characterized in that: The bottom of the pile body (1) is conical, the stabilizing head (2) is circular, and the axis of the pile body (1) and the axis of the stabilizing head (2) are located on the same straight line.

7. The soil and water conservation anti-scouring slope protection pile according to claim 1, characterized in that: The hook (508) consists of an upper half ring and a lower half ring, the upper half ring and the lower half ring are fixedly connected by bolts, and a plug rod is fixedly installed on the inner wall of the upper half ring.

8. The soil and water conservation anti-scouring slope protection pile according to claim 1, characterized in that: The cross section of the bracket (505) is in an inverted "T" shape, and the bracket (505) is located at the center of the hanging rod (504).