Modularized assembly type superimposed shear wall building

By setting steel mesh and rectangular tie bars in modular prefabricated composite shear walls, the structural strength and stability of the modular prefabricated composite shear walls are enhanced, solving the problem of insufficient structural strength in existing technologies and achieving more efficient construction and material utilization.

CN118933180APending Publication Date: 2024-11-12SHENZHEN ANJU GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411164158.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing modular prefabricated composite shear wall buildings have shortcomings in structural strength, resulting in problems such as long construction cycles, large on-site workers, and significant material waste.

Method used

The design employs a first concrete module box and a second concrete module box. By setting steel mesh in the first and second precast wall leaves and setting rectangular tie rods and tie rods between them, an in-plane modular composite shear wall is formed, which enhances the connection stability and structural strength.

Benefits of technology

It improves the overall structural strength and stability of modular prefabricated composite shear walls, reduces on-site construction time and personnel requirements, and reduces material waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933180A_ABST
    Figure CN118933180A_ABST
Patent Text Reader

Abstract

The invention provides a modular assembly type superposed shear wall building, and belongs to the technical field of assembly type buildings. The modular assembly type superposed shear wall building comprises a first concrete module box body and a second concrete module box body, the first concrete module box body comprises a first module prefabricated wall leaf; the second concrete module box body comprises an edge module overlapping shear wall and a second module prefabricated wall leaf, and the second module prefabricated wall leaf and the first module prefabricated wall leaf are connected to form an in-plane module overlapping shear wall. First steel bar meshes are arranged in a first prefabricated wall leaf and a second prefabricated wall leaf respectively, a plurality of rectangular tie bars are arranged between the first prefabricated wall leaf and the second prefabricated wall leaf, and the rectangular tie bars are connected with the two first steel bar meshes, so that when one of the first prefabricated wall leaf and the second prefabricated wall leaf is subjected to horizontal acting force, the first steel bar meshes and the second steel bar meshes are separated from each other; one part of acting force can be dispersed to the other first reinforcing mesh, so that the modular assembly type superimposed shear wall building has higher structural strength.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of prefabricated buildings, and in particular to a modular prefabricated composite shear wall building. Background Art

[0002] The prefabricated construction mode uses prefabricated components to reduce the amount of wet work on site, which improves the construction efficiency and quality to a certain extent. However, there are still problems such as disconnection between design and construction, many structural joints and many on-site assembly operations. Modular buildings use functional modules as the basic construction units, splitting the building into three-dimensional space units. The decoration, plumbing, electromechanical and other processes of each space unit are completed in the factory at one time. The design stage fully considers the requirements from product manufacturing and assembly. The designed products have good manufacturability and assemblability, fundamentally avoiding the manufacturing and assembly quality problems in project implementation, realizing standardized manufacturing and lean management, and solving the problems of aging construction workers and low specialization. Modular buildings integrate more than 90% of the processes in the construction process in an automated factory system. It is the most integrated and industrialized form of prefabricated buildings, and realizes building houses in factories "like building cars". The intelligent construction method of "factory-site collaboration" realizes integrated design, large-scale production and convenient construction, which is in line with the development direction of new building industrialization.

[0003] The structural form of high-rise buildings is mostly influenced by the market and industry of the project location. The box formwork-cast-in-place shear wall system is adopted, and the formwork is replaced by the formwork, which is an integral cast-in-place shear wall. This feature makes the formwork (including truss bars) of the modular box formwork only a permanent formwork and does not participate in the structural calculation, which will cause the structure to be too rigid and heavy. However, the on-site cast-in-place construction process is cumbersome, requiring steel bar tying, formwork support, concrete pouring, maintenance and demoulding, surface plastering, etc., resulting in a long construction period and many on-site workers. At the same time, there are also problems such as the loss of formwork materials and a lot of construction waste, and it is still impossible to build a house on site "like building blocks".

[0004] Modular prefabricated composite shear wall buildings are a type of wall that is processed in the factory. After being transported to the construction site, only a small amount of processing is required, which reduces the number of on-site workers and greatly shortens the construction period. In the design process, modular prefabricated composite shear wall buildings must not only facilitate construction, but also ensure that they have sufficient structural strength. Summary of the invention

[0005] The embodiment of the present application provides a modular assembled composite shear wall building, which can further improve the structural strength of the modular assembled composite shear wall building. The technical solution is as follows:

[0006] The embodiment of the present application provides a modular assembled composite shear wall building, which includes a first concrete module box and a second concrete module box; the first concrete module box includes a first module prefabricated wall leaf; the second concrete module box includes an adjacent module composite shear wall and a second module prefabricated wall leaf arranged oppositely, the second module prefabricated wall leaf is arranged oppositely to the first module prefabricated wall leaf and is connected to form an in-plane modular composite shear wall; the adjacent module composite shear wall includes a first prefabricated wall leaf, a second prefabricated wall leaf, two first steel mesh sheets and a plurality of rectangular tie bars, the first prefabricated wall leaf and the second prefabricated wall leaf are arranged in parallel and spaced apart, and the first prefabricated wall leaf is located on the inner side of the first concrete module box, the second prefabricated wall leaf is located on the outer side of the first concrete module box, the orthographic projection of the first prefabricated wall leaf on the second prefabricated wall leaf is located outside the second prefabricated wall leaf, one of the first steel mesh sheets is located in the first prefabricated wall leaf, and the other of the first steel mesh sheets is located in the second prefabricated wall leaf, and the rectangular tie bars are respectively connected to the two first steel mesh sheets.

[0007] In some examples, the first steel mesh includes a plurality of first horizontal steel bars arranged in parallel and a plurality of first vertical steel bars arranged in parallel, the plurality of first horizontal steel bars and the plurality of first vertical steel bars are cross-arranged to form a mesh, and the first horizontal steel bars are connected to the first vertical steel bars at the intersection; the connection between each of the rectangular tension bars and at least one of the first steel meshes is located at the intersection of the first horizontal steel bars and the first vertical steel bars.

[0008] In some examples, the plane where the rectangular tie bar is located is perpendicular to the first vertical steel bar, and the same rectangular tie bar is connected to each of the first horizontal steel bars in the two first steel meshes; or, the plane where the rectangular tie bar is located is perpendicular to the first horizontal steel bar, and the same rectangular tie bar is connected to each of the first vertical steel bars in the two first steel meshes.

[0009] In some examples, the in-plane modular composite shear wall includes the first module prefabricated wall leaf, the second module prefabricated wall leaf, two second steel meshes, a plurality of rectangular connecting bars and a plurality of tension screws, the first module prefabricated wall leaf and the second module prefabricated wall leaf are arranged in parallel and spaced apart, and the orthographic projection of the first module prefabricated wall leaf on the second module prefabricated wall leaf coincides with the second module prefabricated wall leaf, one second steel mesh is located in the first module prefabricated wall leaf, and the other second steel mesh is located in the second module prefabricated wall leaf, the rectangular connecting bars are respectively connected to the two second steel meshes, the plurality of tension screws are located between the first module prefabricated wall leaf and the second module prefabricated wall leaf, the tension screws pass through the first module prefabricated wall leaf and the second module prefabricated wall leaf, and are respectively connected to the first module prefabricated wall leaf and the second module prefabricated wall leaf.

[0010] In some examples, the second steel mesh includes a plurality of second horizontal steel bars arranged in parallel and a plurality of second vertical steel bars arranged in parallel, the plurality of second horizontal steel bars and the plurality of second vertical steel bars are cross-arranged in a mesh shape, and the second horizontal steel bars are welded and connected at the intersection of the second vertical steel bars on the outside;

[0011] The connection point between each of the rectangular connecting bars and at least one of the second steel meshes is located outside the intersection of the second horizontal steel bars and the second vertical steel bars.

[0012] In some examples, the plane where the rectangular connecting bar is located is perpendicular to the second vertical steel bar, the same rectangular connecting bar is connected to each second horizontal steel bar in the two second steel meshes, and the rectangular connecting bar is at least sleeved outside two adjacent second vertical steel bars in one second steel mesh; or,

[0013] The plane where the rectangular connecting bar is located is perpendicular to the second horizontal steel bar. The same rectangular connecting bar is connected to each second vertical steel bar in the two second steel meshes. The rectangular connecting bar is at least placed outside two adjacent second horizontal steel bars in one of the second steel meshes.

[0014] In some examples, the in-plane module composite shear wall includes a first module prefabricated wall leaf, a second module prefabricated wall leaf, two second steel meshes, a plurality of tie bars and a plurality of dowel bars, the first module prefabricated wall leaf and the second module prefabricated wall leaf are arranged in parallel and spaced apart, and the orthographic projection of the first module prefabricated wall leaf on the second module prefabricated wall leaf coincides with the second module prefabricated wall leaf, one second steel mesh is located in the first module prefabricated wall leaf, another second steel mesh is located in the second module prefabricated wall leaf, a portion of the tie bars is connected to one second steel mesh, and another portion of the tie bars is connected to another second steel mesh, the plurality of dowel bars are located between the first module prefabricated wall leaf and the second module prefabricated wall leaf, the dowel bars are forked, having at least two branches, one branch is inserted in a tie bar connected to one second steel mesh, and the other branch is inserted in a tie bar connected to another second steel mesh.

[0015] In some examples, the in-plane modular composite shear wall further includes a connecting rod connected to a plurality of the dowels arranged in a collinear manner.

[0016] In some examples, the in-plane modular composite shear wall further includes a plurality of cables, one of the cables is movably connected to the same second steel mesh, and the cable is located between the two branches.

[0017] In some examples, the in-plane modular composite shear wall further includes a plurality of one-way locking rings, each of which is connected to the second steel mesh, the cable passes through the plurality of one-way locking rings, and one end of the cable is fixedly connected to the second steel mesh.

[0018] The beneficial effects brought by the technical solution provided by the embodiment of the present application include at least:

[0019] By arranging the first module prefabricated wall leaves of the first concrete module box and the second module prefabricated wall leaves of the second concrete module box relatively and connecting them to form an in-plane modular composite shear wall, the connection between the first concrete module box and the second concrete module box is stabilized, so that the overall structural strength of the modular assembled composite shear wall building is higher. By setting the adjacent module composite shear wall of the concrete module box to include a first prefabricated wall leaf and a second prefabricated wall leaf, and respectively arranging a first steel mesh in the first prefabricated wall leaf and the second prefabricated wall leaf, the strength and stability of the first prefabricated wall leaf and the second prefabricated wall leaf can be improved. By arranging a plurality of rectangular tie bars between the first prefabricated wall leaf and the second prefabricated wall leaf, the rectangular tie bars are connected to the two first steel meshes, so that when one of the first prefabricated wall leaf and the second prefabricated wall leaf is subjected to a horizontal force, a part of the force can be dispersed to the first steel mesh in the other of the first prefabricated wall leaf and the second prefabricated wall leaf through the plurality of rectangular tie bars, so that the adjacent module composite shear wall can withstand a larger force, thereby making the adjacent module composite shear wall of the concrete module box more stable and making the modular assembled composite shear wall building have a higher structural strength. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0021] Figure 1 It is a partial structural schematic diagram of a modular assembled composite shear wall building provided in an embodiment of the present application;

[0022] Figure 2 It is a partial structural schematic diagram of a modular assembled composite shear wall building provided in an embodiment of the present application;

[0023] Figure 3 It is a structural schematic diagram of an edge module composite shear wall provided in an embodiment of the present application;

[0024] Figure 4 It is a schematic diagram of the decomposed structure of an edge module composite shear wall provided in an embodiment of the present application;

[0025] Figure 5 It is a partial structural schematic diagram of a concrete module box provided in an embodiment of the present application;

[0026] Figure 6 It is a partial structural schematic diagram of a concrete module box provided in an embodiment of the present application;

[0027] Figure 7 is a partial structural schematic diagram of a second wall body provided in an embodiment of the present application;

[0028] Figure 8 is a partial structural schematic diagram of a second wall body provided in an embodiment of the present application;

[0029] Fig. 9 It is a structural schematic diagram of a floor slab and a first circular connecting rib provided in an embodiment of the present application;

[0030] Fig.10 It is a structural schematic diagram of a plugging mold provided in an embodiment of the present application;

[0031] Fig.11 It is a structural schematic diagram of a plugging mold provided in an embodiment of the present application;

[0032] Fig.12 It is a structural schematic diagram of a first concrete module box and a second concrete module box provided in an embodiment of the present application;

[0033] Fig.13 It is a structural schematic diagram of an in-plane modular composite shear wall provided in an embodiment of the present application;

[0034] Fig.14 It is a structural schematic diagram of a tension screw provided in an embodiment of the present application;

[0035] Fig.15 It is a partial structural schematic diagram of a first wall body provided in an embodiment of the present application;

[0036] Fig.16 It is a partial structural schematic diagram of a first wall body provided in an embodiment of the present application;

[0037] Fig.17 It is a partial structural schematic diagram of a first wall body provided in an embodiment of the present application;

[0038] Fig.18 This is a schematic diagram of the structure of a floor slab and a second circular connecting rib provided in an embodiment of the present application;

[0039] Fig.19 It is a structural schematic diagram of a first concrete module box and a second concrete module box provided in an embodiment of the present application;

[0040] Fig. 20 It is a structural schematic diagram of an in-plane modular composite shear wall provided in an embodiment of the present application;

[0041] Fig.21 It is a partial structural schematic diagram of a first wall body provided in an embodiment of the present application;

[0042] Fig. 22 It is a partial structural schematic diagram of a first wall body provided in an embodiment of the present application;

[0043] Fig.23 It is a partial structural schematic diagram of an in-plane modular composite shear wall provided in an embodiment of the present application;

[0044] Fig.24 It is a schematic diagram of the local structure of an in-plane modular composite shear wall provided in an embodiment of the present application. DETAILED DESCRIPTION

[0045] Figure 1 is a partial structural diagram of a modular assembled composite shear wall building provided in an embodiment of the present application, such as Figure 1 As shown in a top view, the modular assembled composite shear wall building includes a plurality of concrete module boxes 100 . Figure 1 Only a part of one layer of a modular assembled composite shear wall building is shown in the figure. In the height direction, the concrete module boxes 100 can also be stacked. The multiple concrete module boxes 100 can be divided into concrete edge module boxes, referred to as edge modules, and concrete in-plane module boxes, referred to as in-plane modules, according to different distribution positions. The edge module refers to the concrete module box 100 that is closest to the outermost side of the building. For example Figure 1 The in-plane modules refer to the concrete module boxes 100 located near the center of the building, for example Figure 1 Two concrete module boxes 100 located inside.

[0046] As an example, an embodiment of the present application provides a modular assembled composite shear wall building. Figure 2 is a partial structural diagram of a modular assembled composite shear wall building provided in an embodiment of the present application, such as Figure 2 As shown, the modular assembled composite shear wall building includes a first concrete module box 1000 and a second concrete module box 2000. The first concrete module box 1000 is a concrete in-plane module box, and the second concrete module box 2000 is a concrete edge module box.

[0047] The first concrete module box 1000 includes a first module prefabricated wall leaf 211. The second concrete module box 2000 includes an adjacent module composite shear wall 11002 and a second module prefabricated wall leaf 212 arranged opposite to each other. The second module prefabricated wall leaf 212 is arranged opposite to the first module prefabricated wall leaf 211 and connected to form an in-plane module composite shear wall.

[0048] like Figure 2As shown, the second concrete module box 2000 includes a floor, a floor slab and a plurality of wall leaves, wherein the plurality of wall leaves are connected between the floor and the floor slab. One of the wall leaves is a laminated shear wall 11002 of the adjacent module, and a wall leaf opposite to the laminated shear wall 11002 of the adjacent module is a prefabricated wall leaf 212 of the second module.

[0049] The floor slab and the floor are arranged parallel to each other, and the adjacent module composite shear wall 11002 is connected between the floor slab and the floor. A plurality of wall leaves, the floor slab and the floor enclose a box space. Some of the wall leaves may be provided with doors or windows. As an example, the second concrete module box body 2000 may include four wall leaves, and the floor, the floor slab and the four wall leaves enclose a rectangular box space, and one of the wall leaves of the second concrete module box body 2000 has a window.

[0050] Figure 3 Schematic diagram of a structural side module composite shear wall provided in an embodiment of the present application. Figure 3 As shown, the adjacent module composite shear wall 11002 includes a second wall body 110. The second wall body 110 includes a first prefabricated wall leaf 111 and a second prefabricated wall leaf 112.

[0051] Figure 4 Schematic diagram of the decomposed structure of a composite shear wall of adjacent modules provided in an embodiment of the present application. Figure 4 As shown, the adjacent module composite shear wall 11002 also includes two first steel meshes 120 and a plurality of rectangular tie bars 130 . Figure 4 In order to show the first steel mesh 120, at least a part of the first precast wall leaf 111 and a part of the second precast wall leaf 112 are omitted. The first precast wall leaf 111 and the second precast wall leaf 112 are arranged in parallel and spaced apart, and the first precast wall leaf 111 is located on the inner side of the concrete module box, and the second precast wall leaf 112 is located on the outer side of the concrete module box. When the adjacent module composite shear wall 11002 is constructed on site, the space between the first precast wall leaf 111 and the second precast wall leaf 112 is used for pouring concrete. The orthographic projection of the first precast wall leaf 111 on the second precast wall leaf 112 is located outside the second precast wall leaf 112.

[0052] One first steel mesh sheet 120 is located in the first prefabricated wall leaf 111, and another first steel mesh sheet 120 is located in the second prefabricated wall leaf 112. Rectangular tie bars 130 are connected to the two first steel mesh sheets 120, respectively.

[0053] By arranging the first module prefabricated wall leaf 211 of the first concrete module box 1000 and the second module prefabricated wall leaf 212 of the second concrete module box 2000 relatively and connecting them to form an in-plane modular composite shear wall, the connection between the first concrete module box 1000 and the second concrete module box 2000 is stabilized, so that the overall structural strength of the modular assembled composite shear wall building is higher. By setting the adjacent module composite shear wall 11002 of the concrete module box 100 to include a first prefabricated wall leaf 111 and a second prefabricated wall leaf 112, and respectively arranging first steel meshes in the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112, the strength and stability of the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 can be improved. By arranging a plurality of rectangular tie bars 130 between the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112, the rectangular tie bars 130 are connected to the two first steel meshes 120, so that when one of the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 is subjected to a horizontal force, a part of the force can be dispersed to the first steel mesh 120 in the other of the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 through the plurality of rectangular tie bars 130, so that the adjacent module composite shear wall can withstand a larger force, thereby making the adjacent module composite shear wall more stable and making the modular assembled composite shear wall building have a higher structural strength.

[0054] like Figure 3 As shown, taking the state after the adjacent module composite shear wall 11002 is installed as an example, the lower edge of the first prefabricated wall leaf 111 is lower than the lower edge of the second prefabricated wall leaf 112; the upper edge of the first prefabricated wall leaf 111 is lower than the upper edge of the second prefabricated wall leaf 112, that is, the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 are staggered in the vertical direction, and the edges of the two are not flush. The first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 are staggered to facilitate the splicing of different adjacent module composite shear walls. Similarly, the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 are also staggered in the horizontal direction, and the vertical side of the first prefabricated wall leaf 111 is not flush with the vertical side of the second prefabricated wall leaf 112.

[0055] The first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 can both be prefabricated concrete panels, for example, they can be prefabricated by a mold. In the process of preparing the first prefabricated wall leaf 111, the first steel mesh 120 is placed in the mold in advance, and after the concrete poured into the mold solidifies, it forms a whole with the first prefabricated wall leaf 111. The preparation method of the second prefabricated wall leaf 112 can be the same as that of the first prefabricated wall leaf 111.

[0056] like Figure 2As shown, the upper edge of the first prefabricated wall leaf 111 is flush with the floor slab, and the lower edge of the first prefabricated wall leaf 111 is flush with the floor. The upper edge of the second prefabricated wall leaf 112 is higher than the floor slab, and the lower edge of the second prefabricated wall leaf 112 is higher than the floor.

[0057] Modular buildings usually have two or more floors, that is, during construction, multiple layers of concrete module boxes are stacked together. The second prefabricated wall leaf 112 located outside the adjacent module composite shear wall is set higher, while the first prefabricated wall leaf 111 located inside is set to be flush with the floor slab, which makes it more convenient to stack the concrete module boxes.

[0058] Figure 5 FIG. 1 is a partial structural diagram of a concrete module box provided in an embodiment of the present application, showing two adjacent wall leaves, with at least the floor slab and the floor omitted. Figure 5 As shown, in this example, the concrete module box includes two adjacent module composite shear walls 11002, the two adjacent module composite shear walls 11002 are arranged adjacent to each other, and the first prefabricated wall leaves 111 of the two adjacent module composite shear walls 11002 are connected, and the second prefabricated wall leaves 112 of the two adjacent module composite shear walls 11002 are connected. The two adjacent module composite shear walls 11002 are arranged so that the concrete module box can withstand large horizontal forces in two directions, and is suitable for being arranged at the corners of the outer side of the modular building.

[0059] like Figure 5 As shown, the concrete module box also includes a connecting core column 160, which is located at the connection of two adjacent adjacent module composite shear walls 11002 and arranged along the height direction of the second wall body 110. One end of the connecting core column 160 is located between the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112, and the other end extends out of the lower edge of the first prefabricated wall leaf 111 and the lower edge of the second prefabricated wall leaf 112.

[0060] When the concrete module boxes are stacked, the connecting core column 160 can be inserted into the concrete module box at the lower layer, so that the two adjacent layers of concrete module boxes are connected as one.

[0061] Figure 6 is a partial structural diagram of a concrete module box provided in an embodiment of the present application, Figure 6 In the example shown, concrete has been poured between the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112. Figure 6As shown, the top surface of the poured concrete between the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 may have a groove 1601, which is located at the connection between two adjacent adjacent module composite shear walls 11002 and is arranged along the height direction of the second wall body 110.

[0062] When the concrete module boxes are stacked, the connecting core column 160 of the upper concrete module box is inserted into the groove 1601, so that the adjacent module composite shear walls 11002 of the two adjacent layers of concrete module boxes are connected more tightly.

[0063] like Figure 4 As shown, the first steel mesh 120 includes a plurality of first horizontal steel bars 121 arranged in parallel and a plurality of first vertical steel bars 122 arranged in parallel, the plurality of first horizontal steel bars 121 and the plurality of first vertical steel bars 122 are cross-arranged in a mesh shape, and the first horizontal steel bars 121 are connected to the first vertical steel bars 122 at the intersection. Exemplarily, the first horizontal steel bars 121 and the first vertical steel bars 122 can be connected at the intersection by at least one of welding and bundling.

[0064] The first steel mesh 120 may include a single-layer steel mesh, or may include a multi-layer steel mesh formed by stacking a plurality of steel meshes. In the example where the first steel mesh 120 includes a single-layer steel mesh, the first horizontal steel bar 121 may be a single steel bar, and the first vertical steel bar 122 may also be a single steel bar; in the example where the first steel mesh 120 includes a multi-layer steel mesh, the first horizontal steel bar 121 may include a plurality of steel bars connected together, and the plurality of steel bars in the first horizontal steel bar 121 may be welded or tied to each other; the first vertical steel bar 122 may also include a plurality of steel bars connected together, and the plurality of steel bars in the first vertical steel bar 122 may be welded or tied to each other.

[0065] The number of steel meshes included in the first steel mesh 120 can be set according to the structural strength requirements of the adjacent module composite shear wall. Usually, in situations where the structural strength requirements are different, the first steel mesh 120 includes a larger number of steel meshes in the adjacent module composite shear wall with higher structural strength requirements.

[0066] like Figure 4 As shown, the connection between each rectangular tie bar 130 and at least one first steel mesh 120 is located outside the intersection of the first horizontal steel bar 121 and the first vertical steel bar 122. The outside of the intersection of the first horizontal steel bar 121 and the first vertical steel bar 122 in one first steel mesh 120 refers to the side of the intersection away from the other first steel mesh 120.

[0067] Connecting the rectangular tie rod 130 at the intersection of the first horizontal steel bar 121 and the first vertical steel bar 122 can better disperse the force of the rectangular tie rod 130 on the first steel mesh 120 to various parts of the first steel mesh 120, which is beneficial to further improve the ability of the adjacent module composite shear wall to withstand horizontal loads.

[0068] Optionally, each rectangular tie rod 130 is cross-welded to the outer side of the first vertical steel bar 122 , and the outer side of the first vertical steel bar 122 of the first steel mesh 120 refers to the side away from the other first steel mesh 120 .

[0069] In some examples, the plane where the rectangular tie rod 130 is located is perpendicular to the first prefabricated wall leaf 111. The first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 are arranged in parallel, and the plane where the rectangular tie rod 130 is located can be perpendicular to the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112. The rectangular tie rod 130 can be a steel bar bent into a rectangular frame, and the two ends of the steel bar can be connected to form a rectangular frame structure. As an example, the rectangular tie rod 130 can include a single steel bar bent into a rectangular frame, and can also include a plurality of stacked steel bars bent into a rectangular frame. In the example where the rectangular tie rod 130 includes a plurality of stacked steel bars bent into a rectangular frame, the plurality of steel bars bent into a rectangular frame can be welded or tied to each other.

[0070] The plane where the rectangular tie rod 130 is located is perpendicular to the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112, so that when the adjacent module composite shear wall is subjected to horizontal loads, the force exerted by the rectangular tie rod 130 on the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 is perpendicular to the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112.

[0071] As an example, the plane where the rectangular tie bars 130 are located is perpendicular to the first vertical reinforcement 122. That is, the rectangular tie bars 130 are arranged horizontally.

[0072] Figure 7 is a partial structural diagram of a second wall body provided in an embodiment of the present application, such as Figure 7 As shown, the same rectangular tie rod 130 is connected to each of the first horizontal steel bars 121 in the two first steel meshes 120 .

[0073] One side of the rectangular tie rod 130 can be arranged in an overlapping manner and connected to one of the first horizontal steel bars 121, and the other side of the rectangular tie rod 130 can be arranged in an overlapping manner and connected to another first horizontal steel bar 121. This is conducive to forming a larger connection between the rectangular tie rod 130 and the first steel mesh 120, thereby further improving the structural stability and strength of the adjacent module composite shear wall.

[0074] Exemplarily, the rectangular reinforcement 130 and the first horizontal reinforcement 121 connected thereto may be arranged in the same plane.

[0075] The first horizontal steel bars 121 in the two first steel meshes 120 are arranged horizontally, and the same rectangular tie bar 130 and each first horizontal steel bar 121 in the two first steel meshes 120 can be arranged coplanarly, that is, the two first horizontal steel bars 121 connected to the same rectangular tie bar 130 are arranged at the same height.

[0076] In some examples, the rectangular tie bars 130 are at least wrapped around two adjacent first vertical steel bars 122 in one first steel mesh 120 .

[0077] In this example, a portion of the rectangular tie rods 130 are sleeved outside the first vertical steel bars 122 of the first steel mesh 120 located in the first prefabricated wall leaf 111 , and another portion of the rectangular tie rods 130 are sleeved outside the first vertical steel bars 122 of the first steel mesh 120 located in the second prefabricated wall leaf 112 .

[0078] The rectangular tie rod 130 is sleeved outside the first vertical steel bar 122, so that the rectangular tie rod 130 can exert a large tensile force on the first steel mesh 120 without causing damage to the connection.

[0079] Optionally, the plurality of rectangular tie bars 130 include a first rectangular tie bar 1301 and a second rectangular tie bar 1302. The first rectangular tie bar 1301 is a rectangular tie bar 130 sleeved outside two adjacent first vertical steel bars 122 in one first steel mesh 120, and the second rectangular tie bar 1302 is a rectangular tie bar 130 sleeved outside two adjacent first vertical steel bars 122 in another first steel mesh 120. By putting a part of the rectangular tie rod 130 on the outside of the first vertical steel bar 122 of the first steel mesh 120 located in the first prefabricated wall leaf 111, and putting another part of the rectangular tie rod 130 on the outside of the first vertical steel bar 122 of the first steel mesh 120 located in the second prefabricated wall leaf 112, it is ensured that no matter the adjacent module composite shear wall is subjected to the force directed from the first prefabricated wall leaf 111 to the second prefabricated wall leaf 112, or the force directed from the second prefabricated wall leaf 112 to the first prefabricated wall leaf 111, there is always a part of the rectangular tie rod 130 that can withstand a larger tensile force.

[0080] As an example, one side of the first rectangular tie 1301 at least partially overlaps and is connected to one side of the second rectangular tie 1302. By making one side of the first rectangular tie 1301 partially overlap and connect to one side of the second rectangular tie 1302, when the adjacent module composite shear wall is subjected to horizontal force, the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 can better transmit the force through the rectangular tie 130, so that the force can be more dispersed, thereby improving the stability of the adjacent module composite shear wall.

[0081] Figure 8 is a partial structural diagram of a second wall body provided in an embodiment of the present application, such as Figure 8 As shown, in this example, one side of the first rectangular tie rod 1301 completely overlaps with one side of the second rectangular tie rod 1302, which can further improve the stability of the composite shear wall.

[0082] In other examples, the plane where the rectangular tie bars 130 are located is perpendicular to the first horizontal steel bars 121. The same rectangular tie bar 130 is connected to each of the first vertical steel bars 122 in the two first steel meshes 120. In other words, the rectangular tie bars 130 can also be placed vertically. There will be certain differences in the mechanical properties of the composite shear wall when the rectangular tie bars 130 are placed vertically and horizontally, for example, there will be certain differences in anti-bending and anti-torsion. The appropriate arrangement can be selected according to different occasions.

[0083] like Figure 4 As shown, the second concrete module box 2000 further includes a plurality of first circular connecting ribs 142 . Fig. 9 is a schematic diagram of the structure of a first floor slab and a first circular connecting rib provided in an embodiment of the present application, such as Fig. 9 As shown, the first round-shaped connecting ribs 142 are arranged along the height direction of the composite shear wall 11002, and the middle parts of the plurality of first round-shaped connecting ribs 142 are respectively connected to the first floor slab 141. The first floor slab 141 is located between the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112. One end of the first round-shaped connecting rib 142 is located between the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112, and the other end of the first round-shaped connecting rib 142 extends out of the edge of the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112. The first floor slab 141 can be the top plate of the concrete edge module box of the lower layer.

[0084] During construction, different concrete module boxes will be connected. For example, the concrete module box located in the middle layer of the building will be connected to the concrete module box of the adjacent lower layer and the concrete module box of the adjacent upper layer. The first floor slab 141 and the plurality of first circular connecting ribs 142 are used to connect the adjacent adjacent edge module composite shear walls 11002 into one.

[0085] As an example, during on-site construction, for two adjacent layers of concrete module boxes, one end of the first circular connecting rib 142 of the upper layer concrete module box extending from the edge of the first precast wall leaf 111 and the second precast wall leaf 112 is inserted into the second wall body 110 of the lower layer concrete module box. In the lower layer concrete module box, after the concrete between the first precast wall leaf 111 and the second precast wall leaf 112 is poured and cured, the first circular connecting rib 142 is fixed in the second wall body 110 of the lower layer. Then, concrete is poured between the first precast wall leaf 111 and the second precast wall leaf 112 of the upper layer concrete module box.

[0086] like Figure 4 As shown, the concrete edge module box also includes a blocking mold. The blocking mold includes a first mold 151, a second mold 152 and a connector 153. The connector 153 connects the first mold 151 and the second mold 152. The first mold 151 is located on a side of the first prefabricated wall leaf 111 away from the second prefabricated wall leaf 112, and the first mold 151 can move along the height direction of the second wall body 110. The second mold 152 is located on a side of the second prefabricated wall leaf 112 away from the first prefabricated wall leaf 111, and the second mold 152 can move along the height direction of the second wall body 110. When the edge module composite shear walls 11002 of two adjacent layers of concrete module boxes are spliced ​​together and concrete is poured between the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 of the upper layer of the concrete module box, concrete may overflow from the joints of the two adjacent layers, and the blocking mold can be provided to cover the joints. Since the first mold 151 can move along the height direction of the second wall body 110, and the second mold 152 can move along the height direction of the second wall body 110, in the process of splicing the adjacent module composite shear wall 11002 of two adjacent layers of concrete module boxes, the first mold 151 and the second mold 152 can be moved first to expose the splicing seam, which is convenient for observing the splicing seam and improving the splicing quality of the adjacent module composite shear wall 11002 of two adjacent layers of concrete module boxes. After the splicing is in place, the first mold 151 and the second mold 152 are moved again to cover the splicing seam.

[0087] The connecting piece 153 connects the first mold 151 and the second mold 152 , which can prevent the first mold 151 from being separated from the first prefabricated wall leaf 111 , and prevent the second mold 152 from being separated from the second prefabricated wall leaf 112 .

[0088] Fig.10 is a schematic diagram of the structure of a plugging mold provided in an embodiment of the present application. As an example, Fig.10As shown, the first mold 151 is L-shaped steel, that is, steel with an L-shaped cross section, one side of the first mold 151 fits with the first prefabricated wall leaf 111, and the second mold 152 is square steel, one side of the second mold 152 fits with the second prefabricated wall leaf 112. The connecting member 153 can be a bolt.

[0089] Fig.10 A portion of the first prefabricated wall leaf 111 is shown by a dotted line. As an example, the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 can have a first strip groove 110a, and the connecting member 153 is located in the first strip groove 110a and can slide along the first strip groove 110a, so that the first mold 151 and the second mold 152 can move along the height direction of the second wall body 110.

[0090] In order to reduce leakage at the first strip groove 110a during concrete pouring, the first strip groove 110a can be set to be smaller, and the first strip groove 110a can be blocked during pouring.

[0091] The first mold 151 includes a vertical portion 1511 and a horizontal portion 1512, and the vertical portion 1511 fits with the first prefabricated wall leaf 111. The horizontal portion 1512 can be connected with a plurality of bolts 154, and two nuts 155 can be sleeved outside the bolts 154, and the horizontal portion 1512 is located between the two nuts 155. The blocking mold can also include a plurality of blocks 156, and the blocks 156 have a slot 156a. The blocks 156 are stuck between the horizontal portion 1512 and the nuts 155 located below the horizontal portion 1512 through the slot 156a, so that the blocks 156 are against the surface of the first prefabricated wall leaf 111, and the nuts 155 are tightened. The friction between the blocks 156 and the first prefabricated wall leaf 111 keeps the first mold 151 stable. After the blocks 156 are removed, there is a lack of support below the first mold 151, so that the first mold 151 can be moved downward.

[0092] Fig.11 Schematic diagram of the structure of a plugging mold provided in an embodiment of the present application. Fig.11 In the example shown, the first mold 151 may have a second strip groove 1511a, and the connecting member 153 can move in the second strip groove 1511a relative to the first mold 151. When the position of the first mold 151 needs to be locked, the nut connected to the connecting member 153 can be tightened to clamp the first mold 151 between the nut and the first prefabricated wall leaf 111; when the position of the first mold 151 needs to be adjusted, the nut connected to the connecting member 153 can be loosened, and the first mold 151 can be moved along the second strip groove 1511a, and the nut connected to the connecting member 153 can be tightened after the first mold 151 is moved into place. That is, in this example, the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112 do not need to be provided with the first strip groove 110a, so there is no need to perform a blocking operation before pouring.

[0093] The connector 153 may be provided with a sleeve, such as a plastic sleeve, between the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112. After the pouring is completed, the first mold 151, the second mold 152 and the connector 153 may be removed, and the sleeve may be retained between the first prefabricated wall leaf 111 and the second prefabricated wall leaf 112.

[0094] The cooperation between the second mold 152 and the connecting member 153 may be the same as the cooperation between the first mold 151 and the connecting member 153 .

[0095] A hanging rod 2521 may also be connected to the top of the second mold 152. The hanging rod 2521 may be used to be connected to a lifting device. After the second mold 152 is disassembled, the second mold 152 may be lifted.

[0096] Fig.12 Schematic diagram of the structure of the first concrete module box and the second concrete module box provided in the embodiment of the present application. Fig.12 As shown, the wall leaf of the first concrete module box 1000 close to the second concrete module box 2000 is a first module prefabricated wall leaf 211, and the wall leaf of the second concrete module box 2000 close to the first concrete module box 1000 is a second module prefabricated wall leaf 212.

[0097] Fig.13 Schematic diagram of the structure of an in-plane modular composite shear wall provided in an embodiment of the present application. Fig.13 As shown, the in-plane modular composite shear wall includes a first wall body 210. The first wall body 210 includes a first module prefabricated wall leaf 211 and a second module prefabricated wall leaf 212. The in-plane modular composite shear wall also includes two second steel mesh sheets 220, a plurality of rectangular connecting bars 230 and a plurality of tension screws 270. In order to show the second steel mesh sheets 220, at least a portion of the first module prefabricated wall leaf 211 and a portion of the second module prefabricated wall leaf 212 are omitted in the drawings provided in the embodiments of the present application.

[0098] The first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 are arranged in parallel and spaced apart. When the in-plane module composite shear wall is constructed on site, the space between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is used for pouring concrete. The orthographic projection of the first module prefabricated wall leaf 211 on the second module prefabricated wall leaf 212 coincides with the second module prefabricated wall leaf 212.

[0099] One second steel mesh sheet 220 is located in the first module prefabricated wall leaf 211, and another second steel mesh sheet 220 is located in the second module prefabricated wall leaf 212. The rectangular connecting bars 230 are connected to the two second steel mesh sheets 220, respectively.

[0100] A plurality of tension screws 270 are located between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212. The tension screws 270 penetrate the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, and are connected to the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 respectively.

[0101] By respectively arranging the second steel mesh 220 in the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, the strength and stability of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 can be improved. By arranging a plurality of rectangular connecting ribs 230 between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, the rectangular connecting ribs 230 are connected to the two second steel meshes 220, so that when one of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is subjected to a horizontal force, a part of the force can be dispersed to the second steel mesh 220 in the other of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 through the plurality of rectangular connecting ribs 230. By setting a plurality of tension screws 270, the tension screws 270 penetrate the first module prefabricated wall leaves 211 and the second module prefabricated wall leaves 212, and are respectively connected to the first module prefabricated wall leaves 211 and the second module prefabricated wall leaves 212, so that the first module prefabricated wall leaves 211 and the second module prefabricated wall leaves 212 can withstand a larger horizontal force, so that the first module prefabricated wall leaves 211 and the second module prefabricated wall leaves 212 and the concrete cast between the first module prefabricated wall leaves 211 and the second module prefabricated wall leaves 212 are better connected as a whole to withstand the load, so that the in-plane module composite shear wall can withstand a larger force and has a higher structural strength, which is beneficial to improving the structural strength and stability of the modular prefabricated composite shear wall building.

[0102] Both the tension screws 270 and the rectangular connecting ribs 230 can enhance the structural stability and strength of the in-plane module composite shear wall. Among them, the rectangular connecting ribs 230 can withstand both pressure and thrust. Since they are fixed on the second steel mesh 220, the main function of the rectangular connecting ribs 230 is to disperse the force to a relatively large area to avoid damage to the in-plane module composite shear wall due to excessive local force. The tension screws 270 penetrate the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212. The tension screws 270 mainly bear the tensile force, and the force directly acts on the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 to avoid the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 from separating from each other, thereby maintaining the structural stability of the in-plane module composite shear wall.

[0103] Taking the state after the in-plane module composite shear wall is installed as an example, the lower edge of the first module prefabricated wall leaf 211 is flush with the lower edge of the second module prefabricated wall leaf 212; the upper edge of the first module prefabricated wall leaf 211 is flush with the upper edge of the second module prefabricated wall leaf 212. The vertical side of the first module prefabricated wall leaf 211 is also flush with the vertical side of the second module prefabricated wall leaf 212.

[0104] The first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 can both be prefabricated concrete panels, for example, they can be prefabricated by a mold. In the process of preparing the first module prefabricated wall leaf 211, the second steel mesh 220 is placed in the mold in advance, and after the concrete poured into the mold solidifies, it forms a whole with the first module prefabricated wall leaf 211. The preparation method of the second module prefabricated wall leaf 212 can be the same as that of the first module prefabricated wall leaf 211.

[0105] Fig.14 Schematic diagram of the structure of a tension screw provided in the embodiment of the present application. Fig.14 As shown, the tension screw rod 270 includes a rod body 2701, two baffles 2702 and two fastening nuts 2703. The rod body 2701 passes through the two baffles 2702, and the two fastening nuts 2703 are sleeved outside the rod body 2701, and the two fastening nuts 2703 are located outside the two baffles 2702. The rod body 2701 passes through the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, one baffle 2702 is located on the side of the first module prefabricated wall leaf 211 away from the second module prefabricated wall leaf 212, and is in close contact with the first module prefabricated wall leaf 211; the other baffle 2702 is located on the side of the second module prefabricated wall leaf 212 away from the first module prefabricated wall leaf 211, and is in close contact with the second module prefabricated wall leaf 212.

[0106] By tightening the fastening nuts 2703, the two fastening nuts 2703 are brought close to each other and pressed against the surface of the baffle 2702 to prevent the distance between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 from expanding, thereby ensuring the integrity of the in-plane module composite shear wall structure. The baffle 2702 serves to increase the contact area and prevent the fastening nuts 2703 from damaging the surfaces of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212.

[0107] like Fig.13 As shown, a plurality of rectangular connecting ribs 230 are arranged in an array. In the horizontal direction and the vertical direction, the rectangular connecting ribs 230 and the tensioning screws 270 are arranged alternately.

[0108] In some other possible implementations, the rectangular connecting ribs 230 and the tension screws 270 are alternately distributed in the horizontal direction or the vertical direction.

[0109] The tension screws 270 and the rectangular connecting bars 230 are arranged in an alternating distribution manner, so that the forces acting on the in-plane module composite shear wall are more dispersed, thereby avoiding excessive forces at local locations that may cause damage to the wall structure.

[0110] like Fig.13 As shown, the second steel mesh 220 includes a plurality of second horizontal steel bars 221 arranged in parallel and a plurality of second vertical steel bars 222 arranged in parallel. The plurality of second horizontal steel bars 221 and the plurality of second vertical steel bars 222 are cross-arranged into a mesh, and the second horizontal steel bars 221 and the second vertical steel bars 222 are connected at the intersection.

[0111] Exemplarily, the second horizontal steel bars 221 and the second vertical steel bars 222 may be connected at the intersection by at least one of welding and bundling.

[0112] The second steel mesh 220 may include a single-layer steel mesh, or may include a multi-layer steel mesh formed by stacking a plurality of steel meshes. In the example where the second steel mesh 220 includes a single-layer steel mesh, the second horizontal steel bar 221 may be a single steel bar, and the second vertical steel bar 222 may also be a single steel bar; in the example where the second steel mesh 220 includes a multi-layer steel mesh, the second horizontal steel bar 221 may include a plurality of steel bars connected together, and the plurality of steel bars in the second horizontal steel bar 221 may be welded or tied together; the second vertical steel bar 222 may also include a plurality of steel bars connected together, and the plurality of steel bars in the second vertical steel bar 222 may be welded or tied together.

[0113] The number of steel meshes included in the second steel mesh 220 can be set according to the structural strength requirements of the in-plane modular composite shear wall. Usually, in situations where the structural strength requirements are different, the second steel mesh 220 includes a larger number of steel meshes in the in-plane modular composite shear wall with higher structural strength requirements.

[0114] like Fig.13 As shown, the connection point between each rectangular connecting rib 230 and at least one second steel mesh 220 is located outside the intersection of the second horizontal steel bar 221 and the second vertical steel bar 222 .

[0115] The outer side of the intersection of the second horizontal steel bars 221 and the second vertical steel bars 222 in one second steel mesh 220 refers to the side of the intersection away from the other second steel mesh 220 .

[0116] Connecting the rectangular connecting rib 230 at the intersection of the second horizontal steel bar 221 and the second vertical steel bar 222 can better disperse the force of the rectangular connecting rib 230 on the second steel mesh 220 to various parts of the second steel mesh 220, which is beneficial to further improve the ability of the in-plane modular composite shear wall to withstand horizontal loads.

[0117] In some examples, the plane where the rectangular connecting ribs 230 are located is perpendicular to the first module prefabricated wall leaf 211 .

[0118] The first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 are arranged in parallel, and the plane where the rectangular connecting ribs 230 are located may be perpendicular to the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 .

[0119] The rectangular connecting rib 230 may be a steel bar bent into a rectangular frame, and both ends of the steel bar may be connected to form a rectangular frame structure.

[0120] As an example, the rectangular connecting bar 230 may include a single steel bar bent into a rectangular frame, or may include a plurality of stacked steel bars bent into a rectangular frame. In the example where the rectangular connecting bar 230 includes a plurality of stacked steel bars bent into a rectangular frame, the plurality of steel bars bent into a rectangular frame may be welded or tied to each other.

[0121] The plane where the rectangular connecting rib 230 is located is perpendicular to the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, so that when the in-plane module composite shear wall is subjected to horizontal loads, the force exerted by the rectangular connecting rib 230 on the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is perpendicular to the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212.

[0122] like Fig.13 As shown, in some examples, the plane where the rectangular connecting bar 230 is located is perpendicular to the second horizontal steel bar 221. The same rectangular connecting bar 230 is coplanar and connected to each second vertical steel bar 222 in the two second steel mesh sheets 220. That is, the rectangular connecting bar 230 is arranged vertically.

[0123] As another example, the plane where the rectangular connecting ribs 230 are located is perpendicular to the second vertical reinforcement 222. That is, the rectangular connecting ribs 230 are arranged horizontally.

[0124] That is to say, the rectangular connecting ribs 230 can be placed horizontally or vertically. When the rectangular connecting ribs 230 are placed vertically or horizontally, the mechanical properties of the in-plane module composite shear wall will be different, for example, there will be differences in anti-bending and anti-torsion. The appropriate arrangement can be selected according to different occasions.

[0125] Fig.15 2 is a schematic diagram of a partial structure of a first wall body provided in an embodiment of the present application. In this example, the rectangular connecting ribs 230 are arranged horizontally. Fig.15 As shown, the same rectangular connecting rib 230 is coplanar and connected to each of the second horizontal steel bars 221 in the two second steel meshes 220 . Fig.15 In order to better display the structure, the distance between the two second steel meshes 220 is increased, so that the rectangular connecting rib 230 is separated from one of the second steel meshes 220 .

[0126] The second horizontal steel bars 221 in the two second steel meshes 220 are arranged horizontally, and the same rectangular connecting bar 230 is coplanar with each second horizontal steel bar 221 in the two second steel meshes 220, that is, the two second horizontal steel bars 221 connected to the same rectangular connecting bar 230 are arranged at the same height. One side of the rectangular connecting bar 230 can be arranged overlappingly and connected to one of the second horizontal steel bars 221, and the other side of the rectangular connecting bar 230 can be arranged overlappingly and connected to the other second horizontal steel bar 221, which is conducive to forming a larger range of connection between the rectangular connecting bar 230 and the second steel meshes 220, thereby further improving the structural stability and strength of the in-plane modular composite shear wall.

[0127] In some examples, the rectangular connecting rib 230 is at least wrapped around two adjacent second vertical steel bars 222 in one second steel mesh 220 .

[0128] In this example, a portion of the rectangular connecting ribs 230 are sleeved outside the second vertical steel bars 222 of the second steel mesh 220 located in the prefabricated wall leaf 211 of the first module, and another portion of the rectangular connecting ribs 230 are sleeved outside the second vertical steel bars 222 of the second steel mesh 220 located in the prefabricated wall leaf 212 of the second module.

[0129] The rectangular connecting rib 230 is sleeved outside the second vertical steel bar 222, so that the rectangular connecting rib 230 can exert a large pulling force on the second steel mesh 220 without causing damage to the connection.

[0130] Optionally, the plurality of rectangular connecting ribs 230 include a first rectangular connecting rib 2301 and a second rectangular connecting rib 2302. The first rectangular connecting rib 2301 is a rectangular connecting rib 230 that is sleeved outside two adjacent second vertical steel bars 222 in one second steel mesh 220, and the second rectangular connecting rib 2302 is a rectangular connecting rib 230 that is sleeved outside two adjacent second vertical steel bars 222 in another second steel mesh 220.

[0131] By putting a part of the rectangular connecting bars 230 on the outside of the second vertical steel bars 222 of the second steel mesh 220 located in the prefabricated wall leaf 211 of the first module, and putting another part of the rectangular connecting bars 230 on the outside of the second vertical steel bars 222 of the second steel mesh 220 located in the prefabricated wall leaf 212 of the second module, it is ensured that no matter the in-plane module composite shear wall is subjected to the force directed from the prefabricated wall leaf 211 of the first module to the prefabricated wall leaf 212 of the second module, or the force directed from the prefabricated wall leaf 212 of the second module to the prefabricated wall leaf 211 of the first module, there is always a part of the rectangular connecting bars 230 that can withstand a larger tensile force.

[0132] As an example, one side of the first rectangular connecting rib 2301 at least partially overlaps and is connected to one side of the second rectangular connecting rib 2302 .

[0133] By making one side of the first rectangular connecting rib 2301 partially overlap and connect with one side of the second rectangular connecting rib 2302, when the in-plane modular composite shear wall is subjected to horizontal force, the force can be better transmitted between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 through the rectangular connecting rib 230, so that the force can be more dispersed, thereby improving the stability of the in-plane modular composite shear wall.

[0134] Fig.16 is a partial structural diagram of a first wall body provided in an embodiment of the present application, such as Fig.16 As shown, in this example, one side of the first rectangular connecting rib 2301 completely overlaps with one side of the second rectangular connecting rib 2302, which can further improve the stability of the in-plane module composite shear wall.

[0135] Fig.17 is a partial structural diagram of a first wall body provided in an embodiment of the present application, such as Fig.17 As shown, one side of the rectangular connecting rib 230 is connected with a bent portion, and the bent portion is located on a side where two rectangular connecting ribs 230 at least partially overlap, and the bent portions of the two rectangular connecting ribs 230 are cross-connected. The first wall body also includes a connecting rib 223, which is inserted in the space enclosed by the bent portion and the rectangular connecting rib 230.

[0136] In this example, one side of the first rectangular connecting rib 2301 is connected to the first bending portion 2303, one side of the second rectangular connecting rib 2302 is connected to the second bending portion 2304, and the first bending portion 2303 and the second bending portion 2304 are cross-connected. The overlapping portion of the first rectangular connecting rib 2301 and the second rectangular connecting rib 2302, the first bending portion 2303, and the second bending portion 2304 form a triangular space, and the connecting rib 223 is inserted in the triangular space. The connecting rib 223 can also be connected to the first bending portion 2303 and the second bending portion 2304 respectively. Fig.17 In the example shown, the rectangular connecting ribs 230 are arranged horizontally, the connecting ribs 223 may be parallel to the second vertical reinforcement 222, and the connecting ribs 223 may be inserted in a plurality of colinearly arranged triangular spaces to further enhance the structural strength and stability of the first wall body.

[0137] In other possible implementations, the rectangular connecting ribs 230 may also be arranged vertically, and the connecting ribs 223 are parallel to the second horizontal steel bars 221 .

[0138] like Fig.13 As shown, the in-plane module composite shear wall also includes a plurality of second circular connecting ribs 242 . Fig.18 is a schematic diagram of the structure of a floor slab and a second circular connecting rib provided in an embodiment of the present application, such as Fig.18 As shown, the second round-shaped connecting ribs 242 are arranged along the height direction of the first wall body 210, and the middle parts of the plurality of second round-shaped connecting ribs 242 are respectively connected to the second floor slab 241. The second floor slab 241 is the top slab of the two adjacent concrete modular boxes in the lower layer, and the top slabs of the two adjacent concrete modular boxes in the lower layer form a whole, namely, the second floor slab 241, during the pouring process.

[0139] One end of the second circular connecting rib 242 is located between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 , and the other end of the second circular connecting rib 242 extends out from the edges of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 .

[0140] During construction, different in-plane modular composite shear walls will be connected. For example, the in-plane modular composite shear wall located in the middle layer of the building will be connected to the in-plane modular composite shear wall of the adjacent lower layer and the in-plane modular composite shear wall of the adjacent upper layer. The plurality of second circular connecting ribs 242 are used to connect the first wall bodies 210 of the adjacent in-plane modular composite shear walls into one.

[0141] As an example, during on-site construction, for two adjacent layers of in-plane modular composite shear walls, one end of the second round-shaped connecting bar 242 of the upper layer in-plane modular composite shear wall extending out from the edge of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is inserted into the first wall body 210 of the lower layer. In the lower layer in-plane modular composite shear wall, after the concrete between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is poured and cured, the second round-shaped connecting bar 242 is fixed in the first wall body 210 of the lower layer. Then, concrete is poured between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 of the upper layer in-plane modular composite shear wall.

[0142] In some examples, the in-plane modular composite shear wall further includes a connecting core column, which may be located at an edge of the first wall body 210 and arranged along the height direction of the first wall body 210. One end of the connecting core column is located between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, and the other end extends out of the edge of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212. When splicing adjacent in-plane modular composite shear walls, the end of the connecting core column extending out of the edge of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is used to be inserted into the first wall body 210 of the in-plane modular composite shear wall of the lower layer.

[0143] Exemplarily, the connecting core column may be a rectangular steel structure.

[0144] Fig.19 Schematic diagram of the structure of the first concrete module box and the second concrete module box provided in the embodiment of the present application. Fig.19 As shown, the wall leaf of the first concrete module box 1000 close to the second concrete module box 2000 is a first module prefabricated wall leaf 211, and the wall leaf of the second concrete module box 2000 close to the first concrete module box 1000 is a second module prefabricated wall leaf 212.

[0145] Fig. 20 Schematic diagram of the structure of an in-plane modular composite shear wall provided in an embodiment of the present application. Fig. 20 As shown, the in-plane modular composite shear wall includes a first module prefabricated wall leaf 211 and a second module prefabricated wall leaf 212. The first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 are the wall leaves on the side of the adjacent concrete module boxes close to each other.

[0146] The in-plane modular composite shear wall also includes two second steel mesh sheets 220, a plurality of tie bars 260 and a plurality of dowel bars 280. In order to show the second steel mesh sheets 220, at least a portion of the first module prefabricated wall leaf 211 and a portion of the second module prefabricated wall leaf 212 are omitted in the drawings provided in the embodiment of the present application.

[0147] The first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 are arranged in parallel and spaced apart. When the in-plane module composite shear wall is constructed on site, the space between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is used for pouring concrete. The orthographic projection of the first module prefabricated wall leaf 211 on the second module prefabricated wall leaf 212 coincides with the second module prefabricated wall leaf 212.

[0148] One second steel mesh 220 is located in the first module prefabricated wall leaf 211, and another second steel mesh 220 is located in the second module prefabricated wall leaf 212. A portion of the tie bars 260 is connected to one second steel mesh 220, and another portion of the tie bars 260 is connected to another second steel mesh 220.

[0149] A plurality of dowel bars 280 are located between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212. The dowel bars 280 are forked, and have at least two branches 281, one of which is inserted into a tie bar 260 connected to one second steel mesh 220, and the other branch 281 is inserted into a tie bar 260 connected to another second steel mesh 220.

[0150] By respectively arranging the second steel mesh sheets 220 in the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, the strength and stability of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 can be improved. By respectively connecting the tie bars 260 to the two second steel mesh sheets 220, one branch 281 of the inserted bar 280 is inserted into the tie bar 260 connected to one second steel mesh sheet 220, and the other branch 281 is inserted into the tie bar 260 connected to the other second steel mesh sheet 220, thereby The first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 are connected as a whole by using multiple dowel bars 280. When one of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is subjected to horizontal force, part of the force can be dispersed to the second steel mesh 220 in the other of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 through multiple tie bars 260 and dowel bars 280, so that the in-plane module composite shear wall can withstand greater force and have higher structural strength.

[0151] Taking the state after the in-plane module composite shear wall is installed as an example, the lower edge of the first module prefabricated wall leaf 211 is flush with the lower edge of the second module prefabricated wall leaf 212; the upper edge of the first module prefabricated wall leaf 211 is flush with the upper edge of the second module prefabricated wall leaf 212. The vertical side of the first module prefabricated wall leaf 211 is also flush with the vertical side of the second module prefabricated wall leaf 212.

[0152] The first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 can both be prefabricated concrete panels, for example, they can be prefabricated by a mold. In the process of preparing the first module prefabricated wall leaf 211, the second steel mesh 220 is placed in the mold in advance, and after the concrete poured into the mold solidifies, it forms a whole with the first module prefabricated wall leaf 211. The preparation method of the second module prefabricated wall leaf 212 can be the same as that of the first module prefabricated wall leaf 211.

[0153] like Fig. 20 As shown, the in-plane module composite shear wall further includes a plurality of tension screws 270. The plurality of tension screws 270 are located between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, the tension screws 270 penetrate the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, and the tension screws 270 are connected to the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, respectively.

[0154] By setting a plurality of tension screws 270, the tension screws 270 penetrate the first module prefabricated wall leaves 211 and the second module prefabricated wall leaves 212, and are respectively connected to the first module prefabricated wall leaves 211 and the second module prefabricated wall leaves 212, so that the first module prefabricated wall leaves 211 and the second module prefabricated wall leaves 212 can withstand a larger horizontal force, and the first module prefabricated wall leaves 211 and the second module prefabricated wall leaves 212 are better connected to the concrete cast between the first module prefabricated wall leaves 211 and the second module prefabricated wall leaves 212 as a whole to withstand the load, so that the in-plane module composite shear wall can withstand a larger force and has a higher structural strength.

[0155] like Fig. 20 As shown, a plurality of tie rods 260 are arranged in an array. In the horizontal direction and the vertical direction, the tie rods 260 and the tension screws 270 are alternately arranged.

[0156] In some other possible implementations, the tie bars 260 and the tension screws 270 are alternately distributed in the horizontal direction or the vertical direction.

[0157] The tension screws 270 and the tie bars 260 are arranged in an alternating distribution manner, so that the forces acting on the in-plane module composite shear wall are more dispersed, thereby avoiding excessive forces acting on local positions and causing damage to the wall structure.

[0158] like Fig. 20 As shown, the second steel mesh 220 includes a plurality of second horizontal steel bars 221 arranged in parallel and a plurality of second vertical steel bars 222 arranged in parallel. The plurality of second horizontal steel bars 221 and the plurality of second vertical steel bars 222 are cross-arranged into a mesh, and the second horizontal steel bars 221 and the second vertical steel bars 222 are connected at the intersection.

[0159] Exemplarily, the second horizontal steel bars 221 and the second vertical steel bars 222 may be connected at the intersection by at least one of welding and bundling.

[0160] The second steel mesh 220 may include a single-layer steel mesh, or may include a multi-layer steel mesh formed by stacking a plurality of steel meshes. In the example where the second steel mesh 220 includes a single-layer steel mesh, the second horizontal steel bar 221 may be a single steel bar, and the second vertical steel bar 222 may also be a single steel bar; in the example where the second steel mesh 220 includes a multi-layer steel mesh, the second horizontal steel bar 221 may include a plurality of steel bars connected together, and the plurality of steel bars in the second horizontal steel bar 221 may be welded or tied together; the second vertical steel bar 222 may also include a plurality of steel bars connected together, and the plurality of steel bars in the second vertical steel bar 222 may be welded or tied together.

[0161] The number of steel meshes included in the second steel mesh 220 can be set according to the structural strength requirements of the in-plane modular composite shear wall. Usually, in situations where the structural strength requirements are different, the second steel mesh 220 includes a larger number of steel meshes in the in-plane modular composite shear wall with higher structural strength requirements.

[0162] like Fig. 20 As shown, the connection between each tie rod 260 and at least one second steel mesh 220 is located outside the intersection of the second horizontal steel bar 221 and the second vertical steel bar 222 .

[0163] The outer side of the intersection of the second horizontal steel bars 221 and the second vertical steel bars 222 in one second steel mesh 220 refers to the side of the intersection away from the other second steel mesh 220 .

[0164] Connecting the tie rod 260 at the intersection of the second horizontal steel bar 221 and the second vertical steel bar 222 can better disperse the force of the tie rod 260 on the second steel mesh 220 to various parts of the second steel mesh 220, which is beneficial to further improve the ability of the second steel mesh 220 to withstand horizontal loads.

[0165] In some examples, the plane where the tie rod 260 is located is perpendicular to the first module prefabricated wall leaf 211 .

[0166] The first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 are arranged in parallel, and the plane where the tie rod 260 is located can be perpendicular to the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212.

[0167] The tie rod 260 may be triangular. For example, the tie rod 260 may be a steel bar bent into a triangle, and both ends of the steel bar may be connected to form a triangular frame structure.

[0168] The tensioning bar 260 is set to be a triangle, one side of the triangle can be connected to the second steel mesh 220, and the branch 281 of the inserted bar 280 can be located at a corner of the triangle, so that the tensioning bar 260 and the inserted bar 280 can be more stable when transmitting tension.

[0169] As an example, the tie bar 260 may include a single steel bar bent into a triangular frame, or may include a plurality of stacked steel bars bent into a triangular frame. In the example where the tie bar 260 includes a plurality of stacked steel bars bent into a triangular frame, the plurality of steel bars bent into a triangular frame may be welded or tied to each other.

[0170] The plane where the tie rod 260 is located is perpendicular to the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, so that when the modular composite shear wall is subjected to horizontal loads, the force exerted by the tie rod 260 on the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is perpendicular to the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212.

[0171] like Fig. 20 As shown, in some examples, the plane where the tie bars 260 are located is perpendicular to the second vertical reinforcement 222. That is, the tie bars 260 are arranged horizontally.

[0172] As another example, Fig.21 2 is a partial structural diagram of a first wall body provided in an embodiment of the present application. In this example, the plane where the tie bars 260 are located is perpendicular to the second horizontal reinforcement bars 221. That is, the tie bars 260 are arranged vertically.

[0173] That is to say, the tie rod 260 can be placed horizontally or vertically. There will be certain differences in the mechanical properties of the in-plane modular composite shear wall when the tie rod 260 is placed vertically or horizontally, for example, there will be certain differences in anti-bending and anti-torsion. The appropriate arrangement can be selected according to different occasions. The arrangement of the tie rod 260 is different, and the arrangement of the dowel rod 280 is also different. The embodiment of the present application takes the horizontally arranged tie rod 260 as an example for explanation.

[0174] Fig. 22 is a partial structural diagram of a first wall body provided in an embodiment of the present application, Fig. 22 In order to better show the structure, the distance between the two second steel mesh sheets 220 is increased. Fig. 22 As shown, in this example, the tie bars 260 in the two second steel meshes 220 are arranged horizontally. One side of the tie bar 260 can be overlapped and connected with the second horizontal steel bars 221 of one of the second steel meshes 220, which is conducive to forming a larger range of connection between the tie bar 260 and the second steel mesh 220, thereby further improving the structural stability and strength of the in-plane module composite shear wall.

[0175] Optionally, the tensioning rod 260 is at least wrapped around two adjacent second vertical steel bars 222 in one second steel mesh 220 .

[0176] In this example, a portion of the tension rod 260 is sleeved outside the second vertical steel bar 222 of the second steel mesh 220 located in the prefabricated wall leaf 211 of the first module, and another portion of the tension rod 260 is sleeved outside the second vertical steel bar 222 of the second steel mesh 220 located in the prefabricated wall leaf 212 of the second module.

[0177] The tie rod 260 is placed outside the second vertical steel bar 222 so that the tie rod 260 can exert a greater pulling force on the second steel mesh 220 without causing damage to the connection.

[0178] Optionally, the plurality of tie bars 260 include a first tie bar 2601 and a second tie bar 2602. The first tie bar 2601 is a tie bar 260 sleeved outside two adjacent second vertical steel bars 222 in one second steel mesh 220, and the second tie bar 2602 is a tie bar 260 sleeved outside two adjacent second vertical steel bars 222 in another second steel mesh 220.

[0179] like Fig. 20 As shown, the in-plane modular composite shear wall further includes a connecting rod 282, and the connecting rod 282 is connected to a plurality of dowel bars 280 arranged in a colinear manner.

[0180] In this example, the connecting rod 282 is arranged parallel to the second vertical reinforcement 222. After the connecting rod 282 is connected to the plurality of dowel bars 280, the plurality of dowel bars 280 are formed into a whole, which not only facilitates the arrangement of the dowel bars 280, but also further improves the stability of the overall structure.

[0181] Exemplarily, the connecting rod 282 is connected to the dowel 280 by welding or binding.

[0182] For the example in which the tension reinforcement 260 is arranged vertically, the inserted reinforcement 280 and the connecting rod 282 are arranged parallel to the second horizontal reinforcement 221 .

[0183] like Fig. 20 As shown, the in-plane module composite shear wall also includes a plurality of second circular connecting bars 242. The structure can be referred to Fig.18 The second round-shaped connecting ribs 242 are arranged along the height direction of the in-plane module composite shear wall, and the middle parts of the plurality of second round-shaped connecting ribs 242 are respectively connected to the second floor slab 241. The second floor slab 241 is the top plate of the two adjacent concrete modular boxes on the lower layer, and the top plates of the two adjacent concrete modular boxes on the lower layer form a whole during the pouring process, namely, the second floor slab 241.

[0184] One end of the second circular connecting rib 242 is located between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 , and the other end of the second circular connecting rib 242 extends out from the edges of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 .

[0185] During construction, different in-plane modular composite shear walls will be connected. For example, the in-plane modular composite shear wall located in the middle layer of the building will be connected to the in-plane modular composite shear wall of the adjacent lower layer and the in-plane modular composite shear wall of the adjacent upper layer. The plurality of second round-shaped connecting ribs 242 are used to connect the in-plane modular composite shear walls of two adjacent layers into one.

[0186] As an example, during on-site construction, for two adjacent layers of in-plane modular composite shear walls, one end of the second circular connecting bar 242 of the upper layer of the in-plane modular composite shear wall extends out of the edge of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 and is inserted into the lower layer of the in-plane modular composite shear wall. In the lower layer of the in-plane modular composite shear wall, after the concrete between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is poured and cured, the second circular connecting bar 242 is fixed in the lower layer of the in-plane modular composite shear wall. Then, concrete is poured between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 of the upper layer of the in-plane modular composite shear wall.

[0187] In some examples, the in-plane modular composite shear wall further includes a connecting core column, which may be located at an edge of the first wall body 210 and arranged along the height direction of the first wall body 210. One end of the connecting core column is located between the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212, and the other end extends out of the edge of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212. When splicing adjacent in-plane modular composite shear walls, the end of the connecting core column extending out of the edge of the first module prefabricated wall leaf 211 and the second module prefabricated wall leaf 212 is used to be inserted into the first wall body 210 of the in-plane modular composite shear wall of the lower layer.

[0188] Exemplarily, the connecting core column may be a rectangular steel structure.

[0189] Fig.23 It is a schematic diagram of the local structure of an in-plane modular composite shear wall provided in an embodiment of the present application. Figure 7 The second steel mesh 220 shown in the figure may be the second steel mesh 220 in the prefabricated wall leaf 211 of the first module, or may be the second steel mesh 220 in the prefabricated wall leaf 212 of the second module.

[0190] like Fig.23As shown, in this example, the in-plane modular composite shear wall further includes a plurality of cables 290 , and the same cable 290 is movably connected to the same second steel mesh 220 , and the cable 290 is located between the two branches 281 of the inserted reinforcement 280 .

[0191] By setting the cable 290 to cooperate with the inserted rebar 280, after a branch 281 of the inserted rebar 280 is inserted between the cable 290 and the second steel mesh 220 connected to the cable 290, the cable 290 is tightened to pull the inserted rebar 280 toward the direction of the second steel mesh 220 connected to the cable 290. Figure 7 The cable 290 is shown in an untensioned state.

[0192] Each dowel 280 cooperates with two cables 290, one of which is connected to the second steel mesh 220 in the first module prefabricated wall leaf 211, and the other is connected to the second steel mesh 220 in the second module prefabricated wall leaf 212. The two cables 290 tighten the same dowel 280 in opposite directions, so that the dowel 280 can better transmit the forces acting on the two second steel meshes 220.

[0193] Exemplarily, the cable 290 may be a steel wire rope.

[0194] In some examples, the cable 290 is wound around the branch 281 of the reinforcing bar 280 for at least one circle. By winding the cable 290 around the branch 281, the reinforcing bar 280 can be made more stable.

[0195] Fig.24 Schematic diagram of the partial structure of an in-plane modular composite shear wall provided in an embodiment of the present application. Fig.24 As shown, the in-plane modular composite shear wall also includes a plurality of one-way locking rings 291 , which are connected to the second steel mesh 220 , and the cable 290 passes through the plurality of one-way locking rings 291 , and one end of the cable 290 is fixedly connected to the second steel mesh 220 .

[0196] Exemplarily, the one-way locking ring 291 can be welded to the second steel mesh 220. The one-way locking ring 291 can be an annular metal piece, and the inner wall of the one-way locking ring 291 can have an undercut so that the cable 290 can only pass through the one-way locking ring 291 in one direction to prevent the cable 290 from loosening.

[0197] The branch 281 may be located between adjacent one-way locking rings 291. By fixing one end of the cable 290 to the second steel mesh 220, and providing a plurality of one-way locking rings 291 on the second steel mesh 220, passing the cable 290 through the plurality of one-way locking rings 291, and tightening the other end of the cable 290, the portion of the cable 290 located between adjacent one-way locking rings 291 can be tightened, thereby tightening the inserted steel bar 280. After tightening the inserted steel bar 280, the other end of the cable 290 may also be fixed to the second steel mesh 220.

[0198] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A modular assembled composite shear wall building, characterized in that: It comprises a first concrete module box (1000) and a second concrete module box (2000); The first concrete module box (1000) comprises a first module prefabricated wall leaf (211); The second concrete module box (2000) comprises an adjacent module composite shear wall (11002) and a second module prefabricated wall leaf (212) arranged opposite to each other, wherein the second module prefabricated wall leaf (212) and the first module prefabricated wall leaf (211) are arranged opposite to each other and connected to form an in-plane module composite shear wall; The adjacent module composite shear wall (11002) comprises a first prefabricated wall leaf (111), a second prefabricated wall leaf (112), two first steel mesh sheets (120) and a plurality of rectangular tie bars (130); the first prefabricated wall leaf (111) and the second prefabricated wall leaf (112) are arranged in parallel and spaced apart, and the first prefabricated wall leaf (111) is located on the inner side of the first concrete module box (1000), and the second prefabricated wall leaf (112) is located on the outer side of the first concrete module box (1000); the orthographic projection of the first prefabricated wall leaf (111) on the second prefabricated wall leaf (112) is located outside the second prefabricated wall leaf (112); one of the first steel mesh sheets (120) is located in the first prefabricated wall leaf (111), and the other of the first steel mesh sheets (120) is located in the second prefabricated wall leaf (112); and the rectangular tie bars (130) are respectively connected to the two first steel mesh sheets (120).

2. The modular assembled composite shear wall building according to claim 1, characterized in that: The first steel mesh (120) comprises a plurality of first horizontal steel bars (121) arranged in parallel and a plurality of first vertical steel bars (122) arranged in parallel, the plurality of first horizontal steel bars (121) and the plurality of first vertical steel bars (122) being arranged crosswise to form a mesh, and the first horizontal steel bars (121) and the first vertical steel bars (122) being connected at the intersection; The connection point between each of the rectangular tie bars (130) and at least one of the first steel mesh sheets (120) is located outside the intersection of the first horizontal steel bar (121) and the first vertical steel bar (122).

3. The modular assembled composite shear wall building according to claim 2, characterized in that: The plane where the rectangular tie bar (130) is located is perpendicular to the first vertical steel bar (122), and the same rectangular tie bar (130) is connected to each of the first horizontal steel bars (121) in the two first steel mesh sheets (120); or, The plane where the rectangular tie rod (130) is located is perpendicular to the first horizontal steel bar (121), and the same rectangular tie rod (130) is connected to each of the first vertical steel bars (122) in the two first steel mesh sheets (120).

4. The modular assembled composite shear wall building according to any one of claims 1 to 3, characterized in that: The in-plane modular composite shear wall comprises a first module prefabricated wall leaf (211), a second module prefabricated wall leaf (212), two second steel mesh sheets (220), a plurality of rectangular connecting bars (230) and a plurality of tension screws (270); the first module prefabricated wall leaf (211) and the second module prefabricated wall leaf (212) are arranged in parallel and spaced apart; the orthographic projection of the first module prefabricated wall leaf (211) on the second module prefabricated wall leaf (212) coincides with the second module prefabricated wall leaf (212); a second steel mesh sheet (220) is located between the first module prefabricated wall leaf (211) and the second module prefabricated wall leaf (212); 211), another of the second steel mesh sheets (220) is located in the second module prefabricated wall leaf (212), the rectangular connecting bars (230) are respectively connected to the two second steel mesh sheets (220), the plurality of tension screws (270) are located between the first module prefabricated wall leaf (211) and the second module prefabricated wall leaf (212), the tension screws (270) penetrate the first module prefabricated wall leaf (211) and the second module prefabricated wall leaf (212), and are respectively connected to the first module prefabricated wall leaf (211) and the second module prefabricated wall leaf (212).

5. The modular assembled composite shear wall building according to claim 4, characterized in that: The second steel mesh (220) comprises a plurality of second horizontal steel bars (221) arranged in parallel and a plurality of second vertical steel bars (222) arranged in parallel, the plurality of second horizontal steel bars (221) and the plurality of second vertical steel bars (222) being cross-arranged to form a mesh, and the second horizontal steel bars (221) are welded and connected at the intersections outside the second vertical steel bars (222); The connection point between each of the rectangular connecting bars (230) and at least one of the second steel mesh sheets (220) is located outside the intersection of the second horizontal steel bars (221) and the second vertical steel bars (222).

6. The modular assembled composite shear wall building according to claim 5, characterized in that: The plane where the rectangular connecting bar (230) is located is perpendicular to the second vertical steel bar (222), the same rectangular connecting bar (230) is connected to each second horizontal steel bar (221) in the two second steel mesh sheets (220), and the rectangular connecting bar (230) is at least sheathed outside two adjacent second vertical steel bars (222) in one second steel mesh sheet (220); or, The plane where the rectangular connecting rib (230) is located is perpendicular to the second horizontal steel bar (221), and the same rectangular connecting rib (230) is connected to each of the second vertical steel bars (222) in the two second steel mesh sheets (220), and the rectangular connecting rib (230) is at least sheathed outside two adjacent second horizontal steel bars (221) in one of the second steel mesh sheets (220).

7. The modular assembled composite shear wall building according to any one of claims 1 to 3, characterized in that: The in-plane modular composite shear wall comprises a first module prefabricated wall leaf (211), a second module prefabricated wall leaf (212), two second steel mesh sheets (220), a plurality of tie bars (230) and a plurality of dowel bars (280); the first module prefabricated wall leaf (211) and the second module prefabricated wall leaf (212) are arranged in parallel and spaced apart; the orthographic projection of the first module prefabricated wall leaf (211) on the second module prefabricated wall leaf (212) coincides with the second module prefabricated wall leaf (212); one of the second steel mesh sheets (220) is located in the first module prefabricated wall leaf (211); and the other of the second steel mesh sheets (220) is located in the second module prefabricated wall leaf (211). In the wall leaf (212), a part of the tension bars (230) is connected to one of the second steel mesh sheets (220), and another part of the tension bars (230) is connected to another of the second steel mesh sheets (220). The plurality of inserted bars (280) are located between the first module prefabricated wall leaf (211) and the second module prefabricated wall leaf (212). The inserted bars (280) are forked and have at least two branches (281). One of the branches (281) is inserted into the tension bars (230) connected to one of the second steel mesh sheets (220), and the other branch (281) is inserted into the tension bars (230) connected to another of the second steel mesh sheets (220).

8. The modular assembled composite shear wall building according to claim 7, characterized in that: The in-plane modular composite shear wall further comprises a connecting rod (282), wherein the connecting rod (282) is connected to a plurality of the dowel bars (280) arranged in a colinear manner.

9. The modular assembled composite shear wall building according to claim 7, characterized in that: The in-plane modular composite shear wall further comprises a plurality of cables (290), one cable (290) is movably connected to the same second steel mesh (220), and the cable (290) is located between the two branches (281).

10. The modular assembled composite shear wall building according to claim 9, characterized in that: The in-plane modular composite shear wall also includes a plurality of one-way locking rings (291), wherein the one-way locking rings (291) are connected to the second steel mesh (220), the pull cable (290) passes through the plurality of one-way locking rings (291), and one end of the pull cable (290) is fixedly connected to the second steel mesh (220).